Paint Inspection Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911WN-17-T-0003-00001.pdf | ||
| W911WN17T0003.pdf | ||
| Atch_1-New_Cumberland_Drawings.pdf | ||
| Atch_2_-_Pike_Island_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
Paint Inspection:
Daily Coating Inspection Report
Date: / / M T W Th F S Su
Project #:
Inspector:
Pg. Of COPY To:
QC Mgr Owner
Project/Client: Contr
Location: Attachments:
Description: DFT Sheet NCR/CAR
Requirements:
Contractor: Spec # Revision #
Description of Areas & Work Performed
Surface Conditions
Hold Point Inspections Performed 1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection
Approved By:
Ambient Conditions
New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :
Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F) o o o o Hazard Sample Report # Wet Bulb Temp0 (C/F) o o o o Degree of contamination: % Relative Humidity % % % %
Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0 (C/F) Min/Max / o / o / o / o Degree of Corrosion: Dew Point Temp0
(C/F)
Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed o o o o
Weld Moisture Oils Other Weather Conditions:
Painted Surface Condition: Application Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.
Dry/Over Spray Runs/Sags Pinholes Holidays Primer Intermediate Topcoat Touch-up Abrasion Fall Out Other Generic Type: Qty Mixed:
Surface Preparation Start Time: Finish Time: Est Sq/ft:
Manuf.: Mix Ratio:
Prod Name: Mix Method:
Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:
HP Wash PSI Other Color: Material Temp: o F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs
Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs
Air Supply CFM Air Supply Cleanliness Batch #'s Reducer #:
Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal
(B) % by Vol: % Surface Cleanliness & Profile Measurement (C) Specified WFT Avg: Mils
Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils
SSPC/NACE Spec / Visual Stds Airless/Conv. Spray Brush Roller Other Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap
Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter Dry Film Thickness PSI Tip Sz. Agitator
Gage Type /
Model
Gage
Serial #
Gage Calib.
Verified
Spec Avg.
DFT
Total Avg
DFT
DFT Last
Coat
DFT This
Coat
Inspector's Signature Date