W9128F22Q0012.pdf
PDF 2 MB Posted
- Attached to
- Garrison Project Vault Pumping Services Federal contract opportunity
- Solicitation number
- W9128F22Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_W9128F22Q00012.pdf | ||
| Septic-Vault Pumping Service Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9128F22Q0012 16-Dec-2021
b. TELEPHONE NUMBER
701-654-7748
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 14 Jan 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
RACHAEL M TAYLOR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 968708 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
COE GARRISON PRJT OFC NTR RSC SEC
ERIC KELSEY
USAED, OMAHACENWO-OD-GA-N
PO BOX 527
RIVERDALE ND 58565
TEL: 701-654-7760 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
562991
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF71
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9128F22Q0012
Section SF 1449 - CONTINUATION SHEET
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
SEPTIC TANK PUMPING SERVICE
US ARMY CORPS OF ENGINEERS
(GARRISON PROJECT/ LAKE SAKAKAWEA)
201 First Street
RIVERDALE, NORTH DAKOTA 58565
1.0 General Information.
1.1 Background. This is a services contract to provide all labor, supervision, equipment, and transportation to provide septic tank pumping service for the Corps of Engineers (Garrison Project/Lake Sakakawea). The Corps of Engineers operates several campgrounds, fish cleaning stations, day use and boat ramp locations. The Corps of Engineers requires vault toilets, fish cleaning stations, host pads, and dump stations to be pumped at these locations in order to provide useable facilities for our customers.
1.2 Scope of Work. This is a non-personal services contract to provide Septic pumping/collection and disposal services at U.S. Army Corps of Engineers, Garrison Project/Lake Sakakawea. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform septic tank pumping for the Corps of Engineers as defined in this Performance Work Statement. The government shall not exercise any supervision or control over the contract service providers performing the services.
Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. This is a fixed priced, performance-based service contract where the government defines and measures desired outcomes, while contractor methods are generally not constrained or directed.
1.3 Period of Performance. The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. Active performance period will be 01 May through 30 September and inactive performance period will be 01 October through 30 April. The Period of Performance reads as follows:
Base Year: 01 May 2022 through 30 April 2023 Option Year 1: 01 May 2023 through 30 April 2024 Option Year 2: 01 May 2024 through 30 April 2025 Option Year 3: 01 May 2025 through 30 April 2026 Option Year 4: 01 May 2026 through 30 April 2027
1.4 Contractor Personnel
1.4.1 The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s own payroll.
1.4.1.1 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO and the COR as a potential threat to health, safety, security, general well-being or operational mission of the facility and its population. List of dispatch personnel shall be made available in writing to the Government at the start of the contract.
1.4.1.2 All contractor personnel shall be fully clothed at all times, including enclosed shoes, while performing these services. Clothing shall be clean and neat in appearance.
1.4.1.3 Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.
1.4.1.4 The contractor shall make sure employees have valid driver license(s) before starting work under this contract and throughout the term of the contract.
1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
1.5 Quality Control
1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to insure that the required work is performed in accordance with the standards contained herein. The contractor shall furnish the above written designation to the Contracting Officer’s Representative (COR) no later than the first day of work. The contractor shall include the name(s), address(s), telephone number(s) and email(s) of the responsible individual(s).
1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.
1.6 Quality Assurance. The government will periodically evaluate the contractor’s performance under this contract using quality assurance procedures developed by the Government in accordance with Typical procedures might include periodic sampling, checklists and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.
1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government shall perform inspections in a manner that will not delay the work.
1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to perform the services in conformity with contract requirements and at no increase in cost. If the contract requirements are not met after a second attempt the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
1.6.2.1 Upon verification of a validated customer complaint or corrective action report, the COR will notify the contractor that they are required to re-perform specific services. Re-performance will take place within one (1) business day of the contractor being notified and the COR will be notified when service has been completed for inspection.
1.6.3 The government may take action, if the contractor fails to perform the services again or to take the necessary action to ensure future performance is in conformity with the contract requirements. The government may (1) by contract, or otherwise, perform the services and charge to the contractor any cost incurred by the government that related to the performance of such service or (2) terminate the contract in whole or in part
1.6.4 The contractor is responsible to replace/repair any damage to government property due to negligence, at his or her own cost. The government may take action, if the contractor fails to replace/repair any damage to government property. The government may (1) by contract, or otherwise, replace/repair damaged government property and charge to the contractor any cost incurred by the government to replace/repair any damage.
1.7 Hours of Operation. The contractor is responsible for conducting business, between the hours of 8:00 a.m. and 7:00 p.m. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Should a scheduled pick up time fall during these circumstances the contractor will provide services the following business day. The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within this
PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.8 Pre-Work Meeting. Prior to commencing any activities, the contractor shall arrange a Pre-work Meeting with the COR. The Meeting shall discuss the work requirements, scheduling, submittal process, review of the Activity Hazard Analysis (AHA), and Abbreviated Accident Prevention Plan (AAP). At least one (1) week prior to commencing work, the Contractor shall coordinate their proposed work schedule with the COR.
1.9. Submittals. Prior to commencement of services, the Contractor shall submit the following documents to the COR for review and approval:
a. Activity Hazard Analysis (AHA);
b. Abbreviated Accident Prevention Plan (APP)
c. List of state-approved sanitary landfills or disposal locations used for the contract.
d. Proof of insurance for contractors
1.10 Standards and Regulations. The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:
a. Code of Federal Regulations (CFR), Title 36, Chapter III, Part 327, Rules and Regulations Governing Public Use on Corps of Engineers Water Resource Development Projects EP 1165-2-316 (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerPamphlets/EP_1165-2- 316.pdf?ver=2013-08-22-104526-670)
b. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November 2014; http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf
c. Occupational Safety and Health Standards (29 CFR 1910);
1.10.1 Activity Hazard Analysis (AHA). The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2.
Note: Contractors and other individual employer’s typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing.
1.10.2 Abbreviated Accident Prevention Plan (APP). EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite.
1.11 Physical Security
1.11.1 The contractor shall be responsible for safeguarding all government facilities, property, and materials provided for contractor use. The contractor shall secure at all times all government facilities, property, and materials. Specific security conditions may change based on threats to national defense and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times, as applicable.
1.11.2 Key Control. The contractor shall ensure all keys issued by the government are not lost, stolen, duplicated, or used by unauthorized persons.
1.11.2.1 The Contractor shall immediately report to the COR any occurrences of lost or stolen keys.
1.11.2.2 In the event keys, other than master keys are lost or stolen, the contractor may be required, upon written direction of the COR, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. If a master key is lost or stolen, the government may need to replace all locks and keys for that system. The government will deduct the total cost to replace the locks and keys from the contractor’s monthly invoice.
1.11.2.3 The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall not facilitate access of secured areas to persons other than contractor personnel or subcontractors engaged in performance of contract work requirements.
1.12 Antiterrorism/Operation Security Requirements
1.12.1 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.12.1.1 For contractors who do not require Common Access Card (CAC), but require access to a DoD facility or installation. Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.12.2 Pre-screen candidates using E-Verify Program. The Contractor must pre‐screen candidates using the E‐ verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements.
The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than three (3) business days after the initial contract award.
1.13 Payment
1.13.1 The government will make payment monthly, after the government has inspected and accepted the services, and the government has reviewed, approved, and processed the contractor’s invoice. The contractor shall submit the invoice to the COR and/or any other person that has been designated in the contract to receive the invoice.
1.13.2 The contractor must provide the contractor’s name, address, contract number, period of services completed (i.e., for the month of January or for the period of performance of January 1 through February 23), CLIN number and specific quantities of work performed (i.e., 1 Month, 40 days, 100 acres, etc.), and total requested, for an invoice to be considered proper. The contractor shall submit the invoice by the fifth (5th) of the month for services completed the previous month or submit the invoice upon completion of all services, in accordance with the period of performance stated in the CLIN.
2.0 Definitions. The following definitions and descriptions apply wherever the word(s) or phrase(s) is/are stated in this PWS:
Acceptable Level of Performance (ALP): The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot considered satisfactory on the average. The allowable leeway or variance from a standard before the government will reject the specific service.
Contracting Officer’s Representative (COR): means an individual designated an authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
Performance-Based Contract (FAR 2.101): Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable level of performance (ALP) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance. Document contains sampling/evaluation guides, checklists, and the performance requirements summary (PRS).
3.0 Government Furnished Items and Services
3.1 Services. N/A
3.2 Facilities. The Government will provide the location for services to be provided. Contractor may utilize sanitary lagoons located at lat. 47.484627°, long. -101.410840° for the purpose of disposing of the contents of the Fish Cleaning Station tanks, or other sanitary waste collected on Corps of Engineers property vaults under this contract provided it does not contain trash, rubbish, or debris.
3.3 Utilities. N/A
3.4 Equipment. N/A
3.5 Materials. N/A
4.0 Contractor Furnished Items and Responsibilities
4.1 General. The Contractor shall furnish all supplies, equipment, tools and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials. The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements under this PWS to include but not limited to parts for repair of equipment.
4.3 Equipment. The Contractor shall furnish all equipment to meet the requirements under this PWS. Equipment used by the contractor shall be in compliance with OSHA, EPA and other DOD Directives.
5.0 Specific Tasks
5.1 Basic Services. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform septic tank pumping services at various locations as defined in this Performance Work Statement (PWS). The work shall be performed at the Government owned facilities and the contractor shall guarantee removal (i.e. pumping, back flushing, and agitating) of all liquid, sludge, solids, cans, bottles, bags, or other foreign materials from all septic tanks.
5.2 Pumping Requirements.
5.2.1 Vault Toilets: A total of twenty (20) Vault Toilets are a combination of three (3)-Single 500 gal. max tank, ten (10)-Deluxe Single 1200 gal. max tank, seven (7)-Double 1250 gal. max tank. All vault toilet septic holding tanks will be pumped a minimum of once per season or as scheduled. Tank size and vault design may change as vaults are replaced through the life of this contract period.
Pumped September 30th: three (3) vaults Downstream Campground, two (2) vaults East Totten Trail Campground, three (3) vaults Douglas Creek Campground, four (4) vaults Wolf Creek Campground, one (1) vault Deepwater, one (1) vault Spillway Pond, and one (1) vault West Tailrace.
Pumped July 5th and September 30th: one (1) vault Government Bay Ramp, one (1) vault Missouri River Ramp, one (1) vault Wolf Creek Boat Ramp, one (1) vault East Totten Trail Boat Ramp, and one (1) vault Spillway Overlook.
5.2.2 Fish Cleaning Stations: A total of three (3) fish cleaning stations consisting of two (2)1450 gal. tanks, and one (1) fish cleaning station consisting of two (2) 2000 gal. tanks at each location.
Pumped June 5th, June 30th, July 15th, July 31st, August 15th, August 30th, and September 30th:
Missouri River Ramp (Downstream Boat Ramp), Government Bay, East Totten Trail, and Wolf Creek.
Two (2) optional pumping dates: Available on an as needed basis.
5.2.3 East Totten Trail Dump Station: A total of two (2) 1250 gal. tanks shall be pumped on September 30th.
5.2.4 East Totten Trail Host Pad Holding Tank: A single (1) 1450 gal. tank
Pumped on June 5th, July 15th, August 15th, and September 30th.
Two (2) optional pumping dates: Available on an as needed basis.
5.2.5 Downstream Campground Lift Station “basket”: The lift station “basket” or debris/solid catch cage near the entrance of Loop 1 at the Downstream Campground shall be cleaned/pumped on September 30th.
5.2.6 Spillway Pond Comfort Station Septic Tank: A single (1) 1450 gal. tank
Pumped on September 30th.
5.3 Disposal: The contractor shall transport and dispose of all waste collected during the performance of services to a EPA approved sanitary disposal point or our government furnished location under section 3 of this PWS.
6.0 Performance Requirements Summary. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Performance Standard Performance Threshold
Method of Assessment
PRS #1
Septic Tank Pumping Service
Contractor shall be required to pump the entire contents of each tank from the tank in accordance with the PWS.
Zero Deviation from this requirement
Periodic Sample, Validated Customer Complaint, Random Inspection
PRS #2
Disposal
Disposal of contents to an approved location accordance with the PWS.
Zero Deviation from this requirement
Periodic Sample, Validated Customer
7.0 Attachments
Area maps with septic tank locations
QUOTE SHEET
Septic Tank Pumping Service Contract (Base Year 01 May 2022 - 30 September 2023)
Pumping Days
Number of Units
Total Units
Per Unit Quote Amount
Vault Toilet Tanks (500-1250 gal) 1 15 15 X $ = $
Vault Toilet Tanks (500-1250 gal) 2 5 10 X $ = $
Fish Cleaning Stations (1450-2000 gal) 7 8 56 X $ = $
Optional Fish Station (1450-2000 gal) 2 2 4 X $ = $
East Totten Trail Dump Station 1 2 2 X $ = $
Totten Trail Host Pad Holding Tank 4 1 4 X $ = $
Optional Host Pad Holding Tank 2 1 2 X $ = $
Campground Lift Station "basket" 1 1 1 X $ = $
Spillway Pond Comfort Station Tank 1 1 1 X $ = $
Base Year Total Quote = $
(Option I 01 May 2023 - 30 September 2024)
Number of Units
Total Units
Per Unit Quote Amount
Vault Toilet Tanks (500-1250 gal) 1 15 15 X $ = $
Vault Toilet Tanks (500-1250 gal) 2 5 10 X $ = $
Fish Cleaning Stations (1450-2000 gal) 7 8 56 X $ = $
Optional Fish Station (1450-2000 gal) 2 2 4 X $ = $
East Totten Trail Dump Station 1 2 2 X $ = $
Totten Trail Host Pad Holding Tank 4 1 4 X $ = $
Optional Host Pad Holding Tank 2 1 2 X $ = $
Campground Lift Station "basket" 1 1 1 X $ = $
Spillway Pond Comfort
Option Year Total Quote = $
(Option II 01 May 2024 - 30 September 2025)
Number of Units
Total Units
Per Unit Quote Amount
Vault Toilet Tanks (500-1250 gal) 1 15 15 X $ = $
Vault Toilet Tanks (500-1250 gal) 2 5 10 X $ = $
Fish Cleaning Stations (1450-2000 gal) 7 8 56 X $ = $
Optional Fish Station (1450-2000 gal) 2 2 4 X $ = $
East Totten Trail Dump Station 1 2 2 X $ = $
Totten Trail Host Pad Holding Tank 4 1 4 X $ = $
Optional Host Pad Holding Tank 2 1 2 X $ = $
Campground Lift Station "basket" 1 1 1 X $ = $
Spillway Pond Comfort
(Option III 01 May 2025 - 30 September 2026)
Number of Units
Total Units
Per Unit Quote Amount
Vault Toilet Tanks (500-1250 gal) 1 15 15 X $ = $
Vault Toilet Tanks (500-1250 gal) 2 5 10 X $ = $
Fish Cleaning Stations (1450-2000 gal) 7 8 56 X $ = $
Optional Fish Station (1450-2000 gal) 2 2 4 X $ = $
East Totten Trail Dump Station 1 2 2 X $ = $
Totten Trail Host Pad Holding Tank 4 1 4 X $ = $
Optional Host Pad Holding Tank 2 1 2 X $ = $
Campground Lift Station "basket" 1 1 1 X $ = $
Spillway Pond Comfort
(Option IV 01 May 2026 - 30 September 2027)
Number of Units
Total Units
Per Unit Quote Amount
Vault Toilet Tanks (500-1250 gal) 1 15 15 X $ = $
Vault Toilet Tanks (500-1250 gal) 2 5 10 X $ = $
Fish Cleaning Stations (1450-2000 gal) 7 8 56 X $ = $
Optional Fish Station (1450-2000 gal) 2 2 4 X $ = $
East Totten Trail Dump Station 1 2 2 X $ = $
Totten Trail Host Pad Holding Tank 4 1 4 X $ = $
Optional Host Pad Holding Tank 2 1 2 X $ = $
Campground Lift Station "basket" 1 1 1 X $ = $
Spillway Pond Comfort
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
Garrison Project: Vault Pumping Services Contract Number: Will Be Entered Upon Award
Contractor’s Name: Will Be Entered Upon Award (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: Constance Ellard Organization or Agency: US Army Corps of Engineers, Omaha District, Contracting Division Telephone: 402-995-2726 Email: Constance.R.Ellard@usace.army.mil
b. Contract Specialist - The Contract Specialist acts as an acquisition consultant and serves as the liaison between the contractor and the KO.
Assigned Contract Specialist: Rachael Taylor Telephone: 701-654-7717 Email: Rachael.M.Taylor@usace.army.mil
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: Eric Kelsey Telephone: 701-654-7717 Email: Eric.C.Kelsey@usace.army.mil
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. <Communication should occur with them during QASP development. It will help if they review the draft QASP and accept the final version.>
a. Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
b. Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
c. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph 6.0 in the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Objective
Performance Standard Performance Threshold
Method of Assessment
PRS #1
Septic Tank Pumping Service
Contractor shall be required to pump the entire contents of each tank from the tank in accordance with the PWS.
Zero Deviation from this requirement
Periodic Sample, Validated Customer Complaint, Random Inspection
PRS #2
Disposal
Disposal of contents to an approved location accordance with the PWS.
Zero Deviation from this requirement
Periodic Sample, Validated Customer
5. METHODS OF QA SURVEILLANCE.
Periodic Surveillance will exist to monitor performance. The COR shall use this surveillance method listed in the PRS in the administration of this QASP. The periodic surveillance method will be used on PRS#1 and PRS #2.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
6. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY: Performance meets contractual requirements.
UNSATISFACTORY: Performance does not meet contractual requirements.
7. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
VAULT PUMPING SERVICES
FFP
The contractor shall provide all services at the Government owned Downstream Campground, Downstream Boat Ramp, West Tailrace, Spillway Pond, Wolf Creek Campground, Government Bay, East Totten Trail Campground, Douglas Creek Campground, Missouri River Ramp and Deepwater in accordance with the Performance Work Statement (PWS). The active and inactive period of performance is listed in the PWS.
FOB: Destination
PSC CD: S222
NET AMT
0002 1 Job
OPTION VAULT PUMPING SERVICES
FFP
The contractor shall provide all services at the Government owned Downstream Campground, Downstream Boat Ramp, West Tailrace, Spillway Pond, Wolf Creek Campground, Government Bay, East Totten Trail Campground, Douglas Creek Campground, Missouri River Ramp and Deepwater in accordance with the Performance Work Statement (PWS). The active and inactive period of performance is listed in the PWS.
0003 1 Job
OPTION VAULT PUMPING SERVICES
FFP
The contractor shall provide all services at the Government owned Downstream Campground, Downstream Boat Ramp, West Tailrace, Spillway Pond, Wolf Creek Campground, Government Bay, East Totten Trail Campground, Douglas Creek Campground, Missouri River Ramp and Deepwater in accordance with the Performance Work Statement (PWS). The active and inactive period of performance is listed in the PWS.
0004 1 Job
OPTION VAULT PUMPING SERVICES
FFP
The contractor shall provide all services at the Government owned Downstream Campground, Downstream Boat Ramp, West Tailrace, Spillway Pond, Wolf Creek Campground, Government Bay, East Totten Trail Campground, Douglas Creek Campground, Missouri River Ramp and Deepwater in accordance with the Performance Work Statement (PWS). The active and inactive period of performance is listed in the PWS.
0005 1 Job
OPTION VAULT PUMPING SERVICES
FFP
The contractor shall provide all services at the Government owned Downstream Campground, Downstream Boat Ramp, West Tailrace, Spillway Pond, Wolf Creek Campground, Government Bay, East Totten Trail Campground, Douglas Creek Campground, Missouri River Ramp and Deepwater in accordance with the Performance Work Statement (PWS). The active and inactive period of performance is listed in the PWS.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 N/A Government N/A Government 0003 N/A Government N/A Government 0004 N/A Government N/A Government 0005 N/A Government N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-MAY-2022 TO
30-APR-2023
N/A COE GARRISON PRJT OFC NTR RSC SEC
ERIC KELSEY
USAED, OMAHACENWO-OD-GA-N
PO BOX 527
RIVERDALE ND 58565
701-654-7760
968708
0002 POP 01-MAY-2023 TO
30-APR-2024
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-MAY-2024 TO
30-APR-2025
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-MAY-2025 TO
30-APR-2026
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-MAY-2026 TO
30-APR-2027
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
OCT 2020
52.204-26 Covered Telecommunications Equipment or Services-- Representation.
OCT 2020
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation
NOV 2015
52.213-3 Notice to Suppliers APR 1984 52.216-2 Economic Price Adjustment - Standard Supplies JAN 1997 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.223-20 Aerosols JUN 2016 52.223-21 Foams JUN 2016 52.225-2 Buy American Certificate FEB 2021 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
JUN 2020
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-2 Service Of Protest SEP 2006 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-15 Stop-Work Order AUG 1989 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.204-7021 Contractor Compliance with the Cybersecurity Maturity
Model Certification Level Requirement
NOV 2020
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021
CLAUSES INCORPORATED BY FULL TEXT
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 562991.
(2) The small business size standard is $8,000,000.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition--
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $83,099, the provision with its Alternate II applies.
(D) If the acquisition value is $83,099 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
X (i) 52.204-17, Ownership or Control of Offeror.
X (ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited…