SOW_PICTURES.pdf
PDF 440 KB Posted
- Attached to
- Life Support for Training Exercise Federal contract opportunity
- Solicitation number
- W9124M18QTF19
- Issued by
- Department of the Army
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| more_info.docx | DOCX document | |
| answers_asked_at_site_visit.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
75th RANGER REGIMENT– LIFE SUPPORT MLAT
Place and Period of Performance:
HAAF, GA ; Saber Hall, 11 June-23 June 2018
Background:
75th Ranger Regiment conducts Multilateral Training Exercise at Hunter Army Airfield (HAAF), Georgia
11 June – 23 June 2018. The purpose of this training is to exercise tactical, command, control, and support elements under realistic conditions that replicate the scale, diversity, and complexity of the operational environments currently encountered during overseas combat deployments. This Statement of
Work describes the work necessary to effectively support the stated training objectives and satisfy the commander’s intent for training. The contractor shall provide the required training support in accordance with the specific mission requirements identified in this document. In line with completing training objectives, the training exercise requires the proper life support systems to be in place to support a 500 man element at Hunter Army Airfield (HAAF), Georgia. These systems shall support 24 hour operations and are the minimum necessities to sustain the quality of life during training. These resources must be outsourced because the facilities are not provided and are not available through standard Army equipment inventories. This is a time and material contract where as any unused funding or amendments to reduce the intial scope that decreases the amount of funds already sent shall result in the excess funds returned to the unit.
Mission Objectives:
1. Provide Life Support for a total of 500 personnel.
2. Provide high quality and high durability shower facility, airconditioned sleeping quarters with power outlets and hard floors, and latrines which are accessible 24 hours a day for the duration of the training exercise.
3. Provide gray water service.
4. Provide reliable Power Generation, with backup power source to run these facilities
5. Provide shower support.
6. Maintain cleanliness of area of operation to include removal of trash.
7. Monitor and replenish all toiletries.
8. Have all the necessary functions and components written in this SOW in place and ready for use on 11 June 2018 in HAAF, GA; Saber Hall.
Scope:
1. Shower Facilities
a. Required at HAAF, GA at the Saber Hall location.
b. The contractor shall provide enough shower systems to accommodate 500 personnel per day.
c. Shower facilities shall be in place at Saber Hall, HAAF, GA no later than 11 June 2018 and removed on 23 June 2018.
d. The Contractor shall be capable of linking up to existing sewer system/water supply at
Saber Hall, HAAF, GA. It will be the contractor’s responsibility to coordinate with the proper post management in order to coordinate how to execute this. Contractor shall be assisted by the COR in obtaining approval. If sewer system cannot be utilized it will be the contractor’s responsibility to remove all waste.
e. The Contractor shall provide daily water fill service and gray water service.
7. Fuel
a. All fuel shall be supplied by the contractor. Contractors shall also conduct all refueling operations.
b. Contractor shall ensure airconditioning and power generation is always maintained, and can be quickly fixed if they should fail.
Materials and Equipment
1. Power Generation- Acoustic, quiet running and capable of running lights and electrical outlets to all locations and tents specified in this contract on this site. Contractor shall provide cable ramps for all runs of electrical wire that exceeds 15ft. or crosses a high traffic area.
2. Bulk Water Storage- All Potable and Gray Water Storage shall meet DOD Safety Standards.
3. Showers for training event - Shower Support for 500 personnel capable of linking with existing sewer system at SABER HALL; HAAF, GA. Request for 1 showerhead per 10 personnel.
4. Latrines for SABER HALL- . Latrines (may be chemical) to accommodate 500 personnel, serviced daily. Contractor shall replenish toilet paper as needed. Latrines shall be emplaced at a location specified by 1/75 COR.
5. Handwashing stations – enough handwashing stations to accommodate 500 personnel, serviced daily, with hand soap and paper towels. Handwashing stations shall be collocated with the latrines.
6. Trash Cans- enough trash cans to accommodate 500 personnel. Trash cans shall be monitored, emptied/disposed of when filled to no more than 85% capacity.
Requirements
1. Coordination and Reporting Tasks
a. Provide a single point of contact that has the authority to manage all mobilization, demobilization, and maintenance services during all phases of support.
b. Final coordinations for delivery/pickup times and locations will be conducted NLT 2 days prior to execution.
2. COR: The COR will be identified upon award of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications;
monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of GFP, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is provided to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of this contract.
3. Delivery/Pickup
a. The contractor shall complete set up of the life support equipment NLT 1300 on 11 June
2018 at HAAF, GA.
b. The contractor shall begin teardown of all equipment NET 1700 on 23 June 2018.
c. The contractor shall provide the labor for set up and tear down.
d. Contractor shall maintain cleanliness of all facilities to include trash removal. Soap, paper towels, toilet paper, and trash bags shall be replenished as needed by the contractor.
Government furnished property (GFE):
1. The unit will not furnish any equipment or GFE to the contractor.
Travel and Specifications:
1. The contractor shall be responsible for all travel and lodging for contracted personnel.
2. The contracting company will ensure that all rates are IAW the JFTR for HAAF, GA lodging, per-diem, flight reservations, travel to and from the training sites, and any other costs. These arrangements shall be included in the overall bid and provided at the contractor’s expense and effort.
e. The contractor shall provide transportation, lodging, fuel and maintenance for required personnel to execute the life support requirements.
Battalion Point of Contact:
Name: SSG Ryan Atencio
Phone Number:
Security Requirements:
1. The overall classification required for this requirement is FOUO.
2. This contract does not require the contractor to have access to Communication Security
Information.
3. This contract does not require the use of COMSEC Key.
4. This contract does not require a COMSEC account.
5. This contract does not require the contractor access to Sensitive Compartmented
Information (SCI).
6. This contract does not require the contractor access to For Official Use Only Information
(FOUO).
7. This contract does not require the contractor access to Special Access Program (SAP) material.
8. This contract does not require the contractor access to ALTERNATIVE Compensatory
Control Measures (ACCM).
9. This contract does not require the contractor access to government networks.
a. Enterprise NIPRNet: No
b. Enterprise SIPRNet: No
c. ACCM/FP Network: No
d. SAP Network: No
e. SCI Network: No
10. This contract does not require the contractor access to government networks.
11. This contract does not require the use of government-owned computers.
12. This contract does not require the contract use of contractor owned computers.
Additional Security Requirements needed:
Access and general protection policy and procedures. All contractor employees, including subcontractor employees, requiring access to an Army or USSOCOM controlled installation, facility, or area shall comply with applicable security policies and procedures (provided by the government representative). This includes policies pertaining to the use or prohibition of electronic recorders, devices, cameras, etc. If the Contractor is required to take photographs or videos on a Government Installation, the
Contractor must obtain written permission from the Senior Commander. The contractor shall also provide all information required for background checks to meet installation and facility access requirements to be completed by the installation Provost Marshal Office, Director of Emergency Services, or Security Office.
The contractor workforce must comply with all personal identity verification requirements as directed by
DoD, HQDA, USSOCOM, USASOC and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should Force Protection Condition (FPCON) at any individual facility or installation change, the government may require changes in contractor security matters or processes.
Pre-screen applicants using E-Verify Program. The Vendor must pre-screen applicants using the E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the applicant has two valid forms of government issued identification.
Requirements are driven by the following directives and regulations:
1. DODI 2000.16, DOD Antiterrorism (AT) Standards; 2 Oct 06, incorporating Change 2, 8 Dec 06;
2. AR 525-13, Antiterrorism, 11 Sep 08;
3. USSOCOM Dir 525-4, Antiterrorism/Force Protection (AT/FP), 15 Dec 08;
4. AR 530-1, Operations Security (OPSEC);
5. USSOCOM Dir 525-4, Antiterrorism, HQDA, Integrating Anti-Terrorism (AT) and Operations
Security (OPSEC) into the Contract Support Process Desk Reference 10 Jan 12;
6. HQDA ALARACT 015/2012 – Use of an Antiterrorism/Operations Security (AT/OPSEC) in
Contracting Cover Sheet for Integrating AT/OPSEC;
7. USSOCOM Directive 381-6, Counterintelligence Screening and Debriefing of Linguists, Interpreters, and Role Players, 12 Oct 12.
8. Procedures and Guidance for Contract Role Players Counterintelligence Focused Review
Program, Dept of the Army, DCS, G-2, 19 Dec 11;
9. Contract Linguist Personnel Security Investigation and Counterintelligence - Focused Security
Review Program Policy, DA, DCS, G-2, 20 Sep 10 (with amendments).
Contractor Management Reporting (CMR):
CONTRACTOR MANPOWER REPORTING
Contractor Management Reporting (CMR):
CONTRACTOR MANPOWER REPORTING
The Contractor shall report ALL contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for USASOC, via a secure data website collection site. The contractor is required to fill in all required data fileds, via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://dodcmra.hqda.pentagon.mil.”
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www/ecmra.mil/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www/ecmra.mil/.