Amendment_02.pdf
PDF 48 KB Posted
- Attached to
- Hannibal L/D Conductor Rail System Replacement Federal contract opportunity
- Solicitation number
- W911WN-17-B-8001
About this file
Amendment 02 (09 Dec 16)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results.doc | DOC document | |
| Revision_to_Specifications_Section_01_35_00.00_08.pdf | ||
| Revision_to_Specifications_Section_01_45_01.10.pdf | ||
| Amendment_01.pdf | ||
| Attachment_1_-_Certified_Specifications.pdf | ||
| W911WN-17-B-8001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET462431308
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) extend the bid opening to 12/19/16 at 11:00AM EST; 2) provide a list of the site visit attendees; 3) answ er contractor questions; 4) update the w age determinations; and 5) provide Revised Specifications to reflect the answ ers to the contractor questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-17-B-8001
X 9B. DATED (SEE ITEM 11)
10-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Dec-2016
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-17-B-8001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 12-Dec-2016 11:00 AM to 19-Dec-2016 11:00 AM.
The following have been added by full text:
AMENDMENT 01
The Site Visit Attendees were as follows:
Name Contractor Phone Number
Josh Michulka Wellington Power 724-779-4000
Scott Nuss Wellington Power 724-779-4000
Kevin Reilly Allegheny Crane 412-841-8884
Jon Graham AIG 412-722-0065
Below are questions submitted by interested vendors and answers to those questions:
Q #1: The specification calls for a rail system that will handle 500 amps of current. The present rail system is rumored to support 200 amps. Will the full 500 amps be used?
A #1: The existing system is also a 500 Amp conductor rail. The Plans and Specifications call for a rail system capable of 500 Amp service. Substitutions with less capability are not acceptable.
Q#2: What amperage rating is the breaker supplying the present rail system and the feeder cables to that breaker?
A #2: See Plans, drawing E-5052
Q #3: Can the temporary diesel generator be palced on the bulkhead crane in the vicinity of the Bantam Crane (Auxiliary Crane)?
A #3: The location shall be coordinated with Lockmaster and Contracting Officer per Specifications Section 01 35
00.00 08 par. 1.11.2.2.
Q #4: What is the nameplate data of the four drive motoes used to move the entire bulkhead crane? (i.e. voltage, amps, power, etc)
A #4: 20 HP, 460 VAC, 30 AAC (X2)
Q #5: What is the nameplate data of the main winch on the bulkhead crane?
A #5: 75 HP, 460 VAC, 90 AAC. Bulkhead at hoisting speed of 4.6 FPM=165 tons. Bulkhead at hoisting speed of
2.3 FPM=420 tons. Bulkhead hoist travel speed = 0 to 100 FPM. Normal lift without over travel = 67 feet.
Q #6: What is the nameplate data of the auxiliary crane (Bantam Crane)?
A #6: Shield Bantam Model T-350, Boom Length 55ft, Counterweight 1,500 lbs
Q #7: The operators believe the auxiliary crane lifting capacity has been downgraded to 3 tons. What is the lifting capacity of the auxiliary crane?
A #7: Contractor material lifting capacity is 5,000 lbs.
Q #8: Does the QCS still require a computer with a 3.5” floppy drive?
A #8: No, this will be amended.
Q #9: How many supports presently hold the conductor system to the wall of the bulkhead crane?
A #9: All supports are to be replaced per contract drawings and details shown on drawing E-6053.
Q #10: How many ships traverse the locks on an average week?
A #10: 98
Q #11: The provided Specifications mention UV stable and also High heat (160F). UV covers are PVC and are rated to approximately 104F. High heat is rated to approximately 200F. What do you want us to quote?
A #11: Per the Catalog for Hevi-Bar II UV Resistent covers shown on pages 36 and 48, the maximum temperature is 160F and normal Ambient is 104F. That is where the 160F came from. Please quote the XA-38925, PVC Phase & Ground / Outdoors UV Stable (Black) Conductor Bar Cover for this project, rated maximum temperature is 160F and Normal Ambient is 104F. Please do not quote the high heat Polycarbonate.
Q #12: Regarding minority & female participation goals for each trade at each location, how does the goal work for each county? Is there a goal to hire minorities at that percentage from each county listed?
A #12: Please visit https://www.dol.gov/ofccp/TAguides/TAC_FedContractors_JRF_QA_508c.pdf for information regarding Government minority and Female Participation goals.
Q #13: How do we determine which county the work is being performed?
A #13: All work performed over the waterway is considered West Virginia. Any work performed on the Ohio bank above the low water line is considered Ohio.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
ADDENDUM TO SECTION 00800
00800-1 WAGE RATES
The following schedule of wage rates contains rates applicable to all work under this contract:
Ohio
General Decision Number: OH160002 12/2/2016 Superseded General Decision Number: OH20150002 State: Ohio Construction Type: Heavy and Highway County: Ohio Statewide http://www.wdol.gov/wdol/scafiles/davisbacon/OH2.dvb?v=25
West Virginia
General Decision Number: WV160060 11/04/2016 Superseded General Decision Number: WV20150060 State: West Virginia Construction Type: Heavy County: Wetzel County in West Virginia http://www.wdol.gov/wdol/scafiles/davisbacon/WV60.dvb?v=3
00800-2 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS
a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Bid Item No. 0001, an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in Bid Item No. 0001 will cause the bid to be rejected as non-responsive.
b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Bid Item No. 0001.
In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Bid Item No. 0001.
c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The Government will not reimburse any subcontractor's paid bond premiums.
00800-3 REQUIRED INSURANCE
a. The Contractor shall procure and maintain during the entire period of his performance under this contract, the following minimum insurance. (See also the clause of the contract entitled "Insurance - Work on a Government Installation").
Type
Bodily Injury Amount Propert Damage
Comprehensive General
$500,000 Per Occurrence $100,000
Liability $200,000 Each Person --
Automobile Liability
$500,000 Per Occurrence $20,000
Workmen’s Compensation and Employer’s Liability
As Legally Required by WV and OH
b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply.
Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.
Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.
c. Longshoreman and Harbor Worker's Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. seq.).
00800-4 SAFETY AND HEALTH REQUIREMENTS MANUAL
A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/pages/home.aspx.
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
00800-5 WORK UNDER OTHER CONTRACTS
Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern.
00800-6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the clause entitled "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.
(1) The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
12 9 7 6 6 5 5 5 4 4 6 10
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the clause entitled, "Default (Fixed-Price Construction)".
d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data obtained from the "Climatography of the United States No. 20". The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.
00800-7 WORK PERFORMED BY CONTRACTOR
Within ten (10) days after award of the contract, the successful bidder will be required to furnish a description of the work which he intends to perform with his own organization, the percentage of the total work this represents, and the estimated cost thereof.
00800-8 CONTRACTOR QUALITY CONTROL
Section 01 45 01, USACE QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact Theresa Bonanno, U.S. Army Engineer District, Pittsburgh, Upper Ohio Area Office, 3510 Grand Ave.,Pittsburgh, Pennsylvania 15225, telephone (412) 395-7677. Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.
00800-9 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION.
Those who disseminate information contained on this CD-ROM or in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, DUNS Number and IRS Tax ID Number, and name and telephone number of person receiving the information.
00800-10 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region II. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
00800-11 SUBMISSION OF CONTRACT DOCUMENTATION
Provide contract documentation in an electronic format to the greatest extent practicable.
Contract documentation to be submitted electronically includes, but is not limited to, the following:
Submittals, including ENG 4025 transmittal form Meeting Minutes Construction Photographs Correspondence Requests for Information Payroll Documents Statement and Acknowledgement Forms (SF 1413) Request for Additional Classification (SF 1444) Progress Payment Requests and Supporting Documentation Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing
Audit Report, and Certificate of Current Cost or Pricing Data Contractor Quality Control Reports (with attachments) Accident Reports Schedules and Schedule Updates Closeout Documentation, including Release of Claims
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer.
Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/
The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:
Advance Payment Bond Bid Bond including Annual Bid Bond Performance Bond including Annual Performance Bond
Payment Bond Patent Infringement Bond Any performance security instruments Certificate of Insurance Novation/Change of Name Agreement Assignment of Claims Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings
Paper Payroll Documents Physical signatures on contracts and modifications o SF 1442 o SF 30
(End of Summary of Changes)
File details come from the government source that posted it. Updated .