AMENDMENT 0002.pdf
PDF 411 KB Posted
- Attached to
- Shallow Draft Vessel and Highway Safe Trailer Federal contract opportunity
- Solicitation number
- W9123823Q0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 - QnAs.KO Approved.4.3.2023.docx | DOCX document | |
| Amendment 0001.pdf | ||
| Solicitation W9123823Q0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Issue the questions and answ ers
2. Incorporate an updated Statement of Work.
3. Extend the due date for quotes.
No other changes made or implied.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Apr-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123823Q0002
X 9B. DATED (SEE ITEM 11)
22-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Apr-2023
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123823Q0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 07-Apr-2023 10:00 AM to 12-Apr-2023 10:00 AM.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
90 dys. ADC 1 BRYTE YARD
1645 RIVERBANK ROAD
WEST SACRAMENTO CA 95691
FOB: Destination
L2R0230
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
365 dys. ADC 1 BRYTE YARD
1645 RIVERBANK ROAD
WEST SACRAMENTO CA 95691
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
90 dys. ADC 1 BRYTE YARD
1645 RIVERBANK ROAD
WEST SACRAMENTO CA 95691
To:
CAGE
365 dys. ADC 1 BRYTE YARD
1645 RIVERBANK ROAD
WEST SACRAMENTO CA 95691
The following have been modified:
STATEMENT OF WORK
Statement of Work Shallow Draft Maintenance Work Vessel
Revised February 23, 2023 Revised March 31, 2023
1.0 General Information:
The US Army Corps of Engineers (USACE) operates the Sacramento Shallow Draft Project at Bryte Yard Maintenance Facility, 1645 Riverbank Rd, West Sacramento, CA 95605. This project consists of the placement, retrieval, and maintenance of buoys, which mark the location of the Sacramento River Wing Dams, and clearance of debris and snags. Buoys are placed during low flows to identify boating hazards to the boating and recreating public. This work requires a shallow draft vessel and highway safe trailer.
The purpose of this purchase order is to provide the equipment necessary to mark hazards on the Sacramento River Wing Dams due to low flows of water.
2.0 Statement of Work:
The Contractor shall provide one (1) Work Boat and one (1) trailer to Bryte Yard Maintenance Facility in accordance with the specifications below.
3.0 General Specifications:
The Contractor will supply one (1) Maintenance Work Boat in accordance with the specifications set forth in 3.1.
3.1 – Minimum System Requirements – Shallow Draft Vessel
One (1) fully assembled 2022 22-foot aluminum boat with:
Boat length is a requirement. Boat must stay within length of operator’s license requirements.
Beam – 108” 102” Chine Beam- 84” Side Height – 33 inches Center Length- 22’ Deadrise- 12” Fuel Capacity – 60 gallons Standard Power – 250 Hp-4.2L, 4-Stroke Motor, Transom Mounted Side thickness – 0.190 Bottom Plate thickness – 0.250 Transom Thickness – 0.190 25” Transom height for outboard engine installation with prop lower unit.
Electronics Box- Located aft portside.
14” Transom Tray- Includes 3 door transom rigging area.
Transom Tie Downs- Welded tie downs one port, one starboard at lower transom corners.
2’ Snubbed Bow- Boat to be built as 24’ boat then cut down to 22’ boat to create snubbed bow.
Cleats-(Qty.5) 8” cast aluminum, (2) welded cleats on gunwale ea. side and (1) aft of bow flush deck mounted on bulkhead.
Bow Eye- Stainless steel bow eye.
Hydraulic Steering- Single ram hydraulic steering w/ steering wheel.
4’ Flush Work Deck- Bow to have 4’ (.190”) work deck flush with gunwales.
Deck needs to be reinforced for occupant standing on deck and handling 350LB anchors.
Bow Storage access- Bow flush deck to have storage access compartment from aft bulkhead.
Full Length Side Trays- Full length formed aluminum side trays under gunwales port and starboard.
.190” Bolt-In Aluminum Floors.
Gunwale Safety Rails- ¾” Handrails approx. 4” high both port/stbd sides from transom area to aft edge of bow flush deck.
Offset Console- Covered console w/ folding windshield offset with room for suspension seat mounted behind.
Heavy Duty Davit Mounts- Davit socket mounts on aft face of step deck port side only. Lower mount on deck and upper mount attached to step deck face as a possible.
Underfloor Wireway- Wireway/chase from aft rigging compartment underfloor forward to console.
Recessed Wash Down Hose Holder- Aluminum tube sized to fit 15’ coil washdown hose welded in upper starboard corner of bow step deck face as high as possible.
Operator’s Seat- (qty.1) Shock absorbent, height adjustable suspension pedestal folding back chair
(centered behind console).
Passenger Seats and Removable Pedestals- Qty (7) 15” tall 3pc removable seat pedestals with flush sockets mounted into deck floor. (7) folding seats with cushions installed Stainless Steel Fasteners throughout.
Fire Extinguisher- USCG approved w/mounting bracket, installation location tbd.
Electrical panel- (1) 6 switch electrical panel.
12v Power point & double USB power sockets for charging phones, GPS etc.
Bilge Pumps- (Qty.2) 1250 gph w/auto float switches.
Batteries- (Qty. 2) Group 24 deep cycle batteries w/ selector switch and ACR.
Instrument Panel - Fuel, hours, volts, temp, oil pressure, with oil/temp alarm system.
Navigation/ Anchor Lights- (USCG approved) LED Anchor light and Navigation lights.
Raw Water Washdown Pump- (5gpm) High pressure wash down pump w/coil hose and trigger nozzle included.
Electric Davit- 500lb capacity electric drum line installed port side face of bow step deck.
Paint- Interior Non-skid surfaces- All walking surfaces.
Fuel / Water Separator- Fuel water separator installed in aft rigging compartment.
b. The Contractor shall provide two keys and lanyards for the Maintenance Work Boat.
c. Warranty - The boat shall have a warranty on the boat hull, and warranty on the engine
d. The Contractor will test the Maintenance Work Boat prior to delivery.
3.2 Minimum System Requirements Highway Safe Towing Trailer for Shallow Draft Vessel, above:
The Contractor will provide a highway safe towing trailer for the Maintenance Work Boat. The trailer shall be an all-welded I-Beam, aluminum tandem axle trailer with UHMW bunks and side guides slick bunks, galvanized rims, dual wheel tongue jack, winch, LED lights, Torflex axles, Vault oil bath hubs, disc surge brakes both axles, spare tire, rim, and mount for trailer (15" tires are standard).
4.0 Invoices and Contract Payments:
The Government shall pay the Contractor upon submission of proper invoices for supplies (shallow draft vessel and trailer) delivered and accepted. Deliveries, as defined in the Payment Schedule of the contract, must be accepted by the Government before payment will be made.
Invoices shall be submitted as follows:
Original and One-(1) Copy to
USAED FINANCE CENTER
ATTN: CEFC-FP
5722 Integrity Drive Millington, TN 38054-5005 CEFC-Payments@usace.army.mil
Two additional copies of the invoice shall be provided to:
U.S. ARMY CORPS OF ENGINEERS
Bryte Yard Maintenance Facility 1645 Riverbank Road West Sacramento, CA 95605
5.0 Delivery Date: 90 Days after receipt of award. No more than 365 days ARO.
No person other than the Government Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the Contracting Officer to the Contractor to make changes that impact cost or schedule will be in the form of an official signed modification.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .