17B0010_Solicitation_Mod_02.docx

DOCX document 36 KB Posted

Attached to
DLA / DSCR Bldg. 31F Operations Breezeway Center Federal contract opportunity
Solicitation number
W91236-17-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 02 - incorporate RFI's

View the file

Other files for this federal contract opportunity

Other files attached to DLA / DSCR Bldg. 31F Operations Breezeway Center, newest first.
File Type Posted
AM01_W91236-17-B-0010_DLA_Breezeway_Ops_Center_(Revised_Specs).pdf PDF
DLA_OPS_Breezeway_Design_Narrative.pdf PDF
Combined_Spec_-_RTA.pdf PDF
DLA_Breezeway_RTA_Drawings_Combined.pdf PDF
W91236-17-B-0010_DLA_Breezeway_Ops_Center.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123617B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

BIDDER INQUIRY QUESTIONS & ANS

Bid Inquiry Contracting Officers Report All Inquiries Project: DSCR - Ops Center Breezeway Review: W91236-17-B-0010 (00001) (sorted by CommentID ) Displaying 10 inquiries.

Id
Discipline
Sheet
Detail
Spec
7099286
Project Management

Spec 01 32 01.00 50 Para 3.4 Project Schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The requirement is for the use of Primavera P3. P3 is no longer available. Primavera P6 is what we use for interfacing with RMS. Is P6 acceptable for use in preparing and updating the project schedule?

Forward request by email.

1-0
Evaluation Check and Resolve. P6 Primavera is confirmed as acceptable for project schedules.
1-1
Government Response. P6 Primavera is confirmed as acceptable for project schedules.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7099365
Construction Management

Specification Section 01 50 02.00 50 Para 1.8.1 Resident Engineers Office

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) This Paragraph states, "The Contractor shall provide the Government Resident Engineer with an office which shall be used exclusively by the Government. The office shall be approximately 3600 square feet in floor area and located on a nearby site as directed by the Contracting Officer.

It goes on to say how the trailer will be equipped and maintained. With the small size and short duration of this project, Can this requirement be deleted?

Forward request by email.

1-0
Evaluation Check and Resolve. The trailer requirements appear to be front end carry over from the operation center. Unless this project is paying for a working USACE Government trailer the answer will be remove this requirement.
1-1
Government Response. The trailer requirements appear to be front end carry over from the operation center. Unless this project is paying for a working USACE Government trailer the answer will be remove this requirement.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7106147
Architectural
A701

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The finish schedule on Sheet A-701 indicates resilient base and wall paint in Warehouse Bay F Room 104, Breezeway 105, and Breezeway 102. Please confirm this is only for the new partition wall type 6S shown on Sheets A102 and A103 at column line E33A, and that it does not includes the north, east, and south walls of the entire warehouse Room 104 and breezeways 102 and 105.

1-0
Evaluation Check and Resolve. The Resilient base shall only be applied to the new GWB partitions, where occurring, not to the brick walls.
1-1
Government Response. The Resilient base shall only be applied to the new GWB partitions, where occurring, not to the brick walls.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7106152
Specifications

010502

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Specification 01 05 02, paragraph 1.8.1 specifies a 3,600 square foot trailer with nine offices, 14 windows, kitchen spaces, restrooms, IT equipment, appliances, furniture, and janitorial service. Please confirm if the Contractor is indeed required to include this pricing in the bid.

1-0
Evaluation Check and Resolve. The trailer requirements appear to be a front end carry over from the operation center. Unless this project is paying for a working USACE Government trailer the answer will be remove this requirement.
1-1
Government Response. The trailer requirements appear to be a front end carry over from the operation center. Unless this project is paying for a working USACE Government trailer the answer will be remove this requirement.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7106154
Specifications

002100

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The RFP Section 00 21 00 indicates new flooring in line item A.5. The specifications and drawings do not show new flooring. Please confirm.

1-0
Evaluation Check and Resolve. This specification section shall be ignored.
1-1
Government Response. This specification section shall be ignored.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7108527
Construction Management
A-101 & A102
Note 5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) On sheet A-101, Note 5 states to remove and store sliding door for future use. Only one location is shown.

On sheet A-102, Note 1 States "Salvaged door shall be reinstalled. It shows installing the salvaged door in two different locations.

On sheet A-103, Note 18 States "Salvaged Sliding door shall be installed.

We only remove 1 sliding door but documents show reinstalling three sliding doors.

Please advise By: Forward request by email.

1-0
Evaluation Check and Resolve. Gov Response: The salvaged doors are located on DSCR and the contractor shall demo at least one door to salvage from an existing location on DSCR. The contractor shall install all three doors per the contract drawing. Reuse of existing hardware shall be the responsibility of the contractor to confirm viability. Unusable or missing hardware shall be the responsibility of the contractor to provide and install, subject to approval by the contracting officer.
1-1
Government Response. The salvaged doors are located on DSCR and the contractor shall demo at least one door to salvage from an existing location on DSCR. The contractor shall install all three doors per the contract drawing. Reuse of existing hardware shall be the responsibility of the contractor to confirm viability. Unusable or missing hardware shall be the responsibility of the contractor to provide and install, subject to approval by the contracting officer

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7108914
Construction Management
Sheet A-102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The "FINISH SCHEDULE" shows room # 104 "WALL Finish", as "P"- for Painting. It is assumed that the only wall painting to be done in Warehouse Bay F (104) is to the new Metal stud wall running between Breezeway (105) and warehouse bay F (104). Can you confirm if this is correct.

1-0
Evaluation Check and Resolve. Correct. The GWB wall, only, receives the paint. Brick surfaces remain "natural" brick. The existing wall (to the east) shall remain as is.
1-1
Government Response. Correct. The GWB wall, only, receives the paint. Brick surfaces remain "natural" brick. The existing wall (to the east) shall remain as is.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7110952
Construction Management
EP101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) On drawing EP101, at the Vestibule door, the drawing shows "DOOR MOTOR". At the storefront door for Breezeway 105 Area "B", the drawing shows "DOOR MOTOR" at the two storefront exit doors.

We have been unable to find out the purpose for the door motors as it pertains to the storefront doors.

1-0
Evaluation Check and Resolve. JPHES Response:

• Door motors are shown correctly (Qty: 3). Coordinate with architectural revised drawings that shall indicate automated doors in lieu of manual doors.

• Delete motorized damper connection (between column E31A/E32A). Damper shall be backdraft type.

• Motorized damper connection (between column E32A/E33A) is shown correctly.

1-1
Government Response. • Door motors are shown correctly (Qty: 3). Coordinate with architectural revised drawings that shall indicate automated doors in lieu of manual doors.

• Delete motorized damper connection (between column E31A/E32A). Damper shall be backdraft type.

• Motorized damper connection (between column E32A/E33A) is shown correctly.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7110962
Construction Management
A-102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) On sheet A-102 note 13 calls out for a Overhead coiling fire shutter. There is no description or requirements for the Overhead coiling fire shutter in the drawings or the specifications. Please advise as to the requirements for the Overhead coiling fire shutter.

1-0
Evaluation Check and Resolve. An amendment will be placed on the FBO website to address the fire door shutter spec.
1-1
Government Response. An amendment will be placed on the FBO website to address the fire door shutter spec.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7117706
Construction Management
E-001, MH101 & MH102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Drawing MH102, "Sheet Keynotes" Note #2 Calls for a motorized Damper. Note #3 calls for a Gravity Backdraft Damper. MH101, Vestibule 101, entrance does not show any Damper.

On Drawing EP101 shows "Door motor" at all three door openings. Panelboard L1 schedule shows "Door Motor" at CKT 22, 24 & 26. Please clarify. Are there 3 motorized Dampers

1-0
Evaluation Check and Resolve. Response: See below motorized damper/backdraft damper clarification list:

• GV-1 (serves EF-1): Backdraft damper

• EF-2: Backdraft damper

• Architectural louver (between column E31A/E32A): Backdraft damper

• Architectural louver (between column E32A/E33A): Motorized damper

1-1
Government Response. Response: See below motorized damper/backdraft damper clarification list:

• GV-1 (serves EF-1): Backdraft damper

• EF-2: Backdraft damper

• Architectural louver (between column E31A/E32A): Backdraft damper

• Architectural louver (between column E32A/E33A): Motorized damper

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .