VOL3.PDF
PDF 2 MB Posted
- Attached to
- Training Support Facility, Fort Rucker, AL Federal contract opportunity
- Solicitation number
- W9127819R0035
About this file
Volume 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EM_385-1-1.pdf | ||
| VOL4.PDF | ||
| VOL2.PDF | ||
| RTA-DRAWINGS.pdf | ||
| VOL1.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 3 OF 4
THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS
SOLICITATION NO: W9127819R0035
CADD NO: MHY18006
SPECIFICATIONS
FOR
TRAINING SUPPORT FACILITY
FORT RUCKER, ALABAMA
(DALE COUNTY)
“GOOD ENGINEERING RESULTS IN A BETTER ENVIRONMENT”
U.S. ARMY ENGINEER DISTRICT, MOBILE
109 St. Joseph St
Mobile, Alabama 36602
This page was intentionally left blank for duplex printing.
TRAINING SUPPORT FACILITY W9127819R0035
FORT RUCKER, ALABAMA MHY18006
Table of Contents Page 1
TABLE OF CONTENTS
VOLUME 1 OF 4
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
Contract Clauses
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONTRACT CLAUSES
00 73 00 SUPPLEMENTARY CONDITIONS
CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING
DATA FOR CONTRACTOR PROGRESS PAYMENT INVOICE
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
LEED V4 SCORECARD
01 35 13 SPECIAL PROJECT PROCEDURES
BOEING ARTIFACT
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
SAM FORM 696
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
Table of Contents Page 2
DIVISION 01 - GENERAL REQUIREMENTS (continued)
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
ENV-SW002 USED BATTERY MANAGEMENT
ENV-SW003 USED LAMPS MANAGEMENT
USAACE FORM 2720 DEBRIS RECOVERY PLAN AND STATEMENT
USAACE FORM 2736 WASTE SHIPMENT RECORD
FORT RUCKER ENVIRONMENTAL PROTECTION PLAN
ADEM FORM 300 SOLID WASTE PROFILE SHEET
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
VOLUME 2 OF 4
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
ENV-AS002: FORT RUCKER ASBESTOS ABATEMENT PROCEDURES
USAACE FORM 2739 ASBESTOS ABATEMENT WORK PLAN
USAACE FORM 2738 ASBESTOS ABATEMENT COMPLIANCE CHECKLIST
ADEM FORM 300 SOLID WASTE PROFILE SHEET
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 31 00 CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 16 19 METALLIC OXIDE WATERPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
Table of Contents Page 3
DIVISION 07 - THERMAL AND MOISTURE PROTECTION (continued)
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 42 13 METAL WALL PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
VOLUME 3 OF 4
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 29 00 GYPSUM BOARD
09 30 10 PORCELAIN TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPET TILE
09 84 20 ACOUSTICAL AND WOOD VENEER WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHER CABINETS
10 56 13 STEEL SHELVING & MANUAL MOBILE STORAGE SHELVING UNITS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 32 00 MANUFACTURED WOOD CASEWORK
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
Table of Contents Page 4
DIVISION 14 – CONVEYING EQUIPMENT
14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACnet DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
VOLUME 4 OF 4
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
Table of Contents Page 5
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 23 00.00 20 EXCAVATION AND FILL
31 32 11 SOIL SURFACE EROSION CONTROL
31 63 16 AUGER CAST GROUT PILES
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 19 INTEGRALLY COLORED CONCRETE PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 19 CONCRETE CURBS AND SIDEWALKS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 – UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 – TRANSPORTATION
34 75 13 ELECTRO-MECHANICAL CRASH RATED BEAM VEHICLE BARRIER
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
--End of Project Table of Contents--
SECTION 09 06 00
SCHEDULES FOR FINISHES
05/09
PART 1 GENERAL
1.1 SUMMARY
This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.
PART 2 PRODUCTS
2.1 COLOR SCHEDULE
The color schedule information provided in the following paragraphs lists the colors, patterns and textures required for exterior and interior finishes, including both factory applied and field applied colors. Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from other manufacturers. In the case of difference between the drawings and specifications, colors identified in this specification govern.
2.2 EXTERIOR FINISHES
Reference the following specification and the drawings for manufacturer and color information.
2.2.1 Exterior Walls
Exterior wall colors apply to exterior wall surfaces including recesses at entrances and projecting vestibules. When applicable, paint conduit to closely match the adjacent surface color. Provide wall colors to match the colors listed below.
2.2.1.1 Brick
BR-1: Endicott Brick, Medium Ironspot #77, Utility size.
2.2.1.2 Mortar
LaFargeHolcim, "Putty".
2.2.1.3 Metal Wall Panels, Hardware, and Associated Trim
MP-1: Centria Formawall; Centria "Regal White Gold". MP-1 panels comprise all of the metal wall panels below the 55'-0" level that are visible from the exterior. Additionally, MP-1 will be used at
SECTION 09 06 00 Page 1 the low hip roof fascia and at the barrel roof fascia.
MP-2: Centria Formawall, powder coat white to match Sherwin Williams SW 7005 "Pure White". MP-2 panels comprise all of the metal wall panels that are used to back up other exterior finish materials. MP-2 panels occur behind the 8'-0" high brick/cast stone base, and behind the MP-3 panels that occur immediately below the barrel roof form, above the surrounding low hip roof.
The exterior side will be a prime finish galvanized steel sheet.
The interior panel face will have the SW 7005 powder coat paint finish.
MP-3: Fabral IV deep rib panel. Finish to match Imetco Premium Color Collection: "Preweathered Galvalume".
2.2.1.4 Precast Stone
CS-1: Cast Stone band, 1'-4" high, color to match RockCast "Buffstone". RockCast is a division of Reading Rock, Inc., 800-482-6566.
2.2.1.5 Glass and Glazing
GL-1: Pilkington, Reflective Low-E with Clear Glass
2.2.1.6 Screen Wall
Perforated stainless steel sheet on galvanized steel framing.
2.2.2 Exterior Trim
Provide exterior trim to match the colors listed below.
2.2.2.1 Overhead Coiling Door and Door Frame
Wayne Dalton Thermotite 800C, finish option; "White".
2.2.2.2 Aluminum Doors and Door Frames
CW-1: Clear Anodized aluminum, AA-M10C21A41
2.2.2.3 Fascia
To match Centria "Regal White Gold"
2.2.2.4 Soffits
SOF-1: To match Centria "Regal White Gold"
2.2.2.5 Downspouts and Gutters and Rain Leaders
To match Centria "Regal White Gold"
2.2.2.6 Scuppers
To match Centria "Regal White Gold".
SECTION 09 06 00 Page 2
2.2.2.7 Louvers
Clear Anodized, to match Greenheck "Clear Anodize 215 R-1
AA-M10C22A41".
2.2.2.8 Flashings
Match adjacent material in color.
2.2.2.9 Coping
To match Centria "Regal White Gold".
2.2.2.10 Handrails
Unfinished, galvanized steel.
2.2.2.11 Guardrails
Unfinished, galvanized steel.
2.2.2.12 Caulking and Sealants
Match adjacent material in color.
2.2.2.13 Bollards
Manufacturer's standard Caution Yellow (Federal Standard Color 595, Gloss Level: 80).
2.2.2.14 Signage
Background to match USACE Standard Communication Gray; to match Pantone 408. Lettering to be white. Red highlights, where used, to match USACE Standard Communication Red, Pantone 032.
2.2.2.15 Control Joints
Match adjacent material in color.
2.2.2.16 Expansion Joint and/or Covers
Match adjacent material in color.
2.2.3 Exterior Roof
Apply roof color to exterior roof surfaces including sheet metal flashings, pipes, conduits, electrical appurtenances, and similar items. Provide roof color to match the colors listed below.
2.2.3.1 Metal
SSMR-1: To match Imetco Standard Color Collection, "Silver Cloud".
2.2.3.2 PVC
Color: Manufacturer's standard White.
SECTION 09 06 00 Page 3
2.2.3.3 Penetrations
Match roof in color.
2.3 INTERIOR FINISHES
2.3.1 Interior Floor Finishes
Provide flooring materials to match the colors listed below.
2.3.1.1 Carpet Tile
CPT-1: Carpet Tile, Shaw Sky Tile 5T174- Places Series, "Village 72760" 24" X 24".
CPT-2: Carpet Tile, Shaw Sea Tile 5T172- Places Series, "Village 72760" 24" X 24".
2.3.1.2 Luxury Vinyl Tile
LVT-1: Armstrong Natural Creations NA 237 "Grizzly", 6" X 36".
2.3.1.3 Stair Nosings
Cast Aluminum- Babcock Davis Model No. BSTCA-C3W.
2.3.1.4 Stair Treads and Landings
SC-1 Sealed Concrete.
2.3.1.5 Stringers and Stair Framing
PNT-3: Sherwin Williams SW 7038 "Tony Taupe", Gloss Level G5.
2.3.1.6 Porcelain Tile
CTF-1 (Floors): Crossville Color Blox, "Sea Otter" 12" X 24" X 3/8".
2.3.1.7 Grout
GR-1: Laticrete 24 "Natural Gray".
2.3.1.8 Solid Surface Transition
Corian, "Clam Shell".
2.3.1.9 Entrance Mat
WKM-1: HD – MonoTuft HD™ Carpet, 9325 "Graphite" by Construction Specialties, Inc.
2.3.1.10 Concrete (Integrally Colored)
CON-1, Scofield Chromix C-24 "Charcoal", with polished finish.
2.3.2 Interior Base Finishes
Provide base materials to match the colors listed below.
SECTION 09 06 00 Page 4
2.3.2.1 Resilient Base and Moldings
RBS-1: Johnsonite coved rubber, type TP "29 Moonrock" 4" high.
2.3.2.2 Porcelain Tile
CTB-1: Crossville Color Blox, "Sea Otter", 6" X 12" cove base.
2.3.2.3 Marble Base
MB-1: Alabama White Marble.
2.3.2.4 Grout
GR-1: Laticrete 24 "Natural Grey".
2.3.3 Interior Wall Finishes
Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.
2.3.3.1 Paint
PNT-1: (General wall paint, neutral) Sherwin Williams SW 7029 "Agreeable Gray", Gloss Level G3.
PNT-2: (High wall, metal panels north of column line B) Sherwin Williams SW 7046 "Anonymous", Gloss Level G5.
PNT-4: (Accent Wall) Sherwin Williams SW 6408 "Wheat Grass", Gloss Level G3.
PNT-6: (Interior side of exterior metal wall panels, structure) Sherwin Williams SW 7005 "Pure White", Gloss Level G5.
2.3.3.2 Protective Wall Panel
WP-1 C/S Acrovyn, Shadowgrain texture, #934 "Pearl".
2.3.3.3 Porcelain Tile
CTW-1: Crossville Ceramics, Color Blox series "Sand Box", 12" X 4 24" X 3/8" thick.
2.3.3.4 Grout
GR-2: Laticrete 23 "Antique White".
2.3.3.5 Modular Wood Panel System
WP-2. Manufacturer: Armstrong.
Series: Woodworks Linear Wall Systems.
Description: 7'-6" wide X 1'-8" high panels with 3/4" reveal on furring channels, with 5/8" "BioAcoustic" infill panel behind.
SECTION 09 06 00 Page 5
Color: Light Cherry.
2.3.3.6 Exposed Structural Columns
PNT-6: Sherwin Williams SW 7005 "Pure White", Gloss Level G5.
2.3.4 Interior Ceiling Finishes
Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.
Provide ceiling materials to match the colors listed below.
2.3.4.1 Acoustical Tile and Grid
ACT-1: USG Eclipse, "White".
ACT-2: USG Climaplus Sheetrock lay-in; ZXLA Grid; "White".
2.3.4.2 Paint (Ceilings)
PNT-4: Sherwin Williams SW 7005 "Pure White", Gloss Level G1.
2.3.4.3 Paint (Soffits)
PNT-4: Sherwin Williams SW 7005 "Pure White", Gloss Level G1.
2.3.4.4 Metal Deck
PNT-6: Sherwin Williams SW 7005 "Pure White", Gloss Level G5.
2.3.4.5 Structural Framing
PNT-6: Sherwin Williams SW 7005 "Pure White", Gloss Level G5.
2.3.5 Interior Trim
Provide interior trim to match the colors listed below.
2.3.5.1 Steel Doors
PNT-3: Sherwin Williams SW 7038 "Tony Taupe", Gloss Level G5.
2.3.5.2 Steel Door Frames
PNT-3: Sherwin Williams SW 7038 "Tony Taupe", Gloss Level G5.
2.3.5.3 Aluminum Doors and Door Frames (Curtainwall)
Clear anodized aluminum, AA-M10C21A41.
2.3.5.4 Aluminum Windows (mullion, muntin, sash, trim, and stool)
AA-M10C21A41
2.3.5.5 Wood Doors
WDF-1: Algoma Masonite, Plain Sliced Cherry, RA-100.
SECTION 09 06 00 Page 6
2.3.5.6 Fire Extinguisher Cabinets
Manufacturer's standard White.
2.3.5.7 Handrails
Unfinished galvanized steel.
2.3.5.8 Guardrails
Unfinished galvanized steel.
2.3.5.9 Metal Stairs; includes risersand underside of stairs only
PNT-3: Sherwin Williams SW 7038 "Tony Taupe", Gloss Level G5.
2.3.5.10 Exposed Ductwork
PNT-6: Sherwin Williams SW 7005 "Pure White", Gloss Level G5.
2.3.5.11 Bollards
Standard Safety Yellow.
2.3.6 Interior Window Treatment
Provide window treatments to match the colors listed below.
2.3.6.1 Window Shades
WS-1: MechoSystems EuroVeil Basket Weave 5300 Series (5% open).
2.3.7 Interior Miscellaneous
Provide miscellaneous items to match the colors listed below.
2.3.7.1 Toilet Partitions and Urinal Screens
TPT-1: Wilsonart Carbon Mesh 4880-38.
2.3.7.2 Casework
Break Room cabinets will have base cabinets with PL-2 finish, SS-1 countertop, and wall cabinets with SS-1 finish.
2.3.7.3 Plastic Laminate
PL-1: Wilsonart "Highline" 7970K-18.
PL-2 Wilsonart "Shadow" D96-60.
2.3.7.4 Solid Surfacing Material
SS-1: Corian, "Bone".
2.3.7.5 Corner Guards
CG-1, C/S Acrovyn CO-8, stainless steel.
CG-2, C/S Acrovyn LG Series- 118, 305 "Mushroom".
SECTION 09 06 00 Page 7
2.3.7.6 Signage Message Color
See 10 14 00.20 INTERIOR SIGNAGE for all colors
2.3.7.7 Wall Switch Handles and Standard Receptacle Bodies
Brushed stainless steel.
2.3.7.8 Electrical Device Cover Plates
Brushed stainless steel.
2.3.7.9 Electrical Panels
Manufacturer's standard Gray.
2.3.7.10 Shower Curtain
SC-1" American Hotel Register Hookless; Litchfield, #2240 Litchfields-WHT, "White".
2.3.7.11 Shower Wall Kits and Trim
Bright polished stainless steel.
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 09 06 00 Page 8
SECTION 09 29 00
GYPSUM BOARD
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A108.11 (1992; Reaffirmed 2005) Specifications for Interior Installation of Cementitious Backer Units
ASTM INTERNATIONAL (ASTM)
ASTM C1002 (2014) Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs
ASTM C1047 (2014a) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base
ASTM C1396/C1396M (2014a) Standard Specification for Gypsum Board
ASTM C1629/C1629M (2015) Standard Classification for Abuse-Resistant Nondecorated Interior Gypsum Panel Products and Fiber-Reinforced Cement Panels
ASTM C475/C475M (2015) Joint Compound and Joint Tape for Finishing Gypsum Board
ASTM C840 (2016) Standard Specification for Application and Finishing of Gypsum Board
ASTM C954 (2015) Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from
0.033 in. (0.84 mm) to 0.112 in. (2.84 mm) in Thickness
ASTM D1037 (2012) Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
ASTM D226/D226M (2009) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
SECTION 09 29 00 Page 1
ASTM D2394 (2005; R 2011) Simulated Service Testing of Wood and Wood-Base Finish Flooring
ASTM D5420 (2016) Standard Test Method for Impact Resistance of Flat, Rigid Plastic Specimen by Means of a Strike Impacted by a Falling Weight (Gardner Impact)
ASTM E695 (2003; R 2015; E 2015) Measuring Relative Resistance of Wall, Floor, and Roof Construction to Impact Loading
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2004; Add 2004-01) Standard Practice for the Testing Of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
GREEN SEAL (GS)
GS-36 (2011) Commercial Adhesives
GYPSUM ASSOCIATION (GA)
GA 214 (2010) Recommended Levels of Gypsum Board Finish
GA 216 (2010) Application and Finishing of Gypsum Panel Products
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS)Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (1989; R 2005) Adhesive and Sealant Applications
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
UL Fire Resistance (2014) Fire Resistance Directory
SECTION 09 29 00 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Cementitious Backer Units
Abuse Resistant Gypsum Board
Accessories
Submit for each type of gypsum board and for cementitious backer units.
Certifications
Gypsum Board SD-07 Certificates
Asbestos Free Materials; G Indoor Air Quality; G
SD-11 Closeout Submittals
Recycled Content for Gypsum Board; S
Recycled Content for Paper Facing and Gypsum Cores; S
Indoor Air Quality for Gypsum Board; S
VOC Content of Joint Compound; S
Indoor Air Quality for Non-aerosol Adhesives; S
Indoor Air Quality for Aerosol Adhesives; S
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Ceiling and Wall Systems
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide validation by other third-party program that products meet the requirements of this paragraph. Provide current product certification documentation from certification body. Gypsum wall board and panels must meet the emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type).
SECTION 09 29 00 Page 3
1.3.1.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide validation by other third-party program that products meet the requirements of this paragraph. Sealants and non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) must meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168. Aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) must meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36. Provide current product certification documentation from certification body.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials in the original packages, containers, or bundles with each bearing the brand name, applicable standard designation, and name of manufacturer, or supplier.
1.4.2 Storage
Keep materials dry by storing inside a sheltered building. Where necessary to store gypsum board and cementitious backer units outside, store off the ground, properly supported on a level platform, and protected from direct exposure to rain, snow, sunlight, and other extreme weather conditions.
Provide adequate ventilation to prevent condensation. Store per manufacturer's recommendations for allowable temperature and humidity range. Do not store panels near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives. Do not use materials that have visible moisture or biological growth.
1.4.3 Handling
Neatly stack gypsum board and cementitious backer units flat to prevent sagging or damage to the edges, ends, and surfaces.
1.5 QUALIFICATIONS
Furnish type of gypsum board work specialized by the installer with a minimum of 3 years of documented successful experience.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not expose the gypsum board to excessive sunlight prior to gypsum board application. Maintain a continuous uniform temperature of not less than 50 degrees F and not more than 80 degrees F for at least one week prior to the application of gypsum board work, while the gypsum board application is being done, and for at least one week after the gypsum board is set.
Shield air supply and distribution devices to prevent any uneven flow of air across the plastered surfaces. Provide ventilation to exhaust moist air to the outside during gypsum board application, set, and until gypsum board jointing is dry. In glazed areas, keep windows open top and bottom or side to side 3 to 4 inches. Reduce openings in cold weather to prevent
SECTION 09 29 00 Page 4 freezing of joint compound when applied. For enclosed areas lacking natural ventilation, provide temporary mechanical means for ventilation.
In unglazed areas subjected to hot, dry winds or temperature differentials from day to night of 20 degrees F or more, screen openings with cheesecloth or similar materials. Avoid rapid drying. During periods of low indoor humidity, provide minimum air circulation following gypsum boarding and until gypsum board jointing complete and is dry.
1.7 FIRE RESISTIVE CONSTRUCTION
Comply with specified fire-rated assemblies for design numbers indicated per UL Fire Resistance or FM APP GUIDE.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
2.1.1 Recycled Content for Gypsum Board Materials
Recycled content is identified for some products in this section; provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT. Other products listed in this section may be available with recycled content; identify those products that meet project requirements for recycled content, and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.
2.1.2 Reduce Volatile Organic Compounds (VOC) (LOW-EMITTING MATERIALS) for Products
Reduced VOC content is identified for some products in this section;
provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW-EMITTING MATERIALS). Other products listed in this section may be available with reduced VOC content; identify those products that meet project requirements for reduced VOC content, and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC
COMPOUNDS (VOC) (LOW-EMITTING MATERIALS).
2.2 MATERIALS
Conform to specifications, standards and requirements specified. Provide gypsum board types, gypsum backing board types, cementitious backing units, and joint treating materials manufactured from asbestos free materials only.
2.2.1 Gypsum Board
ASTM C1396/C1396M. Gypsum board must contain a minimum of 5 percent post-consumer recycled content, or a minimum of 20 percent post-industrial recycled content. Provide data identifying percentage of recycled content for gypsum board. Paper facings must contain a minimum of 100 percent post-consumer recycled paper content. Gypsum cores must contain a minimum of 95 percent post-industrial recycled gypsum content. Provide data identifying percentage of recycled content for paper facing and gypsum cores.
Provide certification of indoor air quality for gypsum board.
SECTION 09 29 00 Page 5
2.2.1.1 Regular
48 inch wide, 5/8 inch thick, tapered edges.
2.2.1.2 Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, tapered edges.
2.2.2 Gypsum Backing Board
ASTM C1396/C1396M, gypsum backing board must be used as a base in a multilayer system.
2.2.2.1 Regular
48 inch wide, 5/8 inch thick, square edges.
2.2.3 Abuse Resistant Gypsum Board
48 inch wide, 5/8 inch thick, tapered edges. Reinforced gypsum panel with imbedded fiber mesh or lexan backing tested in accordance with the following tests. Hard body impact test must attain a Level 2 performance in accordance with ASTM C1629/C1629M. Provide fasteners that meet manufacturer requirements and specifications stated within this section.
Abuse resistant gypsum board, when tested in accordance with ASTM E84, have a flame spread rating of 25 or less and a smoke developed rating of 50 or less.
2.2.3.1 Soft Body Impact Test
ASTM E695 or ASTM D2394 for impact penetration and deformation. ASTM E695 using a 60 lb leather bag filled with steel pellets, resisting no less than 300 ft. lb. cumulative impact energy before failure or ASTM D2394 using 5.5 inch hemispherical projectile resisting no less than 264 ft. lb. before failure. Provide test specimen stud spacing a minimum 16 inch on center.
2.2.3.2 Hard Body Impact Test
Comply with hard body impact test in accordance with ASTM C1629/C1629M Classification Level 2.
2.2.3.3 Surface Abrasion Test
Comply with test surface abrasion test in accordance with ASTM C1629/C1629M.
2.2.3.4 Indentation Test
ASTM D5420 or ASTM D1037 for indentation resistance. ASTM D5420 using a 32 oz weight with a 5/8 inch hemispherical impacting head dropped once 3 feet creating not more than 0.137 inch indentation or ASTM D1037 using no less than 470 lb weight applied to the 0.438 inch diameter ball to create not more than a 0.0197 inch indentation depth.
2.2.4 Cementitious Backer Units
In accordance with the Tile Council of America (TCA) Handbook. ASTM C1325.
SECTION 09 29 00 Page 6
2.2.5 Joint Treatment Materials
ASTM C475/C475M. Product must be low emitting VOC types with VOC limits not exceeding 50 g/L. Provide data identifying VOC content of joint compound.
2.2.5.1 Embedding Compound
Specifically formulated and manufactured for use in embedding tape at gypsum board joints and compatible with tape, substrate and fasteners.
2.2.5.2 Finishing or Topping Compound
Specifically formulated and manufactured for use as a finishing compound.
2.2.5.3 All-Purpose Compound
Specifically formulated and manufactured to serve as both a taping and a finishing compound and compatible with tape, substrate and fasteners.
2.2.5.4 Setting or Hardening Type Compound
Specifically formulated and manufactured for use with fiber glass mesh tape.
2.2.5.5 Joint Tape
Use cross-laminated, tapered edge, reinforced paper, or fiber glass mesh tape recommended by the manufacturer.
2.2.6 Fasteners
2.2.6.1 Screws
ASTM C1002, Type "G", Type "S" or Type "W" steel drill screws for fastening gypsum board to gypsum board, wood framing members and steel framing members less than 0.033 inch thick. ASTM C954 steel drill screws for fastening gypsum board to steel framing members 0.033 to 0.112 inch thick.
Provide cementitious backer unit screws with a polymer coating.
2.2.7 Adhesives
Provide certification of indoor air quality for non-aerosol adhesives applied on the interior of the building (inside of the weatherproofing system). Provide certification of indoor air quality for aerosol adhesives used on the interior of the building (inside of the weatherproofing system).
2.2.7.1 Adhesive for Fastening Gypsum Board to Metal Framing
Not permitted.
2.2.8 Accessories
ASTM C1047. Fabricate from corrosion protected steel or plastic designed for intended use. Accessories manufactured with paper flanges are not acceptable. Flanges must be free of dirt, grease, and other materials that may adversely affect bond of joint treatment. Provide prefinished or job decorated materials.
SECTION 09 29 00 Page 7
2.2.9 Asphalt Impregnated Building Felt
Provide a 15 lb asphalt moisture barrier over glass mat covered or reinforced gypsum sheathing. Conforming to ASTM D226/D226M Type 1 (No. 15) for asphalt impregnated building felt.
2.2.10 Water
Provide clean, fresh, and potable water.
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Framing and Furring
Verify that framing and furring are securely attached and of sizes and spacing to provide a suitable substrate to receive gypsum board and cementitious backer units. Verify that all blocking, headers and supports are in place to support plumbing fixtures and to receive soap dishes, grab bars, towel racks, and similar items. Do not proceed with work until framing and furring are acceptable for application of gypsum board and cementitious backer units.
3.1.2 Building Construction Materials
Do not install building construction materials that show visual evidence of biological growth.
3.2 APPLICATION OF GYPSUM BOARD
Apply gypsum board to framing and furring members in accordance with ASTM C840 or GA 216 and the requirements specified. Apply gypsum board with separate panels in moderate contact; do not force in place. Stagger end joints of adjoining panels. Neatly fit abutting end and edge joints.
Use gypsum board of maximum practical length; select panel sizes to minimize waste. Cut out gypsum board to make neat, close, and tight joints around openings. In vertical application of gypsum board, provide panels in lengths required to reach full height of vertical surfaces in one continuous piece. Lay out panels to minimize waste; reuse cutoffs whenever feasible. Treat edges of cutouts for plumbing pipes, screwheads, and joints with water-resistant compound as recommended by the gypsum board manufacturer. Provide type of gypsum board for use in each system specified herein as indicated.
3.2.1 Floating Interior Angles
Minimize framing by floating corners with single studs and drywall clips.
3.2.2 Control Joints
Install expansion and contraction joints in ceilings and walls in accordance with ASTM C840, System XIII or GA 216. Fill control joints between studs in fire-rated construction with firesafing insulation to match the fire-rating of construction.
3.2.3 Application of Abuse Resistant Gypsum Board
Apply in accordance with applicable system of ASTM C840 as specified or
SECTION 09 29 00 Page 8
GA 216. Follow manufacturers written instructions on how to cut, drill and attach board.
3.3 APPLICATION OF CEMENTITIOUS BACKER UNITS
3.3.1 Application
In wet areas (tubs, shower enclosures, saunas, steam rooms, gang shower rooms), apply cementitious backer units in accordance with ANSI A108.11.
Place a 15 lb asphalt impregnated, continuous felt paper membrane behind cementitious backer units, between backer units and studs or base layer of gypsum board. Place membrane with a minimum 6 inch overlap of sheets laid shingle style.
3.3.2 Joint Treatment
ANSI A108.11.
3.4 FINISHING OF GYPSUM BOARD
Tape and finish gypsum board in accordance with ASTM C840, GA 214 and GA 216.
Unless otherwise specified, finish all gypsum board walls, partitions and ceilings to Level 4 in accordance with GA 214. Provide joint, fastener depression, and corner treatment. Tool joints as smoothly as possible to minimize sanding and dust. Do not use self-adhering fiber glass mesh tape with conventional drying type joint compounds; use setting or hardening type compounds only. Provide treatment for water-resistant gypsum board as recommended by the gypsum board manufacturer. Protect workers, building occupants, and HVAC systems from gypsum dust.
3.5 SEALING
Seal openings around pipes, fixtures, and other items projecting through gypsum board and cementitious backer units as specified in Section 07 92 00 JOINT SEALANTS. Apply material with exposed surface flush with gypsum board or cementitious backer units.
3.6 FIRE-RESISTANT ASSEMBLIES
Wherever fire-rated construction is indicated, provide materials and application methods, including types and spacing of fasteners, wall and ceiling framing in accordance with the specifications contained in UL Fire Resistance for the Design Number(s) indicated. Joints of fire-rated gypsum board enclosures must be closed and sealed in accordance with UL test requirements or GA requirements. Seal penetrations through rated partitions and ceilings tight in accordance with tested systems.
3.7 PATCHING
Patch surface defects in gypsum board to a smooth, uniform appearance, ready to receive finishes.
SECTION 09 29 00 Page 9
SECTION 09 30 10
PORCELAIN TILING
11/13
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A137.1 (2012) American National Standards Specifications for Ceramic Tile
ASTM INTERNATIONAL (ASTM)
ASTM C144 (2011) Standard Specification for Aggregate for Masonry Mortar
ASTM C150/C150M (2016; E 2016) Standard Specification for Portland Cement
ASTM C206 (2014) Standard Specification for Finishing Hydrated Lime
ASTM C207 (2006; R 2011) Standard Specification for Hydrated Lime for Masonry Purposes
ASTM C33/C33M (2016) Standard Specification for Concrete Aggregates
ASTM C373 (2016; E 2016)Standard Test Methods for Determination of Water Absorption and Associated Properties by Vacuum Method for Pressed Ceramic Tiles and Glass Tiles and Boil Method for Extruded Ceramic Tiles and Non-tile Fired Ceramic Whiteware Products
ASTM C648 (2004; R 2009) Breaking Strength of Ceramic Tile
ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting
ASTM D226/D226M (2009) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2013) Handbook for Ceramic, Glass, and Stone Tile Installation
SECTION 09 30 10 Page 1
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)
LEED GBDC Ref Guide (2009; R 2010) LEED Reference Guide for Green Building Design, Construction and Major Renovations of Commercial and Institutional Buildings including Core & Shell and K-12 Projects
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
1.2 SUSTAINABILITY REPORTING
Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project LEED BD+C local/regional materials, low-emitting materials, recycled content, rapidly renewable materials and LEED documentation requirements.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
Submittals with "DO" are for Government review by the USACE Resident Engineer. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-04 Samples
Tile; G, DO Accessories; G, DO Transition Strips; G, DO
SD-11 Closeout Submittals
LEED Documentation; S
1.4 QUALITY ASSURANCE
Installers to be from a company specializing in performing this type of work and have a minimum of two years experience. Each type and color of tile to be provided from a single source. Each type and color of mortar, adhesive, and grout to be provided from the same source.
1.5 DELIVERY, STORAGE, AND HANDLING
Ship tiles in sealed packages and clearly marked with the grade, type of
SECTION 09 30 10 Page 2 tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from weather, and store them under cover in accordance with manufacturer's printed instructions.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1-year period.
1.8 EXTRA MATERIALS
Supply an extra 2 percent of each type tile used in clean and marked cartons.
PART 2 PRODUCTS
2.1 TILE
Furnish tiles that comply with ANSI A137.1 and are standard grade tiles.
Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs.
for floor tile in accordance with ASTM C648. Provide floor tiles with a wet dynamic coefficient of friction (DCOF) value of 0.42 or greater when tested in accordance with ANSI A137.1 requirements. For materials like tile, accessories, and transition strips submit samples of sufficient size to show color range, pattern, type and joints. Submit manufacturer's catalog data.
2.1.1 Porcelain Tile
Furnish unglazed, porcelain tile, cove base and trim pieces with color extending uniformly through the body of the tile. Provide tile with a V3 aesthetic classification. Blend tiles in factory and in a packages to have same color range and continuous blend for installation. Provide nominal tile size(s) as indicated on drawings inch and 1/4 or 3/8 inch thick, as dictated by tile size. Provide a 0.10 percent maximum water absorption in accordance with ASTM C373.
2.2 SETTING-BED
Submit manufacturer's catalog data. Compose the setting-bed of the following materials:
2.2.1 Aggregate for Concrete Fill
Conform to ASTM C33/C33M for aggregate fill. Do not exceed one-half the thickness of concrete fill for maximum size of coarse aggregate.
SECTION 09 30 10 Page 3
2.2.2 Portland Cement
Conform to ASTM C150/C150M for cement, Type I, white for wall mortar and gray for other uses.
2.2.3 Sand
Conform to ASTM C144 for sand.
2.2.4 Hydrated Lime
Conform to ASTM C206 for hydrated lime, Type S or ASTM C207, Type S.
2.3 WATER
Provide potable water.
2.4 MORTAR, GROUT, AND ADHESIVE
Submit certificates indicating conformance with specified requirements.
Submit LEED documentation relative to low-emitting materials credit in accordance with LEED GBDC Ref Guide. Include in LEED Documentation Notebook. Submit manufacturer's catalog data.
2.4.1 Dry-Set Portland Cement Mortar
TCNA Hdbk.
2.4.2 Latex-Portland Cement Mortar
TCNA Hdbk.
2.4.3 Ceramic Tile Grout
TCNA Hdbk; petroleum-free and plastic-free sand portland cement grout .
2.4.4 Sealants
Comply with applicable regulations regarding toxic and hazardous materials and as specified. Grout sealant must not change the color or alter the appearance of the grout.
2.5 TRANSITION STRIPS
Provide clear anodized aluminum transitions between tile and carpet or resilient flooring. Provide types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide transition strips that comply with 36 CFR 1191requirements.
2.6 MEMBRANE MATERIALS
Conform to ASTM D226/D226M, Type 1 for 15 pound waterproofing membrane, asphalt-saturated building felt. Conform to ASTM D2103 4 mil for polyethylene film.
2.7 COLOR, TEXTURE, AND PATTERN
Provide color, pattern and texture in accordance with Section 09 06 00
SCHEDULES FOR FINISHES.
SECTION 09 30 10 Page 4
PART 3 EXECUTION
3.1 PREPARATORY WORK AND WORKMANSHIP
Inspect surface to receive tile in conformance to the requirements of TCNA Hdbk for surface conditions for the type setting bed specified and for workmanship. Provide variations of tiled surfaces that fall within maximum values shown below:
TYPE WALLS FLOORS
Dry-Set Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.
Organic Adhesives 1/8 inch in 8 ft. 1/16 inch in 3 ft.
Latex Portland Cement Mortar
1/8 inch in 8 ft. 1/8 inch in 10 ft.
Epoxy 1/8 inch in 8 ft. 1/8 inch in 10 ft.
3.2 GENERAL INSTALLATION REQUIREMENTS
Do not start tile work until roughing in for mechanical and electrical work has been completed and tested, and built-in items requiring membrane waterproofing have been installed and tested. Close space, in which tile is being set, to traffic and other work. Keep closed until tile is firmly set. Do not start floor tile installation in spaces requiring wall tile until after wall tile has been installed. Apply tile in colors and patterns indicated in the area shown on the drawings. Install tile with the respective surfaces in true even planes to the elevations and grades shown. Provide special shapes as required for sills, jambs, recesses, offsets, external corners, and other conditions to provide a complete and neatly finished installation. Solidly back tile bases and coves with mortar. Do not walk or work on newly tiled floors without using kneeling boards or equivalent protection of the tiled surface. Keep traffic off horizontal portland cement mortar installations for at least 72 hours.
Keep all traffic off epoxy installed floors for at least 40 hours after grouting, and heavy traffic off for at least 7 days, unless otherwise specifically authorized by manufacturer.
3.3 INSTALLATION OF WALL TILE
Install wall tile in accordance with the TCNA Hdbk, method W244C-18 and with grout joints as recommended by the manufacturer for the type of tile.
Install wall tile at showers in accordance with the TCNA Hdbk, method B415-18 and with grout joints as recommended by the manufacturer for the type of tile.
3.3.1 Organic Adhesive
Conform to TCNA Hdbk for the organic adhesive installation of porcelain tile.
3.3.2 Ceramic Tile Grout
Prepare and install ceramic tile grout in accordance with TCNA Hdbk.
Provide and apply manufacturer's standard product for sealing grout joints
SECTION 09 30 10 Page 5 in accordance with manufacturer's recommendations.
3.4 INSTALLATION OF FLOOR TILE
Install floor tile in accordance with TCNA Hdbk method F113-18 at ground floor and F121-18 at elevated floor levels, with grout joints as recommended by the manufacturer for the type of tile. Install shower receptors in accordance with TCNA Hdbk method B420-18.
3.4.1 Workable or Cured Mortar Bed
Install floor tile over a workable mortar bed or a cured mortar bed at the option of the Contractor. Conform to TCNA Hdbk for workable mortar bed materials and installation. Conform to TCNA Hdbk for cured mortar bed materials and installation. Provide minimum 1/4 inch to maximum 3/8 inch joints in uniformed width.
3.4.2 Ceramic Tile Grout
Prepare and install ceramic tile grout in accordance with TCNA Hdbk.
Provide and apply manufacturer's standard product for sealing grout joints in accordance with manufacturer's recommendations.
3.4.3 Waterproofing
Shower pans are specified in Section 22 00 00 PLUMBING, GENERAL PURPOSE.
3.5 INSTALLATION OF TRANSITION STRIPS
Install transition strips where indicated, in a manner similar to that of the ceramic tile floor and as recommended by the manufacturer. Provide thresholds full width of the opening. Install head joints at ends not exceeding 1/4 inch in width and grouted full.
3.6 EXPANSION JOINTS
Form and seal joints as specified in Section 07 92 00 JOINT SEALANTS.
3.6.1 Walls
Provide expansion joints at control joints in backing material. Wherever backing material changes, install an expansion joint to separate the different materials.
3.6.2 Floors
Provide expansion joints over construction joints, control joints, and expansion joints in concrete slabs. Provide expansion joints where tile abuts restraining surfaces such as perimeter walls, curbs and columns and at intervals of 24 to 36 feet each way in large interior floor area.
Extend expansion joints through setting-beds and fill.
3.7 CLEANING AND PROTECTING
Upon completion, thoroughly clean tile surfaces in accordance with manufacturer's approved cleaning instructions. Do not use acid for cleaning glazed tile. Clean floor tile with resinous grout or with factory mixed grout in accordance with printed instructions of the grout manufacturer. After the grout has set, provide a protective coat of a
SECTION 09 30 10 Page 6 noncorrosive soap or other approved method of protection for tile wall surfaces. Cover tiled floor areas with building paper before foot traffic is permitted over the finished tile floors. Provide board walkways on tiled floors that are to be continuously used as passageways by workmen.
Replace damaged or defective tiles. Submit copy of manufacturer's printed maintenance instructions.
SECTION 09 30 10 Page 7
SECTION 09 51 00
ACOUSTICAL CEILINGS
08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2010; Errata 2011; Supp 1 2013) Minimum Design Loads for Buildings and Other Structures
ASTM INTERNATIONAL (ASTM)
ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method
ASTM C635/C635M (2013a) Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings
ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels
ASTM C834 (2014) Latex Sealants
ASTM E1264 (2014) Acoustical Ceiling Products
ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling Plenum
ASTM E1477 (1998a; R 2013) Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers
ASTM E580/E580M (2014) Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions
ASTM E795 (2016) Standard Practices for Mounting Test Specimens During Sound Absorption Tests