RFQ_amendment.pdf
PDF 282 KB Posted
- Attached to
- Gallery Sump Pump Replacement Federal contract opportunity
- Solicitation number
- W912BV18Q0128
About this file
Revised Request for Quote
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Gallery Sump Pump Replacement in Structure Fall River Lake and Toronto Lake
This amendment is issued to adjust the magnitude of construction estimated price range and to revised the w age rate determination. This RFQ is extended to 1400 (2:00pm) CT) on 17 September 2018.
The revised magnitude of construction is: $75,000.00 to $150,000.00
The Request for Quote (RFQ) date is extended 09/17/2018 at 1400 (2:00PM
CT) All other terms and conditions remain in effect and unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18Q0128
X 9B. DATED (SEE ITEM 11)
10-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2018
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV18Q0128
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
The following have been deleted:
SWT Supplemental IInformation SWT Supplemental Information SWT Supplemental Information SWT Supplemental Information SWT Supplemental Information SWT Supplemental Information SWT Supplemental Information SWT Supplemental Information
SWT: SWD-QASP
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
The following have been added by full text:
REVISED WAGE RATES
SOLICITATION NO. W912BV18Q0127
Sump Pump Replacements
Toronto Lake and Fall River Lake, Kansas Greenwood and Woodson Counties, Kansas
APPLICABILITY OF WAGE RATES
Wage Decision No. KS180042, Heavy Construction, with 1 modifications, dated 08/24/2018 is applicable to Heavy construction at Greenwood and Woodson Counties, Kansas.
General Decision Number: KS180042 08/24/2018 KS42
Superseded General Decision Number: KS20170042
State: Kansas
Construction Type: Heavy
Counties: Allen, Anderson, Atchison, Barber, Barton, Bourbon, Brown, Chautauqua, Cheyenne, Clark, Clay, Cloud, Coffey, Comanche, Cowley, Crawford, Decatur, Dickinson, Edwards, Elk, Ellsworth, Ford, Graham, Grant, Gray, Greeley, Greenwood, Hamilton, Harper, Haskell, Hodgeman, Jewell, Kingman, Kiowa, Labette, Lane, Lincoln, Logan, Marion, McPherson, Meade, Mitchell, Morris, Morton, Nemaha, Neosho, Ness, Norton, Osborne, Pawnee, Phillips, Pratt, Rawlins, Reno, Republic, Rice, Rooks, Rush, Russell, Scott, Seward, Sheridan, Sherman, Smith, Stafford, Stanton, Stevens, Thomas, Trego, Wallace, Washington, Wichita, Wilson and Woodson Counties in Kansas.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 08/24/2018
ELEC0226-001 09/01/2017
Rates Fringes
ELECTRICIAN......................$ 31.10 15.08
* IRON0024-007 06/01/2018
Rates Fringes
IRONWORKER (REINFORCING AND
STRUCTURAL)......................$ 23.35 12.20
SUKS2014-022 07/09/2014
Rates Fringes
CARPENTER........................$ 17.67 1.62
CEMENT MASON/CONCRETE FINISHER...$ 13.67 0.00
LABORER: Common or General......$ 13.06 0.00
LABORER: Pipelayer..............$ 14.13 1.30
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.84 3.97
OPERATOR: Bulldozer.............$ 16.75 0.00
OPERATOR: Crane.................$ 28.00 0.00
OPERATOR: Loader................$ 16.17 0.00
OPERATOR: Scraper...............$ 15.68 0.00
OPERATOR: Tractor...............$ 15.90 0.00
PAINTER (Brush, Roller, and Spray)...........................$ 18.03 0.78
TRUCK DRIVER: Dump (Tandem) Truck............................$ 15.70 3.58
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
The following have been deleted:
WAGE DETERMINATION
SECTION 01 10 00 - STATEMENT OF WORK
The following have been modified:
STATEMENT OF WORK
PART 1 – GENERAL
1.1 SCOPE OF WORK
The contractor shall provide labor, equipment, and materials needed to efficiently complete all work in accordance with this scope of work, the attached drawings, the specifications, and all other contract documents and requirements. The final result will be a Replacement of two Electric Deep Well Turbine Pumps, Float Switches, Dual Pump Controller, and Controller Enclosure in the Gallery of the Toronto Lake Structure and the Fall River Lake Structure.
1.2 REFERENCES
US ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL,
EM 385-1.1, 30 NOV 14
1.3 BASIS FOR PAYMENT
Payment will be made in a lump sum upon completion of work. Invoices shall be submitted to John Redmond Lake Office, 1565 Embankment Road SW, Burlington, KS 66639-8911.
1.4 WORK HOURS
Regular work hours will be from 7:00 am- 4:30 pm Monday through Friday, excluding federal holidays. Any proposed changes to the work hours must be approved by the Contracting Officer’s Representative (COR).
1.5 COMPLETION TIME
Work shall be completed in 60 calendar days after award and within 30 days after start of work.
1. 6 SAFETY REQUIREMENTS
The contractor shall comply with the Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 dated 30 November 2014 in addition to all applicable Federal, State, and Local safety codes and practices. It is the contractor's responsibility to insure public safety during the entire duration of the contract. Necessary signs, barriers, warning devices, etc. shall be operated and maintained by the contractor at contractor expense. Contractor employees shall comply with the minimum dress requirements as stated in Chapter 5 of EM 385-1-1.
1.7 EQUIPMENT
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with EM 385-1-1. All equipment shall be inspected by the contractor and the inspection reports shall be submitted to the Contracting Officer’s Representative prior to utilization of such equipment to accomplish work on this contract.
Equipment designated for use on the water must be inspected with Government Representative on site.
1.8 WEATHER LIMITATIONS
NONE
1.9 SUBMITTALS
The contractor may be required to furnish certain submittals. These submittals may be progress reports, certifications of materials, safety plans, drawings, training certifications, work plans, etc.
These will be specifically listed and shall be furnished to the Contracting Officer’s Representative. Submittals requiring Government approval shall be formally prepared and approval granted prior to proceeding with work involving these submittals. FIO (For Information Only) submittals do not require Government approval.
The basic submittals shall include but are not limited to:
Contracting Company’s Health and Safety Program.
Job Plan Including:
Proposed Schedule.
List of Equipment Needed for Specific Tasks.
List of Personnel Needed for Specific Tasks.
Key Personnel Certificates, Qualifications, and Credentials.
Accident Prevention Plan (APP).
Activity Hazardous Analysis (AHA)
Anti-terrorism Level 1 Awareness for all personnel accessing the jobsite (including sub-contractors).
Proof of E-verify performed on all personnel accessing the jobsite (including sub-contractors).
Daily site visit, status reports, and pictures.
**Materials, Components, and Equipment Used, Replaced, or Disposed on Government Property or Originating from Government Property shall also require the Contractor to furnish certain documentation at the discretion of the Contracting Officer’s Representative.
1.10 PREWORK CONFERENCE
A pre-work conference will be held with the Contracting Officer and Contractor prior to the commencement of any work. The contractor's responsible person and necessary administrative staff will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, etc., will be covered at this time.
1.11 ENVIRONMENTAL CLEANUP
The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection and preservation of the environment and will be required to restore all damages/disturbances subject to the approval of the Contracting Officer. The contractor shall remove and dispose of all debris off Government property in a state approved disposal site unless specified otherwise. The contractor will be required to comply with all Federal and State environmental requirements.
1.12 COORDINATION OF WORK
The contractor shall coordinate all work with the Contracting Officer’s Representative, maintain communications with lake office personnel relating to campsite use, and efficiently raise awareness to the effected public. The Contractor shall be required to complete the work without impacting the day to day operations in the park. The Government point of contact (POC) for this work will be Eugene Goff at (620) 364-8614. The contractor must also allow government representatives access to contractor facilities with 24-hour notice.
1.13 ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the Contracting Officer upon written request. Pre‐ screen candidates using E‐Verify Program. The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐ verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.14 CONTRACTOR PERSONNEL
Personnel hired by the contractor shall be fully qualified to perform the work in a professional manner and in industry installation standards.
1.14.1 The Contracting Officer may require, in writing, that the contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
1.15 Liquidated Damages
Liquidated damages of $300.00/day shall be incurred by the contractor for every day beyond the end of the performance period in which the contract is not completed.
PART 2 – PRODUCTS
2.1 MATERIALS
All materials shall be new with documentation of purchase. Other than those listed as Government furnished the contractor shall furnish all materials and supplies required to complete this task including, but not limited to, the following;
2.1.1 Deep Well Turbine Pumps.
100 gallons per minute 1,800 rpm rated speed 3 horsepower minimum 50 feet total dynamic head 440 volt, 60-cycle, 3-phase current 50% overall efficiency Automatic oilers Grinder function
2.1.2 Mounting Brackets, Hardware, and Controller with Enclosure.
The contractor is responsible for assuring the proper fitting and application of all associated mounting brackets, fittings, hardware. Certain applications might require custom fabrication.
Time Mark Model 403 Dual Pump Controller/Alternator in a see-through NEMA 3R enclosure or equivalent as approved by contracting officer.
2.2 DELIVERY AND STORAGE
Materials shall be delivered to the site undamaged and stored out of contact with the ground.
Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government.
2.3 GOVERNMENT FURNISHED PROPERTY
NONE
PART 3 – EXECUTION
3.1 ACCOMPLISHMENT OF WORK
All work shall be accomplished in a safe, workmanlike manner and in accordance with standard industry practices. Plumbing work shall comply with the National Plumbing Code. Electrical work shall comply with the National Electrical Code. The contractor shall provide a copy of all required licenses.
3.1.1 MANDATORY PRE-BID SITE VISIT
Contractors are highly encouraged to attend a pre-bid site visit in order to gather all information needed to assess the current site conditions, equipment in use, and materials available for accurate proposals.
3.1.2 SITE PREPARATION
The contractor shall be responsible for all aspects of site preparation including all utility identification and locating. The contractor shall be responsible for repairing any damaged utilities at no cost to the Government. Details pertaining to storage areas or lay-down yards will be at the discretion of the Contracting Officers Representative. The contractor shall remove all debris from the sump pit including granular sand and trash.
3.1.3 PERFORMANCE OF WORK
The contractor shall remove both existing pumps, fasteners, plumbing attachments, and all other hardware that connects the existing pumps to the discharge line along with all electrical wiring from the pumps back to the distribution panel.
The new deep well turbine pumps shall be installed for use with the existing discharge line and new electrical wiring shall be installed from the distribution panel to the pumps by a certified electrician in accordance with the National Electric Code.
Inundated pump section shall be coated in coal tar epoxy. The rest of the installation shall be painted with Silver-Brite or other approved product to prevent corrosion.
Motor name plates shall have rated horsepower of motor, Speed at rated horsepower, Current at rated horsepower, Temperature rise, Locked rotor KVA code letter, Manufacturer's type and frame designation, Manufacturer's serial number, Frequency and voltage.
Each motor shall have 120-volt heater element underneath the windings to hold the temperature of the motor winding approximately 10 degrees C above ambient to assure dependable operation and reduce outage due to excess moisture. Terminal leads shall be in the motor winding terminal box or in a watertight terminal box located adjacent the motor winding terminal box. Heater element shall be designed for continuous operation.
Motor controller shall be provided for each motor in compliance with applicable National Electrical Code requirements. All motor controllers, unless otherwise specified, shall be of weather-tight (dust-tight, splash proof, and moisture-resistant) construction. Each motor over 1/8 horsepower shall be provided with branch circuit (short circuit) protection and overload protection which shall not be combined in one device but may be installed in the same enclosure.
Motor controller shall consist of a circuit breaker and magnetic contactor with overload protection.
3.1.4 DISPOSAL
Disposal of all construction wastes must be performed in accordance with Kansas Department of Health and Environment guidelines. Proof of waste disposal must be submitted to the COR. The removed pumps shall be returned to the government.
3.2 TESTING
Prior to acceptance of work, the pumps shall be tested in all operational capacities and the performance will be tested against the manufacturer’s performance curve.
3.3 WARRANTY
Contractor will guarantee that all completed work will be free of any defects and poor workmanship for a period of 1 year. All defects and poor workmanship found will be corrected with no extra charge to the government.
ATTACHMENT 1
QUALITY ASSURANCE SURVEILLANCE PLAN
1.1 Overview: This Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidance that the Contract Officer's Representative (COR) will use in evaluating the technical performance of the construction contractor in accordance with the terms and conditions of the contract. The QASP objective is to explain Government procedures to be used to verify that appropriate performance and quality assurance methods are used in the management of this contract. The purpose of the QASP is to assure that performance of specific activities and completion of tasks are accomplished in accordance with all requirements set forth in the contract.
This QASP describes the mechanism for documenting noteworthy accomplishments or discrepancies for work performed by the contractor. Information generated from the COR's surveillance activities will directly feed into performance discussions with the contractor.
The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, USACE and DLA receive the quality of services called for in the contract, and the only acceptable level of services received is paid. The QASP details how and when the COR will monitor, evaluate, and document the Contractor’s performance on the contract. The QAS is intended to accomplish the following:
1. Ensure both existing pumps are removed back to the distribution panel.
2. Inundated pump section shall be coated in coal tar epoxy. Rest of the installation shall be painted with Silver-Brite or other approved product to prevent corrosion only approved by the COR.
3. Warranty requirements.
4. Proof of disposal must be submitted to the COR.
2.0 Roles and Responsibilities of USACE Officials: The COR is responsible for technical administration of the project and assures proper surveillance of the contractor's performance.
The COR is responsible for monitoring, assessing, recording, and reporting on the technical performance of the contractor. The COR may be supported by the USACE Project Manager with the day-to-day oversight of technical performance.
The Contracting Officer (KO) has overall responsibility for overseeing the contractor's performance. The KO is responsible for monitoring of the contractor's performance in the areas of Contract compliance, and contract administration; reviewing the COR's assessment of the contractor's performance; and resolving all differences between the COR's assessment and the contractor's assessment of performance. It is the KO that assures the contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor's performance. The KO is the only person authorized to obligate the Government on this
Contract.
The COR and KO may call upon the technical expertise of other USACE officials and subject matter experts (SME) as required. These officials/SMEs may be called upon to review technical documents and products generated by the contractor. Contracting Agency representatives will also conduct reviews of Contract documentation such as invoices, monthly technical progress reports, and work plans.
3.1 Key Tasks/Deliverables to be assessed: At a minimum, the following task deliverables will be evaluated in accordance with this QASP:
1. The new deep well turbine pumps shall be installed for use with the existing discharge line and new electrical wiring shall be installed from the distribution panel to the pumps by a certified electrician in accordance with the National Electric Code.
Additionally, USACE will evaluate performance on the key quality control activities and events specified by the contractor through their Quality Assurance (QA) plan.
4.0 Performance Standards for Key Tasks/Deliverables: Since price is firm-fixed, the contractor's performance will be evaluated by assessing the key tasks/deliverables described above according to two standards: quality and timeliness. For each of these performance standards, the COR will assign one of three ratings to the contractor's performance: superior, acceptable, or unacceptable (as shown in Table 1). Note: These performance standards may be modified to meet the needs of USACE and its customer, Air Force Civil Engineering Center.
Table 1- Performance Standards Performance Standard
Superior Performance Acceptable Performance Unacceptable Performance
Quality Contractor exceeds the requirements in the Contract for the task/deliverable.
Tasks/deliverables are approved after one round of comments from USACE and no revisions are required.
Contractor meets the requirements in the Contract for the task/ Deliverable.
Task/tasks are approved with two rounds of comments received from USACE and no further revisions are required.
Contractor does not meet the requirements in the Contract for the task deliverable.
Tasks/Deliverables require more than two rounds of comments from USACE before being approved.
Timeliness Contractor provides acceptable task/ Deliverable ahead of the schedule.
Contractor provides task/deliverable according to the schedule.
Contractor provides task/deliverable behind the schedule.
If a task deliverable identified as a key QA activity as described in the Contract is rated as being of unacceptable quality at the time the deadline for the task deliverable expires, the task deliverable will automatically receive an unacceptable rating for timeliness. At no point will a task deliverable receive an acceptable or superior rating for timeliness if it is rated as being of unacceptable quality. Overall acceptable performance on a task deliverable requires ratings of acceptable or superior for both the quality and timeliness standards.
5.0 Surveillance Methodology: The surveillance methods listed below will be used in the execution of this QASP.
100% Inspection: At the completion of all key tasks and deliverables, performance will be evaluated through 100% inspection (e.g., document review). The COR will document performance for each completed task deliverable prior to final payment for the task, as described in Section 6.0.
Periodic Progress Inspection: At the COR's discretion, periodic inspections may be conducted to evaluate progress toward and/or completion of key tasks and deliverables. The COR may complete a periodic progress inspection if s/he believes that deficiencies exist that must be addressed prior to task deliverable completion. While corrective action or re-performance will be required if necessary, the contractor will not be financially penalized for unacceptable performance recorded in periodic progress reports, provided that final performance evaluation of the task deliverable is deemed acceptable.
Customer Feedback (if applicable): Additional feedback will be obtained through random customer feedback, if necessary. To be considered valid, customer complaints must set forth clearly and in writing the detailed nature of the feedback, must be signed, and must be forwarded to the KO. The KO will maintain a summary log of all formally received customer feedback as well as a copy of each feedback in a documentation file.
6.0 Surveillance Documentation: The COR will use a performance evaluation form to record evaluation of the contractor's performance for each task and deliverable in accordance with the methodology described in Sections 4.0 and 5.0. The COR must substantiate, through narratives in the form, all superior and unacceptable ratings. Performance at the acceptable level is expected from the Contractor. At a minimum, the evaluation form will indicate actual and scheduled delivery times and number of reviews required to achieve the final product.
The COR will forward copies of all completed performance evaluation forms to the KO and contractor within one week of performing the inspection. When a task deliverable receives an overall unacceptable rating, the contractor will explain, within 15 days, in writing to COR why performance was unacceptable, how performance will be returned to acceptable levels, and how recurrence of the problem will be prevented in the future.
The KO will review each performance evaluation form prepared by the COR. When appropriate, the KO may investigate further to determine if all the facts and circumstances surrounding the event were considered in the COR opinions outlined on the form. The KO will immediately discuss any unacceptable rating with the contractor to assure that corrective action is promptly initiated.
Upon final acceptance of work, the COR will prepare a written ACASS Report for the KO summarizing the overall results of his/her surveillance of the contractor’s performance during the contract period of performance. In the event of unacceptable performance at any time during the contract period of performance, the COR will prepare an interim evaluation. The interim (if applicable) and final ACASS reports will become part of the formal QA documentation. The COR will maintain a complete QA file. This file will contain copies of all performance evaluation forms and any other related documentation. The COR will forward these records to the KO at termination or completion of the Contract.
7.1 Payment and Corrective Action: Full payment for a task deliverable will be provided upon verification of overall acceptable performance, as rated on quality and timeliness. This verification will be recorded in a performance evaluation form submitted to the KO specifying overall contractor’s performance as either acceptable or superior for the task deliverable.
If a task deliverable receives an unacceptable rating for the quality performance standard, re-performance is required until the task deliverable receives an acceptable rating. This re-performance is required regardless of cost or schedule constraints that may result from the unacceptable performance, unless the KO has opted to terminate the Contract. If an acceptable rating is not achieved, the Government may reduce the contract price to reflect the reduced value of the services in accordance with FAR 52.246~4(e). The final QASP will be developed with the COR and the contractor.
(End of Summary of Changes)
File details come from the government source that posted it.