I.A.3_DRAWINGS_1885_Combined.pdf
PDF 1 MB Posted
- Attached to
- CANOPY INSTALL Federal contract opportunity
- Solicitation number
- W9124M-16-B-0003
About this file
DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment.pdf | ||
| pdp11819.pdf | ||
| 1885_Combined_rev1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR CONSTRUCTION 05-01-2015
Troy.Clark2 Typewritten Text
DS-1-5J
ALUMINUM WALKWAY COVER:
1. WORK SHALL INCLUDE DESIGN, FABRICTION AND INSTALLATION OF ALUMINUM
WALKWAY CANOPY SYSTEM AND RELATED FOUNDATION SYSTEM.
2. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS PRIOR TO PREPARATION OF SHOP
DRAWINGS AND FABRICATION.
3. WALKWAY COVER SHALL BE DESIGNED FOR 120 MPH WIND.
4. ALUMINUM FINISH: MEDIUM BRONZE, “KYNAR” FINISH.
5. COORDINATE INSTALLATION OF WALKWAY LIGHTING.
Typewritten Text
DS-1-5J
Typewritten Text
DS-1-5J
Typewritten Text
DS-1-5J
| 1885-01 (G-1) Cover Sheet |
| 1885-02 (C-1) Site Plan |
| 1885-03 (A-1) Elevations and Details |
| 1885-04 (E-1) Electrical Site Plan |
File details come from the government source that posted it. Updated .