W912BV-17-Q-0023_A00002_Webbers_PH_Jan.pdf
PDF 169 KB Posted
- Attached to
- Webbers Falls Janitorial Services Federal contract opportunity
- Solicitation number
- W912BV-17-Q-0023
About this file
AMENDMENT 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV-17-Q-0023_A00001_Webbers_PH_Jan.pdf | ||
| W912BV-17-Q-0023_Webbers_PH_Janitorial.pdf | ||
| SWT_Form_982.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Webbers Falls Pow erhouse Janitorial Services
1. SECTION A, Bidder's Inquiry is extended to 2:00 PM CST on 22 February 2017.
2. SECTION C, APPENDIX A, 3.7 is updated to remove reference to the Cable Tunnel, 3.7.1. is updated to include cleaning of the handrails.
3. SECTION C, TABLE A is updated to remove reference to the Cable Tunnel and to correct the concrete floor square footage to 3,696 total square feet.
4. Extend Offer Due Date from 21 February 2017 at 9:00 AM CST to 1 March 2017 at 2:00 PM CST.
5. POC for this Modification is Douglas Buffington, Douglas.D.Buffington@USACE.Army.mil, phone 918-669-7078, fax 918-669-7495.
6. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.
1. CONTRACT ID CODE PAGE OF PAGES
1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-17-Q-0023
X 9B. DATED (SEE ITEM 11)
20-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Feb-2017
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV-17-Q-0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Feb-2017 09:00 AM to 01-Mar-2017 02:00 PM.
The following have been modified:
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments and complete the price schedule before submitting documents. Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services.
Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes in a file format readable by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address CESWT‐CT‐SS‐Quotes@usace.army.mil and copy
Douglas.D.Buffington@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
TULSA DISTRICT CORPS OF ENGINEERS
DOUGLAS BUFFINGTON, CECT‐SWT‐E
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
FAX: (918) 669‐7495
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x
17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7078) or Douglas.D.Buffington@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.
Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District
Office. The address of the Tulsa District Office is below:
TULSA DISTRICT CORPS OF ENGINEERS
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the past performance references page, if included in solicitation.
3) Complete the Excel pricing schedule provided in the solicitation (all cells except for the unit prices are locked).
4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV‐17‐Q‐0023
The Bidder Inquiry Key is: NVVAKA-ZHWVY2
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 2:00pm (Central) Wednesday, 22 February 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington
Telephone: 918‐669‐7078
E‐MAIL: Douglas.D.Buffington@usace.army.mil
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 2:00 pm local time on Thursday, 9 February 2017 at the
Webbers Falls Powerhouse, US Army Corps of Engineers, 14300 S Powerhouse Rd, Webbers Falls, OK 74470.
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
S P E C I F I C A T I O N S
JANITORIAL AND LAWN MAINTENANCE
WEBBER FALLS POWERHOUSE
OKLAHOMA
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Materials and Supplies 8 Performance Requirements 9 Deductions for Deficient Work 10 Safety 11 Contractor's Facilities 12 Work Schedules 13 Reporting Defective Facilities 14 Building Security 15 Prework Conference 16 Contractor Submittals 17 Billing 18 Contractor Quality Control 19 Antiterrorism and Operations Security Requirements
EXHIBITS
No. TITLE 1 Quality Assurance Report 2 Specifications for Contractor‐Furnished Materials and Supplies 3 Performance Requirements Table 4 Invoice Format 5 Quality Control Inspection Log
APPENDICES
Appendix Title A Janitorial and Lawn Maintenance
1. SCOPE OF WORK. The work required under this specification provides for janitorial and lawn maintenance at the powerhouse and contiguous exterior areas at Webbers Fall Powerhouse.
2. DEFINITIONS.
2.1. Bimonthly. Work required to be performed every other month.
2.2. Biweekly. Work required to be performed every other week.
2.3. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.4. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 3.
2.5. Government. The term "Government" as used herein means the United States of America.
2.6. Performance Requirement (PR). The Government's requirement for each service provided under the contract. Performance Standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.
2.7. Project. The term "project" as used herein means all Government property and easements at Webbers Falls Lake.
2.8. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.9. Quality. Conformance with the contract specification.
2.10. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.11. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.12. Semimonthly. Work required to be performed two times per month.
2.13. Semiweekly. Work required to be performed two times per week.
2.14. Workday. Any day, Monday through Thursday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385‐1‐1, current issue) is hereby incorporated into this specification. EM385‐1‐1 is available on‐line at:
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of work shall be in accordance with this specification.
4.2. Acceptance of work. The Government shall accept work unless the Contracting Officer or the Contracting Officer’s Representative (COR) notifies the contractor of deficient services.
4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the Contracting Officer or the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance Report (SWT Form 982, Exhibit 1).
4.2.2. If the Contracting Officer or the COR notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be reperformed the same day. Work performed on less than a daily schedule shall be reperformed not later than the following day. Refer to paragraph 10 for deficient work not reperformed.
4.2.3. The contractor shall notify the Contracting Officer or the COR when deficiencies have been corrected by completing Part IV of the QA Report, provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer or the COR shall complete Part V of the QA Report and furnish the contractor a copy. A copy will also be provided the Contracting Officer at the Tulsa District Office for filing.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.
5.2.2. The contractor shall provide the Contracting Officer and the COR a local or toll‐free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular‐type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits. Upon request, the contractor shall present equipment to the Contracting Officer for inspection.
6.1. All motorized equipment shall be powered by 115 Volts AC.
6.2. All equipment must be in good operating and mechanical condition and shall comply with EM 385‐ 1‐1.
6.3. Upon request from the Contracting Officer or the COR, the contractor shall present equipment to the Contracting Officer or the COR for inspection. Equipment brought to the project shall not be used until it has passed inspection. The Contracting Officer or the COR shall establish the time and location for these inspections.
6.4 While performing work under this contract, vehicles shall be operated only by legally licensed drivers and parked only on roads, parking areas, or pullouts unless the Contracting Officer or the Site/Lake Manager approves use of other areas.
7. MATERIALS AND SUPPLIES.
7.1. Contractor Furnished. Except for the items listed in subparagraph 7.2., the contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification within specified time limits.
7.1.1. All materials and supplies shall be new and adequate quantities shall be maintained to perform the required services without interruptions. All materials and supplies are subject to review by the Contracting Officer to determine compliance with this specification.
7.1.2. Specifications for selected contractor‐furnished materials and supplies are given in Exhibit 2. In addition to materials and supplies listed in Exhibit 2, the contractor shall furnish the following:
Carpet Shampoo Cleaning compounds Deodorant Cakes Disinfectants Glass Cleaner Mops, brooms, etc.
Paper Towels Soap Toilet Tissue Ultra High Speed Finisher Plastic liners for trash receptacles Spot Remover for carpets & upholstered chairs Lawn Mower and Weed Eater Wax and stripping agents for tile floors Insecticide
7.2. Government Furnished. The Government will furnish potable water.
8. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit
3. The contractor's performance will be evaluated using these PRs as follows:
8.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.
8.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 3. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and reperformed by the contractor: No deduction.
9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not reperformed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. The contractor shall furnish the Contracting Officer and the COR with a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385‐1‐1. The safety plan shall include, but not be limited to the following:
10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
10.1.4. Procedures for treating and transporting injured persons to medical facilities.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the written request of the Contracting Officer.
10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short‐sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385‐1‐1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the Contracting Officer and the COR of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man‐hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
11. CONTRACTOR'S FACILITIES. The contractor shall be responsible for storage of materials, supplies and equipment to maintain the services required by this contract.
12. WORK SCHEDULES. At the beginning of each quarter, the contractor shall furnish the COR a schedule for performing all janitorial work that is required at a weekly frequency or less. A revised schedule shall be furnished the COR prior to the contractor changing his mode of operation.
13. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR or Site Manager each workday.
14. BUILDING SECURITY. The names of contractor personnel authorized to perform work under this contract shall be furnished the Contracting Officer and the COR. Only those persons whose name appears on this list shall be allowed access to buildings. When Government personnel are not present while work is being performed, contractor personnel shall keep buildings locked and refuse entrance to anyone who does not have a key to the buildings. Contractor personnel will be instructed by the COR in the operation of intruder alarm systems and will be responsible for correct operation of these devices when work is performed and Government personnel are not present.
15. PREWORK CONFERENCE. The Contracting Officer or their designated representative shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 16 below. As a minimum, the officer of the company that signed the contract and the on‐site supervisor shall represent the contractor. The Contracting Officer or their designated representative shall establish the location, date, and time of the Prework Conference after consultation with the contractor.
16. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer and/or the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer and/or the COR. If the Contracting Officer and/or the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
16.1. Names of supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
16.2. Safety Plan (submit prior to initiation of work) (subparagraph 10.1.).
16.3. Exposure reports (submit by 2nd workday of each month) (subparagraph 10.5.).
16.4. Work schedules (submit prior to initiation of work and prior to changing schedules) (paragraph 12.).
16.5. Personnel authorized to perform work under this contract (paragraph 14.)
16.6. Insurance Certification submitted prior to initiating work (paragraph 19)
16.7. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 20)
16.8. Background check initiated with the Tulsa District Security Officer prior to initiation of work and prior to any employee entering the facility (subparagraph 20.2.)
17. BILLING.
17.1. The contractor shall submit the original and two copies of invoices at the end of each month for all completed work.
17.2. Invoices shall be prepared in the format shown at
Exhibit 4.
17.3. All exposure reports shall be submitted before an invoice will be accepted.
17.4. Invoices and supporting documents shall be delivered or mailed to Robert S. Kerr Powerhouse, Rt.
2, Box 686, Keota, OK 74941‐8815.
18. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246‐1 "Inspection of Services" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 3.
18.1. Results of quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 5). Furnish a copy of completed inspection logs to the Contract Officer’s Representative weekly.
18.2. Requirements in 18.1. may be waived by the COR if it is determined proper CQC can be achieved without the required submissions. This determination will normally be made on the basis of actual performance by the contractor and shall be made in writing by the COR. If submissions are again required after being waived this reinstatement shall not be considered as grounds for a price increase.
20. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub‐contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or
Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub‐contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and initiation of background check.
20.1. Training materials and verification forms will be provided within two business days of Contract Award.
20.2. Per the ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS, Jun 2015, incorporated in SECTION H, Item 2b:
20.2.1. For contractors who do not require CAC, but require access to a DoD facility or installation. Proposed language: Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (Army Directive 2014‐05 / AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
20.2.2. Contractor personnel who are intended to access Government Facilities unescorted MUST provide the following to the Tulsa District Security Officer prior to attempting to access Government Facilities:
1. PSIP Form completed (Form will be provided upon request)
2. OF 0306 completed
3. Two copies of FD 258 (finger print cards) completed
4. Copy of birth certificate, passport, or Certificate of Naturalization
5. Copy of State issued drivers license or state ID
6. Resume' covering seven years
7. Employees will need to complete the SF 86 and retain this copy. Employees should retain copies of all the above forms.
20.2.3. Once the above forms are turned over the background check will be initiated. The Employees will receive notification/email from the Office of Personnel Management providing them information to fill out an SF 85 on‐line.
EXHIBIT 1
QUALITY ASSURANCE REPORT
The Quality Assurance Report SWT Form 982 is provided at SECTION J as Attachment 1.
EXHIBIT 2
SPECIFICATIONS FOR CONTRACTOR‐FURNISHED
MATERIALS AND SUPPLIES
ITEM APPENDIX SPECIFICATION
HAND SOAP A LIQUID, HIGH LATHERING & SUDSING
CHARACTERISTICS, MILDLY PERFUMED (WOMEN).
HAND SOAP A BAR, LAVA OR EQUIVALENT (MENS).
REFUSE CONTAINER LINER A PLASTIC, 8 TO 32 GALLON.
TISSUE PAPER A 2‐PLY BATH TISSUE, NON‐BLEACHED, NATURAL,
SEPTIC TANK SAFE, MINIMUM OF 500 SHEETS PER
ROLL, 100% POST CONSUMER WASTE RECYCLED
MATERIALS, #100, FORT HOWARD CO. OR EQUAL.
TOWELS A SINGLE PLY, SINGLE‐FOLD, NATURAL, 40% POST
CONSUMER WASTE RECYCLED MATERIALS TO MEET
EPA GUIDELINES AS SPECIFIED IN THE FEDERAL
REGISTER #150, FORT HOWARD OR EQUAL.
URINAL DEODORANT CAKE A PERFUMED, COMMERCIAL QUALITY, SEPTIC TANK
SAFE.
EXHIBIT 3
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENTS PR NO. PERFORMANCE STANDARD
APPENDIX A
Dust furniture, etc. 1 All surfaces free of dust, litter, lint, and soil.
Clean floors 2 Clean. No litter, mop strands, streaks, swirl marks, or detergent residue left on floors.
No standing water on floors. No splash marks on furniture, walls, baseboards, etc.
Finishing floors 3 Entire floor has a uniform, glossy appearance. No scuffmarks or visible wax buildup. Baseboards, furniture, etc., shall be free of cleaning and waxing solutions.
Vacuum carpets 4 Clean. Free of soil, litter, and debris visible at a distance of 10 feet.
Clean carpets 5 Clean. Free of soil spots unless special cleaning agents prove unsuccessful. No evidence of fuzzing caused by harsh rubbing or brushing. Cleaned soil spot areas blend with adjacent areas of carpeting.
Clean light fixtures 6 Clean. Free of insects, insect nests, dirt, grease, and other foreign matter, Clean mirrors & glass (other than windows)
7 Clean. Free of dirt, smudges, streaks, and other foreign matter.
Clean restrooms 8 Clean and Odor‐free. All fixtures, walls, & floors clean. Lavatories, urinals, commodes, & floors sanitary. Soap, towels, & toilet tissue adequate until next cleaning day.
Clean drinking fountains 9 Clean, sanitary.
Grounds keeping 10 Grounds, parking areas, & sidewalks free of refuse & debris.
Lawn Maintenance 11 Smooth cut. 1Height of cut grass does not exceed 1/2 inch from that specified. No uncut vegetation.
Trimming 12 Uniform cut with no scalping of grass. No damage to trees or shrubs.
Refuse collection 13 Containers empty. Liners clean and not torn.
SERVICE REQUIREMENTS PR NO. PERFORMANCE STANDARD
Refuse disposal 14
Refuse deposited in barrels. No refuse left outside barrels or in parking areas.
EXHIBIT 4
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT
PROJECT: ________________________________ SHEET ____ OF ____
CONTRACTOR: _____________________________ DATE: __________
ADDRESS: ________________________________ CONTRACT NO: W912BV‐__‐__‐____
BILLING PERIOD: __________ THRU _________ INVOICE NO: ____________
PAYMENT TERMS: __________________________
(Payment Discount or N/A)
BID ITEM NO. AMOUNT
PAYMENT REQUESTED: __________
CONTRACTOR (Signature/Date)
APPENDIX A
JANITORIAL AND LAWN MAINTENANCE
1. FACILITIES TO BE SERVICED. The facilities to be serviced under the provisions of this appendix consist of the powerhouse and contiguous exterior areas. An inventory of these areas is given in Table A.
2. FREQUENCIES AND TIMES OF SERVICES.
2.1. Services required on each workday shall be performed Monday through Thursday, excluding Federal holidays. All work shall be accomplished between 7:00 a.m. and 3:30 p.m. Services required on a weekly, monthly, quarterly, or semiannual basis shall be performed on any of the workdays specified above.
2.2. Lawn maintenance will be performed during the months of April thru October.
3. DESCRIPTION OF WORK.
3.1. Offices, Lobby, Control Room, Electronic Equipment Room, Kitchen, Hallways, and Stairways (Excluding Restrooms).
3.1.1. Each cleaning day. Empty trash receptacles. Clean sink and counter top; clean and disinfect drinking fountain; and clean tile floors. Dust desktops. Control switchboards, electronic equipment, computers, typewriters, radio, videocassette recorder and copy machine shall not be cleaned.
3.1.2. Weekly. Vacuum carpeted floors. Spot remover shall be used to remove new spills from carpeted floors. Clean exterior surfaces of refrigerators, stoves, and cabinets. The glass on entry doors and other glass enclosures shall be cleaned. Clean windowsills, cabinets, pictures, handrails, and office furnishings. Vinyl tile floors shall be high speed buffed.
3.1.3. Monthly. Clean chairs, including removal of spots from upholstered chairs. Clean walls, doors, ceilings, and HVAC vent covers. Stains or marks that cannot be removed without damaging wall surfaces or paint are exempt from this cleaning. Glass on pictures, mirrors, and office furnishings shall be cleaned.
3.1.4. Semiannually. Finish vinyl tile floors. Tile floors shall be stripped prior to every time they are finished. Steam clean carpeted floors, spot remover shall be used to remove stains. This work shall be accomplished in May and November and shall be completed from start to finish in a two‐week time frame.
3.2. Restrooms/Showers, Locker Rooms, and Janitorial Closets.
3.2.1. Each cleaning day. Wet mop floors. Tile floors shall be buffed after drying. Clean mirrors and plumbing fixtures. A disinfectant shall be used to eliminate odor and minimize health hazards.
Deodorant cakes shall be maintained in urinals. Trash receptacles shall be emptied. Soap, paper towels, and toilet tissue dispensers shall be checked and filled if necessary.
3.2.2. Weekly. Clean walls, partitions, and shower stalls. A disinfectant shall be used to eliminate odor and minimize health hazards.
3.2.3. Quarterly. Clean ceilings, vent covers, and light fixtures.
3.2.4. Semiannually. Wax vinyl tile floors. Tile floors shall be stripped prior to every second time they are waxed. Waxed floors shall be buffed. Clean HVAC vent covers.
3.3. Erection Bay, Generator Room, Turbine Room, Hallways, and Stairways.
3.3.1. Each cleaning day. Empty trash receptacles. Sweep loading platform.
3.3.2. Weekly. Sweep or dust mop floors (wet mopping shall be accomplished if necessary to remove dirt).
3.3.3. Monthly. Clean stairway halls, including ceilings and walls. All floors shall be mopped.
All grease and oil stains shall be removed from floors.
3.3.4. Quarterly. Clean window ledges, doors and frames, and wainscoting.
3.4. Shop Areas.
3.4.1. Each cleaning day. Empty trash receptacles. Sweep or dust mop floors.
3.4.2. Weekly. All floors shall be mopped.
3.4.3. Monthly. Grease and oil stains shall be removed from floors.
3.4.4. Quarterly. Clean window ledges, doors and frames, and wainscoting.
3.5. Interior Storage Areas and Mechanical Equipment Room.
3.5.1. Weekly. Empty trash receptacles. All floors shall be mopped.
3.5.2. Monthly. Grease and oil stains shall be removed from floors.
3.6. Equipment Galleries. Monthly. Sweep stairways and floors. Grease and oil stains shall be removed from floors.
3.7. Intake Structure and Access Galleries.
3.7.1. Weekly. Sweep stairways and floors, clean handrails.
3.7.2. Monthly. Pick up litter, trash and debris.
3.8. Exterior Surfaced Areas, Sidewalks, and Lawn Area.
3.8.1. Each cleaning day. Pick up litter, trash, and debris. Sidewalks shall be swept clean.
3.8.2. Lawn areas shall be maintained between a minimum height of 1½ inches and a maximum of 4 inches. The contractor shall mow approximately 0.10 acre of lawn located in the power plant parking lot.
3.8.3. Trimming shall be accomplished each time the lawn area is mowed.
3.8.4. Cleanup. Prior to mowing, the contractor shall remove rocks and debris that are likely to damage equipment or be thrown by the mower.
3.9. Refuse Disposal. Refuse collected from the powerhouse shall be deposited in Government furnished barrels each cleaning day. The barrels shall be emptied weekly; liners shall be replaced if dirty or torn. Refuse shall be disposed off Government land in accordance with applicable local, state, and Federal laws and regulations.
4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs in Exhibit 3. The terms clean, sanitary, and odor‐free facilities are used in Exhibit 3 and are defined as follows.
4.1. Clean. The contractor shall vacuum, sweep, wash, wipe, or brush facilities to ensure that dirt, dust, rocks, debris, trash, garbage, fecal matter, urine, soap scum, biological formations and resultant stains, insects, insect nests and webs, and residue from cleaning agents are removed.
4.2. Sanitary. The contractor shall disinfect facilities each time they are cleaned.
4.3. Odor‐free. The contractor shall use a chemical agent in a manner that will eliminate odor from facilities.
TABLE A
INVENTORY OF FACILITIES
AREA SIZE
Offices, Lobby, Control Room, Electronic Equipment Room, Kitchen, Hallways, and Stairways (excluding restrooms/showers)
Carpeted Floors 355 SF Ceramic Tile Floors 1,615 SF Rubber Tile Floors 1,770 SF
Restrooms/Showers (Ceramic Tile Floors) 975 SF Restrooms/Showers (Vinyl Tile Floors) 80 SF
Erection Bay, Shop Areas, Generator Room, Turbine Room, Hallways, and Stairways
Concrete Floors 5,488 SF Quarry Tile Floors 12,000 SF
Interior Storage Areas and Mechanical Equipment Room with Concrete Floors 8,589 SF
Equipment Galleries with Concrete Floors 1,500 SF
Intake Structure and Access Galleries with Concrete Floors 3,696 SF
Exterior Surfaced Areas 0.3 AC
Sidewalks 80 LF
Lawn Area 0.1 AC
Flower Beds 80 SF
(End of Summary of Changes)
File details come from the government source that posted it. Updated .