solicitation-18B0010-Replace_Emergency_generator.pdf
PDF 701 KB Posted
- Attached to
- Replace Emergency Generator Federal contract opportunity
- Solicitation number
- W9124M18B0010
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419_Bid_Abstract-18-B-0010-Replace_Emergency_Generator_Bldg._8302.pdf | ||
| OF_1419A_Abstract_Cont_Sheet-18-B-0010-_Replace_Emergency_Generator.pdf | ||
| FS-3968_Combined_REV1.pdf | ||
| Amendment_1,_Rev_1-18-B-0010-_Replace_generator-20180918.pdf | ||
| AMENDMENT_2-_Change_of_bid_opening_TBD.pdf | ||
| Amendment_to_18-B-0010-_Replace_Emergency_Generator-20180904.pdf | ||
| FS-3968_Combined.pdf | ||
| SOW-FS3968.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011196207
REPLACE GENERATOR BLDG 8302, FSGA
1.) Specifications, FS-3968_Combined 5/23/2018
PROJECT NO. YG9-2-7J
PROJECT TITLE: REPLACE Emergency GENERATOR PROJECT LOCATION : Fort Stew art Building 8302 SET ASIDE: 100% set aside Service Disabled Veteran Ow ned Small Businesses
NAICS CODE: 238290
SIZE STANDARD: $36.5 Million MAGNITUTE OF THIS CONSTRUCTION PROJECT : The estimated value of the proposed w ork is betw een $25,000 and $100,000
IAW FAR 22.404-1 -- Types of Wage Determinations : General Decision Number GA 180175 01/05/2018 GA 175
BONDS : A Bid Bond, Payment Bond , and Performance Bond are required for hte bid to be considered responsive and shall be submitted prior to the bid opening.
SITE VISIT : TBD
DUE DATE FOR QUESTIONS : TBD
BID OPENING : TBD
X
TATJANA M. FISHER 912-767-3747
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Aug-2018
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________100 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FORT STEWART
976 WILLIAM H. WILSON AVE SUITE 100
FORT STEWART GA 31314
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (912)767-8420 TEL: FAX:
W9124M18B0010 37
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
REPLACE EMERGENCY GENERATOR BUILDING 8302
IJO No. YG9-02-7J Page 3 of 37
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Replace Emergency Generator Bldg. 8302
FFP
Replace Emergency Generator Bldg. 8302 FOB: Destination
PURCHASE REQUEST NUMBER: 0011196207
PSC CD: Z2JZ
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 28-SEP-2018 1 W0VA USA GAR EN R U MAINT PB00
W0VA USA GAR EN R U MAINT
328 ITALY STREET BLDG 1152
FORT STEWART GA 31314-5185
912-435-0285 FOB: Destination
W33DL4
IJO No. YG9-02-7J Page 4 of 37
Section 00100 - Bidding Schedule/Instructions to Bidders
BID PRICE SCHEDULE
BID PRICE SCHEDULE
Replace Emergency Generator Building 8302
YG9-02-7J
ITEM
NO.
DESCRIPTION
“K” WORK
RENOVATION / REPAIR
“L” WORK
NEW CONSTRUCTION
“M” WORK
FURNITURE / EQUIP
1. Electrical
TOTAL
BASIS OF AWARD
Award will be made on the basis of the lowest responsive, responsible bid received for Item 1.
CLAUSES INCORPORATED BY REFERENCE
52.219-1 Small Business Program Representations OCT 2014
IJO No. YG9-02-7J Page 5 of 37
Section 00600 - Representations & Certifications
52.204-7 System for Award Management OCT 2016 52.204-8 Annual Representations and Certifications JAN 2018 52.209-7 Information Regarding Responsibility Matters JUL 2013 52.213-3 Notice to Suppliers APR 1984 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-10 Contract Award--Sealed Bidding JUL 1990 52.219-1 Small Business Program Representations OCT 2014 52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction
FEB 1999
IJO No. YG9-02-7J Page 6 of 37
Section 00700 - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016 52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.211-13 Time Extensions SEP 2000 52.211-13 Time Extensions SEP 2000 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award NOV 2011 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-9 Small Business Subcontracting Plan JAN 2017 52.219-14 Limitations On Subcontracting JAN 2017 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
IJO No. YG9-02-7J Page 7 of 37
52.222-40 Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-50 Combating Trafficking in Persons MAR 2015 52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.
JUN 2016
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-9 Buy American--Construction Materials MAY 2014 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.236-27 Site Visit (Construction) FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.243-6 Change Order Accounting APR 1984 52.243-7 Notification Of Changes JAN 2017
IJO No. YG9-02-7J Page 8 of 37
52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-10 Default (Fixed-Price Construction) APR 1984 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.227-7033 Rights in Shop Drawings APR 1966 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $281.99 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
IJO No. YG9-02-7J Page 9 of 37
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
CONSTRUCTION
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
W33DL4
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____
IJO No. YG9-02-7J Page 10 of 37
Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
IJO No. YG9-02-7J Page 11 of 37
Section 00800 - Special Contract Requirements
SPECIAL NOTES
ALTERNATE DISPUTES RESOLUTION
In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable in accordance with the authority and requirements of the ADR Act.
EMERGENCY MEDICAL TREATMENT
Emergency medical treatment will be provided by the Winn Army Community Hospital in order to prevent undue suffering or loss of life. Emergencies will be treated only during the period of emergency and appropriate action will be taken to discharge or transfer such patients as soon as the emergency period ends.
Charges for medical care will be at the prevailing rate and at the Contractor's expense.
HOURS OF OPERATION
Normal working hours are 7:30 a.m. through 4:00 p.m. Monday through Friday excluding Federal Holidays.
Notwithstanding the provisions of the Contract Work Hours and Safety Standards Act – Overtime Compensation clause herein, work will not be permitted outside normal work hours, nor on Saturdays, Sundays or legal holidays unless approved by the Contracting Officer. Requests to work other than normal work hours for all work must be submitted in writing a minimum of 2 work days in advance of date on which such work is anticipated. The exclusion of work on Saturdays, Sundays, and holidays has been considered in computing the performance time of this contract. The following legal holidays are observed:
January 1st
3rd Monday of January
3rd Monday of February
Last Monday of May
July 4th
1st Monday of September
2nd Monday of October
November 11th
4th Thursday of November
December 25th
Any other Congressional or Presidential imposed Federal Holiday.
When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies.
IJO No. YG9-02-7J Page 12 of 37
MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by FAR clause 52.236-5 entitled, “Materials and Workmanship”, and listed at Technical Exhibit 1 or any requested deviations from the Technical Provisions shall be submitted on ENG Form 4025-R, “Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certifications”.
Required certificates, manufacturing brochures, etc., shall be submitted in five (5) copies unless otherwise specified.
Submittals requiring manufacturer’s certifications must be executed by an officer of the manufacturing company and notarized. Approval of materials or equipment not noted as a deviation shall not relieve the Contractor from complying with the applicable Technical Provisions.
REMOVAL OF CONTRACTOR PERSONNEL
The Government reserves the right to require removal of any Contractor personnel from the job site who endanger persons or property, or whose continued employment is inconsistent with the interest of military security. The Government also reserves the right to require the Contractor to remove from the job site, any employee found to be under the influence of alcohol, drugs or any other incapacitating agent or any employee involved in the theft of Government property. The removal from the job site of such personnel shall not relieve the Contractor of the requirement to provide personnel to perform services.
REQUIRED INSURANCE
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by Federal and State laws
Employer’s Liability Insurance $100,000
General Liability Insurance:
Bodily Injury Liability $500,000 per occurrence
Auto Liability Insurance $200,000 per person Bodily Injury $500,000 per occurrence Property Damage $20,000 per occurrence
UTILITIES
Utility services required at the work site will be furnished at no cost to the Contractor if in place. Any alterations or connections to the existing utility facilities for accomplishment of this work shall be at no additional cost to the Government. The Contractor is responsible for coordinating with Canoochee Electric Membership Corporation (CEMC) prior to making any alterations to the electrical infrastructure. The Contractor shall remove all alterations before final acceptance of work at no expense to the Government. The Contractor shall carefully conserve any utilities furnished without charge. If utilities are not available at the job site and are required for performance, the Contractor shall provide his own generators or other necessary equipment to provide the utilities. Utilities for the operation of any work/office trailor located on the military installation for the convenience of the Contractor shall be at the Contractor’s expense. CEMC will be the point of contact (POC) for electrical concerns.
ASBESTOS PROHIBITION
“Asbestos”, including chrysotile, ammosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any of these materials that have been chemically treated and/or altered is prohibited from incorporation into the work under this contract. This prohibition does not apply to nor prevent the removal and disposal of
IJO No. YG9-02-7J Page 13 of 37 asbestos materials.
CONTRACT PROGRESS REPORTS
The contractor shall submit FORSCOM Form 59-1-R, Contract Progress Report, accompanied by a brief narrative report of work accomplished, to the Contracting Officer weekly. Each report submitted must be complete, signed and dated by the Contractor.
FIRE PREVENTION
The Contractor shall comply with fire prevention practices as set forth by the National Fire Protection Association in the National Fire Code and other recognized fire prevention agencies and post regulations.
PROGRESS SCHEDULES
The reports contemplated by the clause, FAR 52.236.15, herein entitled, “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to FORSCOM Form 59-R when periods of performance exceed 60 calendar days.
SALVAGE AND DISPOSAL OF MATERIALS
a. Salvage materials, unless otherwise specified, become the property of the contractor upon removal from the job site and should be taken into consideration in formulating bids.
b. Salvage materials to remain as Government property are None.
c. Material not salvageable shall be removed from the job site and disposed of off the installation.
d. All tree debis shall be delivered by the contractor to a central depository location on post as directed by the
COR.
IDENTIFICATION BADGES
The Contractor shall provide each employee an Identification (ID) Badge, which includes the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title.
ID Badges are to be worn at all times the employee is performing work under this contract. Each Contractor employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. Contractor is responsible for collection of ID Badges upon completion of contract or termination of employee.
DOD ANTI-TERRORISM (AT) STANDARDS
(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a US Army installation or a Federally-controlled installation, facility and/or Federally-controlled information systems shall complete Level I AT Awareness Training and receive a certificate of completion. The training is accessible from any computer and is available at https://atlevel1.dtic.mil/at/. The contractor shall certify that their workforce has completed the training and submit the completed certificate(s) to the contracting officer or designee (i.e., the Contracting Officer’s Representative). If an automated system is not available, the contractor may complete the training under the instruction of a qualified Level I AT Awareness Instructor. Level I AT Awareness Instructor qualification must be coordinated with the Installation Security Office and the name(s) of approved instructors shall be provided the contracting officer or designee.
IJO No. YG9-02-7J Page 14 of 37
(b) Anti-terrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.
(2) Installation ATO
(a) Provide online access to AT Level I web based training for all contract personnel who have computer access.
(b) Provide AT briefings for all contract personnel who do not have access to the online website.
(c) Assist organization ATOs in developing and presenting Country Antiterrorism briefs to contract personnel prior to deployments.
(d) Assist organizations who use contract personnel to implement site specific AT measures where required.
(e) At least quarterly, review at random locally generated contracts to ensure that AT requirements are fully documented.
(f) As required, assist contracting officers in identifying AT contract requirements.
RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS
FORT STEWARTAND HUNTER ARMY AIRFIELD
Disposal: All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR) showing the in, out, and tare weights of each load taken from the installation. The COR will provide copies of these tickets to the DPW Environmental Division, Solid Waste Management Section for tracking and regulatory reporting requirements.
Recycling/Salvage: Fort Stewart and Hunter Army Air Field has a mandatory recycling program. The Installation Command Recycling Policy Memorandum #8 can be accessed at http://www.stewart.army.mil/dpw/recycle.asp. All recyclable materials (listed in the recycling policy) generated during the entire term of any construction, demolition, or renovation contract will be turned over to the Fort Stewart or HAAF Recycling Program. Contractors must contact the COR who will coordinate with the DPW Environmental Waste Management Section (912-767-2010) to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap metal or cardboard will be generated, it is possible that a collection bin/container could be provided by the Contractor at no cost to deposit these materials. Salvage materials, unless otherwise specified, become the property of the contractor upon removal from the job site and should be taken into consideration in formulating bids.
Hauling/Transport Requirements: All vehicles and containers used to transport waste or recyclables on or off the Installations will meet all Federal and State DOT requirements. All waste or recyclable materials being transported will be loaded, tied, and covered in such a manner that will prevent any of the materials from leaking, spilling, falling or blowing from/off the vehicle or container. It is the contractor’s responsibility to ensure immediate pickup/ clean-up of any material that is accidentally dropped, spilled or blown from a vehicle or container while in transit on and off the Installation.
Custodial Contract: If this contract is for custodial services or will include a custodial service requirement, the Contractor shall empty or otherwise transfer the contents from the blue recycling containers located inside buildings/facilities to the nearest blue recycling dumpster located outside. The contactor will ensure that all recycled paper products are first placed inside a clear plastic bag and the top is tied closed before it too is placed inside the nearest blue recycle dumpster.
Payment/Funding: If any of the conditions listed under the Recycling, Salvage, and Disposal section are not met, it will be considered a failure to comply with the terms of the contract as discussed in the inspection clause herein.
IJO No. YG9-02-7J Page 15 of 37
Guidance/Question: Anyone requiring further guidance, recycling training for contractors, or has additional questions on this section should contact the DPW Environmental Division, Solid Waste Management Section at 912-767-2010.
Pre-Final and Final Inspection:
a. The Contractor and Government Inspector shall conduct a joint pre-final inspection prior to requesting a final inspection. Any discrepancies noted shall be corrected prior to the final inspection. The Contracting Officer may schedule more than one pre-final inspection if determined necessary.
b. The Contractor shall request final inspection in writing to the Contracting Officer ten days before the desired date.
The final inspection shall be performed with the Contractor, Government personnel and representatives of the using activity. Any discrepancies noted shall be corrected prior to final payment.
Contract Manpower Reporting (CMR) The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors);
(6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost;
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub- Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
AMC LEVEL PROTEST PROGRAM
Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC).
The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO.
IJO No. YG9-02-7J Page 16 of 37
The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be 1 in FAR 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-Level Protest procedures are found at: http://www.amc.army.mil/amc/commandcounsel.html.
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the HQ AMC-Level Protest Procedures.
SCOPE OF WORK
SCOPE OF WORK
IJO NO. YG9-02-7J
The purpose of this project is to place Building 8302, in its entirety, on emergency power.
The original design provides power for specific spaces within the facility. Increased electrical loads entailed by this change requires upsizing the emergency power capacity and reconfiguring the main electrical service. Specifically, the work entails the following:
1. Remove the existing 50 KW propane-fueled emergency generator and automatic transfer switch. These items shall remain the property of the government.
Demolish the existing generator propane fuel tank and accessories.
2. Install a new 80 KW/100 KVA diesel generator, subbase tank, concrete pad, and a 300 ampere combination automatic transfer switch/service disconnect.
3. Reconfigure the existing electrical service as specified.
IJO No. YG9-02-7J Page 17 of 37
END
TECHNICAL PROVISIONS GENERAL
TECHNICAL PROVISIONS
GENERAL
IJO YG9-02-7J
1. DESCRIPTION OF WORK:
1.1 Work to be Done: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with the project Replace Emergency Generator Building 8302, Ft. Stewart, Georgia. Complete in strict accordance with the specifications and drawings. The work includes, but is not necessarily limited to, the following items.
1.1.1 Remove the existing propane-fueled 50 KW emergency generator, automatic transfer switch, and fuel system. Provide new diesel-fueled 80 KW emergency generator with subbase tank, combination automatic disconnect switch, and concrete equipment pad. Reconfigure the facility electrical service. Perform other specified limited demolition. The existing generator and automatic transfer switch shall remain the property of the Government. The existing propane fuel tank shall be emptied by the Government prior to its removal by the Contractor.
1.2 Government Furnished – Government Installed (GF-GI) Furniture and
Equipment: N/A.
1.3 Government Furnished – Contractor Installed (GF-CI) Furniture and
Equipment: N/A.
1.4 Contractor Furnished – Contractor Installed (CF-CI) Furniture and
Equipment: N/A.
1.5 WORK BY OTHERS: The Contractor shall afford the Government and separate contractors’ reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, IJO No. YG9-02-7J Page 18 of 37 and shall connect and coordinate his work with theirs as required by the Contract Documents.
1.6 DRAWINGS AND SITE VISITS
1.6.1 The drawings indicate the extent of the general location and arrangement of existing conditions. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the amount of material required to perform this project. Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious/visible or which should be reasonably anticipated by the Contractor on inspection will not be considered under the Differing Site Conditions provision of the contract.
2. CONSTRUCTION CONSTRAINTS
2.1. Time of Performance
2.1.1 Access to Buildings – All work requiring access to building interiors excluding attics, crawl spaces, etc. and all other work shall be performed between 7:30 a.m. and 4:00 p.m. excluding official holidays, unless otherwise indicated or approved by the Contracting Officer. Requests to work during other than these normal hours shall be made in writing at least 36 hours in advance. For example, a request to work on a Saturday should be made no later than noon on Thursday.
2.1.2 Work Requiring Outages – Work requiring outages of utilities or building systems will be accomplished in accordance with prior-approved schedules.
2.2. Outages – The Contractor’s work requiring outages of utility or building systems will require 15 day advance notice and will be subject to the approval of the Contracting Officer. Notice shall include type of outage, date, and time outage will commence and estimated duration of outage.
2.3. Continuity – All tools, labor, and materials required to complete any item of work within a given work area or requiring an outage of any building utility or system, shall be available at the site prior to commencement thereof.
Once work has commenced on an item of work said work shall be continuously and diligently performed to completion and acceptance.
2.4. Entry – Entry to all areas, except the cantonment area, shall be coordinated with Range Control, Building 8302 (intersection of Highway 144 and Fort Stewart Road 47) and the Provost Marshal’s Office.
IJO No. YG9-02-7J Page 19 of 37
3. CONSTRUCTION ACTIVITIES:
3.1 Contractor shall submit a Safety Plan and Construction Schedule to the
Contracting Officer’s Representative (COR) 10 days in advance of any construction activities to arrange specific schedule for performing work as required by this Contract.
4. FACTORS AFFECTING PERFORMANCE UNDER THIS CONTRACT:
4.1 The Contractor shall coordinate use of the site for access, staging, and parking with the Contracting Officer.
4.2 The Contractor shall be responsible for limiting access of his employees and subcontractors to the area of work defined in the Contract. Contractor shall not have access to restrooms and amenities such as vending machines unless granted permission by the Contracting Officer.
4.3 RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS AT
FORT STEWART AND HUNTER ARMY AIRFIELD
4.3.1 Disposal: All waste generated from construction, demolition, and renovation contracts must be disposed of off the installation in a permitted disposal facility and in accordance with all Federal, State, and Local rules and regulations unless otherwise stated in the contract. At the end of each month, the Contactor will provide copies of all disposal weight/scale tickets to the Contracting Officer’s Representative (COR) showing the in, out, and tare weights of each load taken from the installation. The COR will provide copies of these tickets to the DPW Environmental Division, Solid Waste Management Section for tracking and regulatory reporting requirements.
4.3.1.1 Recycling/Salvage: Fort Stewart and Hunter Army Air Field has a mandatory recycling program. The Installation Command Policy Letter #30 and Command Recycling SOP can be accessed at http://www.stewart.army.mil/info/?id=443&p=1.
All recyclable materials (listed in the recycling SOP) generated during the entire term of any construction, demolition, or renovation contract will be turned over to the Fort Stewart or HAAF Recycling Program. Contractors must contact the COR who will coordinate with the DPW Environmental Waste Management Section (912-767-2010) to arrange for turn-in of recyclable/salvageable materials. In areas where large amounts of scrap
IJO No. YG9-02-7J Page 20 of 37 metal or cardboard will be generated, it is possible that a collection bin/container could be provided to the Contractor at no cost to deposit these materials. Salvage materials, unless otherwise specified, become the property of the Contractor upon removal from the job site and should be taken into consideration in formulating bids.
4.3.1.2 Hauling/Transport Requirements: All vehicles and containers used to transport waste or recyclables on or off the Installations will meet all Federal and State DOT requirements. All waste or recyclable materials being transported will be loaded, tied, and covered in such a manner that will prevent any of the materials from leaking, spilling, falling or blowing from/off the vehicle or container. It is the contractor’s responsibility to ensure immediate pick-up/clean-up of any material that is accidentally dropped, spilled or blown from a vehicle or container while in transit on and off the Installation.
4.3.1.3 Payment/Funding: If any of the conditions listed under the Recycling, Salvage, and Disposal section are not met, it will be considered a failure to comply with the terms of the contract as discussed in the inspection clause herein.
4.3.1.4 Guidance/Question: Anyone requiring further guidance, recycling training for contractors, or has additional questions on this section should contact the DPW Environmental Division, Solid Waste Management Section at 912- 767-2010.
4.4.4 Installing Storage Tanks on Fort Stewart and Hunter Army Airfield
4.4.4.1 Design Requirements for Aboveground Storage Tanks
4.4.4.2 Provide appropriate secondary containment (40 CFR 112.8(c)(2)). All aboveground storage tanks used for the purpose of storing regulated and/or hazardous substances must be double-walled. In order for a tank to be considered double-walled, the interstitial space between the inner and outer wall must be able to be inspected visually or the interstitial space must be equipped with a sensor capable of alarming in case of liquid in the interstice (access to the interstice must also allow for the periodic removal of liquids).
4.4.4.3 Provide tertiary containment (in accordance with 40 CFR 112.8(c)(3)). All above ground storage tanks must be placed on an impervious diked concrete housekeeping pad designed to catch spills caused from transferring substance to/from the tank. This housekeeping pad must come with a valve that allows for the discharge of rainwater from the diked pad after a visual inspection has been done to determine that the water is clean.
IJO No. YG9-02-7J Page 21 of 37
4.4.4.4 Provide Instrumentation (Provide good engineering practices to avoid unwanted discharges, 40 CFR 112.8(c)(8).
1. All aboveground storage tanks must come with a high liquid level alarm that emits both an audible and visual signal to alert operators that the tank must be emptied before further use.
2. The tank must also be equipped with a level gauge that allows for determining the level of liquid in the tank.
3. In the case of any tank equipped with a pump for the purpose of dispensing of a stored substance, the pump must have an automatic cutoff to prevent overfilling of a container.
4.4.4.5 Provide Labeling. All aboveground storage tanks should be labeled in accordance with all applicable local, state, federal laws, or industry standard. At a minimum, the tank should display an appropriate hazard warning, material ID, and storage capacity.
4.5 Generators
4.5.1 A stationary Reciprocating Internal Combustion Engine (RICE) with a rated horsepower of 500 or greater triggers National Emission Standards for Hazardous Air Pollutants (NESHAP) applicability for this source category.
Therefore, a construction permit would be required for generators with a rated horsepower of 500 or greater and coordination with the Installation Environmental Office is required prior to installation of such equipment to ensure permitting requirements are properly documented and maintained up-to-date.
4.5.2 Emergency generators do not require permitting.
4.5.3 REQUIRED SUBMITTAL ITEM: For any generator to be installed or removed; provide the manufacturer, model #, serial #, kW rating, and type of fuel used.
5. AS-BUILT RECORD DRAWINGS:
5.1 The Contractor shall be responsible for maintaining one set of master/record construction drawing prints on the job site on which he shall keep a neat and accurate record of all deviations from the original contract documents as the work progresses. The contractor is responsible for noting all changes and correction on these master/record construction drawing prints promptly as the changes occur in red ink(redline prints) and note date when these changes occurred, but in no case less often than on a weekly basis. The master/record construction drawing prints which are maintained in red ink shall indicate all the changes and modifications incorporated into the work as well as the following:
IJO No. YG9-02-7J Page 22 of 37
5.1.1 Actual locations of all subsurface and concealed utility lines, type of materials used, sizes, etc. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered or obscured, the master/record construction drawings shall show by offset dimensions to two permanently fixed surface features. Valves, splices boxes and similar appurtenances shall be located by dimensions along the utility run from a reference point. The average depth below the surface of each run shall also be recorded.
5.1.2 Any shop drawings that constitute part of the design shall be included with the record drawings.
5.2 The master/record (redline construction drawings) prints with corrections, such as field changes and contract modifications, shall be certified by the Contractor as to their correctness and submitted to the Contracting Officer’s Representative for approval. Once these provisional master/record (redline construction drawing) prints have been approved by the COR, the COR will obtain a compact disc (CD) of computer generated construction drawings from the DPW Engineering Service Division, Building 1141 at Ft. Stewart or Building 1021 at Hunter AAF, as applicable. The contractor shall then transfer all corrections from redline construction drawing prints to the compact disc (CD) of computer generated construction drawings.
Corrections done shall be in MicroStation “.dgn” format. The Contractor shall note on the computer generated construction drawings the words “AS- BUILT” in the revision block with the next revision number to identify any changes made. Also, revision number identification will be placed where any changes were made. The contractor shall then submit AS-BUILT compact disc (CD) of computer generated drawing and one (1) AS-BUILT hardcopy with contractor’s redline corrections to the COR to insure accuracy that all corrections made were transferred from redline construction drawing prints to AS-BUILT hardcopy prints. Once the COR approves the AS-BUILT hardcopy prints the COR will then turn over to DPW/ ESD/ Drafting section for final approval of AS-BUILT compact disc (CD) of computer generated drawings and at this time the Contractor can receive final payment.
6. SECURITY REQUIREMENTS.
6.1 All Contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness…
This is the start of the file's text. The full file is on GovTribe.