AMENDMENT_-_Conformed.pdf
PDF 320 KB Posted
- Attached to
- Build C-130 Mock Up & PLF-PIT Federal contract opportunity
- Solicitation number
- W9124M-16-B-0019
About this file
Solicitation Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT_-_MOCK_UP_.pdf | ||
| DRAWINGS_-_REVISED.pdf | ||
| l.B.7_AMENDMENT_-_Document.pdf | ||
| DRAWINGS_-_0019.pdf | ||
| SOLICITATION_-_MOCK_UP_-_Release.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124M-16-B-0019-0001
0010879325-0001
PROJECT NO: L5-1-5J
PROJECT TITLE: Build C-130 Mock Up and Plf-PIT
PROJECT LOCATION: Hunter Army Airfield Georgia
SET ASIDE: 100% HUBZone
NAICS CODE: 236220 - Commercial and Institutional Building Construction
SIZE STANDARD: $36.5 Million
MAGNITUDE OF CONSTRUCTION PROJECT: The estimated value of the proposed w ork is betw een $25,000 and $100,000.00
All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specifications.
PREBID MEETING/SITE VISIT: Tuesday, 23 August 2016 @ 0900 - See Section L DUE DATE FOR ALL QUESTIONS: Friday, 26 August 2016 BID OPENING: Thursday, 15 Sep 2016 @ 2:00 p.m.
BONDS: Bid Bond and Payment Bond are required.
X
SEBRENA M. BUTLER (912)767-9033
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
15-Aug-2016
(RFP)
(IFB)
CALL:
Build C-130 Mock Up & PLF-PIT
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________45 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________15 Sep 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MISSION & INSTALLATION CONTRACTING CMND
MICC-FORT STEWART
976 WILLIAM H WILSON AVE SUITE 100
FORT STEWART GA 31314-3425
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
L5-1-5J
8. ADDRESS OFFER TO (If Other Than Item 7)
(912)767-2966FAX:TEL: (912)767-8420 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9124M-16-B-0019
Section A - Solicitation/Contract Form
SPECIAL INSTRUCTIONS
1. Bidders must complete and return the SF 1442 Front and Back (2 pages) & Section B (Bid Price Schedule), by date/time specified in Block 13A of the SF 1442. FAX will not be accepted.
2. Bidders must acknowledge receipt of all amendments by giving number and date as required in block 19.
3. Bids and Bid Amendments shall be submitted in sealed envelopes or packages and show Solicitation Number, Date, and Time of closing on the OUTSIDE OF THE ENVELOPE.
4. Please enter your CAGE code, Tax ID (TIN) & DUNS in Block 14 of Page 2.
5. Hard Copy of the bid and electronic copy on CD shall be hand delivered or mailed to the address in Block 7. The envelope shall be marked IAW FAR Clause 52.214-5 and ATTN Sebrena M. Butler/Mary L. Hightower.
6. MICC-Fort Stewart only receives CERTIFIED mail through the US Postal Service on Mondays and Wednesdays at 1:00 pm EST. Regular Mail sent through the US Postal Service is received daily. Please plan accordingly when submitting your Bid/Offer Packages through the US Postal Service
7. Drawings: H-1904 is associated with this soliciation.
8. Contractors must be registered in the System for Award Management (SAM.gov) under NAICS Code 236220. See FAR 52.204-7 and FAR 52.204-8.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Buidl C-130 Mock-UP and PLF Pit HAAF
FFP
The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Build C-130 Mock-Up and PLF Pit complete in strict accordance with specifications and drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010879325-0001
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Contract Manpower Reporting (CMR)
FFP
The contractor will report All contractor labor hours (Including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site - See Section H.
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
TECHNICAL PROVISIONS
GENERAL
Build C-130 Mock-Up and PLF Pit
IJO NO L5-1-5J
1. DESCRIPTION OF WORK:
1.1 Work to be executed: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Build C-130 Mock-Up and PLF Pit complete in strict accordance with specifications and drawings. The work includes, but is not necessarily restricted to, the following items:
1.1.1 Perform engineering work necessary to survey the site and layout the work.
1.1.2 Install silt fence and construction exit.
1.1.3 Excavate and haul soil, compact soil for field installation.
1.1.4 Install concrete slabs for the PLF platform and the C-130, CH-47, and UH-60 mock-ups.
1.1.5 Install metal steps and a shredded rubber tire pit for the PLF platform.
1.1.6 Install folding aluminum benches, steel pipe framing and static line cable for the C-130 mock-up.
1.1.7 Install shackle points in slab and steel pipe framing for the UH-60 mock-up.
1.1.8 Fine grade the site and establish grass on all disturbed areas created as a result of this construction.
1.2 Additives
1.2.1 N/A
1.3 Government Furnished – Government Installed (GF-GI) Furniture and
Equipment:
1.3.1 N/A
1.4 Government Furnished – Contractor Installed (GF-CI) Furniture and
Equipment:
1.4.1 N/A
1.5 Contractor Furnished – Contractor Installed (CF-CI) Furniture and
Equipment:
1.5.1 N/A
1.6 WORK BY OTHERS: The Contractor shall afford the Government and separate contractors’ reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.
1.7 DRAWINGS AND SITE VISITS
1.7.1 The drawings indicate the extent of the general location and arrangement of existing conditions. It is strongly recommended that the Contractor visit the site to determine the complexity of the work and the amount of material required to perform this project. Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious/visible or which should be reasonably anticipated by the Contractor on inspection will not be considered under the Differing Site Conditions provision of the contract.
2. CONSTRUCTION CONSTRAINTS
2.1. Time of Performance
2.1.1 Access to Buildings – All work requiring access to building interiors excluding attics, crawl spaces, etc. and all other work shall be performed between 7:30 a.m. and 4:30 p.m. excluding official holidays, unless otherwise indicated or approved by the Contracting Officer. Requests to work during other than these normal hours shall be made in writing at least 3 business days in advance. For example, a request to work on a Saturday should be made no later than noon on Thursday.
2.1.2 Work Requiring Outages – Work requiring outages of utilities or building systems will be accomplished in accordance with prior approved schedules.
2.2. Outages – The contractor’s work requiring outages of utility or building systems will require 15 day advance notice and will be subject to the approval of the Contracting Officer. Notice shall include type of outage, date, and time outage will commence and estimated duration of outage.
2.3. Continuity – All tools, labor, and materials required to complete any item of work within a given work area or requiring an outage of any building utility or system, shall be available at the site prior to commencement thereof.
Once work has commenced on an item of work said work shall be continuously and diligently performed to completion and acceptance.
3. CONSTRUCTION ACTIVITIES:
3.1 Contractor shall submit a Safety Plan and Construction Schedule to the
Contracting Officer’s Representative (COR) 10 days in advance of any construction activities to arrange specific schedule for performing work as required by this Contract.
3.2 Contractor and crew will be escorted at all times inside of building.
4. FACTORS AFFECTING PERFORMANCE UNDER THIS CONTRACT:
4.1 The Contractor shall coordinate use of the site for access, staging, and parking with the Contracting Officer.
4.2 Contractor shall be responsible for limiting access of his employees and subcontractors to the area of work defined in the Contract.
4.3 Contractor shall maintain haul routes to and from the job site.
4.4 FSGA/HAAF has a mandatory recycling program. Unless otherwise specified, the Government retains all salvage rights. Contractors shall recycle construction & demolition debris as required by the Installation's recycling clause, 52.000-4061: RECYCLING, SALVAGE, AND DISPOSAL
OF MATERIALS FORT STEWART AND HUNTER ARMY AIRFIELD.
Source Reduction is required to reduce the initial input to the solid waste stream. Ensure minimum packing and packaging materials are used for items shipped to the Installation. Also, all military construction, renovation and demolition projects shall include performance requirements for a 60% minimum diversion of C&D waste by weight. Contractor must provide all weight tickets to demonstrate meeting the performance standard.
Specifications must include submission of a contractor’s C&D Waste Management Plan. Concrete and asphalt material shall be hauled and disposed of off of government property. Recycle materials will be broken down when delivered to the Recycling Center (to include metal equipment). Scrap metal will be cut down to no larger than 4 square feet in size.
4.4.1 REQUIRED SUBMITTAL ITEM: The Contractor shall (a) submit a C&D
Waste Management Plan (b) submit copies of all disposal weight/landfill scale tickets to the COR as described in the Referenced Recycling Clause for any off-post disposal or approved Contractor-retained salvage items within 10 days of removal; and (c) turn in all recyclables generated during the entire term of the Contract (unless otherwise approved for off-site disposal/salvage). Contractor, through COR, will coordinate with the DPW Environmental Division (912-767-2010 or 767-8880) to arrange for turn-in of recyclable/salvageable materials.
4.5 Omitted.
4.6 Omitted.
4.7 Omitted.
4.8 Requirements for Sites with Soil Disturbance Less Than 0.75 Acres
4.8.1 An NOI for coverage under the Georgia NPDES will not be necessary.
The following requirements still apply:
4.8.2 The site operator must utilize and implement Best Management Practices (BMPs) in accordance with the “Green Book” (Manual for Erosion & Sedimentation Control for the State of Georgia-most current edition).
4.8.3 Site dewatering requires prior approval from the Installation Environmental Office.
4.8.4 The site operator is required to continuously maintain all BMPs through the duration of site disturbing activities (regardless of NOI requirement). In order for the Army to accept the project as complete, the site must be stabilized to prevent silts and sediments from leaving the construction site.
The Installation, through its Contracting Officer Representative, NRCS, and the DPW Environmental Office, must agree that the project site meets necessary site stabilization parameters as required by the State of Georgia prior to project acceptance by the Army.
4.8.5 At a minimum, a Level 1A E&S Control Certified individual must be on the site during any land disturbance activity in the State of Georgia.
4.8.6 Cross drainage facilities that transport stormwater runoff under roadways must meet the 25- to 100-year design storm, or be in accordance with GA
Department of Transportation requirements, whichever is more stringent.
The design must ensure that the structure/s will not impact any facilities upstream or downstream during heavy rain events. Culverts, bridges, and/or roadway drainage structures require bank stabilization to prevent erosion during rain events.
4.8.7 Ensure all washouts of trucks and equipment is controlled and discharged with adequate E&S control BMPs. Waste material and/or debris must be disposed of properly (not into streams, ditches, or stormwater conveyance systems).
4.8.9 Ensure proper drip pans and secondary containment are utilized for staging, storing, loading, fueling, maintenance, repairs, etc.
4.8.10 Place all fuel storage tanks within plastic lined earthen berms, drive-on, or drive-over containment. The containment area must have a minimum capacity of 110% of the fuel storage tanks capacity for spill prevention, and to capture incidental spills.
4.9 The Army is required to report as-built conditions of low impact development features annually (end of Fiscal Year) on compliance with requirements under Section 438 of the 2007 Energy Independence and Security Act (EISA). Therefore, the Designer of Record shall provide the completed reporting form to the Installation DPW COR / Real Property Officer as part of the DD Form 1354 Transfer and Acceptance of DoD real property contract close-out process.
4.9.1 REQUIRED SUBMITTAL ITEM: The Designer of Record shall determine the Low Impact Development Volume required to be retained on site (difference between pre-project and post-project runoff, ft3) and complete section A-E of the Maintaining Hydrology on Army Construction Projects reporting form.
4.9.2 Requirements for Offsite Soils:
4.9.2.1 Test offsite soils brought in for use as backfill for Total Petroleum
Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Backfill shall contain no more than 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and no more than 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX), and shall pass the TCLP test. Determine TPH concentrations by using EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020.
Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide
Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site.
4.9.2.2 REQUIRED SUBMITTAL ITEM: Within 24 hours of conclusion of physical tests, submit 2 copies of test results, including calibration curves and results of calibration tests. Do not bring material onsite until tests have been approved by the Contracting Officer.
4.9.9.2 Cultural Resources Management (CRM)
4.9.9.3 Should the Installation Environmental Office specify consultation with
CRM, this consultation must happen prior to implementation of project.
4.9.9.4 Accidental Discovery of Remains and Artifacts
Ensure that the SOP for Accidental Discovery of Archaeological Deposits and/or Human Remains is followed (See attached SOP).
5. AS-BUILT RECORD DRAWINGS:
5.1 The Contractor shall be responsible for maintaining one set of master/record construction drawing prints on the job site on which he shall keep a neat and accurate record of all deviations from the original contract documents as the work progresses. The contractor is responsible for noting all changes and correction on these master/record construction drawing prints promptly as the changes occur in red ink(redline prints) and note date when these changes occurred, but in no case less often than on a weekly basis. The master/record construction drawing prints which are maintained in red ink shall indicate all the changes and modifications incorporated into the work as well as the following:
5.1.1 Actual locations of all subsurface and concealed utility lines, type of materials used, sizes, etc. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered or obscured, the master/record construction drawings shall show by offset dimensions to two permanently fixed surface features. Valves, splices boxes and similar appurtenances shall be located by dimensions along the utility run from a reference point. The average depth below the surface of each run shall also be recorded.
5.1.2 Any shop drawings that constitute part of the design shall be included with the record drawings.
5.2 The master/record (redline construction drawings) prints with corrections, such as field changes and contract modifications, shall be certified by the Contractor as to their correctness and submitted to the Contracting Officer’s Representative for approval. Once these provisional master/record (redline construction drawing) prints have been approved by the COR, the COR will obtain a compact disc (CD) of computer generated construction drawings from the DPW Engineering Service Division, Building 1114 at Ft. Stewart or Building 1021 at Hunter AAF, as applicable. The contractor shall then transfer all corrections from redline construction drawing prints to the compact disc (CD) of computer generated construction drawings. Corrections done shall be in MicroStation “.dgn” format. The Contractor shall note on the computer generated construction drawings the words “AS-BUILT” in the revision block with the next revision number to identify any changes made. Also, revision number identification will be placed where any changes were made. The contractor shall then submit AS-BUILT compact disc (CD) of computer generated drawing and one (1) AS-BUILT hardcopy with contractor’s redline corrections to the COR to insure accuracy that all corrections made were transferred from redline construction drawing prints to AS-BUILT hardcopy prints. Once the COR approves the AS-BUILT hardcopy prints the COR will then turn over to DPW/ ESD/ Drafting section for final approval of AS-BUILT compact disc (CD) of computer generated drawings and at this time the Contractor can receive final payment.
6. SECURITY REQUIREMENTS.
6.1 All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or the Contracting officer (if a COR has not been designated) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://jkodirect.jten.mil .
The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
The Contractor and all associated sub-contractor employees shall comply with applicable Installation, facility, and area Commander’s local access and security policies and procedures. If required by this contract, the contractor shall also provide all information for background checks to meet Installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or Installation change, the Government may require changes in contractor security matters or processes.
DOCUMENT 00010
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01000 GENERAL REQUIREMENTS
DIVISION 2 - SITE CONSTRUCTION
SECTION 02050 DEMOLITION
SECTION 02230 SITE CLEARING
SECTION 02754 CEMENT CONCRETE PAVING AND SIDEWALKS
SECTION 02900 SEEDING
DIVISION 3 - CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE
DIVISION 4 - MASONRY
DIVISION 5 - METALS
SECTION 05510 METAL STAIRS
SECTION 05521 PIPE AND TUBE RAILINGS
DIVISION 6 - WOOD AND PLASTICS
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
DIVISION 8 - DOORS AND WINDOWS
DIVISION 9 - FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING SYSTEMS
DIVISION 15 - MECHANICAL
DIVISION 16 – ELECTRICAL
DIVISION 31 –EARTHWORK
SECTION 31 23 00.00 20 EARTHWORK, EXCAVATION AND FILL
DIVISION 32 – EXTERIOR IMPROVEMENTS
END OF TABLE OF CONTENTS
SECTION 01000
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 SUMMARY
A. EXAMINATION OF PREMISES: Prior to submitting a proposal, it is highly recommended that the
Contractor visit the site and fully inform themselves of the amount / character of the work and the local conditions.
B. WORK BY OTHERS: The Contractor shall afford the Government and separate contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate his work with theirs as required by the Contract Documents.
C. USE OF PREMISES: Contractor shall execute the work in a careful and orderly manner with the least possible disturbance to the public, building employees and functioning of the existing building.
D. COORDINATION: Contractor shall be responsible for coordinating all work under the contract.
E. REGULATORY REQUIREMENTS: All work shall be done in accordance with rules and regulations of local state and federal agencies.
F. LAYING OUT WORK: Contractor shall take and verify all conditions and measurements on job and shall be strictly responsible for same. Any questions and discrepancies shall be brought to the immediate attention of the Contracting Officer.
G. "OR EQUAL" PRODUCTS: Equal products of other manufacturers will be accepted only on written approval by the Contracting Officer.
H. MANUFACTURER'S DIRECTIONS: All manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer.
I. PROTECTION OF PERSONS AND PROPERTY: Contractor shall provide and maintain all temporary signs, signals, barricades and/or devices required to ensure safety and protection of property.
1. Provide protecting devices where required in strict accordance with OSHA rules and regulations.
2. All work in progress shall be adequately braced and protected until work is completed.
J. CUTTING & PATCHING: Do not cut and patch in a manner that would result in a failure of the work to perform as intended, decrease energy performance, increase maintenance, decrease operational life, or decrease safety performance.
1. Match existing materials for cutting and patching work with new materials conforming to project requirements.
2. Perform work with workmen skilled in the trades involved. Prepare sample area of each type of work for approval.
3. Cutting: Use cutting tools, not chopping tools. Make neat holes. Minimize damage to adjacent work. Inspect for concealed utilities and structure before cutting.
4. Patching: Make patches, seams, and joints durable and inconspicuous. Comply with tolerances for new work.
K. CLEANING: Contractor shall maintain premises and public property free from accumulation of waste, debris and rubbish caused by operations.
1. Maintain streets, sidewalks and entrances free of encumbrance at all times.
2. FINAL CLEANING: Contractor shall be responsible to thoroughly clean all work areas for acceptance by Owner.
L. GUARANTEE: Prior to final acceptance of the work, submit a written statement to the owner guaranteeing all equipment and systems against defective materials and workmanship for one (1) year from the date of acceptance. Upon written notice and at no expense to the owner, promptly repair all defective materials.
PART 2 - PRODUCTS - Not Applicable To This Section
PART 3 - EXECUTION - Not Applicable To This Section
END OF SECTION
SECTION 02050
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ENGINEERING MANUALS (EM)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6
2011; Change 7 2012) U.S. Army Corps of Engineers Safety and Health Requirements Manual
1.2 GENERAL REQUIREMENTS
The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Rubbish and debris shall be removed from the site daily, unless otherwise directed, to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer. In the interest of occupational safety and health, the work shall be performed in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections. In the interest of conservation, salvage shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified.
1.3 DUST CONTROL
The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
1.4 PROTECTION
1.4.1 Protection of Personnel
During the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the demolition site. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.4.2 Protection of Existing Property
Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The Contractor shall take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government; any damaged items shall be repaired or replaced as approved by the Contracting Officer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.5 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.6 USE OF EXPLOSIVES
Use of explosives will not be permitted.
1.7 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available in accordance with the direction of the Contracting Officer.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 DISPOSITION OF MATERIAL
Title to material and equipment to be demolished, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.
3.2 CLEAN UP
Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. Local regulations regarding hauling and disposal shall apply.
—End of Section—
SECTION 02230
SITE CLEARING
PART 1 - GENERAL
1.01 SUMMARY
A. Provide site clearing operations.
1. Clearing and grubbing of stumps and vegetation.
2. Topsoil stripping and stockpiling.
1.02 REFERENCES
1.03 SUBMITTALS
A. Clearing Plan: Submit list of proposed operations, and identify site improvements and features to remain. Include proposed location for stockpiles.
1.04 QUALITY ASSURANCE
A. Comply with governing codes and regulations. Use experienced workers.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Erosion control, siltation control, and dust control materials suitable for site conditions.
PART 3 - EXECUTION
3.01 SITE CLEARING OPERATIONS
A. Protection of vegetation, landscaping, and site improvements not scheduled for clearing which might be damaged by construction activities.
B. Clearing vegetation, and removal and disposal of debris, rubbish, and site improvements.
C. Topsoil stripping and stockpiling.
D. Temporary erosion control, siltation control, and dust control.
E. Temporary protection of adjacent property, structures, benchmarks, cemeteries, and monuments.
F. Removal and legal disposal of cleared materials.
3.02 CLEARING
A. Prevent damage to existing improvements indicated to remain, including improvements on and off site.
B. Remove heavy growths of grass before stripping. Stockpile satisfactory topsoil containing no large stones, foreign matter and weeds on site for reuse.
C. Prevent erosion and siltation of streets, catch basins and piping. Control windblown dust. Remove waste materials and unsuitable soil from site and dispose of in a legal manner.
3.03 STRIPPING OF TOPSOIL
A. Topsoil shall be stripped from areas indicated on drawings; topsoil shall be stripped to a depth of 4 inches. Topsoil shall be spread on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Topsoil shall be kept separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Any surplus of topsoil from excavations and grading shall be removed from the site.
SECTION 02754
CEMENT CONCRETE PAVING AND SIDEWALKS
A. Provide cast-in-place concrete paving over prepared subbase.
ACI 305R Guide to Hot Weather Concreting ACI 306.1 Standard Specification for Cold Weather Concreting ASTM A 184 Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement ASTM A 185 Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete ASTM A 307 Standard Test Method for Tensile Strength of Chemical-Resistant Mortar, Grouts, and
Monolithic Surfacings ASTM A 615 Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete
Reinforcement ASTM C 33 Standard Specification for Concrete Aggregates ASTM C 94 Standard Specification for Ready-Mixed Concrete ASTM C 150 Standard Specification for Portland Cement ASTM C 309 Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete ASTM C 881 Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.
B. Design Mixes: Submit for approval design mixes, including adjustments for variations in project conditions.
C. Test Reports: Submit for approval test reports.
A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in satisfactory use in similar service for three years. Use experienced installers.
Deliver, handle, and store materials in accordance with manufacturer's instructions.
B. Construction Tolerance: 1/8" in 12' for grade and alignment of top of forms; 1/4" in 12' for vertical face on longitudinal axis.
C. Standards:
1. ACI 301, Specifications for structural Concrete for Buildings.
2. ACI 318, Building Code Requirements for Reinforced Concrete, and CRSI Manual of Standard Practice.
A. Concrete: ASTM C 150, Type I, Portland cement; ASTM C 33, normal weight aggregates;
potable water.
1. Design Mix: ASTM C 94, 3000 psi, 28 day minimum compressive strength.
2. Slump Limits: 8 inches minimum with superplasticizer, 3 inches otherwise.
3. Air Content: 5 to 8 percent.
4. Finish: Broom finish, perpendicular to direction of travel, exposed to view.
5. Finish: As-cast form finish, not exposed to view.
B. Formwork: Plywood or metal panel formwork sufficient for structural and visual requirements.
C. Reinforcing Materials:
1. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
D. Concrete Admixtures: Containing less than 0.1 percent chloride ions.
1. Air-Entraining Admixture: ASTM C 260, for exterior exposed concrete exposed to freeze-thaw.
2. Water-Reducing Admixture: ASTM C 494, Type A, for placement and workability.
3. High-Range Water-Reducing Admixture, Super Plasticizer: ASTM C 494, Type F or G for placement and workability.
4. Water-Reducing, Accelerating Admixture: ASTM C 494, Type E for placement and workability.
5. Water-Reducing, Retarding Admixture: ASTM C 494, Type D for placement and workability.
E. Auxiliary Materials:
1. Nonslip Aggregate Finish: Fused aluminum oxide granules or crushed emery.
2. Liquid Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class A.
3. Water-Based Acrylic Membrane Curing Compound: ASTM C 309, Type 1, Class B.
4. Evaporation Control Compound: Monomolecular film-forming compound.
5. Premolded Expansion Joint Filler Strips: ASTM D 1751 or ASTM D1752, ¼” joint filler unless otherwise noted.
6. Bonding Compound: Polyvinyl acetate or acrylic base.
7. Epoxy Adhesive: ASTM C 881.
3.01 INSTALLATION
A. Proof roll subbase and check for unstable areas. Report unsatisfactory conditions in writing.
Beginning paving work means acceptance of subbase.
B. Comply with concrete section for concrete mix, testing placement, joints, tolerances, curing, repairs and protection.
C. Dispose of over-mixed concrete off-site in a legal manner.
D. Protect concrete paving until weight of a person will not leave any impression. Remove and replace concrete paving which shows impressions or other defects. Skim coating defects is not acceptable.
3.02 CURING AND PROTECTION
A. Comply with ACI standards for Hot (ACI 305R) and Cold (ACI 306.1) Weather Concreting.
B. Concrete shall be protected against loss of moisture and rapid temperature changes for at least 7 days from the beginning of curing operation. All equipment needed for adequate curing and protection of the concrete shall be on hand and ready for use before actual concrete placement begins. Protection shall be provided as necessary to prevent cracking due to temperature changes during the curing period.
C. CURING: Begin initial curing as soon as free water has disappeared from exposed surfaces.
Continue curing by use of moisture-retaining cover or membrane-forming curing compound. Cure formed surfaces by moist curing until forms are removed. Provide protection as required to prevent damage to exposed concrete surfaces.
SECTION 02900
SEEDING
A. Provide landscape work:
1. Finish grading and seeding.
2. Topsoil and soil amendments.
3. Reconditioning existing lawns.
ANLA Z60.1-2004 American Nursery & Landscape Association
B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, connections, and relationship with adjacent construction.
C. Maintenance Data: Submit maintenance data, including maintenance schedule.
D. Notices: Submit 48-hour written notice prior to turnover to Government for watering and maintenance.
C. Testing: Laboratory testing for suitable soil amendments and fertilizer.
A. Lawns: Seed, new crop seed mixture. Weed seed shall not exceed 1 percent by weight of the total mixture. Wet, moldy, or otherwise damaged seed will be rejected.
1. Spring/Summer Seed (Permanent Grass): Seed mixtures shall be proportioned by weight as follows:
Botanical Name Common Name Mixture Percent Percent Pure By Weight Live Seed Cynodon spp. Bermuda – Tifway 419 75 82
2. Fall/Winter Seed (Temporary Grass): Seed mixtures shall be proportioned by weight as follows:
Lolium Multiflorum Annual Rye 75 88
3. Spring/Summer Seed (Temporary Grass): Seed mixtures shall be proportioned by weight as follows:
Panicum Ramosum Brown Top Millet 75 82
F. Topsoil: From site stockpile with additional fertile, friable topsoil from local source.
G. Soil Amendments:
1. Lime: Dolomitic limestone.
2. Aluminum Sulfate: Commercial grade.
3. Peat Humus: Finely divided peat.
4. Superphosphate: 20 percent available phosphoric acid.
5. Sand: Clean, washed sand.
6. Perlite: NBS PS 23.
7. Sawdust: Rotted sawdust free of chips and stones.
8. Manure: Rotted stable manure.
9. Commercial Fertilizer: Neutral character for plant materials and lawns.
10. Mulch: Ground or shredded pine bark mulch.
A. Install materials in accordance with approved submittals. Install landscape work in proper relation with adjacent construction and with uniform appearance. Coordinate with work of other sections.
B. For seeded lawns, apply seed at rate of 1/2 pound per 1000 square feet.
C. Provide maintenance and watering until turnover to Government for maintenance and watering.
Replace damaged materials and dead or unhealthy plants and turf areas prior to turnover to Government.
3.02 PLACING OF TOPSOIL
A. On areas to receive topsoil, the compacted subgrade soil shall be scarified to a 2 inch depth for bonding of topsoil with subsoil. Topsoil then shall be spread evenly to a thickness of 4 inches and graded to the elevations and slopes shown. Topsoil shall not be spread when frozen or excessively wet or dry. Material required for topsoil in excess of that produced by excavation within the grading limits shall be obtained from areas indicated.
3.03 TURF ESTABLISHMENT (SEEDED LAWNS)
A. Length of Period: On completion of the last day of the turfing operation (installation of spring/summer grass), the Turf Establishment Period will be in effect, for at least 3 months, to be re-evaluated at 30, 60 and 90 days. If the stand of turf does not meet the requirements set forth in Stand of Turf the Contractor shall reseed as directed. This re-evaluation shall continue until the stand of turf is acceptable.
B. Stand of Turf: A stand of turf from the seeding operation is defined as a minimum of 100 grass plants per square foot. Bare spots shall be no larger than 6 inches square and total bare spots shall not exceed 2 percent of the total seeded area.
C. Post-Fertilization: Nitrogen carrier fertilizer shall be applied at the rate of 30 pounds per acre after
30 days and again at 90 days.
D. FINAL ACCEPTANCE: At the end of the Turf Establishment Period, a final inspection will be made. Final acceptance of the turf will be based upon a satisfactory stand of turf as defined in the paragraph "TURF ESTABLISHMENT." Rejected areas shall be replanted or repaired as directed by the COR.
SECTION 03300
CAST-IN-PLACE CONCRETE
A. Provide cast-in-place concrete for general building construction, including, without limitation:
1. Footings and foundations.
2. Slabs on grade.
B. Requirements (materials, mixes, finishes) apply to concrete work specified in other sections, such as sidewalk paving and fill for metal pan stair treads.
1.02 SUBMITTALS
1. Liquid membrane forming compound: FIO, instructions and certificates.
B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction,
1. Shop drawings shall be prepared and stamped by a qualified engineer licensed in the jurisdiction of the project.
C. Mix Design: Submit for approval mix design proposed for use.
D. Concrete strength: Submit 7 and 28 day cylinder tests.
1.03 QUALITY ASSURANCE
B. Testing: Employ an independent testing agency acceptable to Government to design concrete mixes and to perform material evaluation tests. Provide 7 and 28 day cylinder tests. Comply with ASTM C 143, C 173, C 31 and C 39.
1. Perform minimum of one test (two cylinders per test) per day for each day concrete is placed and for each 50 cubic yards placed.
C. Standards:
1. ACI 301, Specifications for structural Concrete for Buildings.
2. ACI 318, Building Code Requirements for Reinforced Concrete, and CRSI Manual of
Standard Practice.
A. Concrete Design Mixes, ASTM C 94, 28 Day Compressive Strength:
1. Exterior Site Concrete and Pads Exposed to Weather:
a. Compressive Strength: 3000 psi, Air-Entrained.
B. Formwork: Plywood or metal panel formwork sufficient for structural and visual requirements.
C. Reinforcing Materials:
1. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
D. Concrete Materials: ASTM C 150, Type I, Portland cement; potable water.
1. Normal weight aggregates, ASTM C 33.
2. Fly Ash: ASTM C 618, Type F.
E. Concrete Admixtures: Containing less than 0.1 percent chloride ions.
1. Air-Entraining Admixture: ASTM C 260, for exterior exposed concrete and foundations exposed to freeze-thaw.
2. Water-Reducing Admixture: ASTM C 494, Type A, for placement and workability.
3. High-Range Water-Reducing Admixture, Super Plasticizer: ASTM C 494, Type F or G for placement and workability.
4. Water-Reducing, Accelerating Admixture: ASTM C 494, Type E for placement and workability.
5. Water-Reducing, Retarding Admixture: ASTM C 494, Type D for placement and workability.
F. Auxiliary Materials:
1. Liquid Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class A.
2. Epoxy Adhesive: ASTM C 881, two-component material.
12. Premolded Expansion Joint Filler Strips: ASTM D 1751 or ASTM D1752, ¼” joint filler unless otherwise noted.
G. Concrete Finishes For Formed Surfaces:
1. Surfaces Not Exposed To View: As-cast form finish.
2. Surfaces Exposed To View: Smooth form finish.
H. Concrete Finishes for Monolithic Slabs:
1. Nonslip broom finish for exterior concrete platforms, steps, ramps, and sloped walks.
A. Comply with ASTM C 94. Do not change mix design without approval. Calcium chloride admixtures are not permitted.
B. Chamfer exposed edges/corners to provide straight lines.
C. Tolerance: Plus 1/8" in 10' for grade, alignment, and straightness.
D. Construction Joints: Use keyways, continue reinforcement through joint.
E. Expansion Joints: For exterior work locate 30' o.c. at approved locations. Provide smooth dowels across joint which permit 1" horizontal movement and no vertical shear movement.
F. Isolation Joints: Provide between slabs and vertical elements such as columns and structural walls.
G. Control Joints: Provide sawn or tooled joints or removable insert strips; depth equal to 1/4 slab thickness. Spacing as required and approved.
H. Wall Finishes: As-cast and patched for concealed work; rubbed smooth, filled and cement paste coated for exposed work.
I. Slab Finishes: Obtain sample approval before beginning work.
1. Broom: After trowel finishing, roughen surface by fine brooming perpendicular to traffic direction for exposed exterior walks, steps and ramps.
3.02 CURING AND PROTECTION
A. Comply with ACI standards for Hot and Cold Weather Concreting.
B. Concrete shall be protected against loss of moisture and rapid temperature changes for at least 7 days from the beginning of curing operation. All equipment needed for adequate curing and protection of the concrete shall be on hand and ready for use before actual concrete placement begins. Protection shall be provided as necessary to prevent cracking due to temperature changes during the curing period.
C. CURING: Begin initial curing as soon as free water has disappeared from exposed surfaces.
Continue curing by use of moisture-retaining cover or membrane-forming curing compound. Cure formed surfaces by moist curing until forms are removed. Provide protection as required to prevent damage to exposed concrete surfaces.
SECTION 05510
METAL STAIRS
A. Provide Steel-Framed Stairs and Handrails.
B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction,
1. Shop drawings shall be prepared and stamped by a qualified engineer licensed in the jurisdiction of the project.
B. Handrail and Railing Structural Performance: ASTM E 985.
2.01 STEEL FRAMED STAIRS AND HANDRAILS
A. Materials:
1. Cold-Formed Steel Tubing: ASTM A 500.
2. Steel Pipe: ASTM A 53, standard weight (Schedule 40).
3. Fasteners: Plated fasteners, ASTM B 633, zinc-coated.
B. Abrasive Nosings:
1. Cast units with an integral abrasive grit.
A. Take field measurements prior to fabrication, where possible. Form to required shapes and sizes with true, straight edges, lines and angles. Provide light-tight, hairline joints.
B. Coordinate with work of other sections; provide inserts and templates as needed. Install work plumb and level with uniform appearance.
C. Stairs: Control access to and use of stair systems. Do not permit overloading of stair systems.
Make connections light-proof tight by welding or bolting; conceal fastenings as much as possible.
Grind flush and smooth all exposed welds.
D. Restore damaged finishes and protect work.
SECTION 05521
PIPE AND TUBE RAILINGS
A. Provide pipe and tube handrails and railing systems.
B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, B. Handrail and Railing Structural Performance: ASTM E 985.
A. Steel Pipe and Tube Railing Systems:
1. Steel Pipe, Galvanized Finish: ASTM A 53.
2. Steel Tubing: ASTM A 500 or A 501.
3. Finish: Galvanized.
D. Auxiliary Materials:
1. Exterior/Interior Anchoring Cement: Erosion-resistant hydraulic expansion cement.
2. Galvanizing Repair Paint: SSPC - Paint 20.
A. Take field measurements prior to fabrication, where possible. Form to required shapes and sizes with true, straight edges, lines and angles. Provide light-tight, hairline joints.
B. Install materials and systems in accordance with manufacturer's instructions and approved submittals. Install materials and systems in proper relation with adjacent construction. Coordinate with work of other sections.
C. Coordinate with work of other sections; provide inserts and templates as needed. Install work plumb and level with uniform appearance.
D. Restore damaged finishes and protect work.
SECTION 31 23 00.00 20
EARTHWORK, EXCAVATION AND FILL
PART 1 GENERAL
1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM D 1556 (2007) Density of Soil In-Place by the Sand-Cone Method
ASTM D 1557 (2009) Moisture-Density Relations of Soils and Soil- Aggregate Mixtures Using 10-lb.
Rammer and l8-in. Drop
ASTM D 2167 (2008) Density and Unit Weight of Soil In-Place by the Rubber Balloon Method
ASTM D 2487 (2010) Classification of Soils for Engineering Purposes
ASTM D 3017 (2005) Water Content in Soils and Rock in Place By Nuclear
Methods (Shallow Depth)
GEORGIA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .