W9128F22Q0057 Tank Inspection WPN.pdf
PDF 1 MB Posted
- Attached to
- POL Tank Inspection WPN- Wright Patterson AFB Federal contract opportunity
- Solicitation number
- w9128F22Q0057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J- API External Inspection Template.pdf | ||
| Attachment H - Return To Service Letter.pdf | ||
| Attachment K.2 Wright Patterson-Fac 7272 (Tank 272)-FINAL-2017.pdf | ||
| Attachment K.1 WPN-FY20-FAC 7052-Tank 255-FINAL.pdf | ||
| Attachment B - Tank Listing WPN.xlsx | XLSX spreadsheet | |
| Attachment A - General Installation Security Requirements.pdf | ||
| Attachment G - API Internal Inspection Template.pdf | ||
| Attachment E - API Internal Inspection Telecon Briefing Template.pdf | ||
| Attachment D - Program Reporting.xlsx | XLSX spreadsheet | |
| Attachment C - Tank Data Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9128F22Q0057 25-Apr-2022
b. TELEPHONE NUMBER
402-995-2697
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 10 May 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DESIREE M PETERS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 966752 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
COE PROGRAMS MANAGEMENT BRANCH
LAURA STEPHENS
USA, OMAHA CENWO-PM-P
1616 CAPITOL AVE
OMAHA NE 68102-4901
TEL: 402-995-2802 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
541990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF67
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9128F22Q0057
Section SF 1449 - CONTINUATION SHEET
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 300 dys. ADC 1 COE PROGRAMS MANAGEMENT
BRANCH
LAURA STEPHENS
USA, OMAHA CENWO-PM-P
1616 CAPITOL AVE
OMAHA NE 68102-4901
402-995-2802 FOB: Destination
966752
0002 300 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0003 300 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0004 300 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0005 300 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0006 300 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job API INT Tank Insp FAC 7052 Local ID 255
FFP
All work to conduct Kick-Off Meeting, complete API Internal tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
PSC CD: H391
NET AMT
0002 1 Job API INT Tank Inspect FAC 249
FFP
All work to conduct Kick-Off Meeting, complete API Internal tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
0003 1 Job Wiper Seal FAC 249
FFP
All work to replace Wiper Seal.
0004 1 Job API Tank INT Inspect FAC 252
FFP
All work to conduct Kick-Off Meeting, complete API Internal tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
0005 1 Job Wiper Seal FAC 252
FFP
All work to replace Wiper Seal.
0006 1 Job API EXT Tank Insp FAC 7272 Local ID 272
FFP
All work to conduct Kick-Off Meeting, complete API External tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
PWS
SP-POL-CMP-INSPECT-PWS-PO22
WRIGHT PATTERSON AFB, OH
Part 1 General Information
1. GENERAL:
1.1. Scope: This is a non-personnel services contract to perform inspections on
Department of Defense fuel tanks. This service entails removal, disposal, and transfer of remaining fuel, tank cleaning, replacing wiper seals, and providing an above-ground storage tank (AST) Inspection on tank(s) listed in Attachment B. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2. Background: See attachment K for previous inspection report(s).
1.3. Objectives: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the fuel removal, transfer or disposal of remaining fuel, clean the tank, wiper seal replacement, and perform an AST Internal and External inspection on the tank(s) as applicable at the location and tanks specified in attachment B as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.4. Period of Performance: The period of performance shall be for 300 calendar days starting at the date of contract award. Earlier completion of required services is encouraged and acceptable. Internal Tank Inspections must be phased, meaning only one tank can be taken out of service at a time. Once that inspection is completed and the tank is brought back into service, the next internal tank inspection can occur.
1.5. General Information
1.5.1. Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.2. Recognized Holidays:
New Year’s Day Martin Luther King Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Christmas
1.5.3. Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1630 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Other than normal duty hours must be coordinated with the KO or his/her designated representative. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.
1.5.4. Place of Performance: The work to be performed under this contract will be performed at the installation and facilities identified in Attachment B.
1.5.5. Type of Contract: The government will award a Firm Fixed Price Contract
1.5.6. Security Requirements: Reference Attachment A – General Installation Security Requirements
1.5.7. Site Access: Contractor shall coordinate with Installation personnel for access to the site. Points of contact for the installation will be provided upon award.
1.5.8. Meetings/Kick-Off Meetings: The Contractor shall coordinate with USACE
PM and conduct a kickoff meeting prior to field activities. This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed, and further coordination and scheduling accomplished at this meeting.
1.5.8.1. The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back into service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether or not to place this tank back into service. The Contractor can use Attachment E - API INTERNAL INSPECTION TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both External and Internal Inspection, and State regulated inspection intervals, if applicable. Also, when listing the findings, they shall be categorized as either “Mandatory”, “Recommended”. Coordinate with POC’s from Service Control Point (SCP), DLA, and USACE. Individuals to be identified after project award.
1.5.9. Contracting Officer Representative (COR): The (COR) will be identified by separate letter.
1.5.9.1. The COR is authorized to perform the following functions:
assure that the Contractor performs the technical requirements of the contract perform inspections necessary in connection with contract performance maintain written and oral communications with the Contractor concerning technical aspects of the contract issue written interpretations of technical requirements, including Government drawings, designs, specification monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies assist in coordinating availability of government furnished property
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.5.10. Key Personnel: Certified API 653 Inspector and Project Manager.
1.5.11. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.
The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as they deem necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.5.12. Suitability For Service: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs:
Use a "first, do no harm" approach to classifying tank repairs.
Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer.
Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection.
Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile).
Apply repair determination to individual indications. Do not average across an entire plate or course.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. MANDATORY REPAIR. Action necessary to preserve or restore the structural and hydraulic integrity of the tank or piping, or to mitigate a safety hazard.
Includes any condition which has or may breach the hydraulic or structural integrity of the tank prior to the next integrity inspection.
2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of
Government property.
2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. QUALITY ASSURANCE SURVEILANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. RECOMMENDED REPAIR. Action intended to extend the service life of the tank or piping and to address conditions that currently, or within the next service interval, will not have an adverse effect on tank operability or integrity.
Applicability is limited to exclude soft or elastomeric parts for any pressure containing system.
2.1.13. SUBCONTRACTOR. One that enters into a contract with a prime contractor.
The Government does not have privity of contract with the subcontractor.
2.1.14. TANK INSPECTION. A multi-disciplinary engineering assessment of al petroleum, oil, and lubricant storage tank systems within or connected to the tank hydraulic boundary. Systems include nozzles, appurtenances and conveyance systems such as piping, stilling well, valve, flow control, cathodic protection, overfill protection, spill prevention, containment, leak detection, fire suppression, gauging, ventilation, lighting, and other electrical systems.
Inspection includes a review of cathodic protection reports and relevant as-built records when available. Unless stated otherwise, the limits are the boundary of secondary containment.
2.1.15. TANK INSPECTOR. An individual certified as a fuel storage tank inspector.
The recognized certification is API Std 653.
2.1.16. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.17. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement ANG Army National Guard AR Army Regulation AST Aboveground Storage Tank
API American Petroleum Institute ATG Automatic Tank Gauging AWWA American Water Works Association CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DAF Department of the Air Force DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPA Environmental Protection Agency FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAP International Airport KO Contracting Officer MOGAS Motor Gasoline NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RTO Returned to Operator STI Steel Tank Institute SCP Service Control Point TE Technical Exhibit UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND
SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: No Government furnished items or services are required.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.
4.2.1. Precision Equipment: Contractor is responsible to ensure all equipment to be used is certified and calibrated to the parameters and tolerances of the required equipment.
4.2.2. Gaskets: Composition ring, one piece factory cut, compliant with ASME
B16.21, Buna-N. Gaskets must be composed of either graphite or synthetic fibers in a nitrile binder and must be resistant to the effects of aviation hydrocarbon fuels and manufactured of fire-resistant materials. Use full-faced gaskets for flat-face flanged joints. Buna-N material must conform to SAE
AMS3275.
4.2.3. Flange Bolts, Nuts, and Washers: Bolts for manway covers must conform to
ASME B18.2.1. Bolts must be of sufficient length to obtain full bearing on the nuts and must project no more than three full threads beyond the nuts with the bolts tightened to the required torque. Bolts must be regular hexagonal bolts conforming to ASME B18.2.1 with material conforming to ASTM A193/A193M, Class 2, Grade B8. Bolts must be threaded in accordance with ASME B1.1, Class 2A fit, Coarse Thread Series, for sizes one inch and smaller and Eight-Pitch Thread Series for sizes larger than one inch. Use stainless steel washers dimensioned in accordance with ASTM F436 flat circular and fabricated from the same grade of stainless steel as the bolt.
4.2.4. Periphery Double Wiper Seal and Penetration Seals: Periphery seals must be flexible wiper squeegee and made of closed cell cast urethane. The periphery seal must fit the space between the tank shell and the outer edge of the floating pan with two flexible seals, a primary and a secondary. The seals, primary and secondary as a unit, must accommodate a deviation between the path of the floating pan relative to the tank shell of an additional 100 mm 4 inches of compression and an additional extension of 50 mm 2 inches from its normal compressed position at any fluid level. The primary seal must be above the liquid level. Foam filled coated-fabric seals must not be accepted. The secondary seal must be above the primary seal. Seals must be capable of being replaced during tank operations, be durable in the tank's environment, be abrasion resistant, and not discolor or contaminate the liquid stored in the tank. Seals must be manufactured in the United States and must be provided in minimum continuous lengths of 8.54 meter 28 feet with no factory splices. Seals must be compatible with avgas, fuel oil, gasoline/ethanol, gasoline/MTBE 80/20, gasoline (unleaded), aviation turbine fuels, kerosene, and sea water. Material must be compliant with UFGS 33 56 21.17.
4.3. Project Inspection Management Plan (PMP): As part of the initial PMP, the
Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests.
4.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP): The
Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort. Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.
4.4.1. The Accident Prevention Plan (APP) is required by FAR clause 52.236-13.
The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385-1-1. Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.
Provide additional monitoring for toxic (petroleum) vapors in addition to normal air monitoring requirements.
4.4.2. Abbreviated Accident Prevention Plans may be developed and submitted per
Form A-01 Abbreviated Accident Prevention Plan Checklist Page A-13 of the EM 385-1-1. This may be submitted in order to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.
PART 5
SPECIFIC TASKS
5. Specific Tasks: Per each tank as identified in attachment B
5.1. Basic Services.
5.1.1. Perform a Tel-con kick-off meeting either prior to mobilization or the morning of the commencement of work on-site.
5.1.2. Assist the installation in transferring remaining fuel. Installation will drain tanks down to the stripper line. Tank 255 will require assistance to transfer remaining fuel, approximately 1,500 gallons, between tanks. Transfer will require a pump and hose system through the manway. Dispose of fuel/sludge or residual product not to exceed 500 gallons per tank. The contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Tank cleaning shall be done in accordance with UFGS 33 01 50.55.
5.1.3. The tank Inspection shall be in conformance with applicable industry standards API 653, API RP 575, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local and service requirements. Scan 100 percent of the tank bottom, as interior appurtenances allow, for indications such as metal loss, pits, cracks, gouges, and general corrosion. Distinguish between product and backside indications. Measure metal thickness with an ultrasonic method. Procedures must be compliant with ASME BPVC SEC V.
Record measurements, exclusive of coating, for all tank bottom plates.
Provide UT thickness measurement on no less than five locations per bottom plate and at indications from the screening technologies determined to be relevant. Mark relevant indications on tank surfaces in a neat and professional manner adjacent to the indication. Collect data to be used in the assessment of corrosion growth, structural integrity, brittle fracture, and hydraulic integrity. Complete the API Std 653 checklist and provide them with the DRAFT and FINAL reports. Utilize UFC 3-460-01 Table 8-1 and indicate appurtenances that are not present. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
5.1.4. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency. Visually assess the liner integrity and impermeability where applicable. Containment drain system shall be tested as follows.
5.1.5. Drain Line and Release Valve. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. Test in accordance with applicable requirements of AWWA C600 for hydrostatic testing. Ensure the release valve is closed and pressurize the end of the pipe within the containment basin sump. Test for leakage by filling the pipe with water and pressurizing to 10 psi using a suitable pump connected to the pipeline. The test pressure shall not vary by more than ±1 psi for the duration of the test. Hold this pressure for not less than 2 hours. If the system does not hold pressure, check the outfall point to see if water is bypassing the valve. Test pressure shall be maintained during the test by adding makeup water through the pressure test pump into the pipeline. Accurately note the amount of makeup water required to maintain pressure during the test.
5.1.6. Containment Drain Inlet. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump. Test for leakage by filling the inlet with water to a level at least 1-2 inches above the top of the inlet structure. The inlet shall hold this water for not less than 2 hours with no measurable change in the water level.
5.1.7. The existing wiper seal (foam log, double wiper etc.) shall be removed and completely replaced with a new double wiper seal in accordance with UFGS 33 56 21.17 and the IFR manufacturer's recommendations; penetration seals in the floating pan will also need replaced.
5.1.8. Coverage of the UT scan shall include 5 points per shell plate on the first shell course. Spot UT scans shall be made once every foot along the circumference of the tank shell within the critical zone and along the tank chime as accessible. 5 points per shell plate should also be taken along the spiral staircase for each shell course as accessible. Provide UT scans of tank shell nozzles on the first shell course and their respective reinforcements plates as applicable. Include all findings in the inspection report.
5.1.9. Upon completion of the Internal inspection the contractor shall provide a legible tank stencil or decal, consisting of black letters at least 1” in height, stating the date cleaned and inspected, the contractor’s name and the name of the contractor’s personnel supervising the work. Remove any existing stencils displaying previous inspection information. New information shall be provided in the following format:
Date Cleaned and Inspected: Day-Month-Year ABC Contracting Supervisor: John Doe
5.1.10. Provide Tel-con out briefing prior to closing up the tank.
5.1.11. When the tank is ready to be closed and RTO, the Contractor is responsible to provide new stainless-steel bolts and manway gasket and ensure there are no leaks at the manway by filling the tank to at least the first shell course.
5.1.12. Provide photographic documentation of the following: PLC make and model, Input/Output Alarm Modules including directories, Level Alarm Panel, Annunciator Panel, and any As-Builts that are in the alarm panel. Coordinate with the installation as needed to obtain this information.
5.1.13. Perform an external AST inspection to include visual inspection of the containment area. The tank Inspection shall be in conformance with applicable industry standards API 653, API RP 575, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local and service. Complete the API Std 653 checklist and provide them with the DRAFT and FINAL reports. Utilize UFC 3-460-01 Table 8-1 and indicate appurtenances that are not present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.
5.1.14. Provide DRAFT and FINAL inspection reports per the attached templates.
The report(s) must include a record of NDE findings with drawings depicting plate layout and thickness measurement locations, if applicable. Incorporate engineering analysis, suitability for service analysis, corrosion rate determinations, and remaining service life calculations. Provide separate report for each tank inspected. Specify the due date for the next inspection.
Include the API Std 653 inspector of record certificate number and signature.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
Steel Tank Institute (STI) SP001 Standard for the Inspection of Aboveground Storage Tanks
American Petroleum Institute (API) 653 Standard for the Tank Inspection, Repair, Alteration, and
Reconstruction
650 Welded Tanks for Oil Storage RP 575 Inspection Practices for Atmospheric and Low-pressure Storage
Tanks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 Flammable and Combustible Liquids Code NFPA 70 National Electrical Code (NEC) NFPA 326 Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Petroleum Fuel Systems Maintenance
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 112 EPA: Oil Pollution Prevention
PART 7
ATTACHMENT
7. Attachment/Technical Exhibit List:
7.1. Attachment A – General Installation Security Requirements
7.2. Attachment B – Fuel Storage Tank List
7.3. Attachment C – Fuel Storage Tank Excel Document
7.4. Attachment D – Monthly Contractors Progress, Management and Status Report
7.5. Attachment E – API Internal Inspection Telecon Briefing Template
7.6. Attachment F – API Internal Inspection Report Example
7.7. Attachment G – API Internal Inspection Report Template
7.8. Attachment H – Return to Service Letter
7.9. Attachment I – No Used
7.10. Attachment J – API External Template
7.11. Attachment K – Previous Inspection Reports
7.11.1. Attachment K.1 – Previous Inspection Report for tank 7052 / 255
7.11.2. Attachment K.2 – Previous Inspection Report for tank 7272 / 272
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
API Internal:
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
Para. 1.6.8.1.
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tel-con prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
Clean and provide API 653 Internal Inspection and visual inspection of the containment area
Para. 5.1.3 & 5.1.4.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
PRS # 3.
Provide an API 653 Internal Inspection reports
Para 5.1.14
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
The contractor is to provide a DRAFT and FINAL report for MCX review and comment
PRS #4
Wiper Seal Replacement Para. 5.1.7.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
PRS # 5.
Out-Brief Meeting with USACE and Stakeholders
Para 5.1.10.
State, local, and federal requirements regulating fuel storage tanks
100% Contractor will coordinate a Tel-con and distribute the report of findings 24 hrs prior to the scheduled conference
PRS #6
Fuel transfer and disposal Para. 5.1.2
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
API External:
DELIVERABLES SCHEDULE
DELIVERABLE SCOPE OF
WORK
PARAGRAPH
DUE DATE
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Draft)
4.3 & 4.4 15 days after award
Project Inspection Management Plan/Work Plan, Accident Prevention Plan & Health and Safety Plan (Final)
4.3 & 4.4 5 days after receipt of comments
Inspection and Evaluation Report – (Draft) 5.1.15
28 days after Field Inspection
Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)
5.1.15
7 days after receipt of comments
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
Para. 1.6.8.2
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tel-con prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
On Site Inspection
Para. 5.1.13.
State, local and federal requirements regulating fuel storage tanks.
100% Random Inspection.
PRS # 3.
Provide an API External Inspection with UT testing (If required ATT B).
Para. 5.1.13
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
PRS # 4.
Provide an API 653 Internal Inspection reports
Para 5.1.14.
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
The contractor is to provide a DRAFT and FINAL report for MCX review and comment
WD 2015-5075 REV21 15MAR2022
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5075 Daniel W. Simms Division of | Revision No.: 21 Director Wage Determinations| Date Of Last Revision: 03/15/2022
Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
|If the contract is entered into on or |With certain exceptions Executive Order | |after January 30 2022 or the |14026 applies to the contract. | |contract is renewed or extended (e.g. |The contractor must pay all covered workers | |an option is exercised) on or after |at least $15.00 per hour (or the applicable | |January 30 2022: |wage rate listed on this wage determination| | |if it is higher) for all hours spent | | |performing on the contract in 2022. | |If the contract was awarded on or |With certain exceptions Executive Order | |between January 1 2015 and January 29|13658 applies to the contract. | |2022 and the contract is not renewed |The contractor must pay all covered workers | |or extended on or after January 30 |at least $11.25 per hour (or the applicable | |2022: |wage rate listed on this wage determination| | |if it is higher) for all hours spent | | |performing on the contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
States: Illinois Missouri
Area: Illinois Counties of Bond Calhoun Clinton Jersey Madison Monroe St Clair Missouri Counties of Franklin Jefferson Lincoln St Charles St Louis St Louis City Warren
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.70 01012 - Accounting Clerk II 17.64 01013 - Accounting Clerk III 19.72 01020 - Administrative Assistant 28.49 01035 - Court Reporter 30.70 01041 - Customer Service Representative I 14.37***
01042 - Customer Service Representative II 15.90 01043 - Customer Service Representative III 17.61 01051 - Data Entry Operator I 14.95*** 01052 - Data Entry Operator II 16.31 01060 - Dispatcher Motor Vehicle 20.43 01070 - Document Preparation Clerk 16.85 01090 - Duplicating Machine Operator 16.85 01111 - General Clerk I 14.11*** 01112 - General Clerk II 15.40 01113 - General Clerk III 17.30 01120 - Housing Referral Assistant 20.96 01141 - Messenger Courier 13.96*** 01191 - Order Clerk I 16.37 01192 - Order Clerk II 17.86 01261 - Personnel Assistant (Employment) I 17.23 01262 - Personnel Assistant (Employment) II 19.26 01263 - Personnel Assistant (Employment) III 21.47 01270 - Production Control Clerk 25.31 01290 - Rental Clerk 16.06 01300 - Scheduler Maintenance 16.49 01311 - Secretary I 16.49 01312 - Secretary II 18.44 01313 - Secretary III 20.96 01320 - Service Order Dispatcher 18.27 01410 - Supply Technician 28.49 01420 - Survey Worker 19.05 01460 - Switchboard Operator/Receptionist 15.10 01531 - Travel Clerk I 15.83 01532 - Travel Clerk II 17.05 01533 - Travel Clerk III 18.19 01611 - Word Processor I 15.29 01612 - Word Processor II 17.18 01613 - Word Processor III 19.21 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer Fiberglass 22.82 05010 - Automotive Electrician 22.70 05040 - Automotive Glass Installer 21.62 05070 - Automotive Worker 21.62 05110 - Mobile Equipment Servicer 18.65 05130 - Motor Equipment Metal Mechanic 23.70 05160 - Motor Equipment Metal Worker 21.62 05190 - Motor Vehicle Mechanic 23.70 05220 - Motor Vehicle Mechanic Helper 17.01 05250 - Motor Vehicle Upholstery Worker 20.14 05280 - Motor Vehicle Wrecker 21.62 05310 - Painter Automotive 22.70 05340 - Radiator Repair Specialist 21.62 05370 - Tire Repairer 16.18 05400 - Transmission Repair Specialist 23.70 07000 - Food Preparation And Service Occupations 07010 - Baker 13.31*** 07041 - Cook I 12.37*** 07042 - Cook II 14.34*** 07070 - Dishwasher 11.20*** 07130 - Food Service Worker 10.75*** 07210 - Meat Cutter 17.31 07260 - Waiter/Waitress 9.87*** 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 21.94 09040 - Furniture Handler 14.00*** 09080 - Furniture Refinisher 20.56 09090 - Furniture Refinisher Helper 16.55
09110 - Furniture Repairer Minor 18.84 09130 - Upholsterer 22.61 11000 - General Services And Support Occupations 11030 - Cleaner Vehicles 12.28*** 11060 - Elevator Operator 13.82*** 11090 - Gardener 20.51 11122 - Housekeeping Aide 13.82*** 11150 - Janitor 13.82*** 11210 - Laborer Grounds Maintenance 15.07 11240 - Maid or Houseman 11.26*** 11260 - Pruner 13.24*** 11270 - Tractor Operator 18.70 11330 - Trail Maintenance Worker 15.07 11360 - Window Cleaner 15.73 12000 - Health Occupations 12010 - Ambulance Driver 20.10 12011 - Breath Alcohol Technician 20.50 12012 - Certified Occupational Therapist Assistant 27.33 12015 - Certified Physical Therapist Assistant 25.51 12020 - Dental Assistant 19.43 12025 - Dental Hygienist 32.78 12030 - EKG Technician 25.17 12035 - Electroneurodiagnostic Technologist 25.17 12040 - Emergency Medical Technician 20.10 12071 - Licensed Practical Nurse I 18.33 12072 - Licensed Practical Nurse II 20.50 12073 - Licensed Practical Nurse III 22.85 12100 - Medical Assistant 16.63 12130 - Medical Laboratory Technician 23.04 12160 - Medical Record Clerk 20.02 12190 - Medical Record Technician 22.40 12195 - Medical Transcriptionist 19.95 12210 - Nuclear Medicine Technologist 36.47 12221 - Nursing Assistant I 11.38*** 12222 - Nursing Assistant II 12.80*** 12223 - Nursing Assistant III 13.96*** 12224 - Nursing Assistant IV 15.68 12235 - Optical Dispenser 16.07 12236 - Optical Technician 15.99 12250 - Pharmacy Technician 16.87 12280 - Phlebotomist 16.20 12305 - Radiologic Technologist 26.38 12311 - Registered Nurse I 26.36 12312 - Registered Nurse II 30.84 12313 - Registered Nurse II Specialist 30.84 12314 - Registered Nurse III 37.31 12315 - Registered Nurse III Anesthetist 37.31 12316 - Registered Nurse IV 44.73 12317 - Scheduler (Drug and Alcohol Testing) 25.40 12320 - Substance Abuse Treatment Counselor 22.04 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 21.90 13012 - Exhibits Specialist II 27.12 13013 - Exhibits Specialist III 33.18 13041 - Illustrator I 20.80 13042 - Illustrator II 25.56 13043 - Illustrator III 30.43 13047 - Librarian 30.04 13050 - Library Aide/Clerk 12.34*** 13054 - Library Information Technology Systems 27.12 Administrator 13058 - Library Technician 18.87
13061 - Media Specialist I 19.58 13062 - Media Specialist II 21.90 13063 - Media Specialist III 24.40 13071 - Photographer I 16.71 13072 - Photographer II 18.69 13073 - Photographer III 23.16 13074 - Photographer IV 27.99 13075 - Photographer V 33.88 13090 - Technical Order Library Clerk 15.84 13110 - Video Teleconference Technician 22.13 14000 - Information Technology Occupations 14041 - Computer Operator I 17.10 14042 - Computer Operator II 19.12 14043 - Computer Operator III 21.31 14044 - Computer Operator IV 23.68 14045 - Computer Operator V 26.23 14071 - Computer Programmer I (see 1) 24.21 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 18.26 14160 - Personal Computer Support Technician 26.16 14170 - System Support Specialist 31.59 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 34.92 15020 - Aircrew Training Devices Instructor (Rated) 42.25 15030 - Air Crew Training Devices Instructor (Pilot) 50.64 15050 - Computer Based Training Specialist / Instructor 34.92 15060 - Educational Technologist 33.72 15070 - Flight Instructor (Pilot) 50.64 15080 - Graphic Artist 26.06 15085 - Maintenance Test Pilot Fixed Jet/Prop 43.64 15086 - Maintenance Test Pilot Rotary Wing 43.64 15088 - Non-Maintenance Test/Co-Pilot 43.64 15090 - Technical Instructor 25.46 15095 - Technical Instructor/Course Developer 31.15 15110 - Test Proctor 20.56 15120 - Tutor 20.56 16000 - Laundry Dry-Cleaning Pressing And Related Occupations 16010 - Assembler 12.03*** 16030 - Counter Attendant 12.03*** 16040 - Dry Cleaner 13.74*** 16070 - Finisher Flatwork Machine 12.03*** 16090 - Presser Hand 12.03*** 16110 - Presser Machine Drycleaning 12.03*** 16130 - Presser Machine Shirts 12.03*** 16160 - Presser Machine Wearing Apparel Laundry 12.03*** 16190 - Sewing Machine Operator 14.31*** 16220 - Tailor 14.88*** 16250 - Washer Machine 12.60*** 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 26.27 19040 - Tool And Die Maker 30.63 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 19.14 21030 - Material Coordinator 25.31 21040 - Material Expediter 25.31 21050 - Material Handling Laborer 19.18 21071 - Order Filler 14.20***
21080 - Production Line Worker (Food Processing) 19.14 21110 - Shipping Packer 17.03 21130 - Shipping/Receiving Clerk 17.03 21140 - Store Worker I 13.25*** 21150 - Stock Clerk 19.59 21210 - Tools And Parts Attendant 19.14 21410 - Warehouse Specialist 19.14 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 36.26 23019 - Aircraft Logs and Records Technician 29.69 23021 - Aircraft Mechanic I 34.93 23022 - Aircraft Mechanic II 36.26 23023 - Aircraft Mechanic III 37.64 23040 - Aircraft Mechanic Helper 25.07 23050 - Aircraft Painter 33.46 23060 - Aircraft Servicer 29.69 23070 - Aircraft Survival Flight Equipment Technician 33.46 23080 - Aircraft Worker 31.87 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 31.87 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 34.93
II
23110 - Appliance Mechanic 25.07 23120 - Bicycle Repairer 24.57 23125 - Cable Splicer 39.21 23130 - Carpenter Maintenance 31.16 23140 - Carpet Layer 31.92 23160 - Electrician Maintenance 35.31 23181 - Electronics Technician Maintenance I 30.60 23182 - Electronics Technician Maintenance II 32.13 23183 - Electronics Technician Maintenance III 33.54 23260 - Fabric Worker 26.79 23290 - Fire Alarm System Mechanic 31.65 23310 - Fire Extinguisher Repairer 24.57 23311 - Fuel Distribution System Mechanic 33.03 23312 - Fuel Distribution System Operator 26.22 23370 - General Maintenance Worker 20.77 23380 - Ground Support Equipment Mechanic 34.93 23381 - Ground Support Equipment Servicer 29.69 23382 - Ground Support Equipment Worker 31.87 23391 - Gunsmith I 24.57 23392 - Gunsmith II 28.48 23393 - Gunsmith III 31.22 23410 - Heating Ventilation And Air-Conditioning 26.15 Mechanic 23411 - Heating Ventilation And Air Contidioning 27.15 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 29.42 23440 - Heavy Equipment Operator 34.14 23460 - Instrument Mechanic 31.22 23465 - Laboratory/Shelter Mechanic 29.91 23470 - Laborer 17.17 23510 - Locksmith 22.23 23530 - Machinery Maintenance Mechanic 28.53 23550 - Machinist Maintenance 24.17 23580 - Maintenance Trades Helper 18.37 23591 - Metrology Technician I 31.22 23592 - Metrology Technician II 32.41 23593 - Metrology Technician III 33.65 23640 - Millwright 35.88 23710 - Office Appliance Repairer 22.23 23760 - Painter Maintenance 32.82
23790 - Pipefitter Maintenance 39.52 23810 - Plumber Maintenance 37.86 23820 - Pneudraulic Systems Mechanic 31.22 23850 - Rigger 31.22 23870 - Scale Mechanic 28.48 23890 - Sheet-Metal Worker Maintenance 36.06 23910 - Small Engine Mechanic 21.36 23931 - Telecommunications Mechanic I 29.85 23932 - Telecommunications Mechanic II 30.99 23950 - Telephone Lineman 33.65 23960 - Welder Combination Maintenance 23.21 23965 - Well Driller 25.62 23970 - Woodcraft Worker 31.22 23980 - Woodworker 24.57 24000 - Personal Needs Occupations 24550 - Case Manager 15.17 24570 - Child Care Attendant 11.91*** 24580 - Child Care Center Clerk 14.84*** 24610 - Chore Aide 11.65*** 24620 - Family Readiness And Support Services 15.17 Coordinator 24630 - Homemaker 15.17 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 34.87 25040 - Sewage Plant Operator 28.20 25070 - Stationary Engineer 34.87 25190 - Ventilation Equipment Tender 25.02 25210 - Water Treatment Plant Operator 28.20 27000 - Protective Service Occupations 27004 - Alarm Monitor 21.29 27007 - Baggage Inspector 15.38 27008 - Corrections Officer 19.37 27010 - Court Security Officer 24.75 27030 - Detection Dog Handler 18.05 27040 - Detention Officer 19.37 27070 - Firefighter 30.14 27101 - Guard I 15.38 27102 - Guard II 18.05 27131 - Police Officer I 28.32 27132 - Police Officer II 31.48 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 14.16*** 28042 - Carnival Equipment Repairer 15.53 28043 - Carnival Worker 10.03*** 28210 - Gate Attendant/Gate Tender 13.67*** 28310 - Lifeguard 11.59*** 28350 - Park Attendant (Aide) 15.28 28510 - Recreation Aide/Health Facility Attendant 11.15*** 28515 - Recreation Specialist 18.93 28630 - Sports Official 12.17*** 28690 - Swimming Pool Operator 18.00 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 27.15 29020 - Hatch Tender 27.15 29030 - Line Handler 27.15 29041 -…
This is the start of the file's text. The full file is on GovTribe.