W912BV17Q0105_A00001_Fall_River_Herbicide.pdf
PDF 224 KB Posted
- Attached to
- Fall River and Toronto Lake Herbicide Services Federal contract opportunity
- Solicitation number
- W912BV17Q0105
About this file
Amendment 0001 to the Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fall_River_&_Toronto_Herbicide_Map.pdf | ||
| Fall_River_&_Toronto_Herbicide_Map.pdf | ||
| W912BV17Q0105_Fall_River_Herbicide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Fall River and Toronto Lake Herbicide Services, Kansas
1. This Amendment to the Solicitation is to correct an error in the SOW and to add a map for the Fall River Dam.
2. SECTION C, 12.5 - Change from Applicator Certif ication License for Texas and Oklahoma to Applicator Certif ication License for Kansas.
3. SECTION J - Add Attachment 2, Fall River Dam Herbicide Application Map (show s entire dam and close-up view s of the East and West sides of the dam).
4. POC for this Amendment is Douglas Buffington, Douglas.D.Buffington@USACE.Army.mil, phone 918-669-7078, fax 918-669-7495.
6. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Dec-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV17Q0105
X 9B. DATED (SEE ITEM 11)
08-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Dec-2017
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV17Q0105
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
S P E C I F I C A T I O N S
FALL RIVER & TORONTO LAKES
KANSAS
MAINTENANCE CONTRACT
FOR
HERBICIDE APPLICATION
ORGANIZATION OF SECTION C
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Pre-work Conference 12 Contractor Submittals 13 Insurance 14 Billing 15 Antiterrorism and Operations Security Requirements
APPENDICES
No. Title
A APPLICATION OF HERBICIDES
1. SCOPE OF WORK. The work required under this specification provides for herbicide application of Fall River Administration Area, Fall River Dam Area, Toronto Dam Area, Dam Site Park, Overlook Park, Whitehall Bay Campground, and North Rock Ridge Campground at Fall River Lake in Greenwood and Woodson County, Kansas. Fall River Lake Project is located five (5) miles north of Fall River, Kansas in Greenwood County. It is situated with 75 miles east of Wichita, KS the state’s largest metropolitan area. Toronto Lake Project is located 15 miles north of Fredonia and 15 miles west of Yates Center, Kansas in both Wilson and Woodson Counties.
2. DEFINITIONS.
2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 3.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.
2.5. Project. The term "project" as used herein means all Government property and easements at Fall River and Toronto Lakes.
2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.7. Quality. Conformance with the contract specification.
2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.10. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, (EM 385-1-1, current version) is hereby incorporated into this specification. A copy of the manual may be found on-line a @http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.html.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of work shall be in accordance with this specification and the dates specified for initiation and completion of work found in Appendix A.
4.2. Acceptance of Work. When work is completed, the contractor will notify the Contracting Officer’s Representative (COR) or Contracting Officer. The COR or Contracting Officer will accept work after an inspection. The acceptance of work does not relieve the contractors work from complying with Performance requirements.
4.2.1. If the COR or Contracting Officer notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work.
4.2.2. The contractor shall notify the COR or Contracting Officer when corrective work is completed. When work has been corrected, the COR or Contracting Officer shall conduct an inspection to determine that the corrective work was completed.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during their absence, shall be designated in writing to the COR and the Contracting Officer prior to initiation of work.
5.2.2. The contractor shall provide the COR and the Contracting Officer a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:00 p.m. on all workdays. Use of a cellular-type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish work within reasonable time frames not to exceed the response times set forth in Appendix A.
6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the Contracting Officer or COR for inspection. Equipment brought to the project shall not be used until it has passed inspection by the Contracting Officer or COR. The COR or Contracting Officer shall establish the time and location for these inspections.
6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.
6.3. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR and Site
Manager approves use of other areas. All vehicles will only be operated by drivers possessing a valid state issued driver’s license.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1 located in the attachments. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the COR.
7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246-4 "Inspection of Services" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 3.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 3. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and re-performed by the contractor: No deduction.
9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not re-performed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. Prior to initiating work, the contractor shall furnish the COR and the Contracting Officer a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
10.1.4. Procedures for treating and transporting injured persons to medical facilities.
10.1.5. Fire prevention plans.
10.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs in writing. Job hazard analysis directed in writing by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 2 located in the attachments.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the written request of the Contracting Officer.
10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the COR and the Contracting Officer of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR and the Contracting Officer immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing to the COR monthly by the 2nd workday of the following month.
11. PRE-WORK CONFERENCE. The Contracting Officer or their designated representative shall conduct a Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 12 below. As a minimum, the contractor shall be represented by the officer of the company that signed the contract and the on-site supervisor. The Contracting Officer or their designated representative shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.
12. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer and/or the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished. If the Contracting Officer and/or the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
12.1. Names of on-site supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
12.2. Safety Plan (subparagraph 10.1.).
12.3. Job Hazard Analysis (subparagraph 10.1.6.)
12.4. Exposure reports (submit by 2nd workday of each month) (subparagraph 10.5.).
12.5. Applicator Certification License for Kansas Texas and Oklahoma.
12.6. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 15)
12.7. E-Verify completed (subparagraph 15.2.)
13. INSURANCE
13.1 REQUIRED INSURANCE and INSURANCE CERTIFICATE: Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance:
a. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.
b. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $300,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.
c. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $100,000 per person and $300,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
13.2 The contractor shall submit to the Contracting Officer a copy of their insurance certificate within 5 calendar days of notification of contract award.
14. BILLING.
14.1. The contractor shall submit the original and two copies of invoices for all completed work.
14.2. Invoices shall be prepared in the format shown at
Exhibit 5 located in the Attachments.
14.3. All exposure reports shall be submitted before an invoice will be accepted.
14.4. Invoices and supporting documents shall be delivered or mailed to the COR at:
Attention: TO BE PROVIDED AT AWARD Fall River Lake Project Office 2453 Lake Rd Fall River, KS 67047
15. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and pre-screening via E-Verify Program.
15.1. Training materials and verification forms will be provided to the contractor within two business days of Contract Award.
15.2 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 10 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
APPENDIX A
APPLICATION OF HERBICIDES
1. SCOPE OF WORK. Contractor shall provide all labor, equipment, and supplies to perform herbicide application at Fall River and Toronto Lakes.
1.1. The contractor shall initiate work 1 April through 30 September of each year during the contract.. Services shall be performed so as to provide the desired vegetation-free appearance during the growing season (1 April through 30 September). Application of pre-emergent may begin as early in the Period of Performance work year as weather conditions allow.
2. DESCRIPTION OF WORK.
2.1. Fall River Dam – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: face of dam from water line to guardrail; all wicks, extensions, collector ditches, and rock areas on both sides of the Outlet structure; guard rail along upper dam road; east and west dam parking lot and guardrail; east and west outlet parking lot guard rail; perimeter of concrete dam structure; lower west access road and parking lot to dam structure; relief well drainage; outlet stilling basin riprap; and outlet channel riprap running approximately 100 yards down river. Map located in Attachments.
2.2. Administration Area – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: administration area compound, perimeter fencing, parking lots and sidewalks; volunteer camp sites; weather station fence and sidewalk; and sewage lagoon fence. Map located in Attachments.
2.3. Toronto Dam – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: face of dam from water line to guardrail; all wicks, extensions, collector ditches, and rock areas on both sides of the Outlet structure; guard rail along upper dam road; east outlet parking lot guard rail;
perimeter of concrete dam structure and wing walls; lower west access road and parking lot to dam structure; relief well drainage; outlet stilling basin riprap and outlet channel riprap approximately 200 yards downstream; and east and west outlet stair case. Map located in Attachments.
2.4. Dam Site Campground – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: Dam Site West campground sites 1 – 13; Dam Site East campground sites 16 – 33; shower house parking lot and sidewalk; dump station; raw water supply structure; trash containment pads; vault toilet parking lot and sidewalk; sewage lagoon fence (lagoon located east of Dam Site East); Brown’s Group Camp; group camp vault toilet parking lot and sidewalk; playground borders where composite edging is present; and volunteer campsites. Map located in Attachments.
2.5. Whitehall Bay Campground – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: Whitehall Bay campground sites 1 – 21, 22, 23, 26 – 28; Group Camp 30 sites A – L, shelter and sidewalks;
Group Camp 29 sites A – F, shelter and sidewalks; Group Camp 25 sites A – D, shelter and sidewalks; Group Camp 24 sites A – D, shelter and sidewalks; volunteer campsites; sewage lagoon fence; upper shower house parking lot and sidewalk; lower shower house parking lot and sidewalk; vault toilet and sidewalk; beach parking lot and sidewalk; boat ramp parking lot, and rip rap surrounding boat ramp; trash containment pads; dump station; lift station fence; and water treatment building and parking lot. Map located in Attachments.
2.6. North Rock Ridge Campground – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: boat ramp parking lots, and rip rap surrounding boat ramp; North Rock Ridge campground sites 1 – 21;
vault toilet and sidewalk dump station; trash containment pad. Map located in Attachments.
2.7. Overlook Park – Total Vegetation Control.
Apply herbicide for a total control of vegetation to achieve a 95% kill rate on the: parking lot and sidewalks to Overlook; perimeter of Overlook structure; and Old water treatment building and parking lot. Map located in Attachments.
3. SPECIAL TECHNICAL PROVISIONS. All work required by this specification shall conform to the following special technical provisions:
3.1. All work shall be performed or supervised by an applicator certified by the state of Kansas to apply herbicides. A copy of licenses shall be furnished to the COR prior to start work.
3.2. All vehicles used by the contractor in performance of the contract shall be properly marked as required by State regulations.
3.3. No storage of chemicals will be allowed on the project. Cleaning of pesticide containers and decontamination procedures shall not be performed on Government property.
3.4. Disposal of discarded pesticide containers shall be in a state and federal approved site. The contractor shall provide the location used to dispose of materials resulting from work performed under this contract.
3.5. The contractor shall comply with the procedures set forth in the project’s hazardous spill prevention plan.
3.6. The Contractor shall provide and have available at the work site a copy of the SDS (Safety Data Sheets) for each type of pesticide used.
3.7. Applications in areas normally occupied by project personnel or visitors shall be performed during periods of low use. Appropriate signs shall be posted and remain in place until the risk of exposure has been minimized.
3.8. All herbicide mixing and applications shall be made in accordance with the pesticide manufacturer’s recommendations, and applicable Federal, State, and local regulations.
3.9. The Contracting Officer may request pesticide application inspections from State or local environmental officials to ensure public and environmental safety.
3.10. The contractor shall submit an application report each time pesticides are applied. The report shall contain, at a minimum, the information shown on example located in exhibit 6.
3.11 An approved surfactant shall be utilized when applying herbicides. Surfactant shall be compatible with the type of herbicide being applied.
3.12 Contractor shall apply a chemically approved spray indicator to the herbicide to visually ensure application coverage.
4. Sustainability Compliance. The contractor furnished materials and supplies shall be in compliance and meet the minimum standards for recycled products and the BioPreferred Program requirements set forth by the EPA and USDA. Information for EPA and USDA designated product categories can be found at:
https://www3.epa.gov/epawaste/conserve/tools/cpg/products/index.htm https://www.biopreferred.gov/BioPreferred/
5. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 1 located in the Attachments.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Fall River and Toronto
Herbicide Application Map
6 30-MAY-2017
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Fall River and Toronto Herbicide Application Map
6 30-MAY-2017
Attachment 2 Fall River Dam Herbicide Application Map
3 21-DEC-2017
(End of Summary of Changes)
File details come from the government source that posted it.