AMENDMENT0010.pdf

PDF 26 KB Posted

Attached to
Replace Door Bldg 16520 Federal contract opportunity
Solicitation number
W9124M-15-B-0010
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Stewart

About this file

AMENDMENT0002

View the file

Other files for this federal contract opportunity

Other files attached to Replace Door Bldg 16520, newest first.
File Type Posted
ABSTRACTROOF.xls XLS spreadsheet
AMENDMENT0010.pdf PDF
STATEMENTOFWORK0010.pdf PDF
DRAWINGS0010.pdf PDF
SOLICITATION0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010705740 YG9-6-2J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to add the Specification, Section 07411 - "Metal Roof Panels," to the Statement of Work - Technical Provision General.

b. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M-15-B-0010

X 9B. DATED (SEE ITEM 11)

02-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jul-2015

CODE

MISSION & INSTALLATION CONTRACTING CMND

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314-3425

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124M-15-B-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The Issued By organization has changed from

MISSION & INSTALLATION CONTRACTING CMND

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314

to

MISSION & INSTALLATION CONTRACTING CMND

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314-3425

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

SPECIFICATION - SECTION 07411

SECTION 07411

METAL ROOF PANELS

PART 1 - GENERAL

1.01 SUMMARY

A. Provide manufactured roof panels.

1.02 SUBMITTALS

A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used.

B. Shop Drawings: Submit shop drawings indicating material characteristics, details of construction, connections, and relationship with adjacent construction.

1. Submit engineering calculations indicating wind uplift pressure calculations according to local building code for project location with respect to appropriate Importance Factor, Exposure category and Safety Factor.

C. Samples: Submit two representative samples of each material specified indicating visual characteristics and finish. Include range samples if variation of finish is anticipated.

D. Metal Roof Weathertightness Warranty: Submit manufacturer's standard warranty.

Include labor and materials to repair or replace defective materials.

1. Warranty Period: 10 years commencing on date of substantial completion.

E. Panel / Trim Material Warranty: Furnish manufacturer's panel coating warranty covering cracking, checking, peeling, and fade and chalk.

1. Warranty Period: 20 years.

1.03 QUALITY ASSURANCE

A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions.

B. Governing Code: IBC 2012

C. Design Wind Speed: 120 MPH

PART 2 - PRODUCTS

2.01 MATERIALS

A. Manufacturers: ATAS International, Berridge Manufacturing, McElroy Metal, or approved equal.

B. Roof System: Roof shall be tested and certified to meet Underwriters Laboratory uplift rating: UL 580 for Class 90 wind uplift resistance.

1. Type: Factory-formed machine locked standing-seam (2” min.), concealed fastened, roof panel system, 24 ga.

2. Roofing Panel Finish: Fluoropolymer, Kynar 500.

3. Roof panel system must allow individual roof panel removal and replacement from any point on the roof without damage to adjacent roof panel(s).

4. Panels must be furnished and installed in continuous lengths from ridge to eave with no overlaps. Panels too long to ship will be manufactured on site using manufacturer’s employees and equipment.

C. Sheet Materials: Galvanized steel sheet, ASTM A653, G90 coating, 24 gauge (.0239 inch).

D. Flashing, Trim and Closures:

1. Flashing and / or trim: furnish at the rake, corners, eaves, framed openings, and wherever necessary to provide finished appearance, Provide same material and finish as adjacent material. Min. 24 ga.

2. Closures: Solid cell, preformed rubber or neoprene closures matching profile of roof panels as required.

E. Gutters and Downspouts: Design in accordance with SMACNA Architectural Manual.

1. 26 ga, min.

F. Related Materials:

1. Caulking and sealants.

2. #30 asphalt saturated organic felt - ASTM D226, Type II

3. 5/8” OSB - APA Rated Sheathing Exposure 1

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install materials and systems in accordance with manufacturer's instructions and approved submittals. Install materials and systems in proper relation with adjacent construction and with uniform appearance. Coordinate with work of other sections.

B. Apply panels and associated items for neat and weathertight enclosure. Avoid "panel creep" or application not true to grid lines.

C. Protect factory finishes from mechanical damage or abrasions.

D. Install approved type closures to exclude weather. Install weather seal under ridge cap.

Flash and seal roof panels at eave, gable and perimeter of all openings through roof and elsewhere as required or shown on drawings.

E. Restore damaged components and finishes. Clean and protect work from damage.

END OF SECTION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .