A.01.30_PWS_Attachment_3_-_PRS.pdf

PDF 79 KB Posted

Attached to
Norfork Lake Area Debris Removal Federal contract opportunity
Solicitation number
W9127S-17-Q-0031
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

PWS Attachment 3 - Performance Requirements Summary (PRS)

View the file

Other files for this federal contract opportunity

Other files attached to Norfork Lake Area Debris Removal, newest first.
File Type Posted
A.01.30_PWS.pdf PDF
A.01.30_PWS_Attachment_2_D.jpg JPG image
A.01.30_PWS_Attachment_2_L.jpg JPG image
A.01.30_PWS_Attachment_2_F.jpg JPG image
A.01.30_PWS_Attachment_2_E.jpg JPG image
A.01.30_PWS_Attachment_2_G.jpg JPG image
A.01.30_PWS_Attachment_2_N.jpg JPG image
A.01.30_PWS_Attachment_2_J.jpg JPG image
A.01.30_PWS_Attachment_2_K.jpg JPG image
A.01.30_PWS_Attachment_2_A.jpg JPG image
A.04.36_Wage_Rates.pdf PDF
A.01.30_PWS_Attachment_2_C.jpg JPG image
A.01.30_PWS_Attachment_2_P.jpg JPG image
A.01.30_PWS_Attachment_2_I.jpg JPG image
A.01.30_PWS_Attachment_2_B.jpg JPG image
A.01.30_PWS_Attachment_2_M.jpg JPG image
A.01.30_PWS_Attachment_4_-_QASP.pdf PDF
A.01.30_PWS_Attachment_2_O.jpg JPG image
A.01.30_PWS_Attachment_1_-_Security_Requirements.pdf PDF
A.01.30_PWS_Attachment_2_H.jpg JPG image
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold

Method of Surveillance

PRS # 1.

The contractor shall perform work according to the contract.

5.1 The contractor shall provide all

personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform debris cleanup/removal and roadway/campsite sweeping within identified parks on Norfork Lake.

1 critical

Planned Sampling

PRS # 2

The Contractor shall remove all debris according to contract.

5.1 The work consists of removing all

debris that exceeds 2” in diameter from the lake flooding within the recreation parks on Norfork Lake. Attached are park maps including the labeled area that shall receive debris clean up within the boundary limits.

The debris cleanup shall consist of removing all silt rows, sand, paper, tires, rocks, cans, glass, driftwood and other types of debris to the water’s edge in the areas specified within each park. All ditches and culverts shall be cleaned up and re-established to allow accurate drainage flow. Some handwork may be required. Contractor shall dispose of all debris types collected during cleanup operations by hauling to a legally established landfill off of government property. The specified areas shall be mow-able without any chances of flying debris by the mowing crew. Any areas that receive rutting from equipment usage, shall be restored at no additional cost. If any of the results of debris cleanup are considered to be unsatisfactory, Contractor shall re-clean the unsatisfactory areas within twenty-four (24) hours after notifications with no additional cost to the government.

The contractor shall have ninety (90) days from the Notice to Proceed (NTP) to complete the debris removal and sweeping for each line item. Contractor shall begin work only once the lake levels are within five (5) feet of their seasonal conservation pools, or when given approval by the Contracting Officer.

1 critical Planned

PRS # 3

The Contractor shall sweep roadways/campsites according to contract.

5.1 The work consists of removing all

debris within the recreation park roadways on Norfork Lake. Reference Attachment 2 titled "Park Maps" demonstrating park maps specifying the areas that shall receive roadway sweeping within the boundary limits. The roadway sweeping shall consist of removing all silt, dirt, mud, sand, paper, rocks, cans, glass, driftwood and other types of debris in the areas specified within each park. Sweeping areas shall include all main roadways, parking lots, campsite turnouts, and concrete camping pads and any other asphalt/concrete surfaces. Contractor shall make every effort to minimize streaks left by sweepers.

Any disposal of all debris types collected during sweeping operations shall be hauled to a legally established landfill off of government property. If any of the results of road sweeping cleanup are considered to be unsatisfactory, Contractor shall re-sweep the unsatisfactory areas within twenty-four (24) hours after notifications with no additional cost to the government.

The contractor shall have ninety (90) days from the Notice to Proceed (NTP) to complete the debris removal and sweeping for each line item. Contractor shall begin work only once the lake levels are within five (5) feet of their seasonal conservation pools, or when given approval by the contracting officer.

1 critical Planned