Specs_Atch_1_Paint_Inspection_Form.pdf

PDF 50 KB Posted

Attached to
New Gate & Valve Operating Hydraulic Cylinders Federal contract opportunity
Solicitation number
W911WN-17-T-0003
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Paint Inspection Form

View the file

Other files for this federal contract opportunity

Other files attached to New Gate & Valve Operating Hydraulic Cylinders, newest first.
File Type Posted
W911WN-17-T-0003-00001.pdf PDF
W911WN17T0003.pdf PDF
Atch_1-New_Cumberland_Drawings.pdf PDF
Atch_2_-_Pike_Island_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

Paint Inspection:

Daily Coating Inspection Report

Date: / / M T W Th F S Su

Project #:

Inspector:

Pg. Of COPY To:

QC Mgr Owner

Project/Client: Contr

Location: Attachments:

Description: DFT Sheet NCR/CAR

Requirements:

Contractor: Spec # Revision #

Description of Areas & Work Performed

Surface Conditions

Hold Point Inspections Performed 1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection

Approved By:

Ambient Conditions

New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :

Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F) o o o o Hazard Sample Report # Wet Bulb Temp0 (C/F) o o o o Degree of contamination: % Relative Humidity % % % %

Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0 (C/F) Min/Max / o / o / o / o Degree of Corrosion: Dew Point Temp0

(C/F)

Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed o o o o

Weld Moisture Oils Other Weather Conditions:

Painted Surface Condition: Application Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.

Dry/Over Spray Runs/Sags Pinholes Holidays Primer Intermediate Topcoat Touch-up Abrasion Fall Out Other Generic Type: Qty Mixed:

Surface Preparation Start Time: Finish Time: Est Sq/ft:

Manuf.: Mix Ratio:

Prod Name: Mix Method:

Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:

HP Wash PSI Other Color: Material Temp: o F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs

Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs

Air Supply CFM Air Supply Cleanliness Batch #'s Reducer #:

Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal

(B) % by Vol: % Surface Cleanliness & Profile Measurement (C) Specified WFT Avg: Mils

Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils

SSPC/NACE Spec / Visual Stds Airless/Conv. Spray Brush Roller Other Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap

Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter Dry Film Thickness PSI Tip Sz. Agitator

Gage Type /

Model

Gage

Serial #

Gage Calib.

Verified

Spec Avg.

DFT

Total Avg

DFT

DFT Last

Coat

DFT This

Coat

Inspector's Signature Date

File details come from the government source that posted it. Updated .