W912BV19Q0081_Amendment_001.pdf
PDF 418 KB Posted
- Attached to
- Fall River Lake Waterline Replacement at Riverside East Federal contract opportunity
- Solicitation number
- W912BV19Q0081
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PREBID_Roster_FLR_Waterline_W912BV-19-Q-0081.pdf | ||
| W912BV-19-Q-0081.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
WATERLINE REPLACEMENT AT RIVERSIDE EAST AT FALL RIVER LAKE, GREENWOOD COUNTY, KANSAS
Amendment 0001 is herby issued to incorporate information from EM 1110-1-400 into the specifications concerning the maximum PSI for output at individual campsites.
All remaining terms and conditions remain in effect.
The solicitation due date remains unchanged.
Contract Specialist: Lindsey Byfield (lindsey.m.byf ield@usace.army.mil)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV19Q0081
X 9B. DATED (SEE ITEM 11)
16-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2019
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
EM 1110-1-400
01 Nov 04
4-4
Table 4.3
Lantern Hanger Checklist (Photos I-13 and I-14)
Location/Placement Located within the hardened living area Required Placed out of the access path Required Placed so lanterns illuminate the table and doorway of the camping unit
Required
Distance from the ground to the lantern holder approximately 6.5 ft (2 m)
Recommended
Provide moveable and/or swivel hangers Optional
4.0 Water Hydrants. Table 4.4 provides guidance for location, placement, construction, and design features of water hydrants.
Table 4.4
Water Hydrant Checklist Location/Placement
Individual water hydrants located on the driver side of the campsite to accommodate normal RV hookups (Drawing C-6)
Required
Sited at least 5 ft (1.5 m) off the camp pad and protected to the extent practical to minimize risk from vehicles
Required
Campsites with electric hookups should have water hydrants
Recommended
Construction & Design Features UA lever handles standard for all hydrants Required In cold climate regions, protect hydrants and tubing against freeze with self-draining, frost-proof sill cock or other acceptable drain-back means and provide low-point gravity-flow drain lines with force air connections
Required
Back-flow prevention valves installed in accordance with applicable state and local laws
Required
Feeder lines to individual campsites shall not exceed 45 psi (310 kPa) since greater pressures may damage recreational vehicle water lines
Required m5odkcrw Highlight m5odkcrw Highlight
W912BV19Q0081
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it.