AMENDMENT 0004 for Military Working Dog Kennel - Peterson
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am_0005.pdf | ||
| Am_0006.pdf | ||
| Appendix_D.pdf | ||
| Am_0003.pdf | ||
| Appendix_B.pdf | ||
| W9128F-19-R-0006_Specs_Updated.pdf | ||
| Am_0002.pdf | ||
| Appendix_B.pdf | ||
| Am_0001.pdf | ||
| W9128F-19-R-0006_Specs.pdf | ||
| W9128F-19-R-0006_Plans.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0004 W9128F
MILITARY WORKING DOG KENNEL, PETERSON AIR FORCE BASE, COLORADO
See attached documentation for content of the changes to RFP
Date for receipt of proposals is 3 JAN 2019 at 1400 hours
Government Point of Contact: Ms. Zandra Hearn,Contract Specialist (402) 996-3717
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
5475 TECH CENTER DRIVE, SUITE 205
COLORADO SPRINGS, CO 80919
See Item 6
W9128F-19-R-0006
12/17/2018
10/24/2018
12/17/2018
Am #0004 - 2 (Continuation SF 30)
17 DEC 2018
Solicitation No. W9128F 19 R 0006
Date of Issue: 24 OCT 2018 Date of Receiving Proposals: 3 JAN 2019
SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of
MILITARY WORKING DOG KENNEL AT PETERSON AIR FORCE BASE, COLORADO
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, in the revised specification sections marked with an asterisk, changes have been identified by highlighting. Sections not marked with an asterisk have only had submittal destinations edited aside from Section 09 30 10, which was edited to address errors which resulted in empty paragraphs (where you could read, “[Enter Appropriate Subpart Title Here],” in previous sets).
Pages or Sections Deleted Pages or Sections Substituted or Added 01 33 00 01 33 00*
REGISTER REGISTER
01 91 00.15 01 91 00.15 07 61 14.00 20 07 61 14.00 20 09 30 10 09 30 10 22 00 00 22 00 00 23 00 00 23 00 00 23 03 00.00 20 23 03 00.00 20 23 05 15 23 05 15 23 05 93 23 05 93 23 07 00 23 07 00 23 09 00 23 09 00 23 11 25 23 11 25 23 21 13.00 20 23 21 13.00 20 23 21 23 23 21 23 23 23 00 23 23 00 23 25 00 23 25 00 23 31 13.00 40 23 31 13.00 40 23 52 00 23 52 00 23 54 19 23 54 19 23 82 02.00 10 23 82 02.00 10 26 56 00 26 56 00 33 30 00 33 30 00* ** ** ** Appendix C ** ** ** Appendix D
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
4. Electronic Offers will be received until 2:00 p.m., local time at place
Am #0004 - 3 (Continuation SF 30) of receiving proposals, 3 JAN 2019, as stated in the Request For Proposal. In case the AMRDEC website is unreachable, offerors should e-mail proposals to the following individuals:
Ms. Zandra Hearn, via Zandra.F.Hearn@usace.army.mil
Ms. Christine Wilson, via Christine.L.Wilson@usace.army.mil
Attachments:
Spec Pages listed in 1.a. above (except for Appendix D, which is provided under separate cover)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
17 DEC 2018
jlb/2099
Military Working Dog Kennel PEA0
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11; OMA 1/15
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.2.4 Administrative Submittals
1.3 SUBMITTALS
1.4 ELECTRONIC SUBMITTALS
1.4.1 Exceptions
1.4.2 File Format
1.4.3 Digital File Naming
1.4.4 Content
1.4.5 Delivery
1.5 SUBMITTAL CLASSIFICATION
1.5.1 Government Approved G
1.5.2 Information Only
1.6 PREPARATION
1.6.1 Transmittal Form
1.7 INFORMATION ONLY SUBMITTALS
1.8 VARIATIONS
1.8.1 Considering Variations
1.8.2 Proposing Variations
1.8.3 Warranting That Variations Are Compatible
1.8.4 Review Schedule Is Modified
1.9 SUBMITTAL REGISTER
1.9.1 Use of Submittal Register
1.9.2 Contractor Use of Submittal Register
1.9.3 Approving Authority Use of Submittal Register
1.9.4 Contractor Action Code and Action Code
1.9.5 Copies Delivered to the Government
1.10 SUBMITTAL ITEM PROCEDURES
1.10.1 "G-DO" or "G-AE" Submittals
1.10.2 Government Approved (G-AO/G-RO) and FIO Submittals
1.10.3 Certificates of Compliance
1.10.4 Purchase Orders
1.10.5 Operation and Maintenance Data/Manuals
1.11 SCHEDULING
1.12 GOVERNMENT APPROVING AUTHORITY
1.12.1 Review Notations
1.13 DISAPPROVED OR REJECTED SUBMITTALS
1.14 APPROVED/ACCEPTED SUBMITTALS
1.15 APPROVED SAMPLES
1.16 WITHHOLDING OF PAYMENT
1.17 STAMPS
SECTION 01 33 00 Page 1 Am_0004
1.18 ADDITIONAL CONSTRUCTION SUBMITTAL AND DOCUMENTATION REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11; OMA 1/15
PART 1 GENERAL
Attachments: Submittal Register ENG Form 4025, Transmittal Form
1.1 SUMMARY
The Contractor is responsible for total management of his work including approval, scheduling, control, certification of all submittals and compliance with all applicable Buy-American Act and Trade Agreement Act clauses. The submittal management system provided in these specifications is intended to be a complete system for the Contractor to use to control the quality of materials, equipment and workmanship provided by manufacturers, fabricators, suppliers and subcontractors. Review each submittal for contract compliance. This review is based on the contract drawings and specifications. Compliance with all applicable Buy American Act and Trade Agreement Clauses is to be included in this review. The Contractor must provide the country of origin on ENG Form 4025 for each item submitted. Submittals that comply will be forwarded to the Government. Submittals that do not conform will be returned to the originator to be corrected. The Submittal Register (ENG Form 4288) will be utilized to log and monitor all submittal activities. No construction or installation activities are to be performed until required approvals of applicable submittals have been made. Check to assure that all materials and/or equipment have been tested, submitted and approved during the preparatory phase of quality control inspections.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal; and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with
SECTION 01 33 00 Page 3 manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work) or the start of the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Unless otherwise designated, the submittals listed below will be handled as Administrative Submittals.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction Progress Schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices
Health and safety plan
Work plan
Quality Control(QC) plan
Permits
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SECTION 01 33 00 Page 4
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and
SECTION 01 33 00 Page 5 clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings, special warranties, posted operating instructions, training plan and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
SECTION 01 33 00 Page 6
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2.4 Administrative Submittals
The Government reserves the right to handle the following submittals (listed below) as administrative submittals via a Serial Letter as directed by the Area or Resident Office. When directed by the Area or Resident Office (as directed), administrative sumbittals are submitted for acceptance by the Government. Format for the Serial Letter is as directed by the Area or Resident Office. Submit three (3) copies of administrative submittal items, unless directed otherwise. Administrative submittals may include the following submittals: Submittal Register (this section), Quality Control Plans (Section 01 45 00.00 10 QUALITY CONTROL, Accident Prevention Plans (Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS), Revisions to Environmental Protection Plans (Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION) and other submittals as directed by the Contracting Officer.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The Government may elect to handle this submittal as an administrative submittal as outlined above. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G-RO
1.4 ELECTRONIC SUBMITTALS
Electronic format will be utilized for submission of construction submittal items required by the specifications, including ENG Form 4025 Transmittal Form, with exceptions noted below.
1.4.1 Exceptions
Submit all SD-04 (Samples) submittals and other submittals, where noted in the specifications to be in physical, hard-copy form. Number of hard copies shall be as required in the "SUBMITTAL ITEM PROCEDURES" paragraph below.
SECTION 01 33 00 Page 7
1.4.2 File Format
Electronic submittals may be submitted by any means readily accessible to the Government including, but not limited to, the following:
a. E-mails with text and all attachments less than or equal to 14MB in size. The Government IT system does not currently support e-mail transmissions of greater than 14MB. Should this e-mail transmission size limitation change during the course of the Contract, larger e-mail transmissions may become acceptable, but no time extensions will be granted for transmission errors resulting from oversized email attachments.
b. Internet Secure File Transfer Protocol (FTP) systems compatible with Government IT systems.
c. Mailed CD-ROM or DVD-ROM media.
d. Contractor-funded file sharing website compatible with Government IT systems.
e. Any other secure, Government-approved means of transmitting digital media.
Means of transfer must provide documents freely accessible to the Government. If the means of transfer is by e-mail, FTP repository, or similar, files shall be capable of being downloaded without errors or disruption. Regardless of the method of transfer, the files shall be able to be archived on Government IT systems without error or restriction.
Once provided, all submittal documents shall become Government property.
ZIP-file or similar archives requiring a password for access to the archive are permissible provided the password for the archive is static, permanent, not use-limited, and provided to the Government at the time of transmission. Any individual files provided electronically to the Government in 'SECURED' format, password-protected, or utilizing any other such method of file restriction shall be deemed defective and returned to the Contractor for correction. Regardless of errors encountered during the electronic submittal process the Contractor shall be responsible for delays resulting from the inadequacy of media delivery method, file-formatting, or file restriction issues. No time extensions will be granted for delays resulting from improper file formatting, file restrictions, or inadequate file transfer methods.
Discussion and decisions on a consistent Means of transfer throughout the duration of the project will be made at the pre-construction conference.
The format of electronic submittals is Adobe Acrobat Portable Document Format (PDF), compatible with Adobe X, unless agreed to and directed otherwise by the Contacting Officer's Representative. For As-built drawings, see Section 01 78 39.00 24 AS-BUILT DRAWINGS.
1.4.3 Digital File Naming
Label and name electronic files delivered to the Government in a manner that is logical and consistent throughout the duration of the project. A file naming convention that clearly indicates the transmittal number, component of submittal, and revision number associated with the submittal will be discussed and confirmed at the pre-construction kickoff conference.
1.4.4 Content
Submit one (1) set of readily copied and legible electronic documents and associated matching ENG Form 4025 Transmittal Form. Duplicate copies of
SECTION 01 33 00 Page 8 electronic submittals are not desired. Content and format of the electronic submittal shall conform to all requirements listed herein. Delivery methods of both electronic and hard-copy submittals shall remain consistent throughout the duration of the Contract, in compliance with Contract specifications.
1.4.5 Delivery
Delivery of submittals will be similar to those described in the "SUBMITTAL ITEM PROCEDURES" paragraph below. Notifications of file transfers will be sent to the Government recipients listed below. The means of contact and notification by mail or email will be coordinated and confirmed at the pre-construction conference.
1.5 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
Unless directed otherwise, the words "Government Approval" associated with "G" designated submittals are interpreted in the context of the below defined submittal types. Submittal Reviewers include the following:
DO - District Office AE - Architect Engineer CR - Government Conformance Review DA - Designer of Record AO - Area Office or other designated Government Office RO - Resident Office
1.5.1 Government Approved G
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
All submittals noted in the technical specifications and Submittal Register as "G-DO", "G-AE", "G-AO" and "G-RO" are subject to Government Approval.
Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.5.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.6 PREPARATION
1.6.1 Transmittal Form
Use the attached sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the RMS CM software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
SECTION 01 33 00 Page 9
1.7 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.8 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.8.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.8.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.8.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
SECTION 01 33 00 Page 10
1.8.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.9 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM). The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.9.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
SECTION 01 33 00 Page 11
1.9.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.9.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.9.4 Contractor Action Code and Action Code
Entries for columns (j) and (o), are to be used are as follows (others may be prescribed by Transmittal Form):
NR - Not Received
AN - Approved as noted
A - Approved
RR - Disapproved, Revise, and Resubmit
1.9.5 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.10 SUBMITTAL ITEM PROCEDURES
1.10.1 "G-DO" or "G-AE" Submittals
Except as noted below, all "G-DO" or "G-AE" submittals are to be submitted in seven (7) copies. All seven (7) copies are to be mailed directly to the addressee shown below using the transmittal form. Additionally, submit one
(1) copy of the transmittal form to the Area Engineer or Resident Engineer (as directed).
Except as noted below, all "G-DO" or "G-AE" hard copy submittals are to be submitted in three (3) copies. All three (3) copies are to be mailed
SECTION 01 33 00 Page 12 directly to the addressee shown below using the transmittal form.
Additionally, submit one (1) copy of the transmittal form to the Area Engineer or Resident Engineer (as directed). See paragraph: ELECTRONIC SUBMITTALS for submittal items being transmitted electronically.
Technical Reviewer
District Office(DO) Russell Matthews U.S. Army Corps of Engineers Omaha District Attn: CENWO-CD-S-TS 1616 Capitol Ave Omaha, NE 68102-4901
FourFront Design, Inc.
517 7th Street Attn: Joel Simonyak Rapid City, SD 57701
E-mail: Joel.Simonyak@fourfrontdesign.com
Electronic Submittals and e-mail notifications of Electronic Submittals posted to AMRDEC SAFE or other FTP repositories should be sent to Russell Matthews at the following e-mail address:
CENWO.ConstructionSubmittal@usace.army.mil
Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed), accompanied by five (5) copies of the transmittal form. Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed), accompanied by three (3) copies of the transmittal form.
Submit each required submittal, which is in the form of a drawing, as five
(5) of the drawing. Drawing prints are to be either blue or black line permanent-type prints on a white background or blueprint and shall be sufficiently clear and suitable for making legible copies.
Catalog cuts and other descriptive data which have more than one model, size, or type or which shows optional equipment must be clearly marked to show the model, size, or type and all optional equipment which is provided. Submittals on component items forming a system or that are interrelated are to be submitted at one time as a single submittal in order to demonstrate that the items have been properly coordinated and will function as a unit.
Submit An additional copy of all submittals related to fire protection/detection systems concurrently to the Base Civil Engineering or Post DPW Office. The mailing address for these submittals will be obtained at the preconstruction conference.
Hard Copy Drawings: Submit each required submittal, which is in the form of a drawing, as three (3) prints of the drawing. Drawing prints are to be either blue or black line permanent-type prints on a white background or blueprint and shall be sufficiently clear and suitable for making legible copies.
SECTION 01 33 00 Page 13
All hard copy submittals must be presented such that they fit into a standard size (letter) cabinet file drawer. Larger drawings must be folded to fit and not rolled. See paragraph: ELECTRONIC SUBMITTALS above for electronic submittals.
Catalog cuts and other descriptive data which have more than one model, size, or type or which shows optional equipment must be clearly marked to show the model, size, or type and all optional equipment which is provided. Submittals on component items forming a system or that are interrelated are to be submitted at one time as a single submittal in order to demonstrate that the items have been properly coordinated and will function as a unit.
For hard copy submittals, submit an additional copy of all submittals related to fire protection/detection systems concurrently to the Base Civil Engineering or Post DPW Office. The mailing address for these submittals will be obtained at the preconstruction conference. For electronic submittals, the means of transfer will be discussed at the Pre-Construction Conference.
1.10.2 Government Approved (G-AO/G-RO) and FIO Submittals
Except as noted below, data for all Government Approved submittal items are to be submitted in five (5) copies to the Area or Resident Engineer (as directed). All five copies are to be submitted using the transmittal form. Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed) accompanied by five (5) copies of the transmittal form.
Except as noted below, data for all items listed as "FIO" Submittals in the various sections are to be submitted in five (5) copies. All five (5) copies are to be submitted to the Area or Resident Engineer (as directed) using the transmittal form. Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed) accompanied by five (5) copies of the transmittal form.
All submittals must be reviewed and approved by the Contractor's Quality Control Representative prior to submittal to the Government.
The Government has the option to review any For Information Only submittals.
Except as noted below, data for all Government Approved submittal items are to be submitted in three (3) copies (hard copy submittals) to theArea or Resident Engineer (as directed). All three (3) copies are to be submitted using the transmittal form. Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed) accompanied by three (3) copies of the transmittal form.
Except as noted below, data for all items listed as "FIO" Submittals in the various sections are to be submitted in three (3) copies (hard copy submittals). All three (3) copies are to be submitted to the Area or Resident Engineer (as directed) using the transmittal form. Items not to be submitted in multiples, such as samples and test cylinders, are to be submitted to the Area or Resident Engineer (as directed) accompanied by three (3) copies of the transmittal form.
SECTION 01 33 00 Page 14
All hard copy submittals must be presented such that they fit into a standard sizse (letter) cabinet file drawer. Larger drawings must be folded to fit and not rolled. See paragraph: ELECTRONIC SUBMITTALS above for electronic submittals.
All submittals must be reviewed and approved by the Contractor's Quality Control Representative prior to submittal to the Government.
The Government has the option to review any For Information Only submittals.
***NOTE: All submittals that have no corresponding entry in the "CLASSIFICATON GOVT OR A/E REVWR" column of the attached submittal register are to be considered FIO.
1.10.3 Certificates of Compliance
Each certificate must be signed by an official authorized to certify in behalf of the manufacturing company and contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates must contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification is not to be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.10.4 Purchase Orders
Copies of purchase orders are to be furnished to the Contracting Officer when the Contractor requests assistance for expediting deliveries of equipment or materials, or when requested by the Contracting Officer for the purpose of quality assurance review. Each purchase order issued by the Contractor or his subcontractors for materials and equipment to be incorporated into the project are to (1) be clearly identified with the applicable DA contract number, (2) carry an identifying number, (3) be in sufficient detail to identify the material being purchased, (4) indicate a definite delivery date, and (5) display the DMS priority rating, if applicable.
1.10.5 Operation and Maintenance Data/Manuals
Where required by various technical sections, operations and maintenance data/manuals are to be provided by the Contractor in two (2) hard copies and three (3) separate electronic copies (on CD-ROM),one (1) hard copy and three (3) separate electronic copies (three (3) CD-ROM copies), unless directed otherwise. Provide legible hard copies of the operations and maintenance data that are assembled in three-ring binders with index and tabbed section dividers and having a cover indicating the contents by equipment or system name and and include the project title and location.
The legible electronic copies of the operation and maintenance data on the CD-ROMs are to be in a Adobe Acrobat .PDF format (Version 9.0) and be organized using bookmarks that define the contents by equipment or system name and includes Project Name and Location, unless directed otherwise by the Contracting Officer. Include the same information on the CD-ROM cover. Operation and maintenance data for mechanical and electrical systems are to be submitted for approval to the Contracting Officer 90 days prior to final tests of these systems, unless otherwise specified. Each operation and maintenance manual must contain a copy of all warranties and
SECTION 01 33 00 Page 15
***NOTE: All submittals that have no corresponding entry in the "CLASSIFICATON GOVT OR A/E REVWR" column of the attached submittal register are to be considered FIO.
a list of local service representatives required by Section 01 78 36.00 24 WARRANTY OF CONSTRUCTION. If field testing requires these copies to be revised, they are to be updated and resubmitted for approval within 10 calendar days after completion of tests. The Operations and Maintenance Data are to be shown as a separate activity on the Contractor prepared construction schedule bar chart or Network Analysis System (Project Schedule). In addition, all wiring and control diagrams and approved system layout drawings must be submitted and included with the O&M Data.
1.11 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Allow a minimum of 20 calendar days exclusive of mailing for any Government reviews and approvals, unless directed otherwise. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.12 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. All copies of the approved submittal will be retained by the Contracting Officer, except for two (2) copies of the submittal will be returned to the Contractor for hard copy submittals.
SECTION 01 33 00 Page 16
For electronic submittals, see paragraph: ELECTRONIC SUBMITTALS above.. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.
1.12.1 Review Notations
Contracting Officer review will be completed per paragraph SCHEDULING above. Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.13 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.14 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is
SECTION 01 33 00 Page 17 responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.15 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.16 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.17 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 18
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
1.18 ADDITIONAL CONSTRUCTION SUBMITTAL AND DOCUMENTATION REQUIREMENTS
In addition to the construction submittal and documentation requirements of the underlying contract, the contractor shall also provide ALL submittals and official documentation electronically to 21 CES. These submittals, subsequent resubmittals and official documentation shall be provided in PDF format at the same time as the submittals/documents are sent to USACE and shall be delivered by the contractor directly to the 21 CES project manager as designated by the USACE Contracting Officer's Representative (COR). Any physical samples or other items which are part of the submittal or documentation, but cannot be sent electronically, shall be scanned (in color) or photographed and the image(s) included as part of the submittal/documentation while the associated physical object(s) shall still be delivered to the USACE CO/COR. These PDF files shall be provided using a logical file naming convention as designated by the USACE CO/COR.
Additionally, all electronic submittals/documents shall be compiled by the contractor at the end of the project and provided to both the 21 CES Project Manager and USACE via CDs as a closeout submittal. These requirements pertain to all submittals and official documentation, including but not limited to material submittals, RFIs, ASIs, O&Ms, & serial letters.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 19
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 58 PAGES
Military Working Dog Kennel
01 30 00.24 SD-02 Shop Drawings
1.24 G ROEquipment Room Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.9 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals GPreliminary High Performance and Sustainable…
This is the start of the file's text. The full file is on GovTribe.