About this file

This document contains an amendment to a solicitation and the related solicitation. The amendment provides responses to questions received regarding Solicitation Number W911W6-22-R-0004, which seeks proposals for Advanced Future Vertical Lift (FVL) Rotor Hub Technologies. The solicitation requests proposals to mature technologies that enable increased aircraft performance, reduced wake-induced tail loads, and more sustainable rotorcraft through advanced rotor hub concepts. Technologies of interest include tiltrotor hub concepts, soft inplane hub designs, advanced rotor damping configurations, materials that enhance inherent lag damping, reduced coaxial rotor spacing, increased structural efficiency, low maintenance hub designs, and hub-based power generation or control. The period of performance is anticipated to be 36 months with total government funding of approximately $2.4 million over three years. Two awards are anticipated. Proposals are due by February 9, 2022. Deliverables include program plans, cost and progress reports, test plans, and a final report and briefing.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Call W911W6-22-R-0004 is hereby amended to post questions received and Government responses.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911W622R0004

X 9B. DATED (SEE ITEM 11)

21-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jan-2022

CODE

ARMY CONTRACTING COMMAND (ACC)

REDSTONE/CCAM-MZD-B

BLDG 401 LEE BLVD

FORT EUSTIS VA 23604-5577

W911W6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911W622R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A AMENDMENT

QUESTIONS & ANSWERS

Reference/Location Question Response

1 Call paragraphs 3.2

Anticipated Funding for the Program &

3.4 Number of

Awards Anticipated

BAA states: Anticipated funding is approximately $2.4M total. Government anticipates two awards. Is it anticipated that each awardee will receive $2.4 each or

$1.2 each assuming both awards are equally acceptable? Can you please clarify?

$2.4M total, so two awards would receive up to $1.2M in

Government funding.

2 Call paragraph 3.3

Does the Government has any preference towards award instrument? The call does not indicate any limitations or impact on source selection. Is this correct?

Correct. Per the Master BAA, Offerors may propose an instrument consistent with instruments outlined in the Master

BAA. Instrument proposed should be clearly identified in the proposal and the criteria and/or any requirements (as stated in

Master BAA) for the instrument proposed, as applicable, must be clearly addressed (i.e. cost share for instance, if a TIA is proposed, etc.) in the proposal.

(End of Summary of Changes)