Sewer Line Construction - Grayson, KY Federal contract opportunity
Solicitation number
W9123718Q0019
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Request for Quotations

View the file

Other files for this federal contract opportunity

Other files attached to Sewer Line Construction - Grayson, KY, newest first.
File Type Posted
A.01.38_EXHIBITS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRAYSON LAKE

FRANK JEFFREY

50 LAUNCH RAMP ROAD

GRAYSON KY 41143-9612

TEL: 606-474-5107 EXT8800 FAX:

W81F8E81644910

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W9123718Q0019 09-Jul-2018 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

USACE, CONTRACTING BRANCH

PATRINA SINGLETON, 502 8TH STREET

HUNTINGTON WV 25701

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

24-Jul-2018(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

304-399-6936PATRINA G SINGLETON

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W9123718Q0019

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job GRL Sewer Line

FFP

Contractor shall provide all labor, supplies, materials, and equipment necessary to replace all drain, sewer, and vent lines at Grayson Lake, Grayson, KY in accordance with the attached Statement of Work.

FOB: Destination

MILSTRIP: W81F8E81644910

PURCHASE REQUEST NUMBER: W81F8E81644910

NET AMT

PRICE BREAKOUT SCHEDULE

ITEM DESCRIPTION QTY UNIT TOTAL

0001 Reimbursement of actual cost of payment protection for quote in excess of $35,000.00 for the Base Work (see FAR 52.228-13)

1 JOB $

0002 Labor for the replacement drain, sewer, and vent lines in accordance with the attached Statement of Work at Grayson Lake, Grayson, KY.

1 JOB $

0003 Material and supplies for the replacement of drain, sewer, and vent lines in accordance with the attached Statement of Work at Grayson Lake, Grayson, KY.

1 JOB $

TOTAL WORK $

SPECIAL CONTRACT REQUIREMENTS

*Please direct ALL QUESTIONS to Patrina Singleton at (304)399-6936 or patrina.g.singleton@usace.army.mil .

**SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE

52.236-27 FOR ADDITIONAL INFORMATION. Any information received at a Site Visit which conflicts with this solicitation should be brought to the immediate attention of Mrs. Singleton. The solicitation, and resulting contract, shall be the governing document in all cases.

NOTE: Award will be made to the lowest price offeror who meets the technical requirements of the solicitation and is deemed responsible by the Contracting Officer.

This procurement is 100% Small Business Set Aside.

QUOTATION INSTRUCTIONS: Quotes are to be e-mailed to Patrina Singleton at patrina.g.singleton@usace.army.mil . Per FAR 36.204 the estimated price range for this project is between $100,000 and $250,000.00.

The following will need to be provided with your quote:

Company Name and Address Phone and Fax Numbers Email address Business Size (Large/small/HUBZone/8A/Women Owned/Service-Disabled Veteran Owned) Name and credentials of any subcontractors to be used

Contractors must be registered in the System for Awards Management (SAM) database (www.sam.gov ) to receive an award (See FAR 52.204-7). (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

Contractor is registered with SAM: _____ YES _____ NO (See FAR 52.204-7) Provide business Unique Entity Identifier number: ___________________________ (phone 800-333-0505 for Unique Entity Identifier number).

Provide business CAGE code: _______________________________

Provide Tax Identification Number: _________________________________

Please note, as of April 2018, GSA's System for Award Management (SAM) system is requiring new registrations and renewals of existing registrations to submit an original signed notarized letter identifying the authorized Entity Administrator. Vendors are encouraged to check their entity's status in SAM.gov and plan accordingly. If the prospective contractor is not registered in the SAM database, the Contracting Officer will following the procedures at FAR 4.1103. Contact the supporting Federal Service Desk at www.fsd.gov, or by telephone at 866-606-8220 (toll free) or 334-206-7828 (internationally) Monday through Friday from 8 a.m. to 8 p.m. (EDT), for FREE assistance.

Contractors are not required to submit an Accident Prevention Plan (APP) with their quote.

The successful offeror will be required to submit this document upon award. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference.

The contractor that receives this award will have 10 calendar days to provide an Accident Prevention Plan (APP). If this deadline is not met, the contractor will be given a cure notice stating that they will have 10 calendar days to submit an APP, otherwise the contract may be terminated for default.

CONTRACTOR SUBMITALS: The successful offeror shall provide as a minimum the following documentation:

a. Full Accident Prevention Plan

b. Activity Hazard Analysis

c. Invoice as stated on the contract award

d. Man-hour report to project office at completion of work

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

REPLACE PROJECT OFFICE SEWER LINES

Grayson Lake, Grayson, KY

1. Statement of Work: Contractor shall replace all interior drain, sewer and vent lines of Grayson Lake project office. All disturbed walls and floors shall be repaired as specified below. Contractor shall provide two separate temporary restrooms prior to work beginning. All work shall be in accordance with state and local laws. All excess building material shall be disposed of off government property in accordance with state and local laws.

2. Drain and Sewer Lines: All interior drain lines in the project office are currently cast iron. These lines shall be replaced with 4” schedule 40 PVC in accordance with state and local codes. Current lines shall be removed and new lines installed tying three toilet fixtures, one shower, four sinks, and 4 floor drains. New plumbing shall exit at the front of the building near the kitchen outside wall. Once the drain exits the building the plumbing shall run parallel to the outside of the office wall towards the septic tank. New plumbing shall tie into the existing septic system at the tank. New vent pipes shall be installed in accordance with state and local code utilizing the nonbearing wall between the visitor’s restroom and the main project restroom. Contractor shall eliminate 2 floor drains located in the hall near maintenance office. These drains shall be sealed in the manor to ensure liquid or gasses do not escape.

All floor drains and shower drains shall be installed with a trap in accordance with state and local codes. (Exhibits B, D, & E)

3. Demolition and Prep Work: All furniture shall be removed and stored prior to work beginning. All toilets, mirrors, sinks, vanities, cabinets, light fixtures, and doors shall be salvaged for reinstallation. Government will provide storage located at adjacent garage bays. Contractor shall remove and dispose of approximately 1500 sq. feet of locking laminate flooring, 215sq. ft. amount of ceramic tile floor, 100 sq. ft. amount of carpet, and 600 feet of base board and door trim. (Exhibit B – Flooring Layout Diagram) Contractor shall remove approximately 10 cubic yards of concrete walkway/curb to accommodate the lateral line from the office to septic tank. Contractor shall isolate work zone area by installing plastic sheeting to minimize dust existing the work zone. Precautions shall be taken to minimize disturbance in non-work zone areas. All excess building material shall be disposed of off government property in accordance with state and local laws.

4. Construction and Installation: Floor drains that are to be capped off will also need to be brought up to grade to surrounding floor. Contractor shall then install approximately 1500 sq. ft. of ceramic tile no smaller than one square foot per tile and no larger than 4 square foot per tile. This tile shall be installed throughout the office to take place of the laminate flooring. 215 sq. ft. of tile shall then be placed in each of the three bathrooms where the floor drains were replaced. The floor drain located in the shower of the employee restroom has mosaic tile around it. A tile of like size shall be replaced on the shower floor. Grout lines shall be determined by style of tile. The contractor shall provide tile samples to the Government for approval. Carpet that is removed shall be replaced with like kind (outdoor marine grade carpet). (Exhibit B) The shared wall between the three project restrooms that house the bathroom vent pipes shall be reconstructed and faced with sheetrock and painted with a color that suites the Government. Paint samples are to be provided. All salvaged items are to be reinstalled to original condition. All baseboard and trim work affected by the construction process shall be replaced with new materials and painted white with a semi-gloss finish. Baseboards shall match what is currently installed in resource managers office (5 ¼”).

5. Concrete Walkways: The walkways in front of the office shall be removed and reconstructed once lateral septic line is installed. Approximately 12 yds. of concrete shall be poured. Concrete shall be reinforced with wire mesh, be 4000 psi in strength, and have a finished edge and a brushed surface. The concrete shall be four inches thick and be surrounded by a six inch curb. ABA ramp shall be running slope no steeper that 1:12. All affected areas shall be cleaned and restored to original conditions (ground leveled, seeded and straw applied, topsoil installed, no landscaping installed). (Exhibit C)

6. Delivery Information: Work to be completed within 14 calendar days of Notice to Proceed.

ADDRESS:

50 Launch Ramp Road Grayson, KY 41143

7. Site Visit and Additional Information: A site visit is highly encouraged and should be schedule prior to making a quote. Prospective offerors may contract:

US Army Corps of Engineers ATTN: Frank Jeffrey Grayson Lake 50 Launch Ramp Grayson, KY 41143 Phone: 606-474-5815 Email: francis.s.jeffrey2@usace.army.mil

8. Hours of Operation: Normal working hours are Monday-Friday, 0730-1600 Eastern. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Ten Federal Holidays observed are as follows:

New Years Day (January 1st) Martin Luther King Day (3rd Monday in January) President’s Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October)

Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th) When one of the above designated holidays falls on a Sunday, the following Monday is observed as the legal holiday. When a designated holiday falls on a Saturday, the preceding Friday is observed as the legal holiday.

9. Contractor Accident Prevention Plan (APP):

a. General: Contractor shall comply with all Federal, State and Local safety requirements including those specified by the Occupational Safety and Health Act (OSHA) in 29 CRF 1910 General Industry Standard, 1926 Construction Standard and the U.S. Army Corps of Engineers Safety & Health Requirements Manual EM 385-1-1 as currently revised. Where a conflict exists between safety standards/requirements the contractor shall comply with the more stringent requirement. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, any project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.

b. Contractor Accident Prevention Plan (APP): The Contractor shall prepare a site-specific Accident Prevention Plan following the outline provided in EM 385-1-1, Appendix A as a minimum. The contractor shall address each element and sub-element in the outline in the order they appear in Appendix A. Any item from the outline that does not apply must be listed, in its assigned place and a brief explanation of the reason it is not required/provided. The APP shall address any unusual or unique aspects of the project or activity. This plan must be accepted by the Contracting Officer prior to commencement of any work. Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399- 5039/5032/5326. The web address for EM 385-1-1 is:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

(1) The contractor shall have on site an employee designated as a Site Safety and Health Officer (SSHO) who has completed the OSHA 30-hour Construction Safety training or its equivalent as specified in EM 385-1-1, 01.A.17 and has at least five years’ experience relative to the work to be performed. No work will be permitted unless the SSHO is present at the work site.

(2) Work crews of two or more must have two people holding current certification in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on component that cannot be taken online and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.

(3) All work that potentially exposes the worker to falls of six feet or more will require the contractor to submit a Site Specific Fall Protection & Prevention Plan in accordance with EM 385-1-1, Section 21.D.

(4) Cranes and hoisting equipment shall be operated only by qualified personnel (operators licensing, physical and drug testing in accordance with EM 385-1-1 Section 16.B). Note: CDL Medical Clearance is not acceptable. Please see attached medical clearance requirements.

(5) Effective November 8, 2010 all “Signalpersons” and “Riggers” shall be qualified. This is a mandatory requirement in accordance with 29 CFR 1926.1400 Regulations. Riggers must be a qualified person for the performance of specified hoisting activities such as during assembly/disassembly, in accordance with OSHA 1926.1404(r)(1) and 1926.1425(c)(3).

c. Risk Management Process: The Contractor shall utilize risk management tools such as Activity Hazard Analysis (AHA), Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs) or similar tools to identify, assess, prioritize risks and develop controls to minimize, monitor and control the probability and/or impact of unfortunate events to an acceptable level. Within each major phase, all activities, tasks or Definable Features of Work (DFOWs) shall be identified that will require an AHA/JSA/JHA. For each work activity, task or DFOW contractor shall prepare the initial AHA/JSA/JHA. A Risk Assessment Code (RAC) is assigned to each step, to the risk that remains after controls have been applied (residual risk) a final RAC (cannot be lower than the highest step RAC) shall be assigned. See EM 385-1-1 Section 01.A.14.b. for further guidance or contact the SOHO for assistance. The AHA/JSA/JHA shall be reviewed and accepted by the proper authority in order to proceed with the activity. All on-site employees shall review the accepted AHA/JSA/JHA prior to performing work and during weekly and “Tool Box” safety meetings as appropriate.

(1) AHA/JSA/JHA shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. AHA/JSA/JHA should indicate compliance with EM 385-1-1 personal protective equipment requirements (safety-toed work boots, safety glasses, gloves, hard hats, etc.), work crews of two or more must have two people currently qualified in first aid and CPR and the appropriate first aid kit on site. Single individuals working alone must have current certification in First Aid only.

(2) The names of the Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA and this manual) shall be identified and included in the AHA/JSA/JHA, as well as proof of their competency/qualification.

c. Accident/Mishap Reporting: The Contractor shall report all recordable mishaps to the GDA within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in: days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence.

(1) Immediate notification to the GDA is required for all serious accidents:

a. Fatal Injury/illness;

b. Permanent totally disabling injury/illness;

c. Permanent partial disabling injury/illness;

d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;

e. $500,000 or greater accidental property damage;

f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site;

g. USACE aircraft destroyed or missing;

The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29 CFR 1904.39.

(2) In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.

a. Electrical (includes Arc Flash, electrical shock, etc.);

b. Uncontrolled Release of Hazardous Energy (includes electrical and non-electrical);

c. Load Handling Equipment (LHE) or Rigging;

d. Fall-from-Height (any level or other than same surface);

e. Underwater Diving

10. Damage Reports: All instances where Government materials supplies, property, and/or equipment are damaged shall be reported immediately to the Resource Manager.

11. Minimum Personal Protective Equipment: Long pants, safety toe shoes/boots, and shirts with minimum 4 inch sleeves, hard hat, hearing protection as needed, and safety eyewear. Additional Personal Protective Equipment may be needed and should be determined using the Activity Hazard Analysis.

12. Pre-Construction Conference: The Contractor shall attend a Pre-Construction Conference prior to the initiation of work under this contract. The Contractor’s Accident Prevention Plan and all contractor submittals (Special Contract Requirements) must be approved prior to this meeting.

13. Security Requirements: All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12:

Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) personal information in order to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Huntington District Security Management Office of the background investigation. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities. The Contractor must also provide the following:

(1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name,

(3) Contract Number and

(4) Task Order Number when applicable.

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form).

FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-

258) may be obtained by Contracting Division by contacting the Huntington District Security Management office).

Contractor shall report any changes in personnel or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative. The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise Contractor of the decision.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. All Foreign National Visit Requests MUST be submitted to the Security Management Office 30 days in advance of the visit per Army Regulation 380-10, Foreign Disclosure and Contacts with Foreign Representatives. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Security Management Office by phone, letter, or email at the following numbers/addresses:

CELRH-SM

502 Eighth Street Huntington, WV 25701

Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil

AT/OPSEC Requirements: The following shall be accomplished by the contractor prior to the issuance of the Notice to Proceed:

(1) Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

(2) Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

(3) Pre-Screen Candidates Using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.

This Form will be provided to the Contracting Officer and shall become part of the official contract file.

14. Contractor Invoice: Contractor shall submit their invoice to:

US Army Corps of Engineers Grayson Lake 50 Launch Ramp Grayson, KY 41143

15. Wage Rates: Davis-Bacon wage rates are applicable to this procurement and are attached to this solicitation in accordance with contract clause FAR 52.222-6.

16. Deficiencies: If the contractor fails to perform, or if performance in any area is judged unsatisfactory, the Government will take corrective action. See FAR Clause 52.246-12.

ADDITIONAL INFORMATION:

5152.231-9000

UAI 5152.231-9000 Equipment Ownership and Operating Expense Schedule.

EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)

(a) This clause does not apply to terminations. See UAI 5152.249-9000, Basis for Settlement of Proposals, and Federal Acquisition Regulation (FAR) part 49.

(b) Allowable costs for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region II. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the simplified acquisition threshold (SAT), the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(End of clause)

5152.236-9009

UAI 5152.236-9009 Partnering As prescribed in 5136.570-100(j), insert the following clause:

PARTNERING (FEB 2000)

In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the Contractor, primary subcontractors and designers, and the US Army Corps of Engineers., the Contractor, primary subcontractors and designers, and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule.

This partnership would be bilateral in membership and participation will be completely voluntary. Any cost associated with effectuating this partnership, excluding travel and lodging cost of Government personnel, will be borne by each party. The partnering meetings, if needed, shall be held informally during the period of performance at Grayson Lake, Grayson, KY; at the request of either the Contractor or the Government. Attendance via phone converence/web meeting would be allowed for those personnel not already working on site.

5152.249-9000

UAI 5152.249-9000 Basis for Settlement of Proposals As prescribed in 5149.505(d), insert the following clause:

BASIS FOR SETTLEMENT OF PROPOSALS (MAR 2009)

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).

(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

DAVIS BACON WAGE RATES

General Decision Number: KY180083 06/15/2018 KY83

Superseded General Decision Number: KY20170083

State: Kentucky

Construction Type: Building

County: Carter County in Kentucky.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/19/2018 2 01/26/2018 3 02/16/2018 4 04/20/2018 5 06/01/2018 6 06/15/2018

ASBE0080-011 03/07/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................ $ 31.98 20.99

BOIL0040-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 35.10 27.56

CARP0472-004 06/01/2017

Rates Fringes

CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 28.87 18.73

ELEC0317-005 06/01/2017

Rates Fringes

ELECTRICIAN......................$ 32.86 22.28

Wiremen.....................$ 33.31 24.11

ENGI0181-083 06/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR (Bobcat/Skid Steer/Skid Loader) ..........................$ 29.86 14.65

ENGI0181-084 07/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

(Oiler)..........................$ 31.18 15.15

ENGI0181-090 06/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

(Crane)..........................$ 31.90 15.15

CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL

RECEIVE $.50 ABOVE THE WAGE RATE.

ENGI0181-091 06/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

(Forklift).......................$ 29.86 14.65

* IRON0769-002 06/01/2018

IRONWORKER (Structural and Reinforcing)

ZONE 1......................$ 31.67 25.27

ZONE 2......................$ 31.67 25.27

ZONE 3......................$ 31.67 25.27

ZONE 1 - (no base rate increase) Up to 10 mile radius of Union Hall, 1643 Greenup Ave, Ashland, KY.

ZONE 2 - (add $0.40 per hour to base rate) 10 to 50 mile radius of Union Hall, 1643 Greenup Ave, Ashland, KY.

ZONE 3 - (add $2.00 per hour to base rate) 50 mile radius & over of Union Hall, 1643 Greenup Ave, Ashland, KY.

LABO0189-007 06/01/2017

Rates Fringes

LABORER (Pipelayer)..............$ 22.98 12.10

LABO1392-004 07/01/2017

Rates Fringes

LABORER (Mason Tender - Brick)...$ 23.07 12.20

PAIN1072-005 12/01/2017

Rates Fringes

PAINTER (Spray Only).............$ 27.76 15.45

PAIN1195-003 12/01/2017

Rates Fringes

GLAZIER..........................$ 28.33 10.86

PLAS0132-015 06/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 22.00 12.55

PLUM0248-001 06/01/2017

Rates Fringes

PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 35.00 25.12

SFKY0669-002 04/01/2017

SPRINKLER FITTER.................$ 33.75 15.84

SHEE0110-006 06/01/2017

Rates Fringes

SHEET METAL WORKER (Excludes HVAC Duct Installation)..........$ 29.17 22.00

* UAVG-KY-0007 01/01/2018

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 29.54 22.85

* UAVG-KY-0008 01/01/2018

Rates Fringes

LABORER: Power Tool Operator....$ 26.98 14.24

SUKY2015-004 06/02/2015

Rates Fringes

BRICKLAYER.......................$ 24.61 11.88

CARPENTER (Form Work Only).......$ 20.69 9.05

CARPENTER, Excludes Drywall Hanging, Metal Stud Installation, and Form Work......$ 25.25 12.07

LABORER: Common or General......$ 20.36 11.20

LABORER: Mason Tender - Cement/Concrete..................$ 22.27 10.42

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 25.08 13.00

OPERATOR: Bulldozer.............$ 25.36 13.00

OPERATOR: Grader/Blade..........$ 24.33 13.00

PAINTER (Brush and Roller).......$ 18.36 7.07

PIPEFITTER (HVAC Pipe

Installation Only)...............$ 25.63 20.94

PLUMBER..........................$ 32.60 18.78

ROOFER...........................$ 22.31 7.41

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 22.86 13.00

TILE FINISHER....................$ 17.67 7.45

TILE SETTER......................$ 25.77 6.10

TRUCK DRIVER: Dump Truck........$ 17.07 6.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey.

Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH- 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-2 Additional Bond Security OCT 1997 52.228-11 Pledges Of Assets JAN 2012 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-12 Inspection of Construction AUG 1996 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7001 Contractor Purchasing System Administration MAY 2014 252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

(a) Definitions. As used in this clause--

Electronic Funds Transfer (EFT)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.