Amendment #0002 Drawings for Sol W9128F18R0043 Repair Chilled Water System, Cheyenne Mountain AFS, CO
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| Site_Visit_Roster_-_11_Jul_18.pdf | ||
| W9128F-18-R-0043_Specs.pdf | ||
| W9128F-18-R-0043_11x17-Plans.pdf | ||
| W9128F-18-R-0043_Full-Sized-Plans.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-000
G
EN
ER
A L
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T
C
AP
IT
O L
AV
E.
O M
A H A, N E
6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
MECHANICAL GENERAL NOTES
ORDER OF WORK NOTES
WORK PERFORMED AS PART OF THIS PROJECT MUST BE DONE IN A MANNER THAT WILL
ALLOW THE CHILLED WATER SYSTEM TO REMAIN FULLY FUNCTIONAL THROUGHOUT THE
ENTIRE CONSTRUCTION PERIOD. WHERE INDICATED ON THE PLAN SHEETS, EXISTING
STRAINERS, AUTOMATIC CONTROL VALVES AND ISOLATION VALVES MAY BE USED FOR
TEMPORARY COOLING EQUIPMENT. NO AIR HANDLING UNITS, CRAC UNITS, FAN COIL
UNITS OR OTHER SPACE COOLING EQUIPMENT WILL BE ALLOWED TO BE OUT OF
SERVICE WITHOUT APPROVAL, IN WRITING, FROM THE CONTRACTING OFFICER’S
REPRESENTATIVE. IN NUMEROUS AREAS OF THE COMPLEX THIS WILL REQUIRE
INTERMIXED DEMOLITION AND NEW CONSTRUCTION.
DUE TO THE AMOUNT OF PIPING, CONDUIT, EQUIPMENT, ETC LOCATED WITHIN THE
AREAS WHERE WORK WILL BE PERFORMED, IT IS NOT POSSIBLE TO SHOW ALL EXISTING
CONDITIONS. THE CONTRACTOR SHOULD ANTICIPATE THAT SOME ALTERATION OR
ADJUSTMENT TO THE ROUTING OF THE NEW CHILLED WATER SUPPLY AND RETURN
PIPING WILL BE REQUIRED. THIS SHALL BE DONE AT NO ADDITIONAL COST TO THE
GOVERNMENT. WHERE SIGNIFICANT ALTERATION OR ADJUSTMENT TO THE ROUTING OF
THE PIPING IS REQUIRED, THIS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICERS REPRESENTATIVE, IN WRITING, FOR RESOLUTION, BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
WHERE TEMPORARY CHILLED WATER SUPPLY AND / OR RETURN LINES ARE REQUIRED,
THE CONTRACTOR SHALL CHOOSE THE MOST CONDUCIVE POINTS, IN THE EXISTING
SYSTEM, TO CONNECT THE TEMPORARY LINES TO AND SHALL CHOOSE THE ROUTING OF
THE LINES. TEMPORARY CHILLED WATER SUPPLY AND / OR RETURN LINES SHALL NOT
BE RUN THROUGH DOORWAYS, PREVENTING CLOSING OF DOORS, WITHOUT APPROVAL,
IN WRITING, FROM THE CONTRACTING OFFICER’S REPRESENTATIVE. TEMPORARY
PIPING MAY BE RUN ALONG THE ROOF OF THE COMPLEX BUILDINGS, BELOW THE
COMPLEX BUILDINGS, WITHIN THE EXISTING PIPE CHASES OR ALONG THE OUTSIDE OF
THE COMPLEX BUILDINGS. ALL TEMPORARY PIPING SHALL BE PROPERLY SUPPORTED /
RESTRAINED SUCH THAT A BLAST OR SEISMIC EVENT WILL NOT CAUSE DAMAGE TO THE
PIPING AND POTENTIALLY CAUSE LOSE OF CHILLED WATER TO SPACE COOLING
EQUIPMENT.
WHERE TEMPORARY PIPING IS INSTALLED THROUGH A BUILDING WALL OR FLOOR, THE
PIPING SHALL BE REMOVED WHEN NO LONGER REQUIRED AND THE PENETRATION SHALL
BE REPAIRED AND RETURNED TO THE ORIGINAL CONDITION.
ALL PENETRATIONS THROUGH A BUILDING WALL OR ROOF SHALL COMPLY WITH DETAILS
FOR TYPICAL PIPE PENETRATIONS. THIS SHALL INCLUDE TEMPORARY PIPING.
WHERE “HOT-TAPPING” OF EXISTING PIPING IS REQUIRED, A 3-INCH LONG PIPE NIPPLE
WITH CAP SHALL BE PROVIDED AT THE TAPPING VALVE AFTER USE OF THE VALVE IS
COMPLETE. THE PIPING AND VALVE SHALL BE INSULATED. THE CAP SHALL BE LEFT
UNINSULATED.
SHOULD THE REQUIRED “FUTURE” BRANCH LINE CONNECTION POINTS IN THE NEW
CHILLED WATER SUPPLY AND RETURN MAIN PIPING ON THE COMPLEX ROOF BE IN
ADEQUATE TO ACCOMMODATE FLUSHING REQUIREMENTS, THE CONTRACTOR SHALL
ADD ADDITIONAL CONNECTION POINTS TO ACCOMMODATE THE PIPE FLUSHING
REQUIREMENTS.
THE NEW CHILLED WATER SUPPLY AND RETURN PIPING LOOPS ON THE ROOFS OF THE
COMPLEX BUILDING WILL INCLUDE NUMEROUS CONNECTION POINTS FOR FUTURE
PIPING. THESE POINTS MAY BE USED BY THE CONTRACTOR AS CONNECTION POINTS
FOR TEMPORARY CHILLED WATER SUPPLY AND RETURN PIPING DURING CONSTRUCTION
OF THE CHILLED WATER SUPPLY AND RETURN RISER PIPING.
WHERE NEW CONTROL VALVES ARE REQUIRED, THEY SHALL MATCH THE EXISTING
UNLESS OTHERWISE INDICATED AND SHALL UTILIZE THE EXISTING CONTROL SYSTEM
OUTPUT.
WHERE NEW TEMPERATURE SENSORS ARE REQUIRED, THEY SHALL MATCH THE
EXISTING UNLESS OTHERWISE INDICATED AND SHALL UTILIZE THE EXISTING CONTROL
SYSTEM INPUT.
BUTTERFLY VALVES SHALL BE INSTALLED WITH A WELD NECK FLANGE ON EACH SIDE OF
THE VALVE.BUTTERFLY VALVES SHALL BE INSTALLED WITH A WELD NECK FLANGE ON
EACH SIDE OF THE VALVE.
WHERE PIPE ELEVATION DIMENSIONS ARE PROVIDED ON THE DRAWINGS THEY ARE TO
THE PIPE CENTERLINE, UNLESS INDICATED OTHERWISE.
THE EXISTING PIPE SUPPORTS ON THE ROOF OF THE COMPLEX BUILDINGS MAY BE USED
TO TEMPORARILY SUPPORT THE NEW PIPING DURING INSTALLATION BUT SHALL NOT BE
USED TO PERMANENTLY SUPPORT THE NEW PIPING. ALL NEW PIPING INSTALLED ON
THE ROOF OF THE COMPLEX BUILDINGS SHALL BE SUPPORTED WITH NEW PIPING
SUPPORTS AS INDICATED ON THE DRAWINGS.
WHERE TEMPORARY COOLING EQUIPMENT IS PROVIDED, A STRAINER SHALL BE
PROVIDED IN THE CHILLED WATER SUPPLY LINE AND AN AUTOMATIC CONTROL VALVE
SHALL BE PROVIDED IN THE CHILLED WATER RETURN LINE. THE CONTROL VALVE SHALL
BE OPERATED BY THE EXISTING HVAC CONTROL SYSTEM TO MAINTAIN THE
TEMPERATURE IN THE SPACE BEING SERVED AND TO ALLOW MONITORING OF THE
OPERATION AT THE CCC. TEMPORARY COOLING EQUIPMENT SHALL BE OPERATED FOR
A MINIMUM OF 48 HOURS BEFORE THE PERMANENT EQUIPMENT IS TAKEN OUT OF
SERVICE TO VERIFY PROPER OPERATION OF THE TEMPORARY EQUIPMENT AND TO
VALIDATE ITS ABILITY TO MEET THE COOLING REQUIREMENTS.
WHERE WORK IS REQUIRED IN ROOMS WITH COMPUTER ROOM AIR CONDITIONING
(CRAC) UNITS, ACCESS TO THE ROOMS WILL REQUIRE COORDINATION WITH THE ROOM
OCCUPANTS. THE CONTRACTOR SHALL REQUEST ACCESS TO THESE ROOMS, IN
WRITING, A MINIMUM OF 14 DAYS IN ADVANCE OF THE REQUIRED ACCESS. REQUESTS
FOR ACCESS SHALL BE SUBMITTED TO THE USACE CONTRACTING OFFICERS
REPRESENTATIVE.
PIPING PENETRATIONS THROUGH CHASE WALLS SHALL BE FIRESTOPPED.
UNLESS INDICATED OTHERWISE, THE NEW PIPE SUPPORTS SHALL BE USED TO SUPPORT
NEW PIPING ONLY, NOT EXISTING PIPING OR OTHER UTILITIES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
IN ORDER TO ACCOMPLISH THE REQUIRED WORK WHILE KEEPING THE CHILLED
WATER SYSTEM SERVING THE COMPLEX FULLY FUNCTIONAL, CLOSE
COORDINATION WILL BE REQUIRED REGARDING THE ORDER OF THE WORK. THE
FOLLOWING IS A GENERAL DESCRIPTION OF THE ORDER OF WORK AND IS
PROVIDED AS GENERAL GUIDANCE ONLY. NOT ALL STEPS ARE DESCRIBED.
REVISIONS TO THIS ORDER OF WORK MAY BE ALLOWED PROVIDED THAT THEY DO
NOT COMPROMISE THE ABILITY OF THE CHILLED WATER SYSTEM, INCLUDING
CONNECTED SPACE COOLING EQUIPMENT, TO REMAIN FULLY OPERATIONAL
DURING THE ENTIRE CONSTRUCTION PERIOD:
THE NEW CHILLED WATER SUPPLY AND RETURN PIPING SYSTEM ON THE
ROOF OF THE COMPLEX BUILDINGS, INCLUDING PIPE SUPPORTS, VALVES,
INSULATION, DRAINS AND VENTS, SHALL BE FULLY CONSTRUCTED AND
PRESSURE TESTED. THIS SHALL INCLUDE PIPE INSULATION, ISOLATION
VALVES FOR EACH NEW RISER PIPE AND CONNECTION OF THE NEW CHILLED
WATER SUPPLY AND RETURN PIPING TO THE EXISTING CHILLED WATER
SUPPLY AND RETURN PIPING AT THE CHILLED PLANT. THIS SHALL NOT
INCLUDE CONSTRUCTION OF THE NEW CHILLED WATER SUPPLY AND RETURN
RISER PIPING. (THE EXISTING CHILLED WATER SUPPLY AND RETURN PIPING
SHALL REMAIN UNALTERED WHILE THIS NEW PIPING IS BEING
CONSTRUCTED.)
THE FOLLOWING ARE THE TYPICAL STEPS REQUIRED FOR CONSTRUCTION OF
EACH SET OF NEW CHILLED WATER SUPPLY AND RETURN RISER PIPING:
TEMPORARY CHILLED WATER SUPPLY AND RETURN LINES OF THE
QUANTITY AND SIZE SHALL BE CONNECTED TO EACH PIECE OF SPACE
COOLING EQUIPMENT AS INDICATED ON THE MECHANICAL ROOM PLANS
ALLOWING THE EQUIPMENT TO BE PROVIDED WITH CHILLED WATER AFTER
THE EXISTING ISOLATION VALVES AT THE TOP OF THE RISER PIPING HAVE
BEEN CLOSED. THE TEMPORARY CHILLED WATER RETURN LINE(S) SHALL
INCLUDE ONE OR MORE TEMPORARY CHILLED WATER CONTROL VALVES
TO CONTROL THE CHILLED WATER FLOW. THE CONTROL VALVE SHALL BE
OPERATED FROM THE EXISTING HVAC CONTROL PANEL FOR THE PIECE OF
EQUIPMENT IT IS SERVING AND SHALL CONTROL THE WATER FLOW USING
THE SAME CONTROL SCHEME AS WAS IN PLACE PRIOR TO THE START OF
WORK.
IN EACH MECHANICAL EQUIPMENT ROOM, THE EXISTING ISOLATION
VALVES IN THE CHILLED WATER BRANCH LINES (TYPICALLY LOCATED
NEAR THE POINT OF CONNECTION OF THE BRANCH LINES TO THE RISER
PIPING) SHALL BE CLOSED. THE SPACE COOLING EQUIPMENT WILL THEN
BE SUPPLIED WITH CHILLED WATER ONLY BY THE TEMPORARY CHILLED
WATER SUPPLY AND RETURN LINES.
1.
2.
WITH ALL SPACE COOLING EQUIPMENT ASSOCIATED WITH A GIVEN
SET OF CHILLED WATER SUPPLY AND RETURN RISER PIPES BEING
PROVIDED WITH CHILLED WATER VIA TEMPORARY PIPING ONLY, THE
SPACE COOLING EQUIPMENT SHALL BE OPERATED FOR A MINIMUM
OF 48 HOURS TO DEMONSTRATE THAT THE EQUIPMENT WILL
OPERATE PROPERLY WITH THE TEMPORARY CHILLED WATER LINES
AND THE TEMPORARY CHILLED WATER CONTROL VALVE
ARRANGEMENTS.
WHEN ALL SPACE COOLING EQUIPMENT ASSOCIATED WITH A GIVEN
SET OF CHILLED WATER SUPPLY AND RETURN RISER PIPES HAS
DEMONSTRATED PROPER OPERATION FOR A MINIMUM OF 48 HOURS,
THE EXISTING ISOLATION VALVES AT THE TOP OF THE RISER PIPES
SHALL BE CLOSED AND THE RISER PIPING SHALL BE REMOVED.
BRANCH PIPING TO EACH MECHANICAL EQUIPMENT ROOM SHALL BE
REMOVED UP TO THE EXISTING BRANCH LINE ISOLATION VALVES.
THE ISOLATION VALVES SHALL REMAIN.
NEW CHILLED WATER RISER PIPING SHALL BE CONSTRUCTED AS
INDICATED ON THE MECHANICAL EQUIPMENT ROOM PLANS. THE
NEW PIPING SHALL TYPICALLY BE ROUTED WHERE THE OLD RISER
PIPING WAS REMOVED, IN ORDER TO MINIMIZE CONFLICTS. AT EACH
MECHANICAL ROOM, CHILLED WATER SUPPLY AND RETURN BRANCH
PIPING SHALL EXTEND FROM THE NEW RISER PIPING INTO THE
MECHANICAL EQUIPMENT ROOM AND SHALL BE CONNECTED TO THE
EXISTING CHILLED WATER SUPPLY AND RETURN BRANCH PIPING, AS
SHOWN ON THE MECHANICAL EQUIPMENT ROOM PLANS. THIS SHALL
INCLUDE NEW ISOLATION VALVES, WHERE / AS SHOWN ON THE
MECHANICAL EQUIPMENT ROOM PLANS. THE NEW CHILLED WATER
SUPPLY AND RETURN RISER PIPING SHALL BE CONNECTED TO THE
NEW CHILLED WATER SUPPLY AND RETURN MAIN PIPING ON THE
COMPLEX ROOF AS SHOWN ON THE ROOF NEW PIPING PLAN
DRAWINGS. (THE ISOLATION VALVES IN THE NEW PIPING RISERS
SHALL REMAIN CLOSED.)
THE NEW CHILLED WATER RISER PIPING AND NEW PIPING IN THE
MECHANICAL EQUIPMENT ROOMS SHALL BE FILLED, PRESSURE
TESTED AND FLUSHED.
THE ISOLATION VALVES IN THE NEW RISER PIPING SHALL BE
OPENED, ALLOWING THE ASSOCIATED MECHANICAL EQUIPMENT TO
BE PROVIDED WITH CHILLED WATER FROM THE NEW SYSTEM.
VALVES IN THE TEMPORARY CHILLED WATER SUPPLY AND RETURN
PIPING SERVING THE ASSOCIATED MECHANICAL EQUIPMENT SHALL
BE CLOSED. THE OPERATION OF THE COOLING EQUIPMENT SHALL
BE MONITORED FOR A MINIMUM OF 48 HOURS TO VERIFY PROPER
OPERATION.
TEMPORARY COOLING EQUIPMENT AND TEMPORARY CHILLED
WATER SUPPLY AND RETURN LINES SHALL BE REMOVED.
ANY BUILDING PENETRATIONS MADE TO ALLOW THE INSTALLATION
OF TEMPORARY CHILLED WATER LINES SHALL BE REPAIRED.
A.
B.
C.
D.
ORDER OF WORK NOTES (CONT.)
3.
4.
16.
17.
E.
F.
G.
AFTER ALL NEW RISER PIPING AND MECHANICAL EQUIPMENT ROOM PIPING HAS
BEEN CONSTRUCTED, TESTED, PLACED INTO OPERATION, VERIFIED AS
FUNCTIONING PROPERLY AND ACCEPTED BY THE GOVERNMENT, THE EXISTING
CHILLED WATER SUPPLY AND RETURN PIPING OF THE ROOF OF THE COMPLEX
AND FROM THE CHILLER PLANT TO THE ROOF OF THE COMPLEX, SHALL BE
REMOVED AND SCRAPPED. CONTRACTOR MAY TEMPORARILY STORE DEMOLISHED
PIPING AND INSULATIONS NEAR THE BUILDING 1000 BUT SHALL PROMPTLY
DISPOSE OF THEM FROM THE SITE.
MAIN CHILLED WATER SUPPLY AND RETURN LOOPS ON THE ROOF OF BUILDINGS
8000, 9000 AND 11000 SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS.
H.
I.
THE EXISTING JIB CRANE LOCATED ON THE ROOF OF BUILDING 1000 SHALL BE
AVAILABLE FOR USE BY THE CONTRACTOR FOR WORK REQUIRED BY THIS PROJECT.
THE CONTRACTOR SHALL INSURE THAT WHILE USING THE CRANE THE LOAD RATING FOR
THE CRANE IS NOT EXCEEDED. CONTRACTOR PERSONNEL SHALL BE TRAINED BY
CMAFS PERSONNEL IN THE USE OF THE CRANE, PRIOR TO USING THE CRANE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY BUILDING DAMAGE CAUSED
BY CONTRACTOR PERSONNEL WHILE USING THE CRANE.
POINT-OF-USE WELDING EXHAUST SHALL BE UTILIZED FOR ALL WELDING PERFORMED
INSIDE THE CHEYENNE MOUNTAIN AFS COMPLEX. THE EXHAUST SYSTEM SHALL
ADEQUATELY CAPTURE ALL SMOKE GENERATED BY WELDING PROCEDURES AND
CONVEY IT OUTSIDE THE COMPLEX OR SHALL FILTER THE EXHAUST AND DISCHARGE IT
BACK INTO THE VICINITY OF THE WORK AREA. THE COMPLEX EXHAUST SYSTEM SHALL
NOT BE UTILIZED IN ANY WAY FOR REMOVAL OF WELDING SMOKE.
WELDING SHALL BE IN ACCORDANCE WITH NFPA 51B. WHERE ITEMS ARE WELDED TO
THE ROOF OF ANY BUILDING, THE AREA WHERE THE WORK IS PERFORMED AND THE
AREA DIRECTLY BELOW WHERE THE WORK IS PERFORMED SHALL BE INSPECTED
DURING AND FOR ONE HOUR AFTER COMPLETION OF THE WORK TO INSURE THAT NO
IGNITION OF BUILDING MATERIALS OR CONTENT HAS OCCURRED.
PRIOR TO INSTALLING ANY PIPING OR PIPING SUPPORT IN AREAS BETWEEN BUILDINGS
CONTACTOR SHALL ENSURE THAT THERE IS AT LEAST 24 INCH OF FREE RATTLE SPACE
FOR BUILDING MOVEMENT, IN AREAS BETWEEN BUILDINGS AND ROCK FACES THERE
SHALL BE 12 INCH OF FREE RATTLE SPACE." AND/ OR ALL PIPING THAT IS AFFIXED TO
THE OUTSIDE OF THE BUILDINGS SHALL BE AT LEAST 12 INCH FROM ANY ROCK WALL
AND 24 INCH IF RUNNING BETWEEN BUILDINGS FOR ANY REASON.
SURFACES TO BE PAINTED SHALL BE PAINTED WITH A 23-A-Z THREE PART COATING
SYSTEM WITH ONE COAT PRIMER, INTERMEDIATE TOP COATS OF PAINT. THE PRIMER
SHALL COMPLY WITH THE REQUIREMENTS OF SSPC-40; THE INTERMEDIATE COAT SHALL
COMPLY WITH THE REQUIREMENTS OF SSPC-41; THE TOP COAT SHALL COMPLY WITH
THE REQUIREMENTS OF SSPC-38. SURFACE TO BE PAINTED SHALL BE DRY AND
CLEANED IN ACCORDANCE WITH THE PAINT MANUFACTURERS REQUIREMENTS.
APPLICATION SHALL BE BY SPRAY IN ACCORDANCE WITH THE MANUFACTURER'S
WRITTEN INSTRUCTIONS. LIMITED USE OF BRUSH AND ROLLER APPLICATION IS
PERMITTED PROVIDED THE SPECIFIED FILM THICKNESSES ARE ACHIEVED. THE
CONTRACTOR SHALL PROVIDE VENTILATION IN THE AREA OF PAINTING, IN ACCORDANCE
WITH THE MANUFACTURERS REQUIREMENTS.
THE CONTRACTOR SHALL OBTAIN ELECTRICAL POWER FOR WELDING AND GENERAL
POWER PURPOSES FROM ELECTRICAL PANELS IN THE THIRD FLOOR MECHANICAL
EQUIPMENT ROOMS. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED TEMPORARY
CIRCUIT BREAKERS, DISCONNECTS, WIRING, DISTRIBUTION PANELS, ETC. WIRING
BETWEEN THE THIRD FLOOR MECHANICAL EQUIPMENT ROOMS AND THE ROOF SHALL BE
ROUTED IN THE PIPE CHASES AND SHALL NOT BE ROUTED THROUGH HALLWAYS /
CORRIDORS. PENETRATIONS THROUGH A BUILDING ROOF SHALL BE PROVIDED WITH
EMP PROTECTION AS INDICATED ON THE DRAWINGS. AFTER COMPLETION OF WORK
REQUIRING TEMPORARY POWER, THE TEMPORARY WIRING AND EQUIPMENT SHALL BE
REMOVED BY THE CONTRACTOR AND THE ROOF SHALL BE RETURNED TO ITS ORIGINAL
CONDITION. THE CONTRACTOR SHALL FIELD VERIFY POWER AVAILABILITY IN THE
MECHANICAL EQUIPMENT ROOMS. ALL WORK SHALL BE DONE IAW NATIONAL
ELECTRICAL CODE AND ALL APPLICABLE OSHA REQUIREMENTS. ALL CONNECTIONS TO /
REVISIONS TO THE CURRENT ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE
CMAFS ELECTRICAL SHOP.
19.
MECHANICAL GENERAL NOTES(CONT.)
18.
20.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
21.
22.
23.
M-301
8" CWS (EX.)
8" CWR (EX.)
8" CWS FROM
POWERPLANT
DISTRIBUTION PUMPS
INSIDE OF CHILLER BAY
8" CWR TO 10" MAIN RETURN
HEADER INSIDE CHILLER BAY
CHILLER BAY
1 2
8" CWS/CWR TO 10" MAIN
HEADER INSIDE CHILLER BAY
3" CWS/CWR (EX.) TO AHU ON
CHILLER BAY ROOF
8" CWS (EX.)
8" CWR (EX.)
8" CWS (EX.)8" CWR (EX.)8" CWR
EXISTING
FLEXIBLE
CONNECTOR
8" CWR (EX.)
8" CWS (EX.)
8" CWS
NEW INSERTION
TYPE ISOLATION
VALVES TO BE
INSTALLED PRIOR TO
DEMOLITION OF
REMAINING SET OF
CWS/CWR PIPING
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-201
C H
IL
LE
D W
A T
ER
L
IN
E N
EW
P
IP
IN
G P
LA
N
(1 O
F 3)
A R
EA
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T O
M
AH
A, N
E 6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
1/4" = 1'-0"M-201
1 CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1
MECHANICAL GENERAL NOTES
ONE SET OF EXISTING CHILLED WATER SUPPLY/RETURN PIPING
(INCLUDING INSULATION, PIPING SUPPORTS, VALVES, OR OTHER ITEMS)
SERVING THE ELECTRICAL BAY & GENERATOR BAY SHALL NOT BE
REMOVED UNTIL NEW CHILLED WATER SUPPLY/RETURN PIPING AND NEW
BRANCH PIPING CONNECTIONS TO ALL ASSOCIATED AIR HANDLING UNITS
ARE COMPLETED, TESTED, AND ACCEPTED BY THE GOVERNMENT. THIS
APPLIES TO CHILLED WATER PIPING FED BY THE POWERPLANT
DISTRIBUTION PUMPS IN THE CHILLER BAY.
EXISTING CHILLED WATER CONTROL VALVE, BALANCING VALVE,
STRAINER, PRESSURE GAGES, THERMOMETERS AND OTHER ANCILLARY
DEVICES IN THE VICINITY OF EACH AIR HANDLING UNIT ON THE ROOF OF
THE GENERATOR BAY, SERVER ROOM ON THE FIRST FLOOR OF THE
GENERATOR BAY, AND SECOND FLOOR OF THE ELECTRICAL BAY SHALL
REMAIN AND BE REUSED, UNLESS SPECIFICALLY INDICATED OTHERWISE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING BUILDINGS, OTHER EQUIPMENT, AND COMPONENTS THAT ARE
TO REMAIN INTACT WHILE PERFORMING THE SPECIFIED WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING OFFICERS
REPRESENTATIVE (COR) OF ANY DAMAGES THAT MAY HAVE OCCURRED
AND PERFORM REPAIR AND / OR REPLACEMENT WORK AT NO
ADDITIONAL COST TO THE GOVERNMENT.
1.
2.
3.
MECHANICAL KEYNOTES
1 INSTALL NEW 8" INSERTION TYPE GATE VALVES IN THE EXISTING 8"
CWS/CWR PIPING.
INSTALL TWO (2) 6" VALVED AND THREADED HOT TAPS IN THE EXISTING
8" CWS/CWR PIPING INSIDE OF CHILLER BAY FOR TEMPORARY HOSE
CONNECTIONS.
PROVIDE 8" VALVED TAPS ON THE SIDE OF NEW 8" CWS/CWR PIPING TO
BE USED FOR TEMPORARY HOSE CONNECTIONS. CONNECT
TEMPORARY CHILLED WATER CWS/CWR HOSES TO THESE TAPS. SEE
SECTION-1 ON SHEET M-301 FOR NEW 8" VALVED TAPS TO BE USED FOR
PERMANENT CWS/R PIPING CONNECTIONS.
INSTALL NEW 8" CWS LINE AT APPROXIMATELY 3'-8 1/2" A.F.F AND NEW
8" CWR LINE AT APPROXIMATELY 5' A.F.F. SUPPORT NEW PIPING FROM
THE EXISTING PIPE SUPPORTS.
PLAN NORTH
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
5 4 3
KEYPLAN
UP
M-201
2 ISOMETRIC VIEW - AREA 1
NEW 8" ISOLATION
VALVES TO BE
CONNECTED TO
FLEX CONNECTORS
AND PERMANENT
PIPING PER SHEET
M-211.
TAPS FOR
PERMANENT
PIPING
CONNECTIONS
TAPS FOR
TEMPORARY
HOSE
CONNECTIONS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
MD301
M-301
8" C
W S
(E X.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-202
C H
IL
LE
D W
A T
ER
L
IN
E N
EW
P
IP
IN
G P
LA
N
(1 O
F 3)
A R
EA
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T O
M
AH
A, N
E 6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
1/4" = 1'-0"M-202
1 CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2
MECHANICAL KEYNOTES
1 INSTALL NEW 8" CWS/CWR PIPING BELOW REMAINING SET OF
EXISTING CWS/CWR PIPING AS SHOWN. SEE SECTION 2 ON SHEET
M-301.
PLAN NORTH
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
5 4 3
KEYPLAN
UP
INSTALL NEW 8" CWS/CWR PIPING
BELOW THE EXISTING REMAINING SET OF CWS/CWR
PIPING ON THE EXISTING PIPE SUPPORTS.
MECHANICAL GENERAL NOTES
ONE SET OF EXISTING CHILLED WATER SUPPLY/RETURN PIPING
(INCLUDING INSULATION, PIPING SUPPORTS, VALVES, OR OTHER ITEMS)
SERVING THE ELECTRICAL BAY & GENERATOR BAY SHALL NOT BE
REMOVED UNTIL NEW CHILLED WATER SUPPLY/RETURN PIPING AND NEW
BRANCH PIPING CONNECTIONS TO ALL ASSOCIATED AIR HANDLING UNITS
ARE COMPLETED, TESTED, AND ACCEPTED BY THE GOVERNMENT. THIS
APPLIES TO CHILLED WATER PIPING FED BY THE POWERPLANT
DISTRIBUTION PUMPS IN THE CHILLER BAY.
EXISTING CHILLED WATER CONTROL VALVE, BALANCING VALVE,
STRAINER, PRESSURE GAGES, THERMOMETERS AND OTHER ANCILLARY
DEVICES IN THE VICINITY OF EACH AIR HANDLING UNIT ON THE ROOF OF
THE GENERATOR BAY, SERVER ROOM ON THE FIRST FLOOR OF THE
GENERATOR BAY, AND SECOND FLOOR OF THE ELECTRICAL BAY SHALL
REMAIN AND BE REUSED, UNLESS SPECIFICALLY INDICATED OTHERWISE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING BUILDINGS, OTHER EQUIPMENT, AND COMPONENTS THAT ARE
TO REMAIN INTACT WHILE PERFORMING THE SPECIFIED WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING OFFICERS
REPRESENTATIVE (COR) OF ANY DAMAGES THAT MAY HAVE OCCURRED
AND PERFORM REPAIR AND / OR REPLACEMENT WORK AT NO
ADDITIONAL COST TO THE GOVERNMENT.
1.
2.
3.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
MD303
MD303
ELECTRICAL BAY
CAT WALK
HAND RAIL
8" CWR (EX.)8" CWR (EX.)
8" C
W S
(E X.
8" C
W R
(E X.
8" CWS (EX.)
8" CWR (EX.)
8" CWR (EX.)
8" CWS (EX.)
8" C
W S
(E X.
8" C
W R
(E X.
4" CWS (EX.)
4" CWR (EX.)
8" C
W R
8" C
W S
8" CWS8" CWR
8" CWR8" CWS
NEW 8" CWS PIPING TO BE INSTALLED
BELOW NEW 8" CWR PIPING. NEW PIPE SUPPORTS
ATTACHED TO CAT WALK STRUCTURE. REFER TO
DETAIL 6 ON SHEET MSD02 FOR PIPE SUPPORTS.
UTILIZE EXISTING OPENING
AFTER DEMOLITION OF EXISTING PIPING
M-302
M-302
M-302
M-302
4" VALVED TAPS TO BE USED FOR
TEMPORARY HOSE CONNECTIONS
SERVING AHU ON SECOND FLOOR
OF ELECTRICAL BAY.
4" VALVED TAPS TO BE USED
FOR PERMANENT PIPING
CONNECTIONS SERVING AHU
ON SECOND FLOOR OF
ELECTRICAL BAY.
8" CWR
3 ADJUST PIPING CONFIGURATION
IF NECESSARY TO SUPPORT NEW
PIPES BY EXISTING PIPE
HANGERS
ADJUST PIPING ELEVATION IF
NECESSARY TO SUPPORT NEW
PIPES BY EXISTING PIPE HANGERS
REFER TO DETAIL 2 ON SHEET
MSD02 FOR THE VERTICAL PIPE
SUPPORTS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-203
C H
IL
LE
D W
A T
ER
L
IN
E N
EW
P
IP
IN
G P
LA
N
(1 O
F 3)
A R
EA
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T O
M
AH
A, N
E 6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
1/4" = 1'-0"M-203
1 CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3
MECHANICAL KEYNOTES
1 INSTALL NEW 8" CWS/CWR PIPING AS SHOWN. SEE SECTION VIEWS
ON SHEET M-302 & ISOMETRIC VIEW ON SHEET M-901.
CAPPED EXISTING ISOLATION VALVES PER SHEET MD-203 AND
MD-302.
CONNECT TEMPORARY CWS/CWR HOSES FROM NEW 8" CWS/CWR
PIPING TO VALVED AND THREADED TAPS INSTALLED ABOVE
ISOLATION VALVES ON EXISTING 4" CWS/CWR PIPING SERVING
ELECTRICAL BAY SECOND FLOOR AHU. REFER TO SHEET M-302 AND
M-901 FOR CLARIFICATION OF REQUIRED WORK. PIPE PENETRATION
THROUGH THE BUILDING WALL SHALL BE SEALED IN ACCORDANCE
WITH DETAIL 1 ON SHEET M-501.
PLAN NORTH
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
5 4 3
KEYPLAN
UP
MECHANICAL GENERAL NOTES
ONE SET OF EXISTING CHILLED WATER SUPPLY/RETURN PIPING
(INCLUDING INSULATION, PIPING SUPPORTS, VALVES, OR OTHER ITEMS)
SERVING THE ELECTRICAL BAY & GENERATOR BAY SHALL NOT BE
REMOVED UNTIL NEW CHILLED WATER SUPPLY/RETURN PIPING AND NEW
BRANCH PIPING CONNECTIONS TO ALL ASSOCIATED AIR HANDLING UNITS
ARE COMPLETED, TESTED, AND ACCEPTED BY THE GOVERNMENT. THIS
APPLIES TO CHILLED WATER PIPING FED BY THE POWERPLANT
DISTRIBUTION PUMPS IN THE CHILLER BAY.
EXISTING CHILLED WATER CONTROL VALVE, BALANCING VALVE,
STRAINER, PRESSURE GAGES, THERMOMETERS AND OTHER ANCILLARY
DEVICES IN THE VICINITY OF EACH AIR HANDLING UNIT ON THE ROOF OF
THE GENERATOR BAY, SERVER ROOM ON THE FIRST FLOOR OF THE
GENERATOR BAY, AND SECOND FLOOR OF THE ELECTRICAL BAY SHALL
REMAIN AND BE REUSED, UNLESS SPECIFICALLY INDICATED OTHERWISE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING BUILDINGS, OTHER EQUIPMENT, AND COMPONENTS THAT ARE
TO REMAIN INTACT WHILE PERFORMING THE SPECIFIED WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING OFFICERS
REPRESENTATIVE (COR) OF ANY DAMAGES THAT MAY HAVE OCCURRED
AND PERFORM REPAIR AND / OR REPLACEMENT WORK AT NO
ADDITIONAL COST TO THE GOVERNMENT.
1.
2.
3.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
M-303
M-304
AHU-6
8" CWR
8" CWS
8" CWR
8" CWR
8" C
W R
8" C
W S
8" C
W S
8" C
W R
8" C
W S
(E X.
8" C
W R
(E X.
8" CWR (EX.)
8" CWS (EX.)
8" CWR
8" C
W S
8" C
W R
4" CWS (EX.)
4" CWR (EX.)
M-304
FLEX CONNECTORS AND
90 DEGREE ELBOWS. FOR CLARITY,
SEE SECTION VIEW 1 ON SHEET M-303. REFER
TO DETAIL 2 ON SHEET MSD02 AND DETAIL 1
ON SHEET MSD03 FOR PIPE SUPPORTS.
GENERATOR BAY ROOF
MANWAY ACCESS LADDER
4" C
W S
(E X.
4"
C W
R (E
X.
CWS/CWR SERVING GENERATOR BAY
SERVER ROOM AHU ON FIRST FLOOR
SEE SECTION
VIEW 1 AND
KEYNOTE #3 ON
SHEET M-304
FOR GENERATOR
BAY SERVER
ROOM NEW
PIPING
CONNECTION.
8" CWS
REFER TO DETAIL 1 ON SHEET MSD01 FOR
THE PIPE SUPPORTS. PROVIDE STEEL
REINFORCED CONCRETE PIERS IF
NECESSARY TO MOUNT PIPE SUPPORT BASE
PLATES. REFER TO DETAIL 6 ON SHEET
MSD01 FOR THE PIPE SUPPORT.
REFER TO DETAIL 6 ON SHEET
MSD02 FOR THE PIPE SUPPORT.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-204
C H
IL
LE
D W
A T
ER
L
IN
E N
EW
P
IP
IN
G P
LA
N
(1 O
F 3)
A R
EA
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T O
M
AH
A, N
E 6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
1/4" = 1'-0"M-204
1 CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4
MECHANICAL KEYNOTES
CONTINUE INSTALLING NEW 8" CWS/CWR PIPING AS SHOWN. FOR
CLARITY OF NEW PIPING ARRANGEMENT, SEE SECTION VIEWS ON
SHEET M-303 & M-304.
CONSTRUCT NEW 8" CWS PIPING UP TO THE LOCATION NEW
ISOLATION VALVE SHOWN. REMAINING CWS PIPING SHALL BE
CONSTRUCTED AFTER DEMOLITION OF EXISTING 8" CWR PIPING.
CONTINUE INSTALLING NEW 8" CWR PIPING AS SHOWN. FOR CLARITY
OF NEW PIPING ARRANGEMENT, SEE SECTION VIEWS ON SHEET M-303
& M-304.
INSTALL TEMPORARY ISOLATION VALVE ON EXISTING 4" CWR BRANCH
PIPING CLOSEST TO TEE FITTING ON EXISTING 8" MAIN CWR PIPING.
SEE SECTION VIEW 2 AND PERTINENT KEYNOTES ON SHEET M-304
FOR REQUIRED STEPS OF WORK RELATED TO GENERATOR BAY AHU
NEW PIPING CONNECTIONS. THIS WORK IS TYPICAL FOR ALL SIX (6)
AIR HANDLING UNITS ON GENERATOR BAY ROOF. THIS PART OF
WORK SHALL BE SEQUENCED IN AN ORDER OF AHU-1 TO AHU-6.
SINCE AHU-6 IS NORMALLY IN OPERATION FOR GENERATOR BAY
COOLING AND VENTILATION PURPOSES, OTHER AHUS SHALL BE
OPERABLE AFTER NEW PIPING CONNECTIONS PRIOR TO START NEW
PIPING WORK ON AHU-6.
PLAN NORTH
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
5 4 3
KEYPLAN
UP
MECHANICAL GENERAL NOTES
ONE SET OF EXISTING CHILLED WATER SUPPLY/RETURN PIPING
(INCLUDING INSULATION, PIPING SUPPORTS, VALVES, OR OTHER ITEMS)
SERVING THE ELECTRICAL BAY & GENERATOR BAY SHALL NOT BE
REMOVED UNTIL NEW CHILLED WATER SUPPLY/RETURN PIPING AND NEW
BRANCH PIPING CONNECTIONS TO ALL ASSOCIATED AIR HANDLING UNITS
ARE COMPLETED, TESTED, AND ACCEPTED BY THE GOVERNMENT. THIS
APPLIES TO CHILLED WATER PIPING FED BY THE POWERPLANT
DISTRIBUTION PUMPS IN THE CHILLER BAY.
EXISTING CHILLED WATER CONTROL VALVE, BALANCING VALVE,
STRAINER, PRESSURE GAGES, THERMOMETERS AND OTHER ANCILLARY
DEVICES IN THE VICINITY OF EACH AIR HANDLING UNIT ON THE ROOF OF
THE GENERATOR BAY, SERVER ROOM ON THE FIRST FLOOR OF THE
GENERATOR BAY, AND SECOND FLOOR OF THE ELECTRICAL BAY SHALL
REMAIN AND BE REUSED, UNLESS SPECIFICALLY INDICATED OTHERWISE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING BUILDINGS, OTHER EQUIPMENT, AND COMPONENTS THAT ARE
TO REMAIN INTACT WHILE PERFORMING THE SPECIFIED WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING OFFICERS
REPRESENTATIVE (COR) OF ANY DAMAGES THAT MAY HAVE OCCURRED
AND PERFORM REPAIR AND / OR REPLACEMENT WORK AT NO
ADDITIONAL COST TO THE GOVERNMENT.
1.
2.
3.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
GENERATOR BAY ROOF
AHU-1 AHU-2 AHU-3 AHU-4 AHU-5
M-305
M-305
8" CWR 8" CWR 8" CWR
4" CWS (EX.) 4" CWR (EX.)
1 1 1 1
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
M-205
C H
IL
LE
D W
A T
ER
L
IN
E N
EW
P
IP
IN
G P
LA
N
(1 O
F 3)
A R
EA
C H
EY
EN
N E
M O
U N
TA
IN
A
FB
, C O
LO
R
AD
O
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, 1
0 5
PN
SA
X C
(F
Y1 7)
O M
A H A
D
IS
T R
IC
T O
M
AH
A, N
E 6 8
K.
P
AR
K
K.
P
AR
K
M
IC
H
AE
L T.
S M
IT
H
M . S
M
IT
H
JU
N
E
W
F1
8R
1/4" = 1'-0"M-205
1 CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5
MECHANICAL KEYNOTES
PLAN NORTH
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
5 4 3
KEYPLAN
UP
FOR GENERATOR BAY ROOF AHU NEW PIPING CONNECTIONS, REFER
TO SECTION VIEW 2 AND KEYNOTE #3 ON SHEET M-304.
CONTINUE INSTALLING NEW 8" CWR PIPING AS SHOWN. FOR CLARITY
OF NEW PIPING ARRANGEMENT, SEE SECTION VIEWS ON SHEET
M-305.
MECHANICAL GENERAL NOTES
ONE SET OF EXISTING CHILLED WATER SUPPLY/RETURN PIPING
(INCLUDING INSULATION, PIPING SUPPORTS, VALVES, OR OTHER
ITEMS) SERVING THE ELECTRICAL BAY & GENERATOR BAY SHALL NOT
BE REMOVED UNTIL NEW CHILLED WATER SUPPLY/RETURN PIPING
AND NEW BRANCH PIPING CONNECTIONS TO ALL ASSOCIATED AIR
HANDLING UNITS ARE COMPLETED, TESTED, AND ACCEPTED BY THE
GOVERNMENT. THIS APPLIES TO CHILLED WATER PIPING FED BY THE
POWERPLANT DISTRIBUTION PUMPS IN THE CHILLER BAY.
EXISTING CHILLED WATER CONTROL VALVE, BALANCING VALVE,
STRAINER, PRESSURE GAGES, THERMOMETERS AND OTHER
ANCILLARY DEVICES IN THE VICINITY OF EACH AIR HANDLING UNIT ON
THE ROOF OF THE GENERATOR BAY, SERVER ROOM ON THE FIRST
FLOOR OF THE GENERATOR BAY, AND SECOND FLOOR OF THE
ELECTRICAL BAY SHALL REMAIN AND BE REUSED, UNLESS
SPECIFICALLY INDICATED OTHERWISE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING BUILDINGS, OTHER EQUIPMENT, AND COMPONENTS THAT
ARE TO REMAIN INTACT WHILE PERFORMING THE SPECIFIED WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONTRACTING OFFICERS
REPRESENTATIVE (COR) OF ANY DAMAGES THAT MAY HAVE
OCCURRED AND PERFORM REPAIR AND / OR REPLACEMENT WORK AT
NO ADDITIONAL COST TO GOVERNMENT.
FOR GENERATOR BAY ROOF AHU NEW PIPING CONNECTIONS, REFER
TO SECTION VIEW 2 AND KEYNOTE #1 & #2 ON SHEET M-304.
CONTINUE INSTALLING NEW 8" CWR PIPING AS SHOWN. FOR CLARITY
OF NEW PIPING ARRANGEMENT, SEE SECTION VIEWS ON SHEET
M-305.
1.
2.
3.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
- G
EN
ER
A L R
EV
IS
IO
N
S
J U
LY
REFER TO DETAIL 6 ON SHEET
MSD02 FOR THE PIPE SUPPORTS.
| CM10M-000 |
| Sheets |
| M-000 - GENERAL |
| CM13M-201 |
| Sheets |
| M-201 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1 |
| M-202 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2 |
| M-203 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3 |
| M-204 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4 |
| M-205 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5 |
| CM13M-202 |
| Sheets |
| M-201 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1 |
| M-202 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2 |
| M-203 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3 |
| M-204 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4 |
| M-205 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5 |
| CM13M-203 |
| Sheets |
| M-201 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1 |
| M-202 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2 |
| M-203 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3 |
| M-204 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4 |
| M-205 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5 |
| CM13M-204 |
| Sheets |
| M-201 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1 |
| M-202 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2 |
| M-203 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3 |
| M-204 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4 |
| M-205 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5 |
| CM13M-205 |
| Sheets |
| M-201 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 1 |
| M-202 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 2 |
| M-203 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 3 |
| M-204 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 4 |
| M-205 - CHILLED WATER LINE NEW PIPING PLAN (1 OF 3) - AREA 5 |