W9123719B0003_0001.pdf

PDF 395 KB Posted

Attached to
Bluestone Dam Cofferdam Construction Federal contract opportunity
Solicitation number
W9123719B0003
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Bluestone Dam Cofferdam Construction, newest first.
File Type Posted
Abstract_of_Bids.pdf PDF
W9123719B0003_0003.pdf PDF
Dewatering_Photos_-_October_2004.pdf PDF
W9123719B0003_0002.pdf PDF
Pre-Bid_Questions_and_Answers.pdf PDF
Pre-Bid_Sign_In_Sheet.pdf PDF
Directions_for_Pre-Bid_Site_Visit.pdf PDF
W9123719B0003.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above-referenced solicitation is hereby amended to establish a due date for questions. All questions are to be submitted via email to Leah.S.Morgan@usace.army.mil by 5:30 PM Eastern Time on January 4, 2019.

In addition, paragraph (h) of the Determination of Responsibility w ithin Section 00 21 00, Instructions To Bidders, has been deleted.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Dec-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123719B0003

X 9B. DATED (SEE ITEM 11)

13-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Dec-2018

CODE

USACE, CONTRACTING DIVISION

LEAH MORGAN, 502 8TH STREET

HUNTINGTON WV 25701

W91237 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123719B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required performance has changed from Construction of a temporary cofferdam at Bluestone Dam, Hinton, West Virginia. The estimated order of magnitude of this procurement is between $10,000,000.00 and $25,000,000.00. The North American Industry Classification System (NAICS) Code for this acquisition is 237990.

This is a full and open procurement. In accordance with FAR 19.1307, this project requires the HUBZone 10% price evaluation.All bidders must return the Standard Form 1442, Section 00 10 00 (Bid Schedule), Section 00 45 00 (Representations and Certifications, in its entirety), and a bid guarantee (see FAR Clause 52.228-1).Contractor registration is available through the System for Award Management (SAM), available at www.sam.gov. Offerors must comply with requirements of 52.204-7, 52.204-8, 52.232-33, and any other SAM requirements, to include completing requirements in this solicitation through SAM.Refer to "Instructions to Offerors" for acceptable submission format. SUBMISSIONS RECEIVED SOLELY VIA ELECTRONIC MEDIA SUCH AS CD, DVD, THUMBDRIVE, EMAIL, OR FACSIMILE WILL NOT BE CONSIDERED.A pre-bid meeting and site visit will be conducted. See FAR Clause 52.236-27, Alt 1. to Construction of a temporary cofferdam at Bluestone Dam, Hinton, West Virginia. The estimated order of magnitude of this procurement is between $10,000,000.00 and $25,000,000.00. The North American Industry Classification System (NAICS) Code for this acquisition is 237990.

This is a full and open procurement. In accordance with FAR 19.1307, this project requires the HUBZone 10% price evaluation.All bidders must return the Standard Form 1442, Section 00 10 00 (Bid Schedule), Section 00 45 00 (Representations and Certifications, in its entirety), and a bid guarantee (see FAR Clause 52.228-1).Contractor registration is available through the System for Award Management (SAM), available at www.sam.gov. Offerors must comply with requirements of 52.204-7, 52.204-8, 52.232-33, and any other SAM requirements, to include completing requirements in this solicitation through SAM.Refer to "Instructions to Offerors" for acceptable submission format. SUBMISSIONS RECEIVED SOLELY VIA ELECTRONIC MEDIA SUCH AS CD, DVD, THUMBDRIVE, EMAIL, OR FACSIMILE WILL NOT BE CONSIDERED.A pre-bid meeting and site visit will be conducted. See FAR Clause 52.236-27, Alt 1.All questions are due by 5:30 PM Eastern Time on January 4, 2019..

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO BIDDERS

BID OPENING

The bid opening will be held at the U.S. Army Corps of Engineers, Room 125, 502 8th Street, Huntington, WV 25701. For date and time of bid opening, see Block 13 on Standard Form 1442. Upon arrival, attendees must check in with the security desk to have the guards contact Leah Morgan at ext. 5548 to submit your bid and be escorted to the room for the bid opening.

PRICE BASIS

Bidders are advised that only bids submitted on a firm-fixed price basis will be considered, and that bids submitted on any other than firm-fixed price basis will be rejected.

Bid price alterations, i.e., crossed-out or white-out changes on the bid will not be accepted unless the change(s) is/are initialed.

BID QUANTITIES

Bids for less than specified quantities of each item in the Schedule will not be considered. Failure to submit a unit price for each item where required in the bid schedule will be considered as a material deviation from the requirements of the solicitation, and the bid will be rejected. (FAR 14.404-2)

ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by the bidders:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of job and extended price will be corrected; and

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends their bid to be evaluated on the basis of unit prices, extensions, and totals arrived at by resolution of arithmetic discrepancies as provided above and bid will be so reflected on the abstract of bids.

ADDITIONAL INSTRUCTIONS

I. BIDS MUST SET FORTH FULL, ACCURATE, AND COMPLETE INFORMATION AS REQUIRED BY

THIS INVITATION FOR BID (INCLUDING ATTACHMENTS). THE PENALTY FOR MAKING

FALSE STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001.

II. THE HUNTINGTON DISTRICT CORPS OF ENGINEERS DOES NOT ACCEPT BIDS BY

FACSIMILE TRANSMISSIONS AND/OR EMAIL.

III. NOTE THE AFFIRMATIVE ACTION REQUIREMENTS OF THE EQUAL EMPLOYMENT

OPPORTUNITY CLAUSE (FAR 52.222-23) WHICH WILL APPLY TO THE CONTRACT

RESULTING FROM THIS SOLICITATION.

IV. ONE SEALED PAPER ORIGINAL AND ONE PAPER COPY OF BIDS ARE DUE AT THE

PLACE SPECIFIED ON THE STANDARD FORM 1442, ITEM 8. IN ADDITION TO THE HARD

COPIES, IT IS PREFERRED THAT BIDDERS SUBMIT A SEARCHABLE PDF DOCUMENT ON

A CD OR DVD. SUBMISSIONS RECEIVED SOLELY VIA ELECTRONIC MEDIA SUCH AS

CD, DVD, THUMBDRIVE, EMAIL, OR FACSIMILE WILL NOT BE CONSIDERED.

V. IF THE APPARENT LOW BIDDER IS OTHER THAN SMALL BUSINESS, A

SUBCONTRACTING PLAN MAY BE REQUIRED IN ACCORDANCE WITH FAR CLAUSE

52.219-9 ALTERNATE I (DEVIATION), SMALL BUSINESS SUBCONTRACTING PLAN.

DETERMINATION OF RESPONSIBILITY

To ensure award is made to a responsible bidder, a determination of responsibility will be conducted. The apparent low bidder will be contacted by the Contracting Officer and will be required to provide the requested responsibility information within 4 calendar days. As part of this responsibility determination, the Contracting Officer will utilize the guidance contained in FAR 9.104-1 which states to be determined responsible, a prospective contractor must:

a. Have adequate financial resources to perform the contract or the ability to obtain them.

b. Be able to comply with the required or proposed delivery or performance schedule.

c. Have a satisfactory performance record.

d. Have a satisfactory record of integrity and business ethics.

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them.

f. Has the necessary production, construction, and technical equipment and facilities, or theability to obtain them.

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

(End of Summary of Changes)

File details come from the government source that posted it.