Solicitation.pdf
PDF 511 KB Posted
- Attached to
- Mowing Services for Eufaula Lake Federal contract opportunity
- Solicitation number
- W912BV-16-R-0115
About this file
Solicitation for Eufaula Lake Mowing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ACCIDENT_PREVENTION_PROGRAM.pdf | ||
| EUF_MWG_MAPS.pdf | ||
| SWT_Form_990.pdf | ||
| SWT_Form_982.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV-16-R-0115 16-Jun-2016
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
02:00 PM 30 Jun 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DOUGLAS D BUFFINGTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7,500,000.00
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF105
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BV-16-R-0115
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments and complete the checklist before submitting documents.
Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes in a file format readible by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address Douglas.D.Buffington@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
TULSA DISTRICT CORPS OF ENGINEERS
DOUGLAS BUFFINGTON, CECT‐SWT‐E
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
FAX: (918) 669‐7495
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x
17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7078) or Douglas.D.Buffington@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.
Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District
Office. The address of the Tulsa District Office is below:
TULSA DISTRICT CORPS OF ENGINEERS
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the past performance references page, if included in solicitation.
3) Complete the pricing schedule using the Excel Spreadsheet provided in the solicitation.
4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV‐16‐R‐0115
The Bidder Inquiry Key is: 5PMNVJ‐XHN786
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 1:00pm (Central) Wednesday, 27 June 2016 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington
Telephone: 918‐669‐7078
E‐MAIL: Douglas.D.Buffington@usace.army.mil
Guidance on how to submit a FOIA request can be found at http://www.usace.army.mil/FOIA.aspx. Please ensure your request is submitted in a timely matter to receive feedback before the solicitation closing date.
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 23 June 2016 at 9:00 AM CST to be held at the Eufaula Lake
Office in Oklahoma. Directions from Porum: Follow State Highway 2 approximately 1.5 miles to State Highway 71, turn to the Right (West) on State Highway 71 and go approximately 7 miles to the lake office on the left side of the road (signage is on the roadside in front of the metal fencing). Physical Address is: 102 East BK 200 Road, Stigler, OK (Using GPS will most likely NOT provide the correct end location).
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
Section B - Supplies or Services and Prices
PRICE SCHEDULE
Contractor: Grand
Total
PROJECT: EUFAULA LAKE
PRICE SCHEDULE Base Period XX Jul 16 - 31 Mar 17
CONTRACTOR: 0
ITEM NO SERVICES QTY UNIT UNIT
PRICE
AMOUNT
SCHEDULE I
* IMPROVED AREAS
0001 A Belle Starr South 12 EA $ - 0002 A Brooken Cove North 12 EA $ - 0003 A Damesite South 12 EA $ - 0004 A Elm Point 12 EA $ - 0005 A Gentry Creek 12 EA $ - 0006 A HWY 9 Landing
(East/North/South)
12 EA $ -
0007 A Mill Creek Bay 12 EA $ - 0008 A Oak Ridge 12 EA $ - 0009 A Porum Landing 12 EA $ - 0010 A Project Office, East
Storage Yard & South Overlook
16 EA $ -
0011 A Damsite East & Fishing Areas
12 EA $ -
Total Improved $ -
0012 A Dam Embankment NTE 4 EA $ -
0013 A Herbicide Application NTE 4 EA $ -
PRICE SCHEDULE 1ST OPTION YEAR 1 APR 2017-31 MAR 2018
CONTRACTOR: 0
ITEM NO SERVICES QTY UNIT UNIT
PRICE
AMOUNT
SCHEDULE I
* IMPROVED AREAS
1001 A Belle Starr South 12 EA $ - 1002 A Brooken Cove North 12 EA $ - 1003 A Damesite South 12 EA $ - 1004 A Elm Point 12 EA $ - 1005 A Gentry Creek 12 EA $ - 1006 A HWY 9 Landing
(East/North/South)
12 EA $ -
1007 A Mill Creek Bay 12 EA $ - 1008 A Oak Ridge 12 EA $ - 1009 A Porum Landing 12 EA $ - 1010 A Project Office, East
Storage Yard & South Overlook
16 EA $ -
1011 A Damsite East & Fishing Areas
1012 A Dam Embankment NTE 4 EA $ -
1013 A Herbicide Application NTE 4 EA $ -
PRICE SCHEDULE 2ND OPTION YEAR 1 APR 2018-31 MAR 2019
ITEM NO SERVICES QTY UNIT UNIT
PRICE
AMOUNT
SCHEDULE I
* IMPROVED AREAS
2001 A Belle Starr South 12 EA $ - 2002 A Brooken Cove North 12 EA $ - 2003 A Damesite South 12 EA $ - 2004 A Elm Point 12 EA $ - 2005 A Gentry Creek 12 EA $ - 2006 A HWY 9 Landing
(East/North/South)
12 EA $ -
2007 A Mill Creek Bay 12 EA $ - 2008 A Oak Ridge 12 EA $ - 2009 A Porum Landing 12 EA $ - 2010 A Project Office, East
Storage Yard & South Overlook
16 EA $ -
2011 A Damsite East & Fishing Areas
2012 A Dam Embankment NTE 4 EA $ -
2013 A Herbicide Application NTE 4 EA $ -
PRICE SCHEDULE 3RD OPTION YEAR 1 APR 2019-31 MAR 2020
ITEM NO SERVICES QTY UNIT UNIT
PRICE
AMOUNT
SCHEDULE I
* IMPROVED AREAS
3001 A Belle Starr South 12 EA $ - 3002 A Brooken Cove North 12 EA $ - 3003 A Damesite South 12 EA $ - 3004 A Elm Point 12 EA $ - 3005 A Gentry Creek 12 EA $ - 3006 A HWY 9 Landing
(East/North/South)
12 EA $ -
3007 A Mill Creek Bay 12 EA $ - 3008 A Oak Ridge 12 EA $ -
3009 A Porum Landing 12 EA $ - 3010 A Project Office, East
Storage Yard & South Overlook
16 EA $ -
3011 A Damsite East & Fishing Areas
3012 A Dam Embankment NTE 4 EA $ -
3013 A Herbicide Application NTE 4 EA $ -
PRICE SCHEDULE 4TH OPTION YEAR 1 APR 2020-31 MAR
ITEM NO SERVICES QTY UNIT UNIT
PRICE
AMOUNT
SCHEDULE I
* IMPROVED AREAS
4001 A Belle Starr South 12 EA $ - 4002 A Brooken Cove North 12 EA $ - 4003 A Damesite South 12 EA $ - 4004 A Elm Point 12 EA $ - 4005 A Gentry Creek 12 EA $ - 4006 A HWY 9 Landing
(East/North/South)
12 EA $ -
4007 A Mill Creek Bay 12 EA $ - 4008 A Oak Ridge 12 EA $ - 4009 A Porum Landing 12 EA $ - 4010 A Project Office, East
Storage Yard & South Overlook
16 EA $ -
4011 A Damsite East & Fishing Areas
4012 A Dam Embankment NTE 4 EA $ -
4013 A Herbicide Application NTE 4 EA $ -
Section C - Descriptions and Specifications
STATEMENT OF WORK
S P E C I F I C A T I O N S
EUFAULA LAKE
OKLAHOMA
MAINTENANCE CONTRACT
FOR
MOWING SERVICES
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following page.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title
1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Reporting Defective Facilities 12 Required Insurance And Insurance Certificate 13 Prework Conference 14 Contractor Submittals 15 Billing 16 Changes in Amount of Facilities Serviced 17 Work Schedules 18 Materials and Supplies
EXHIBITS
No. TITLE
1 Performance Requirements Table 2 Quality Assurance Report 3 Maximum Response Times for CDMs 4 Quality Control Inspection Log 5 Example of Job Hazard Analysis 6 Invoice Format
APPENDICES
Appendix Title
A Mowing – Corps Directed Mowing – Improved Areas B Mowing – Corps Directed Mowing – Herbicide & Dam Embankment
Facilities Inventory & Mowing Maps
1. SCOPE OF WORK. The work required under this specification provides for the mowing, trimming, and edging of public use areas, the dam embankment, and other project lands at Eufaula Lake, Oklahoma.
2. DEFINITIONS.
2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 1.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Corps Directed Mowing (CDM). The means by which selected mowing work is ordered.
2.5. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.
2.6. Project. The term "project" as used herein means all Government property and easements at Eufaula Lake.
2.7. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.8. Quality. Conformance with the contract specification.
2.9. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.10. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.11. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, current version) is hereby incorporated into this specification. The Contracting Officer or their designee will furnish EM 385-1-1 to the contractor after contract award. EM 385-1-1 is also available on-line at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual .aspx .
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. CORPS DIRECTED MOWING.
4.2.1. Initiation and execution of work shall be performed in accordance with this specification and the performance standards (Performance Requirements Table, Exhibit 1).
4.2.1.1. The Contracting Officer’s Representative (COR) will initiate CDMs by providing the area to be mowed and the desired completion date.
4.2.1.2. The COR will discuss the CDM with the contractor and the dates for initiating and completing work shall be negotiated. Negotiations shall be completed and agreed upon by both parties within one workday. If times cannot be agreed upon the Contracting Officer will decide.
4.2.1.3. Although the start and finish dates are negotiable, the limits set forth in Exhibit 4, Maximum Response Times for CDMs, shall not be exceeded unless waived by the COR. Weather delays will be taken into consideration.
4.2.1.4. In accordance with contract clause 52.246-4(e) "Inspection of Services", the COR may cancel the CDM when work is not completed within the limits set forth in Exhibit 4. The provisions outlined in paragraph 9.4. will apply when work is cancelled.
Deductions will be based on work not started at the time the CDM is cancelled.
4.2.1.5. If the COR cancels an CDM prior to the contractor initiating work, no payment shall be made to the contractor. If the COR cancels a CDM after work is initiated, the provisions and procedures of the Changes Clause shall be followed except that modification of the contract shall not be required. Work is considered initiated when mobilization of resources to the work site has begun.
4.2.1.6. Mowings will be ordered only if the COR determines such mowings are necessary. Mowings of semi-improved and embankment areas may not be necessary at all locations at the same time. Payment will only be made for areas actually mowed.
4.2.2. Acceptance of work. When work is completed, the contractor will notify the COR. The COR will accept work unless services are found to be deficient.
4.2.2.1. If the COR notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Reperformance of work to correct deficiencies must be completed within the original CDM response time.
4.2.2.2. The contractor shall notify the COR when corrective work is completed.
When work has been corrected, the COR will provide an email notification to the contractor and copy the Tulsa District Office.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.
5.2.2. The contractor shall provide the COR and Contracting Officer a telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish all equipment necessary to accomplish the various types of work specified. Equipment breakdowns do not relieve the contractor of the responsibility to complete work properly and on time.
6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR for inspection. The contractor shall not use equipment until it has passed inspection by the COR.
The COR shall establish the time and location for these inspections.
6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.
6.2.1. Tractors shall be equipped and operated in accordance with the following:
6.2.1.1. Power take offs on tractors shall operate at a minimum of 540 rpm during mowing operations.
6.2.1.2. Seat belts shall be worn at all times by equipment operators. Refer to subparagraph 16.B.08. of EM 385-1-1.
6.2.1.3. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than 1/4-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.11.a of EM 385-1-1.
6.2.1.4. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.
6.2.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:
6.2.2.1. Mowers shall be rear discharge only and equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.
6.2.2.2. Mowers shall be equipped with slides and wheels.
6.2.2.3. Brush hogs shall not be used on the slopes of dikes around oxidation ponds.
6.2.2.4. Mowers used on the embankment of the dam shall have a minimum cutting width of 15 feet. Use of a Riding Wide Area Mower of at least 100 inches of cutting surface is acceptable in lieu of a 15 foot batwing mower.
6.2.2.5. Mulching mowers shall not be used.
6.2.2.6. Brush hogs shall not be used within improved areas.
6.2.2.7. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.
6.2.3. Edgers shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.
6.2.4. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:
EUFAULA LAKE
MOWING SERVICES
PROVIDED BY
(Contractor's Name)
6.3. Equipment Operation.
6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.
6.3.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.
6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer or the COR and the Lake Manager approves use of other areas. All vehicles shall be properly licensed and maintained in a safe, clean condition. All contractor/sub contractor drivers shall maintain a valid state driver’s license.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.
7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.
7.3. Whenever QA inspections indicate the contractor’s performance is marginal or unsatisfactory; the contractor shall furnish the COR a written plan for correcting his/her CQC program within two (2) workdays. In addition, the contractor shall also furnish written status reports on the implementation of this plan weekly until the COR determines that performance is satisfactory. The COR will inform the contractor of the criteria to be used in determining marginal and unsatisfactory performance at the Pre-work Conference. The contractor will also be advised of any changes to these criteria prior to being used for evaluation.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 1. A copy of this program will be provided to the COR.
8.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 5). A copy of completed inspection logs shall be furnished the Contracting Officer and the COR weekly.
8.2. The Contracting Officer may waive the requirements in subparagraph 8.1. if they determine proper CQC can be achieved without the required submissions. The Contracting Officer will normally make this determination on the basis of actual performance by the contractor. If the requirements in subparagraph 8.1. are determined by the Contracting Officer to once again become required submissions this will be at no additional cost to the Government.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and reperformed by the contractor: No deduction.
9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not reperformed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. The contractor shall furnish the COR a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
10.1.4. Procedures for treating and transporting injured persons to medical facilities.
10.1.5. Fire prevention plans.
10.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 6.
10.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).
10.1.6.2. Equipment operation and maintenance (for each type of equipment).
10.1.6.3. Vehicle operation and maintenance.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the Contracting Officer.
10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the Contracting Officer and COR of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing to the COR monthly by the 2nd workday of the following month.
11. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the Contracting Officer each workday.
12. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
12.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.
12.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.
12.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
13. PREWORK CONFERENCE. The COR shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 13 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting Officer Representative shall establish the location, date, and time of the Prework Conference after consultation with the contractor.
14. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer Representative prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer Representative. If the Contracting Officer Representative determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
14.1. Names and phone numbers of on-site supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1. and 5.2.2.).
14.2. Provide a copy of the Contractor Quality Control program (paragraph 8)
14.3. Safety Plan (subparagraph 10.1.).
14.4. Job Hazard Analysis (subparagraph 10.1.6.)
14.5. Exposure reports (submit by 2nd workday of each month) (subparagraph 10.5.).
14.6. Required certificates of insurance (paragraph 11.)
14.7. Work schedules as applicable (section 17.)
14.8. Herbicide Certificate (Appendix A subparagraph 3.5 and Appendix B subparagraph 3.2.2.)
14.9. Herbicide Material Safety Data Sheets (MSDS) as applicable (Appendix A subparagraph
3.5 and Appendix B subparagraph 3.2.2.)
15. BILLING.
15.1. The contractor shall submit an original and two copies of invoices on completed work only at the end of each month. However, an invoice for completed CDMs may be submitted at any time during the month.
15.2. Invoices shall be prepared in the format shown at Exhibit 7.
15.3. All exposure reports and requested documents shall be submitted before an invoice will be accepted.
15.4. Invoices and supporting documents shall be delivered or mailed to the Lake Manager, Route 4, Box 5500 Eufaula Lake Office, Stigler, OK 74462.
16. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.
16.1. Services required are deleted for a period of one (1) month or longer in an entire park.
16.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.
17. WORK SCHEDULES. The contractor is responsible for managing all work performed under this specification, including written work schedules as prescribed below. The COR’s authority in reviewing these schedules is limited to assuring compliance with this specification.
If the COR determines the schedules do not comply with this specification, the contractor shall revise his schedules and resubmit them.
18. MATERIALS AND SUPPLIES.
18.1. Contractor furnished. The contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification within the specified time limits.
18.2. Government Furnished. The Government will furnish potable water for workers and equipment. The contractor shall be responsible for transporting water needed to work sites that lack potable water.
EXHIBIT 1
PERFORMANCE REQUIREMENTS
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS
APPENDIX A
Improved areas 1 Smooth cut. 1Height of cut grass does not exceed 1/2 inch from that specified. No uncut vegetation.
Edging 3 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.
APPENDIX B
Embankment area 5 Smooth cut. 1Height of cut grass does not exceed 1 inch from that specified. 2No uncut vegetation.
APPENDICES A & B
Trimming 6 Uniform cut with no scalping of grass. No damage to trees or shrubs.
Clean designated areas after mowing
7 No vegetation or debris left on paved surfaces.
1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.
2. The Contracting Officer will relax this requirement to a degree when the height of grass prior to mowing is excessive. The Contracting Officer shall make the determination of excessive grass height unilaterally.
EXHIBIT 2
QUALITY ASSURANCE REPORT
The Quality Assurance Report (SWT Form 982) is provided at SECTION J as Attachment 1.
EXHIBIT 3
MAXIMUM RESPONSE TIMES FOR CDMs
MAXIMUM RESPONSE TIMES FOR CORPS DIRECTED MOWINGS
RESPONSE TIMES
WORK DESCRIPTION START1 FINISH2
Appendix A – Improved Areas 2 WD 5 CDM
Appendix B – Embankment 5 WD 10 CDM
WD - Workdays CDM - Calendar Days
EXHIBIT 4
QUALITY CONTROL INSPECTION LOG
The Quality Control Inspection Log (SWT Form 990) is provided at SECTION J as Attachment 2.
EXHIBIT 5
EXAMPLE OF JOB HAZARD INSPECTION LOG
The Example of Job Hazard Analysis is provided at SECTION J as Attachment 3.
EXHIBIT 6
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT
PROJECT: ________________________________ SHEET ___ OF ___
CONTRACTOR: _____________________________ DATE: ___________
ADDRESS: ________________________________ CONTRACT NO: W912BV-__-_-____
BILLING PERIOD: ________ THRU __________ INVOICE NO: __________
PAYMENT TERMS: ____________________________
(Payment Discount or N/A)
CDM OR
BID ITEM
NO. DEDUCTION AMOUNT TOTAL
PAYMENT REQUESTED: ______________
CONTRACTOR (Signature/Date)
APPENDIX A
CORPS DIRECTED MOWING – IMPROVED AREA’S
1. FACILITIES TO BE SERVICED. Public use areas and Lake Office complex. An inventory of mowing areas bid by the "mowing" is given in Table A. All mowing maps are at the end of Appendix B.
2. FREQUENCIES AND TIMES OF SERVICE.
2.1. Work shall be performed between 7:00 a.m. and 8:00 p.m., from 1 April through 31 October.
2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.
3. DESCRIPTION OF WORK. The contractor shall perform the following work as directed.
3.1. Improved areas are highly developed areas, normally located in PUA’s. These area’s shall be mowed to a height of 1 ½ inches. In addition, mow the areas described below and around facilities shown on the drawings
3.2. Areas adjacent to all roads and parking areas shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the Contracting Officer to provide a safe viewing distance for vehicles approaching the intersections.
3.3. Areas around park and lake entrance signs. Park entrance signs are located beside roads shown on the attached maps. The area to be mowed around these park signs shall follow the mow line of the previous mowing. If there needs to be any changes, the Contracting Officer will determine the length of the new area to be mowed in front of these signs.
3.4. Areas around oxidation ponds shall be mowed from the edge of the water to a point 10 feet outside of fences. The oxidation pond shall be mowed every time the park is mowed.
3.5. Trimming shall be performed around all vertical objects protruding from the ground, including under guardrails, trees, reservation bollard signposts, and fence posts which exist within the limits of improved areas. This includes trimming along railroad ties delineating pullouts.
3.6. Edging shall be accomplished along all concrete walkways and curbs that are flush with the ground each time areas are mowed.
3.7. The contractor may apply approved herbicides in lieu of trimming. The Project Manager must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The Contracting Officer shall furnish the forms.
3.8. Cleanup. Prior to mowing, the contractor shall remove rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.
4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.
The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the Contracting Officer disagree about the suitability of conditions for mowing operations, the Contracting Officer will determine whether work shall progress or stop. Areas excluded by these conditions will also be excluded in the inspections.
TABLE A
INVENTORY OF CORPS DIRECTED MOWING AREAS – IMPROVED AREAS
TABLE A HAS 10 MOWINGS WITH 2 OPTION MOWINGS
IMPROVED
AREAS PLAYGROUNDS TOILETS SHELTERS
LOCATION (MOWINGS) (AC) (NO) (NO) (NO)
Belle Starr South 10 54.41 2 5 2
Brooken Cove North 10 45.63 1 7 2
Lady Bird Landing & South Overlook 10 41.60 1 6 2
Elm Point 10 14.48 0 1 1
Gentry Creek 10 26.76 1 4 0
Highway 9 Landing (East/North/South) 10 41.8 1 5 1
Mill Creek Bay 10 17.33 0 1 1
Oak Ridge 10 7.4 0 2 0
Porum Landing 10 27.63 1 4 2
Project Office East Storage Yard 16 10.25 0 0 0
Damsite East & Fishing Areas 10 14.67 0 3 1
TOTAL 301.96 7 38 12
APPENDIX B
HERBICIDE AND DAM EMBANKMENT ( NTE 4 )
1. FACILITIES TO BE SERVICED. Dam embankments, saddle dikes, levees, public use areas, lake office complex and other project lands. An inventory of mowing areas bid by the mowing is given in Table B. All mowing maps are at the end of Appendix B.
2. FREQUENCIES AND TIMES OF SERVICE.
2.1. Work shall be performed between 7:00 a.m. and 8:00 p.m., from 1 April through 31 October.
2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.
3. DESCRIPTION OF WORK. The contractor shall perform the following work as directed.
3.1. Mowing shall be performed on the Dam Embankment area and shall be mowed to a height of 4 inches. The limits of these areas are shown on the attached maps.
3.2. Trimming.
3.2.1. Every time the embankments is mowed trimming shall be accomplished around piezometers, staff gauges, relief wells, manholes, guard posts, and buildings located on the embankment; along the edge of the embankment riprap; and around guardrail and signposts on both sides of the embankment road.
3.2.2. The contractor may apply approved herbicides in lieu of trimming. The Project Manager must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The Contracting Officer shall furnish the forms.
3.3. Herbicide. Vegetative growth shall be controlled with an approved herbicide in the following areas.
3.3.1 Interior areas and fences of the east yard compound, and project office compound.
3.3.2 Riprap areas of dam wrap-around, south toe-bank and slope road.
3.3.3. All Federal, State and local licensing and application requirements shall be met prior to and during application of herbicides.
4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.
The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the Contracting Officer disagree about the suitability of conditions for mowing operations, the Contracting Officer will determine whether work shall progress or stop. Areas excluded by these conditions will also be excluded in the inspections.
TABLE B
INVENTORY OF WORK ORDER BASED
HERBICIDE AND EMBANKMENT AREAS ( NTE 4 )
HERBICIDE EMBANKMENT
AREAS AREAS
LOCATION ( # of CDM’s) (AC) (AC) Dam Embankment NTE 4 17
Dam North/South Riprap Wrap Arounds, Dam South Toe Bank, Slope Road Riprap & Rock Drain South (including all fences) NTE 4 4
East Yard Compound NTE 4 1
Powerhouse Compound NTE 4 1
Powerhouse Switchyard NTE 4 1
Project Office Compound NTE 4 1
TOTALS 8 17
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
CLAUSES INCORPORATED BY REFERENCE
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
(End of clause)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUNE 2012)
(a) Definitions. As used in this clause–
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
(End of clause)
Section H - Special Contract Requirements
ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS, Jun 2015
The Contractor shall comply with the following requirements marked with an “X”.
XX 1. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .