Sac Weir Q and As.docx

DOCX document 14 KB Posted

Attached to
Sacramento Weir Clearing Project Federal contract opportunity
Solicitation number
W91238-21-R-0078
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document contains questions and answers regarding a solicitation for vegetation and debris clearing services for the American River Common Features 2016 Sacramento Weir Widening Project. Key details include that the contractor is not responsible for removing debris not shown on the clearing plans, the railroad tracks will be inactive during the contract period so coordination is not required, and irrigation equipment only needs to be removed to the extent necessary for tree removal and erosion control work. The related federal contract opportunity is for non-personal services to provide vegetation and debris clearing services issued by the Department of the Army Corps of Engineers Sacramento District. The solicitation number is W91238-21-R-0078 for the Sacramento Weir Clearing Project.

View the file

Other files for this federal contract opportunity

Other files attached to Sacramento Weir Clearing Project, newest first.
File Type Posted
Sac Weir Clearing Revised PWS.docx DOCX document
Site Visit Update.pdf PDF
W9123821R007800001.pdf PDF
Sac Weir Clearing Site showing map.pdf PDF
W9123821R0078 - Sac Weir Tree Clearing.pdf PDF
Exhibit A Clearing Plans.pdf PDF
Exhibit B Debris Removal Plans 08312020.pdf PDF
Sac Weir Clearing PWS.pdf PDF
A1.13 Appendix A - PPQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

WRDA 16 AMERICAN RIVER COMMON FEATURES 2016

SACRAMENTO WEIR WIDENING PROJECT

Vegetation Clearing Contract

1. Are we to demo and off haul watering system pulled up from orchard as we remove trees? Refer to section 5.11.1 and 5.11.2; the following has been added to the PWS “Remove existing irrigation equipment and pipe only to the extent necessary to remove the trees and perform any leveling or erosion control seeding as required by this contract. “

2. Are we responsible for trash dumped along water edge that was not pictured in scope of work? The contractor is not responsible for removing any debris not shown on the debris removal plans. Refer to section 5.10; the following has been added to the PWS “Debris or trash not shown or listed on the debris clearing plans is not included in this contract.”

3. Will the railroad tracks be active? The RR will not be active, refer to section 1.7.22;

The following was added:

The railroad will be inactive during the duration of this contract.

The following has been removed from the PWS:

All work within 20 feet laterally from the railroad tracks, or on the railroad embankment must be coordinated at least five days in advance with the Railroad’s General Manager, Brenton MacDonald. For any work occurring on the above mentioned areas, contact the Railroad Dispatch, Cole Pennington at the start of the work day and at the end of the work day. Provide flagmen if required by the Railroad. No trees, limbs, branches or any debris may be left on or within 10’ of the Railroad tracks at any time. No trees, limbs, branches or other debris may be dropped on the railroad tracks. If any damage to the RR tracks or embankment occurs at any time, contact the RR dispatch immediately.

Sierra Northern Railway P.O.C.s:

President/CEO: Ken Beard Phone: (530) 666 9646 Mobile: (209) 613 4729 kbeard@sierrarailroad.com

General Manager: Brenton MacDonald Phone: (530) 666-9646 ext. 416 | Cell (530) 650-5440 bmacdonald@sierrarailroad.com

Dispatch: Cole Pennington Phone: (530) 908-9467

File details come from the government source that posted it. Updated .