Request for Information Responses. Amended_Copy

View the file

Other files for this federal contract opportunity

Other files attached to Installation of Kitchenettes, newest first.
File Type Posted
Conform_Copy.pdf PDF
Revised_-_Bldg._2471_Kitchenette.pdf PDF
Revised_-_Bldg._2450_Kitchenette.pdf PDF
Revised_-_Bldg._2476_Kitchenette.pdf PDF
Revised_-_Bldg._2480_Kitchenette.pdf PDF
Template_Proposal_Breakdown_KTR.XLSX XLSX spreadsheet
Bldg._2476_Kitchenette.pdf PDF
Solicitation_W911SG19R0030.pdf PDF
Bldg._2480_Kitchenette.pdf PDF
Bldg._2450_Kitchenette.pdf PDF
Bldg._2471_Kitchenette.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Provide Updated/Revised draw ings/diagram B. Provide responses to RFI's C. Extend Solicitation Closing date to 29 July 2019 by 12:00 P.M. MST.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SG19R0030

X 9B. DATED (SEE ITEM 11)

01-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2019

CODE

MICC-FT BLISS W911SG

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SG19R0030

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 19-Jul-2019 12:00 PM to 29-Jul-2019 12:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

1. POINT OF CONTACT (POC):

SSG Rhooms Julian, Contract Specialist Tel: (915) 569-7657 Email: julian.d.rhooms.mil@mail.mil

2. COMPETITION REQUIREMENTS: This procurement is a Small Business set-aside acquisition.

3. SITE VISIT: The Government has scheduled a one day site visit at Fort Bliss, TX at 9:30 a.m. MST on 9

July 2019.

a. We will meet at the 919TH Mission & Installation Contracting Command - Fort Bliss 111 Pershing Rd. Fort Bliss, TX 79916. Please arrive early enough to facilitate going through the access control points or the (Cassidy Gate) which is in close proximity to our address. To receive a visitor’s vehicle pass, you will need to provide a driver’s license, vehicle registration and proof of insurance at the vehicle security access control point at either the Chaffee Gate or the Buffalo Soldier Gate. The purpose of the site visit is to provide the contractor insight into the job requirements.

b. Contractors who wish to attend the site visit shall provide the name(s), company name, position title, telephone number, email address and mailing address of all attendees via email to julian.d.rhooms.mil@mail.mil no later than 3:00 p.m. MST on 8 July 2019.

c. The site visit is limited to a maximum of two (2) attendees per company. Contractor representatives should be prepared to furnish identification if requested.

d. Individual or group questions will not be answered during the site visit. Potential offerors may submit written questions in accordance with number 4 (below) of this instructions to offerors section.

Note: Remarks and explanations made by the Government representatives during the course of the site visit, whether orally or in writing, shall not change or qualify any of the terms or conditions of this solicitation. The solicitation can only be changed by a formal, written amendment issued by the Contracting Officer (KO).

4. REQUEST FOR INFORMATION (RFI): All offeror inquiries or questions shall be submitted in writing electronically at julian.d.rhooms.mil@mail.mil no later than 11 July 2019 by 3:00 p.m. MST. An amendment will then be issued with all questions and answers. **After the due date no additional RFI’s will be answered**

5. PROPOSAL DUE DATE: Proposals are due no later than 12:00 p.m. MST on 29 July 2019. Proposals shall be emailed to julian.d.rhooms.mil@mail.mil. Proposals SHALL include the following in order to be considered (failure to include all line items shall be subject for rejection of the offer):

a. Cover sheet on company letterhead with your DUNS number, CAGE code, Tax ID, and primary point of contact information;

b. Signed and completed Standard Form 1442 along with any amendments;

c. Letter from bonding company indicating offeror’s ability to obtain performance and payment bonds in the amount of their offer;

d. Project Schedule per Evaluation Factors; and

e. Past Performance per Evaluation Factors.

f. Proposal Breakdown

Please note that all correspondence via e-mail shall contain a subject line that reads, “Installation of Kitchenettes W911SG-19-R-0030, Company Name”. If sending attachments via e-mail, ensure only .pdf, .doc or .xls documents are sent. In the body of the email please ensure to list the number of attachments submitted. It is the Contractor’s responsibility to verify all emails along with all attachments are received by the Contract Specialist listed above.

6. BONDNG REQUIREMENTS:

a. Performance and Payment Bonds:

(1) The penal amount of the bonds shall be 100 percent of the awarded price.

(2) The Government may require additional bond protection when a contract price is increased.

The increase in protection shall generally equal 100 percent of the increase in contract price. The Government may secure additional protection by directing the contractor to increase the penal amount of the existing bond or obtain an additional bond.

b. Offer Guarantee:

(1)An Offer Guarantee is not required. Instead of submitting an Offer Guarantee, offerors are to submit a letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.

7. SYSTEM FOR AWARD MANAGEMENT (SAM): Offeror must be registered in the database IAW

FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in FAR 52.219-1(c), Small Business Program Representations (Alternate I), Representations.

EVALUATION FACTORS FOR AWARD

The Government will award a contract resulting from this solicitation using the evaluation method “Lowest Price Technically Acceptable.” This method is appropriate when best value is expected to result from selection of the technically acceptable offer with the lowest evaluated reasonable price. Offers will be evaluated for acceptability but not ranked using the non-price factors. Evaluation factors and significant sub factors that establish the requirements of acceptability are set forth below. Award will be made on the basis of the lowest evaluated reasonable price of proposals meeting the acceptability standards for non-price factors (FAR 15.101-2). The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from price, technical and past performance. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. The Government reserves the right to waive informalities and minor irregularities in offers received. If a minor clerical error has occurred, then the offeror may be given an opportunity to correct the minor error within the constraints of the "clarifications" process.

This solicitation is for a firm, fixed price construction contract. Award shall be made to the technically acceptable offer that provides the lowest reasonable price. The Government intends to award a contract to one offeror deemed responsible in accordance with Federal Acquisition Regulation (FAR 9.1).

Offerors are required to submit technical proposals addressing the Evaluation Factors and Sub-Factors identified.

The procurement is being conducted utilizing the Lowest Price Technically Acceptable (LPTA) source selection process in accordance with FAR 15.101-2. Proposal will be evaluated for acceptability, but not ranked, using the non-price evaluation factors. Award will be made on the basis of the lowest evaluated reasonable price of proposals meeting the acceptability standards for non-price factors. There shall be no trade-offs. Offers evaluated as not Technically Acceptable will not be eligible for award, regardless of price.

The proposal must set forth full, accurate and complete information as required by the solicitation. The Government will rely on such information for the award of the contract. By submission of the offer, the Offeror agrees that all items proposed will be utilized for the duration of the contract and any substitutions will require prior Contracting Officer's approval.

The offeror shall be held responsible for the validity of all information supplied in the proposal, including the information provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.

To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of two (2) separate parts; Part I –Technical Proposal - Part II - Price Proposal.

The Government’s technical evaluation team will evaluate the technical proposals on an acceptable or unacceptable basis, assigning one of the ratings described below for each subfactor. Any subfactor evaluated as “Unacceptable” will render the entire proposal unacceptable and, therefore, unawardable.

Only those proposals determined to be technically acceptable, at time of award, will be considered for award.

However, the offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

This solicitation requires the evaluation of price and the following non-price factors Factor 1: Technical – Evaluation of this factor will be based on the offeror's submission of a project schedule that demonstrates the offeror's understanding of the work requirement including estimated timeframes for ordering supplies and completing construction.

Sub-factor:

a. Experience – Previous experience will be evaluated as “Acceptable or Non-Acceptable”. To be acceptable, offerors must provide information demonstrating they have successfully performed as prime contractor within the last three (3) years* on at least one (1) construction project of equal or greater size and complexity and magnitude within the same or similar scope of work as identified in this solicitation. Past

TABLE 1 - TECHNICAL RATINGS

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

performance information shall be obtained by the Contract Specialist from any other sources available to the Government to include, but not limited to, PPIRS or other databases.

*The three (3) years shall be calculated from the solicitation issue date.

**Note** In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” Aspects of Past Performance Evaluation: The past performance evaluation results are an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements.

This assessment is based on the offeror’s record of relevant and recent past performance information that pertains to the requirements outlined in the solicitation.

Factor 2: Price –Prices will be evaluated for reasonableness through a comprehensive comparison of each proposal received. Reasonableness will be determined based on prices submitted by the competition, current market conditions, and comparison to the Government estimate. Prices will also be evaluated to determine if they are either excessive or insufficient for the effort to be accomplished, and for any unbalanced areas within the offeror's pricing proposal. A price that is too low or too high may endanger the proposal's opportunity for award of a contract.

Each proposal shall be evaluated to ensure that all information provided in the RFP has been addressed, is accurate and complete.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title of File

Revised - Bldg. 2450 Kitchenette

Revised - Bldg. 2471 Kitchenette

Revised - Bldg. 2476 Kitchenette

Revised - Bldg. 2480 Kitchenette

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

REQUEST FOR INFORMATION

RFI’s

Contractor question

1. Is hood brand BROAN ELITE/E-64 series authorized for this application ?

Response:

Contractor must submit a submittal of Broan Catalog Cut for approval by COR, with the exact model and options indicated, but a quick review of online catalog cuts suggests that the Broan Elite line includes acceptable models for this application.

Contractor question

2. Light under cabinets need to dim or just on/off?

Response:

Yes, the lights need to be dimmable as well as on/off. See drawings.

Contractor question

3. As per site visit, panel 1C room 140 will be use instead 1 A-B in building 2476 Response:

New Panel 1C-A will be fed from Panel 1C in room 140. See updated drawings.

Contractor question

4. Can we get better clarification on the new ceiling tile set up/area for all kitchens?

Response:

Notes have been added and revised in the Architectural sheets Contractor question

5. Will the government provide the fire alarm panel programming software?

Response:

No.

Contractor question

6. Will the fire alarm contractor need to submit on fire alarm drawings?

Response:

Yes.

Contractor question

7. Will the fire alarm need to be hardwired?

Response:

Yes.

Contractor question

8. Will the government provide the model/part number for the Legrand Adorne under-cabinet light/power?

Response:

The under-cabinet light/power is a system of different components. See drawings for component list. The contractor must submit a submittal of under-cabinet light/power for approval by COR. Approved equal will be acceptable.

Contractor question

9. Will there be limitations as to where and how much we can core drill?

Response:

Core drilling is limited to that necessary to run piping/conduit as indicated. Contractor shall use pilot holes to verify locations and avoid core drilling through structural ribs, beams or columns.

Contractor question

10. We are aware that the hoods are being provided by the Government. Will the ovens be furnished by the Government as well?

Response:

The ranges will be provided by the government after the completion of this contract. The hoods are to be provided by the contractor within the requirements of this contract.

Contractor question

11. How much notice will we have to provide to shut off the water to each barrack?

Provide two weeks’ notice to the COTR and Contract Specialist of any utility interruption. Also, coordinate with the users to minimize disruption to tenants.

Contractor question

12. For the kitchenette in Building 2476 has it been decided what panel will be supplying power to new panel 1A-B?

The new panel will be renamed Panel 1C-A and be fed from Panel 1C in room 140. See drawings.

(End of Summary of Changes)