Solicitation amended with updated Performance Work Statement including Security Information and Requirements and additional information regarding questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Water_Testing_at_Black_Butte_Lake_Solicitation_and_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123819R0046
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The follow ing questions are answ ered in the attached updated Performance Work Statement (PWS).
1) Is a boat required to access any of the sampling points? Refer to 16.1 of PWS
2) Can you provide GPS points of the sampling locations? Refer to 16.1 of PWS
3) Does the USACE have a specific lab in mind for coliform, nitrate/nitrite samples (such as ERDC)? Or is the contractor responsible for the lab? Does the USACE provide airbills if shipping samples is required, or does that cost fall to the contractor? Refer to 16.2 of PWS
4) Section 15 of the PWS states that the contractor needs a valid CA drivers license. Will a valid drivers license from a different state be sufficient? Yes, refer to 15 of PWS
5) When is Nitrate sampling to be performed? Refer to 16.8 of PWS
Additionally, Please see Security, Section 10, of the Performance Work Statement for additional requirements and information. The deadline for submission of Questions is 5:00 pm PDT, 27 March 2019. Questions received late are not guaranteed a reply.
1. CONTRACT ID CODE PAGE OF PAGES
1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123819R0046
X 9B. DATED (SEE ITEM 11)
07-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Mar-2019
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
UPDATED PWS MARCH 20, 2019
WATER QUALITY TESTING SERVICES
Black Butte Lake Performance of Work Statement
March 20, 2019
1 SCOPE OF WORK
1.1. General Information: Contractor shall provide all labor, materials, equipment, supplies, transportation and supervision necessary to perform all Water Quality Testing Services at Black Butte Lake, Tehama and Glenn Counties, CA. See Figure 1.
1.2 Work Locations: Services shall be performed at all developed recreation areas within the Black Butte Lake boundaries. The Contractor shall possess a vehicle in good working order to make trips between work locations and fulfill Performance Work Statement (PWS) requirements.
2. REQUIREMENTS
Contractor shall be knowledgeable and proficient in performing Water Quality testing services. The Contractor shall hold all licenses, certifications, and permits required by the State of California and register with both Glenn and Tehama County as required to perform water quality testing services at Black Butte Lake.
Contractor shall provide proof of all licenses, certifications, and permits to the COR before the commencement of services.
3. DEFINITIONS
3.1 Where "as shown", "as indicated", "as detailed", or words of similar meaning are used, it will be understood that reference is made to this PWS.
3.2 Where "as directed," "as required," "as permitted," "approval," "acceptance," or words of similar importance are used, it shall be understood that direction, requirement, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise.
3.3 Contractor. The term Contractor as used herein refers to both the prime Contractor and any subcontractors or personnel. The prime Contractor shall ensure that his/her subcontractors comply with the PWS.
3.4 Contracting Officer’s Representative (COR). The Government employee appointed by the
Contracting Officer, with limited authorities specific to this contract.
3.5 Quality Assurance (QA). A method used by the Government to provide some measure of control over the quality of purchased services.
3.6 Quality Assurance Evaluator (QAE). The Government employee designated to evaluate the quality of services provided.
3.7 Contract Discrepancy Report (CDR). See Attachment A – Performance Work Requirements Summary.
4. CONTRACTOR’S QUALITY CONTROL PROGRAM
Contractor shall establish a complete Quality Control Program (QCP) for the performance requirements of this contract and shall provide a written copy to the Government no later than 30 days after contract award.
Contractor shall maintain the QCP throughout the contract performance period; and, at any time upon verbal or written request, shall provide a copy to the Government for review. The QCP shall include as a minimum the following:
4.1 A method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable. Contractor shall use process control procedures and quality data analysis techniques.
4.2 Corrective action procedures for deficiencies and measures to prevent recurrence. The corrective actions shall address the deficiency and an action to prevent future deficiencies. Additional inspection(s) are not considered a corrective action. The QCP shall be evaluated for adequacy and changed or updated by Contractor as a part of all corrective actions taken by Contractor.
5. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
This plan will be used by the Government to assure that the work specified under this contract is being completed satisfactorily by Contractor, and that a viable QCP is in place. This plan is included as an attachment to the PWS and contract. The QASP will consist of periodic inspections conducted by the COR or QAE.
Payment analysis will be conducted by using the random, planned, 100% sampling methods, or validated complaint. However, the Government has the right to change or modify inspection methods at its discretion.
Management Support Rating Criteria are included in Attachment E.
6. PERFORMANCE EVALUATION MEETINGS
Contractor shall meet with the COR as often as determined necessary by the Government. An effort will be made to resolve any and all problems identified.
7. PERFORMANCE CRITERIA
Acceptable and unacceptable contract performance will be determined by the COR in accordance with Attachment A – Performance Work Requirements Summary. When Contractor’s performance is considered to be unsatisfactory, a report will be made to the COR to determine the deduction in price to be taken. Contractor shall respond to any complaints and/or ratings of poor performance within 5 calendar days after receipt of the report. The COR will require Contractor to explain, in writing, the cause of the discrepancy, and corrective action to obtain an acceptable level(s), and corrective action to preclude a recurring incidence of the problem.
Contractor will not be paid for that portion of performance determined to be unsatisfactory by the COR.
8. REMEDIAL ACTIONS
8.1 The COR will verbally advise or give a written inspection report to Contractor of discrepancies the first time they occur and ask Contractor to correct the problem. A notation will be made on the COR checklist of the date and time the deficiency was discovered and the date and time Contractor was notified.
8.2 If the Government created any of the discrepancies, these will not be counted against Contractor’s performance. When the Government has caused Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
8.3 When Contractor is not meeting the limits of satisfactory performance, a CDR will be issued to Contractor.
The seriousness of the failures should govern whether to issue a CDR at the end of the period, or as soon as the limits of satisfactory performance are exceeded.
8.4 When a CDR is issued for a service, the Contracting Officer must deduct from the periodic payment, a percentage of that payment as indicated in the Performance of Work Requirements Summary, Attachment A.
8.5 If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, another CDR will be issued and the appropriate amount deducted from the periodic payment in accordance with the disincentive rate listed in the Performance of Work Requirements Summary, Attachment A.
8.6 A third CDR will be the cause for a Cure Notice. However, the Contracting Officer may issue a Cure Notice or Show Cause letter at any time he/she deems appropriate. Depending on the overall performance of Contractor, an unsatisfactory reply to the Cure Notice should require a Show Cause letter to be issued, followed by consideration of termination of the contract.
9. INVOICES AND PAYMENT
9.1 Estimated Quantity Line Items: All Section B Pricing Schedule Line Items with quantities are estimated-quantity Line Items. The quantities are estimated amounts and are not guaranteed amounts. Contractor shall only be paid for work actually performed. At no time shall Contractor exceed the estimated quantity on any estimated quantity Line Item. Contractor shall establish a tracking system of actual quantities against the contract’s estimated quantities for each estimated quantity Line Item and shall maintain the tracking system up to date throughout the life of the contract. When the actual quantity of any Line Item reaches 85% of the estimated quantity on any estimated quantity Line Item, the Contractor shall notify the Government’s Contract Specialist and the COR in writing by fax or e-mail within two calendar days. Once the Government is notified that the actual quantity has reached 85% of the estimated quantity on any Line Item and if the Government determines that the estimated quantity needs to be increased, Contractor shall receive an official modification to the contract action signed by the Contracting Officer increasing the quantity and the amount obligated on the contract before Contractor shall proceed to work over the existing estimated quantity. The modification will set the new estimated quantity that Contractor shall not exceed without another modification
9.2 Invoices for payments shall be submitted upon completion of tasks as outlined in Section B, Pricing
Schedule. Invoices shall include all necessary information, including any necessary supporting documentation required as part of this Performance Work Statement. All invoices shall reflect the Contract number; see Block 2 of the Standard Form 1449. The final invoice shall be marked “Final.”
9.3 In the event that any part or the entire park is permanently or temporarily closed, the segments of this contract pertaining to that area may not be required and therefore not utilized. Contractor shall not perform work in those closed areas or facilities that shall not be in use and shall not be compensated for work not accomplished.
9.4 The COR will compare the Contractor’s performance to Industry Standards and will not exclude common sense considerations. If the performance in any required service is unsatisfactory, and poor performance is clearly the fault of the Contractor, monthly payments to Contractor will be reduced by the Contracting Officer based upon documentation provided by the COR as deemed appropriate per bid sheet. In the event of continued unsatisfactory performance with documentation of three (3) incidences where correction and time to cure has been given, the Contracting Officer may determine it is the best interest of the Government to terminate the contract.
9.5 Invoices shall be submitted monthly in arrears, after services have been provided, to the addresses specified below. Contractor shall deduct from invoice appropriately for deficiencies and/or no shows. The Contractor is responsible for providing an acceptable invoice to the Government for payment. Incomplete or incorrect invoices are not acceptable and will be returned to Contractor for correction. Payment will be net 30 days after receipt of an invoice in a format acceptable to the Government and verified and approved by the COR and subject to routine processing requirements.
9.6 Contractor shall provide an invoice on Contractor letterhead for services rendered. Each invoice will have a number/date and will include the following information:
a. Contractor name and address (same as stated in block 17a of contract)
b. Contractor remittance address (if different from 1 above)
c. Contract number (see block 2 of contract)
d. Contractor Federal Tax I.D./Individual tax identification number
e. Description, quantity, unit, unit price and amount (should look exactly like your bid schedule)
f. Service date(s)
g. Total Amount
9.7 Contractor shall send invoices to the COR for review and approval prior to submission to the USACE
Finance Center in Millington. The COR address is:
USACE, Sacramento District Attn: CE-SPK-CO-SF, Mr. William E. Miller, Park Manager Black Butte Lake, 19225 Newville Road, Orland, CA 95963-8901
Contractor shall direct payment question to the COR. Incomplete or inaccurate invoices will be returned to the Contractor.
9.8 Upon review and approval by COR, Contractor shall send original invoice to:
USACE Finance Center CEFC-A@usace.army.mil 5722 Integrity Drive Millington, TN 38054-5005
10. SECURITY
10.1 The Contractor shall pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e- verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
10.2 AT Level 1 Training
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
10.3 Access and General Protection/Security Policy and Procedures All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force ProtectionCondition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
10.4) iWATCH and/or CorpsWatch Training The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
11. GOVERNMENT FURNISHED PROPERTY AND RESPONSIBILITIES
11.1 The Government will not be responsible for any loss, damage or theft of Contractor items.
11.2 The Government will not furnish any storage facilities at project site for use by Contractor to store supplies and equipment.
11.3 The Government will be held financially accountable only for those scheduled service performed by the
Contractor. Circumstances beyond the control of the government, which may occur, would reduce the number of services required. Those visits impacted by any of the below listed causes may be rescheduled or omitted. Please note that all Line Items are estimated quantity line items. Possible causes for nonperformance may include but not limited to:
a. Contractor negligence;
b. Lack of sufficient or competent personnel;
c. Improper use and/or lack of safety gear worn and/or used by contractor personnel;
d. Equipment malfunction;
e. Damaged or missing facilities;
f. Recreation area closures;
g. High lake level (flooded recreation areas);
h. Unfavorable weather conditions (rain, wind, etc.);
i. Other acts of God preventing contract compliance.
12. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
12.1 Contractor shall maintain safe and sanitary work conditions at all times.
12.2 The Contractor shall have sufficient equipment and labor to perform services prescribed. If for any reason the Contractor shall be unable to perform any service as scheduled, the COR shall be notified in advance.
12.3 Keys. Contractor shall be responsible for all keys issued. Keys are for the exclusive use of Contractor while performing the specified services. Contractor shall be liable for any costs involved in changing locks due to lost keys. Report lost keys to the COR immediately. Keys shall be turned in to the COR immediately upon contract completion and/or termination.
12.4 Security. Contractor shall maintain all lock combinations, codes, locations, and instructions in a confidential and secure manner.
12.5 Clothing and Appearance. Contractor shall wear clothing suitable for the weather and work conditions while performing contract duties. A clean, well-groomed appearance shall be maintained at all times while on duty.
Contractor will maintain personal hygiene.
12.6 Equipment. General safety equipment includes safety shoes, work gloves and/or other additional personal safety equipment required for specific work duties. Vehicle use shall be restricted to paved, dirt, or gravel roadways. Off-road operation of Contractor vehicles shall be prohibited unless provided specific exception by the COR. Equipment used by Contractor for the specified service shall be in satisfactory operating condition and be maintained in this condition. The Government reserves the right to require Contractor to discontinue the use of unsatisfactory equipment and to require that such equipment be replaced with acceptable equipment to maintain contract compliance. The decision of the COR as to serviceability of the equipment shall be final. Equipment shall meet current Federal, State and local safety requirements and all applicable requirements of the Corps of Engineers Safety Manual, EM 385-1-1.
12.7 The Contractor shall provide a telephone number(s) and means of contract 24 hours a day, every day. The contact shall be a person, answering service or machine. Once the Corps has notified this contact, the Contractor shall be considered officially notified when called for problems or other work related items.
12.8 The Contractor shall hold all permits, licenses, and certifications required by the State of California and both
Glenn and Tehama County as required, and provide proof of all permits, licenses, and certifications before the commencement of work.
12.9 The Contractor shall immediately notify the Park Office of any chemical spills or hazardous waste encountered on Government property.
12.10 The Contractor shall complete and submit a Job Hazard Analysis to the COR 15 days prior to commencement of work. A sample format is shown in Attachment G. Form shall describe specific job hazards and how Contractor shall perform the job safely.
12.11 The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to government property, the Contractor shall replace or repair the damage at no expense to the Government as directed by the COR. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
12.12 Area Safety. The work to be performed shall be within the boundaries of public recreation areas and the attention of Contractor shall be directed to the need for extreme caution and care while driving and/or operating equipment in these locations. Contractor shall comply with all state and local traffic laws including but not limited to posted speed limits. Contractor shall not park in any reserved or restricted parking areas except as approved in advance by the COR.
12.13 Repair/Work Order Forms. Contractor shall report vandalism and potential safety hazards. Any situation within or interfering with Contractor’s performance of work shall also be reported. Contractor shall complete Repair/Work Request Form and submit it to the Park Office on the day the problem is discovered. Damaged or inoperative facilities shall be reported. If the damaged facilities pose an immediate danger to the public, Contractor shall notify the Park Office or a Park Ranger.
13. MANAGEMENT
13.1 Contractor shall manage the total work effort associated with water quality testing services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, and quality control.
Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices. Contractor shall maintain an adequate workforce to complete work in accordance with the time and quality standards specified therein. If for any reason Contractor shall be unable to perform any service as scheduled, the COR shall be notified in advance.
13.2 Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor shall plan and schedule work to ensure material, labor, supplies and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.
14. WORK SCHEDULE
14.1 Days of Operation: A typical Water Quality Service schedule is shown in Attachment B. The information contained in this attachment is provided as a generalized example only, and shall be subject to change.
Service dates may change, as directed by the COR. Contractor shall be notified at least 24 hours in advance for significant schedule changes and as much time as possible for minor schedule changes. Contractor requests for modification of duty hours shall be submitted in writing for action by the COR.
14.2 Hours of Operation: Work completed under this statement of work shall be accomplished between 8:00 a.m. and 4:30 p.m., Monday through Friday. Service times and dates may change, as directed by the COR.
The Contractor shall be notified at least 72 hours in advance for significant schedule changes and as much time as feasible for minor schedule changes, such as closing on holidays and weekends. Contractor requests for modification of duty hours shall be submitted in writing for action by the COR.
14.3 Federal Holidays: When a service day falls on a Federal Holiday, the service shall be performed on that day.
The ten Federal Holidays are as follows:
New Years Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
When one of the above designated holidays falls on a Sunday the following Monday shall be observed as the legal holiday. When a designated holiday falls on a Saturday the preceding Friday shall be observed as a legal holiday.
15. PRE-WORK MEETING
Contractor shall meet with the COR on the first scheduled work day to discuss contract requirements and provide proof of meeting the following requirements:
a. General park orientation.
b. Valid Driver’s License.
c. General Liability Insurance.
d. Automobile Liability Insurance.
e. Worker’s Compensation Insurance (if you have employees).
f. Submittal of required licenses and/or administrative materials.
g. Safety and first-aid responsibilities.
h. Contract statement of work and compliance.
i. Acceptable performance standards.
j. Billing procedures.
k. Quality Control Program.
l. E-Verify.
16. WATER QUALITY TESTING SERVICE REQUIREMENTS.
Contractor shall provide Water Quality Testing Services described herein. See Attachment E for Outflow calculations.
16.1 Service Areas:
a. Buckhorn (BH): Includes one drinking water system. Buckhorn also has a waste water oxidation pond that serves the entire recreation area.
b. Buckhorn Group Area (BHGA): Includes one drinking water system.
c. Orland Buttes (OB): Includes one drinking water system. Orland Buttes also has a waste water oxidation pond that serves the entire recreation area.
d. Eagle Pass (EP): Includes a waste water oxidation pond that serves the entire recreation area.
Note: Eagle Pass is part of the Park Office drinking water system.
e. Park Office (HQ): Includes one drinking water system which provides drinking water to the Park
Office, Observation Point, Eagle Pass, and South Canal Storage Area. There is no wastewater oxidation pond associated with the Park Office area.
All sampling points are accessible by motor vehicle.
The selected contractor will be shown these locations and will be responsible determining the best method of sampling each location.
16.2 On-site Sampling: This service includes on-site "trips" to the work locations on each day service is provided. The Contractor is responsible for all costs incurred, which should include, but is not limited to, the cost of travel, labor, and materials necessary to collect water samples at Black Butte Lake.
An accredited California State certified lab shall be utilized for all sample testing. The Contractor is responsible for all associated costs including shipping.
16.3 Reports:
a. Report the results of the following tests to the appropriate monitoring agency in the appropriate format in accordance with Attachment D, Reporting Schedule. A total of 16 reports are required by this contract which includes 12 monthly summary drinking water reports and 4 quarterly wastewater reports.
b. A summary of all tests and monitoring performed during the monthly billing period shall be submitted to the Park Office with the invoice. The Contractor shall also provide the COR with duplicate copies of all reports or information that are submitted to the State or county. Reports may be faxed or mailed but must be received by the Park Office no later than 10 days following the end of each month.
c. The Contractor shall report the monitoring data in tabular form. The data shall be summarized to clearly illustrate compliance with:
d. County, State and/or Federal regulations regarding potable water and non-community drinking water systems, (coliform, nitrate testing, mineral analysis, etc.). Data shall be reported to the Division of Drinking Water at the address below. The Contractor shall file these reports monthly using an approved format acceptable to the State Office of Drinking Water. Reports must be received by the State Office of Drinking Water within 10 days following the end of each month.
Send to:
STATE OF CALIFORNIA DEPARTMENT
OF PUBLIC HEALTH
DIVISION OF DRINKING WATER AND ENVIRONMENTAL
MANAGEMENT
364 Knollcrest Drive, Suite 101 Redding, CA 96002
(530) 224-4800 FAX (530) 224-4844
e. Waste Discharge Requirements. Reports (oxidation pond inflow, dissolved oxygen, and depth/ freeboard) shall be completed and sent to the Park Office within 10 days following the end of each quarter. Once report is received, the Park Office shall file reports with the Water Resource Control Board.
16.4 Oxidation Pond Inflow: The Contractor shall determine oxidation pond inflow by monitoring discharge pump hour meters, monthly, as specified below. For billing purposes, the total pond inflow calculations for each oxidation pond shall be considered as 1 service (1 oxidation pond equals 1 service) regardless of the number of meters or calculations in an area. See Attachment E, Outflow Calculations.
a. BH. Monthly. There are two meters in each of four (4) restrooms in Buckhorn Recreation Area which shall be monitored for the full 12 month period. (No readings are required from the Group Use Area restroom or Restroom #1; these areas are pumped to another restroom where the readings are taken.)
b. EP. Monthly. There are two meters in one restroom in Eagle Pass Recreation Area which shall be monitored for the full 12 month period.
c. OB. April through 15 September. Meter locations within the Orland Buttes Recreation Area shall be provided to the Contractor and shall be monitored for the specified six months only (April thru Sept).
16.5 Dissolved Oxygen: Contractor shall sample and perform dissolved oxygen tests monthly on the oxidation ponds; one test on each oxidation pond. If the pond is dry, and the Contractor is unable to complete the test, the report will indicate “dry”, and the service will be considered complete.
a. BH. Perform one (1) service per month for the full 12 month period.
b. OB. Perform one (1) service per month for the full 12 month period. It is the Contractor's responsibility to arrange for access into this area during off-season area closure (Oct-Mar).
c. EP. Perform one (1) service per month for the full 12 month period
16.6 Depth and Freeboard: Contractor shall measure the effluent depth and freeboard and monitor the conditions at the oxidation ponds, monthly, as specified below and at designated locations. The Contractor shall report any odor, seepage, rodent activity, vegetation growth, and when depth approaches maximum permitted levels to the COR. Notification within 24 hours is required. During the designated months, monitoring services shall still be performed even if ponds are dry.
a. BH. Perform one (1) service per month for the full 12 month period.
b. OB. Perform one (1) service per month for the full 12 month period. It is the Contractor's responsibility to arrange for access into this area during off-season area closure (Oct-Mar).
c. EP. Perform one (1) service per month for the full 12 month period.
16.7 Coliform Tests: Contractor shall sample and perform coliform tests on drinking water systems, monthly as specified below and at designated locations.
a. BH. Samples shall be collected, 1 test per month, for the full 12 month period.
b. HQ. Samples shall be collected, 1 test per month, for the full 12 month period.
c. BHGUA. Samples shall be collected, 1 test per month, for the following nine (9) months only:
March (the last week), April, May, June, July, August, September, October and November. It is the Contractor's responsibility to arrange for access into this area prior to opening day on April 1.
d. OB. Samples shall be collected, 1 test per month, for the following seven (7) months only:
March (the last week), April, May, June, July, August and September. It is the Contractor's responsibility to arrange for access into this area during the last week of March in anticipation of opening day on April 1.
16.8 Nitrate Tests: Contractor shall sample and perform tests on drinking water systems, annually in April, at
BH, BHGUA, OB, and HQ (1 service per area) as specified by the COR. The PWS has a sample schedule attached.
The schedule is a sample and can be adjusted when the contract is awarded. If the contract is awarded after the April sampling date, then the nitrate sampling will be conducted at the end of the service period.
16.9 Nitrite Tests: Required once every three years. Samples to be collected in April 2020 and 2023 only.
Contractor shall sample and perform tests on drinking water systems at BH, BHGUA, OB and HQ (1 service per area) as specified by the COR.
16.10 Service Record Sheet: Contractor shall deliver to the COR a completed service record sheet for each service day. Service record sheets shall include a description of each service performed, date, start time, total time on project, the number of Contractor personnel, and the signature of the service person. A typical service sheet is located in Attachment F, or an equivalent, shall be used. It shall be the Contractor’s responsibility to provide additional copies.
17. STANDARDS OF EMPLOYEE CONDUCT
17.1 Contractor shall be required to adhere to the following standards of dress and conduct while performing work. These regulations are enforceable as per the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. The Contractor shall also comply with the California State Health Code, Cal-OSHA, and Tehama and/or Glenn Counties' Codes.
17.2 Contractor shall exercise tact, diplomacy, and courtesy at all times while dealing with the public. The recreation area shall be available to any visitor without regard to sex, race, creed, color, or national origin.
Contractor shall not engage in loud or boisterous behavior or use profane language.
17.3 Weapons shall not be carried or displayed in the public use areas at any time.
17.4 Contractor shall cooperate fully with Corps of Engineers employees, other Corps of Engineer Contractors, and local law enforcement and State agencies. Contractor shall not direct the work of other Contractors.
Contractor shall be responsible for all Government material in his possession and be accountable for any loss, damage, or misuse.
17.5 Commercial activities shall not be conducted on Government property.
17.6 The work to be performed shall be within the boundaries of land administered by the U.S. Army Corps of
Engineers. Contractor is subject to all Title 36 regulations while completing work under this contract. No special provisions or entitlements shall be granted to Contractor.
17.7 Contractor shall not use intoxicating beverages and/or drugs at the work site. Contractor shall not be under the influence of any substance that impairs the ability to perform the prescribed services.
18 PERIOD OF PERFORMANCE
18.1 This contract consists of a Base Period and four (4) Option Periods. The Base Period shall be from Date of Award until 31 December 2019. The Government may elect to exercise the option periods. Option Period One (1) is scheduled to be 01 January 2020 until 31 December 2020; Option Period Two (2) shall be 01 January 2021 until 31 December 2021; Option Period Three (3) shall be 01 January 2022 until 31 December 2022; Option Period Four (4) shall be 01 January 2023 until 31 December 2023. The maximum life of the contract, including any options, will not exceed five (5) years.
18. SUPERVISION AND TRAINING
18.1 Contractor shall provide a supervisor who speaks fluent English.
18.2 Contractor shall maintain satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. Contractor shall remove employees for cause, to include, but not limited to, misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government.
18.3 Contractor shall at all times abide by all applicable sections of EM 385-1-1, all references as outlined in EM
385-1-1 and all applicable OSHA requirements. The Web Address for EM-385-1- 1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
18.4 Contractor shall also be responsible for training and safety precautions for personnel performing work under these specifications. OSHA standards shall be observed by Contractor in all work performed.
Appropriate safety equipment shall be furnished by Contractor to personnel who shall be properly equipped at all times.
18.5 For safety and security purposes, Contractor shall submit, in writing, the name, address and phone number of all personnel performing services prior to the commencement of work. Contractor shall submit, in writing, the name of all employees discharged during this contract.
19. AUTHORITIES AND TECHNICAL DIRECTION
19.1 Contractor shall take no direction, from any Government employee or any other person other than the COR, that changes the terms and conditions of this contract or any change that impacts the cost, price, or schedule.
19.2 Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification issued to the Contractor – received prior to Contractor acting upon those changes. Any direction given by Government employees or any other person outside their authority shall be reported to the Contracting Officer.
19.3 The COR is limited to the authorities stated in the COR appointment letter. When a COR is appointed, they will be appointed by written letter from the Contracting Officer to Contractor and COR specific to this contract only. COR appointment letters from previous contracts at this installation are not valid for this contract.
Attachment A PERFORMANCE
REQUIREMENTS SUMMARY
1. The purpose of the following exhibit is to:
1.1 List the contract requirements considered most critical to acceptable contract performance.
1.2 Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory.
1.3 Define the procedure the Government shall use in reducing the Contractor’s monthly payment if satisfactory performance is not rendered.
2. The Government’s quality assurance procedures are based on actual performance of the contract and all areas will be reviewed periodically.
3. The criteria for acceptable and unacceptable performance are as follows:
3.1 Contract Requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
3.2 If the quality of the work does not comply with the contract requirements, the COR will initiate and the Contractor shall be required to complete a Contract Discrepancy Report (CDR).
3.3 The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The Contractor will not be paid for services not rendered in accordance with the standards set forth in the contract.
3.4 If the level of performance is deemed unacceptable to the Government concurrent with two unsatisfactory ratings, monthly payment will be reduced for unsatisfactory performance by the percentage as shown in the chart below:
Attachment A
QUALITY ASSURANCE SURVEILLANCE PLAN
(1) OBJECTIVE: On-site Sampling Services
Performance Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform On-site Sampling per PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of required Onsite Sampling for Water Quality testing.
(2) OBJECTIVE: Water Quality Reporting Services Performance Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Water Quality Reporting Services per PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of Water Quality Reporting Services.
(3) OBJECTIVE: Oxidation Pond Inflow Calculation Services
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Oxidation Pond Inflow Calculation Services per PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of required Oxidation Pond Inflow Calculation Services.
(4) OBJECTIVE: Dissolved Oxygen Services
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Dissolved Oxygen Services per
PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of Dissolved Oxygen Services.
(5) OBJECTIVE: Depth and Freeboard Services
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Depth and Freeboard Services per PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL. Incentive: Full payment of invoice. Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of Depth and Freeboard Services.
(6) OBJECTIVE: Coliform Sample and Testing Services
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Coliform Sample and Testing Services per PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL. Incentive: Full payment of invoice. Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of required Coliform Sample and Testing Services.
(7)OBJECTIVE: Nitrate Testing Services Performance Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Nitrate Testing Services per
PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of required Nitrate Testing Services.
(8) OBJECTIVE: Nitrite Testing Services
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Perform Nitrite Testing Services per
PWS.
100% required at both the MAL and DL
Field inspection by the COR
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall develop a plan for successful completion/performance of required Nitrite Testing Services.
(9) OBJECTIVE: Quality Control Program
Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Establish Quality Control Program per
PWS.
100% required at both the MAL and DL
Review by the COR within 30 days after contract award.
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice.
Remedy: The CONTRACTOR shall establish and maintain a QCP and submit to COR.
(10)OBJECTIVE: E-Verify Performance Standard
Minimum Acceptable Level (MAL)
Method and Frequency of Inspection
Disincentive, Incentive & Remedy
Contractor has completed E-Verify to determine the employment eligibility of employees performing direct, substantial work under PWS.
100% required at both the MAL and DL
Review by COR prior to initialization of any work.
Disincentive: 100 % of invoice deduction for failing to meet MAL.
Incentive: Full payment of invoice. Remedy:
CONTRACTOR shall develop a plan for meeting this requirement within 10 days of discovery. Verification of completion submitted to COR.
Attachment B
TYPICAL SCHEDULE OF SERVICES BY AREA
PARK OFFICE (HQ) Drinking Water System only
TYPE DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
Coliform X X X X X X X X X X X X
Nitrate X
EAGLE PASS (EP) Oxidation Pond Only
Inflow X X X X X X X X X X X X
Dissolved O2 X X X X X X X X X X X X
D & F X X X X X X X X X X X X
ORLAND BUTTES CAMPGROUND (OB) Drinking Water System AND Oxidation Pond (Open April through mid September)
Inflow X X X X X X
Dissolved O2 X X X X X X X X X X X X
D & F X X X X X X X X X X X X
Coliform X X X X X X X
BUCKHORN RECREATION AREA (BH) Drinking Water System AND Oxidation Pond
Inflow X X X X X X X X X X X X
Dissolved O2 X X X X X X X X X X X X
D & F X X X X X X X X X X X X
Coliform X X X X X X X X X X X X
BUCKHORN GROUP USE (BHGUA) Drinking Water System only (Open March through October)
Coliform X X X X X X X X X
Attachment C
BASE YEAR MANAGEMENT SUPPORT RATING CRITERIA
CLIN PERFORMANCE
OBJECTIVE
INDICATORS OF SUCCESS
Water Quality Testing Service
Contractor shall furnish all labor, materials, equipment, supplies, transportation necessary to provide water quality testing services at various locations at Black Butte Lake, Tehama and Glenn Counties, Orland, CA in accordance with (IAW) the Performance Work Statement (PWS) dated 22 Feb 2019
0002 Onsite Sampling Services CONTRACTOR has completed the required services IAW
PWS.
0003 Report Services CONTRACTOR has completed the required services IAW
PWS.
Oxidation Pond Inflow Services
CONTRACTOR has completed the required services IAW
PWS.
0005 Dissolved Oxygen CONTRACTOR has completed the required services IAW
PWS.
Depth and Freeboard Services
CONTRACTOR has completed the required services IAW
PWS.
0007 Coliform Services CONTRACTOR has completed the required services IAW
PWS.
0008 Nitrate Test Services CONTRACTOR has completed the required services IAW
PWS.
0009 Nitrite Test Services CONTRACTOR has completed the required services IAW
PWS.
0010 Quality Control Program CONTRACTOR has established and maintained a QCP and submitted a copy to COR.
0011 E-Verify CONTRACTOR has verified all personnel working on this project through E-Verify.
End
Attachment D REPORTING
SCHEDULE
MONTHLY REPORTS on drinking water systems (total of 12) Reports shall be filed no later than:
November 10 May 10
December 10 June 10
January 10 July 10
February 10 August 10
March 10 September 10
April 10 October 10
QUARTERLY REPORTS on oxidation ponds (total of 4) Reports shall be filed no later than:
January 15 July 15
April 15 October 15
Attachment E OUTFLOW
CALCULATIONS
1. Meter Readings- Collect monthly meter readings of individual hour meters from designated locations.
2. Operating Hours- Determine length of pump operations of individual pumps between readings…
This is the start of the file's text. The full file is on GovTribe.