Attachment_1_-_Performance_Work_Statement_Redacted.pdf
PDF 4 MB Posted
- Attached to
- Analytical Task Support Federal contract opportunity
- Solicitation number
- W911S7-16-R-0047
About this file
Attachment 1 - Performance Work Statement
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Counter-Improvised Explosive Device and Explosive Hazard Analytical Task Support Subject Matter Experts
PART 1 GENERAL INFORMATION
1.1. Background: Army’s participation and transition away from Overseas Contingency Operations (OCO) due to shrinking budgets has exposed capability shortfalls in the Army’s ability to address and develop innovative solutions towards Counter-Improvised Explosive Device (C-IED), Explosive Hazard (EH), and asymmetric threats. To address these shortfalls, U.S. Army Training and Doctrine Command (TRADOC) identified one C-IED organization, U.S. Army Maneuver Support Center of Excellence (MSCoE), to establish a Directorate for Counter Improvised Explosive Devices (DCIED). DCIED leads selected MSCoE, TRADOC, and Headquarters, Department of the Army (HQDA) efforts to identify and analyze immediate Warfighting Needs (WfN) of Soldiers and organizations engaged in OCO to assure their survivability, reduce their vulnerability, and improve their overall warfighting effectiveness in an era of little to no growth, and in some cases, with a reduction in organizational structure. DCIED accomplishes these tasks by identifying, analyzing, and characterizing the critical survivability and vulnerability shortcomings (e.g. “capability gaps”) that hinder the ability of Army maneuver support forces to operate effectively in current operations as part of OCO. In addition to this role, DCIED is also responsible for leading and participating in efforts to find solutions that eliminate or mitigate survivability and vulnerability shortcomings of U.S. forces through the identification, evaluation, integration, and assessment of candidate solutions from across the domains of Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel, and Facilities (DOTMLPF).
1.2. Objectives: Provide support services for MSCoE to execute its mission to analyze, provide recommendations, and develop course(s) of action (COA) to integrate C-IED and EH considerations across the Warfighting Functions (WfF) supporting the Army of 2025.
1.3. Scope: The Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments on C-IED materiel and non-materiel processes, concepts and strategies, C-IED related documents, and C-IED doctrine. Services include participation in select C-IED Working Groups (WG) and other forums. The Contractor shall accomplish analytical and technical Subject Matter Expertise (SME) at these locations: U.S. Army Pacific Command (USARPACOM), Honolulu, HI; U.S. Army in Europe (USAREUR), Wiesbaden, Germany; Joint Improvised Threat Defeat Agency (JIDA), Crystal City, VA; U.S. Army Forces Command (FORSCOM), Fort Bragg, NC; TRADOC, Fort Eustis, VA; U.S. Army Combined Arms Center (CAC), Fort Leavenworth, KS; MSCoE, Fort Leonard Wood (FLW), MO; U.S. Army Maneuver Center of Excellence (MCoE), Fort Benning, GA; and U.S. Army Intelligence Center of Excellence (ICoE), Fort Huachuca, AZ.
1.4. General Information
1.4.1. Quality Control (QC): The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
The Contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall provide one (1) copy of the QCP to Contracting Officer Representative (COR) at the kick-off meeting. The plan shall include:
1.4.1.1. An inspection system covering all the support provided by the Contractor. It shall specify the areas to be inspected on both a scheduled or unscheduled basis, how often inspections are accomplished, and the title of the individual(s) who shall perform the inspection.
1.4.1.2. The methods for identifying and preventing defects in the quality of support performed before the level of performance becomes unacceptable.
1.4.1.3. Provisions that those records are maintained by the Contractor for all inspections conducted by the Contractor and explain the necessary corrective actions taken. This documentation shall be made available to COR and KO during the term of this Contract.
1.4.2 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in Contractor’s QCP.
1.4.3 Special Qualifications: Contractor shall provide personnel to perform required services that meet the following qualifications:
1.4.3.1 Senior Military Analyst (SMA) for USAREUR – USAREUR has Article 72 SOFA requirements for contractors performing Senior Military Analyst duties: Master's degree in a related field and 3 years of specialized experience; OR Bachelor's degree in a related field and 6 years of specialized experience; OR 10 years of specialized experience.
1.4.3.2 Knowledge Manger (KM)/Web Developer. In order to conduct KM duties and website development/management, Fort Leonard Wood requires the following training. The contractor shall provide personnel with this training or have the ability to complete the training within 15 days of contact execution. This training is available on SKillPort:
• Dream Weaver
• All of the "Web Content and OPSEC Certification Training" Module:
• OPSEC-WEB-5000, Web Content and OPSEC Intro Module
• WEB-DOD-001, DOD Web Guidance Training Module
• OPSEC-WEB-5002, Web Content and OPSET Training Module
• OPSEC0WEB-5003, Army Webmaster Website Training Module
1.4.3.3 Explosive Ordnance Disposal (EOD) Experience for Senior Military Analyst; In accordance with ATP 4-32.16 dated 6 May 2016, Naval Surface Warfare Center (NSWC) Indian Head, Explosive Ordnance Disposal Technology Division (IHEODTD) limits access to EOD publications to military EOD-qualified personnel. The contractor shall provide knowledgeable military qualified EOD personnel as Senior Military Analyst/s in order to conduct DOTMLPF assessments, doctrinal reviews, and capability review and analysis. In order to conduct tasks described in this PWS contractor personnel will require access to EOD publications.
1.4.4 Key Personnel: The following personnel are considered key personnel by Government: PM, PM- SMA and alternate PM-SMA. The Contractor shall provide a PM-SMA who shall be responsible for the performance of the work. The name of PM-SMA and an alternate who shall act for the Contractor when PM-SMA is absent shall be designated in writing to the KO. PM-SMA or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract. The PM- SMA, or alternate shall, be available from 0730 to 1630, Monday through Friday except Federal holidays or when the Government facility is closed.
1.4.5 Identification of Contractor Employees: The Contractor shall provide each employee an Identification (ID) Badge, which includes at a minimum the company name, employee name, and a color photo of the employee. ID Badges for key personnel shall also indicate job title. These ID Badges shall be at no additional cost to the Government. ID Badges shall be worn at all times during which the employee is performing work under this contract. All Contractor employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit.
The Contractor shall be responsible for the collection of ID Badges upon completion of the contract or termination of an employee. A listing of issued identification cards shall be furnished to the COR prior to the contract performance date and updated as needed to reflect Contractor personnel changes. Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. IAW
1.4.8 PHASE IN/PHASE OUT (PI/PO) PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, Contractor shall have personnel on board, during 30 day PI/PO period. During PI period, Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
PART 2 DEFINITIONS AND ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to Government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of Government. Note: The only individual who can legally bind Government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. FEDERAL ACQUISITION REGULATION. The principal set of rules established to govern the acquisition process of the Government purchasing goods and services.
2.1.7. GOVERNMENT FURNISHED PROPERTY. Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.
2.1.8. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the key personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.9. MONTHLY STATUS REPORT. To keep project status visible to senior management in the customer and delivery organization by providing an appropriate summary of project status on a regular monthly basis.
2.1.10. PERFORMANCE WORK STATEMENT. Explains concisely what is to be accomplished in terms of results so that the Government can monitor and evaluate the progress and final result of the project effectively.
2.1.11. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.12. QUALITY ASSURANCE. Government procedures to verify that services being performed by Contractor are performed according to acceptable standards.
2.1.13. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.14. QUALITY CONTROL (QC). All necessary measures taken by Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.15. QUALITY CONTROL PLAN (QCP). The Contractor’s standardized procedure/methodology for self-monitoring and documenting contract performance to ensure all contact requirements are met.
2.1.16. SUBCONTRACTOR. One that enters into a contract with a prime contractor. Government does not have privity of contract with the subcontractor.
2.1.17. WORK DAY. A day on which Government is routinely present, usually Monday through Friday, excluding federal holidays. The number of hours per day Contractor provides services IAW the contract.
2.1.18. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
AR Army Regulation ArCAT Army Capabilities Assessment Tool AtN Attack the Network ATP Army Techniques Publication ATS Analytical Task Support CAC Common Access Card CAC U.S. Army Combined Arms Center C-IED Counter Improvised Explosive Devices COA Course(s) of Action COI Community of Interest CONEMP Concept of Employment CONOPS Concept of Operations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative CP Campaign Plan CoC Council(s) of Colonels CRM Comment Resolution Matrix CST Central Standard Time DA Department of the Army DCIED Directorate for Counter Improvised Explosive Devices DCS Defense Collaboration Services DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DODI Department of Defense Instruction DOTMLPF Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel, and Facilities DtD Defeat the Device EH Explosive Hazards EOD Explosive Ordnance Disposal EXSUM Executive Summary FAR Federal Acquisition Regulation FAX Facsimile FLW Fort Leonard Wood FORSCOM U.S. Army Forces Command FTR Federal Travel Regulation GFI Government Furnished Information GFP Government Furnished Property GOSC General Officer Steering Committee HQDA Headquarters Department of the Army IA Information Assurance IASO Information Assurance Support Officer IAW In Accordance With ICoE U.S. Army Intelligence Center of Excellence ID Identification IT Information Technology
IPR In Progress Review IPT Integrated Process Team JIDA Joint Improvised Threat Defeat Agency KM Knowledge Management KO Contracting Officer LAN Local Area Network MCoE U.S. Army Maneuver Center of Excellence MSCOE Maneuver Support Center of Excellence NEC Network Enterprise Center NIPR Non-secure Internet Protocol Router NLT No Later Than OCI Organizational Conflict of Interest OCO Overseas Contingency Operations OCONUS Outside Continental United States (includes Alaska and Hawaii) OEF Operation Enduring Freedom OIF Operation Iraqi Freedom OPSEC Operational Security PIPO Phase In/Phase Out PM-SMA Project Manager-Senior Military Analyst POA&M Plan of Action and Milestones POC Point of Contact PoP Period of Performance PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RFI Request for Information SIGACTS Significant Activities SIPR Secure Internet Protocol Router SMA Senior Military Analyst SME Subject Matter Expert SOP Standard Operating Procedures SVTC Secure Video Teleconference TRADOC U.S. Army Training and Doctrine Command TtF Train the Force TTP Tactics, Techniques, and Procedures USAREUR U.S. Army Europe USARPACOM U.S. Army Pacific Command VTC Video Teleconference WfF Warfighting Functions WfN Warfighting Needs WG Working Group WTI Weapons Technical Intelligence
PART 4 CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Secret Facility Clearance: Contractor shall possess and maintain a SECRET facility clearance from the Defense Security Service. Contractor personnel, performing work in support of this contract shall have a SECRET security clearance granted from the Defense Industrial Security Clearance Office. A draft DD254 is provided as Attachment 1.
4.3. Personnel.
4.3.1. Contractor shall furnish adequate supervision, including a PM and the labor necessary to perform all services in an orderly, timely, and efficient manner. Contractor PM shall have authority to act on behalf of Contractor. Contractor shall utilize qualified and experienced employees capable of achieving goals established in this contract. All personnel will maintain current qualifications and possess all training required to meet mission requirements.
4.4. IAW AR 25-2, only GFP will be used on installation networks, unless expressly approved by
NEC.
PART 5 SPECIFIC TASKS
5. Specific Tasks: The Contractor shall provide services for ATS throughout C-IED and EH COI (which includes, but is not limited to USARPACOM, USARAF, HQDA, JIDA, FORSCOM, TRADOC, CAC, MSCoE, MCoE, and ICoE). Contractor shall provide a conduit for information exchange between DCIED and C-IED and EH COI related to emerging, current, and future C-IED and EH related issues. In no event shall the Contractor act or hold itself out as representing Government or any instrumentality thereof as an agent. Furthermore, Contractor shall not speak on behalf of or otherwise perform inherently governmental functions.
For purposes of Paragraphs 5.1, 5.2, 5.3, and 5.4, when DCIED higher headquarters forwards identification of a specific C-IED or EH related tasking for action to DCIED, DCIED, through the COR, will promptly forward the request for analysis/assessment to the Contractor PM-SMA via a bi-weekly work plan (Technical Exhibit 4). In the event that the requirement cannot be delayed until issuance of the regularly scheduled bi-weekly work plan, the COR will modify the existing work plan and provide to the PM-SMA to ensure time for the Contractor to conduct, complete, and tender deliverables IAW timelines identified in this PWS.
To accomplish these tasks, the Contractor shall analyze and understand the DCIED mission and responsibilities, processes, as well as those of other organizations within the C-IED and EH COI. In their analysis, the Contractor shall consider these major Army challenges: uncertainty of future operational environment, reconstitution of forces as the result of Operation Iraqi Freedom (OIF) and Operation Enduring Freedom (OEF) drawdown, C-IED lessons learned and capabilities supporting Force 2025, anticipating demands of future threats and a constrained fiscal environment. Contractor shall use DCIED Standard Operating Procedure (SOP) for C-IED Initiative Assessments and WTI IED Lexicon 4th Edition 2012 or most current version (limited release – Government will provide at kick-off meeting) as guides for level of detail and format for deliverable materials. The analysis and assessment process is an iterative review process and shall be completed continuously throughout the PoP. Written assessments based on a thorough analysis of the requirement may require development of information papers, presentations, and other documents as specified in Paragraph 5.1. Contractor shall complete assessments, which, based on historical knowledge, Government estimates will take no more than 31,200 man-hours, during the PoP of this contract (average of 40 hour work week). This estimate is provided for information purposes only. In addition, the Government is not guarantying a certain amount of man-hours and the purpose of the data is to provide information to the Contractor for the purpose of proposal preparation. This effort shall include the following:
5.1. For deliverables identified in Paragraphs 5.1.1 through 5.1.7, Contractor shall provide electronically to COR a Plan of Action and Milestones (POA&M) for the deliverable within 10 working days of the bi-weekly work plan, provided to Contractor PM-SMA, who identifies required task(s) with suspense dates. The POA&M shall include key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. Time allotted for Government staffing (based on historical data the average staffing and collection of comments takes between five (5) and 10 working days after receipt of documents), and an In-Progress Review (IPR) scheduled at a minimum every 30 days until completion of the task. Government will provide a POA&M concurrence or non concurrence with recommended adjustments to Contractor PM-SMA within 48 hours of Contractor submission.
Contractor shall include a status of each tasking in their Weekly Significant Activities (SIGACTS) reports (paragraph 5.7).
All documents shall be submitted IAW approved POA&M. COR will staff Contractor’s initial draft to pertinent Army and Joint DoD organizations and based on results of that staffing will either accept the initial draft as the proposed final draft or will provide comments and recommendations from Government to Contractor PM-SMA for revision. Contractor shall address all comments and recommendations and provide a proposed final draft to COR within 10 working days upon receipt of Government’s comments and recommendations. COR will either accept the proposed final draft as the final revised document or will provide comments and recommendations from Government to Contractor PM-SMA for revision.
Contractor shall address all comments and recommendations and provide a final revised document to COR within two (2) working days upon receipt of Government’s comments and recommendations. COR shall return the document to Contractor, as needed, until document meets criteria provided in paragraph 5.12 of this PWS. Assessments, analysis, reports, presentations, etc., shall be prepared in Microsoft Word®, Microsoft PowerPoint®, Microsoft Excel®, shall follow AR 25-50 (preparing and Managing Army Correspondence) standards and submitted electronically to the COR ready for Army senior executive level presentation.
5.1.1. C-IED and EH Materiel and Non-Materiel Processes, Concepts, and Strategies. Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments on C-IED and EH materiel and non-materiel processes, concepts, and strategies. The written assessment shall provide recommendations as to the possible COAs to manage or sustain the process, concept, or strategy. The Government anticipates between 12 and 36 assessments per year.
5.1.2. C-IED and EH Related Documents. Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments on C-IED and EH related documents to include Joint Urgent Operational Needs Statements (JUONS), Operational Needs Statements (ONS), Concepts of Operations (CONOPs), Concepts of Employment (CONEMP), Tactics, Techniques, and Procedures (TTPs), deliberate DOTMLPF assessments, Charters, SOPs, system capability evaluations, and other documents associated with training Soldiers and units on warfighting capabilities rapidly fielded to Army forces (e.g. training manuals, training support packages, training strategies, graphic training aids, handbooks, and other training-related electronic and printed documents). These documents will generally vary from 10 to 100 pages in length and will cover the spectrum from tactical to strategic levels. The Contractor shall provide recommendations as to the possible COA(s) to develop, manage, or sustain existing, emerging, or newly identified capabilities; recommend changes to best practices based on mission analysis, responsibilities, processes, products, and deliverables of the DCIED, Army and Joint DoD organizations; and provide recommendations to support document and doctrine development required by the rapid fielding of new warfighting capabilities for Army maneuver support forces and the new capabilities that will integrate with the units’ existing warfighting capabilities and processes. The Government anticipates between 30 and 60 assessments per year.
5.1.3. C-IED and EH Capability Gap Assessment. Contractor shall, through selective databases (e.g.
Army Capabilities Assessment Tool (ArCAT), etc.), review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments identifying materiel and non-materiel solutions that the current and future Army requires to conduct C-IED and EH missions in environments where IEDs and other explosives are a threat. The written assessment shall provide technical, quantitative, and qualitative analysis of specific C-IED materiel and/or non-materiel solutions identifying effectiveness/contributions of identified C-IED and EH solutions or capability gaps of the solution against current and future IED and other explosives threats. The written assessment must be organized by DOTMLPF, the Army’s WfF, required capabilities, and capability gaps, as appropriate. The Government anticipates between one (1) and three (3) reviews per year.
5.1.4. C-IED and EH Doctrine Review. Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments of Army and Joint DoD organizations doctrine revisions for C-IED and EH implications as they pertain to C-IED and EH fundamentals; C-IED integration; Defeat the Device (DtD); Attack the Network (AtN); and Train the Force (TtF) frameworks as described in Army Techniques Publication (ATP) 3-90.37, Countering Improvised Explosive Devices (or successor publications). Contractor shall provide recommendations for the incorporation of C-IED and EH considerations within the doctrine revisions. Contractor shall submit their written assessment (recommendations and comments) using the standard Comments Resolution Matrix (CRM) or DA Form 2028. The Government anticipates between ten (10) and 30 reviews per year.
5.1.5. Army Techniques Publication (ATP) 3-90.37, Countering Improvised Explosive Devices, July 2014. Within six (6) weeks prior to end of contract PoP (base year and exercised option years), and as identified in the bi-weekly work plan, Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments addressing needed revisions to ATP 3-90.37. The Contractor shall submit their written assessment (recommendations and comments) using the standard CRM or DA Form 2028.
5.1.6. TRADOC C-IED Campaign Plan (CP). Within six (6) months of contract PoP start date (base year and exercised option years), and as identified in the bi-weekly work plan, the Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments identifying required changes to the CP to ensure the document includes the proper framework to anticipate, adapt, and respond to IED and EH threats. Contractor shall submit their written assessment (recommendations and comments) using the standard CRM or DA Form 2028.
5.1.7. DCIED SOP for Initiative Assessments, dated 27 January 2012. Within 180 days of the contract base year and second option year (if exercised) PoP start date, and as identified in the bi-weekly work plan, Contractor shall review, analyze, provide supporting documents, conduct research, recommend changes, and provide a written assessment identifying required changes to the SOP to ensure the document includes current and relevant procedures for conducting C-IED and EH assessments and analysis (i.e. DOTMLPF, capabilities, CONOPS, CONEMP, TTP, etc.). Contractor shall submit their written assessment (recommendations and comments) using the standard CRM or DA Form 2028.
5.1.8. Contractor shall provide EOD related C-IED technical analysis, assessments, research, briefings and related supporting tasks coordinated by the POA&M process. The contractor will have daily interactions with the EOD integration office and DCIED at MSCoE. Contractor will participate in EOD related C-IED trips, meetings, program management reviews and IPTs; and document through issue of trip report(s), Technical EXSUM (Exhibit 5), and other documentation as required. These documents will generally vary from 10 to 100 pages in length and will cover the spectrum from tactical to strategic levels.
The Contractor shall provide recommendations as to the possible COA(s) to develop, manage, or sustain existing, emerging, or newly identified capabilities; recommend changes to best practices based on mission analysis, responsibilities, processes, products, and deliverables of the DCIED, Army and Joint DoD organizations; and provide recommendations to support document and doctrine development required by the rapid fielding of new warfighting capabilities for Army maneuver support forces and the new capabilities that will integrate with the units’ existing warfighting capabilities and processes. The Government anticipates between five (5) and ten (10) EOD related C-IED assessments/documents per year.
5.2. Limited DOTMLPF Analysis IAW Directorate for Counter Improvised Explosive Devices (DCIED) Standard Operating Procedures (SOP) for Counter Improvised Explosive Device (C-IED) Initiative Assessments. Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments on complex, multi-functional, multi-discipline, multi-service or joint efforts requiring limited DOTMLPF analysis as identified in the bi-weekly work plan.
The written assessment shall provide recommendations for COAs for each DOTMLPF solution covered by the assessment and specify whether Army support for the solution(s) should be terminated, maintained for the duration of current Army operations, or forwarded into the Army future force. The “Quick Look Assessment” process is 14 days. Contractor shall submit a Quick Look Support Form and critical Request for Information (RFI) NLT day three (3) within the 14 day cycle. If the RFIs are critical and it is determined that the timeline cannot be maintained, Contractor shall request an extension. As an alternative to requesting an extension, Contractor may submit the Quick Look Form NLT day three (3) using information at the Contractor’s immediate disposal. The Contractor can then submit an “updated” Quick Look Form that reflects additional analysis as part of the completed Limited DOTMLPF assessment.
Length of extensions are determined on a case-by-case basis. Contractor shall include status of each assessment in their weekly SIGACTS reports. Government anticipates between five (5) and 15 Limited DOTMLPF assessments per year.
5.3. Knowledge Management (KM)/Web Development. Contractor shall provide KM/web development support at FLW to update, maintain, monitor, and validate C-IED and EH content. Contractor shall:
5.3.1. Research KM tools and resources across the Army to establish standards and policies that support web development to enhance C-IED and EH initiative collaboration between COIs.
5.3.2. Design, implement, and maintain a Non-Secure Internet Protocol Router Network (NIPR) and Secure Internet Protocol Router Network (SIPR) C-IED and EH web presence that communicates C-IED and EH initiatives and supports collaborative capabilities.
5.3.3. Provide graphics support to include preparing handouts, tri-folds, and other publications.
5.3.4. Develop and manage spreadsheets for data entry and reporting.
5.3.5. Identify and assist stakeholders in their connection to the C-IED and EH COIs.
5.3.6. Provide recommendations for web presence improvements.
5.3.7. Coordinate conference rooms, VTC/SVTC rooms, or other venue for meetings (e.g. IPRs, IPTs, CoCs, GOSCs, etc.).
5.3.8. Provide initial updates to existing C-IED and EH web sites NLT 90 days after contract PoP start date with updates and web site refinements, as needed, on a continual bases. The COR will approve web site content and all other products prior to publication or release.
5.4. C-IED and EH Training. Contractor shall provide an annual assessment of institutional C-IED and EH training and provide recommendations to improve current training, training shortfalls, and training/courses or tasks that can be eliminated. The contractor will provide the Government a quarterly IPR with the final assessment with recommendations provided NLT 30 days prior to the end of each PoP (base year and option years if exercised).
5.5. C-IED and EH Working Groups (WG). Contractor shall participate in C-IED and EH WGs, focus groups, and related forums that have C-IED and EH implications. Contractor shall determine Contractor attendance based on topic/focus area of the WG and as identified in the bi-weekly work plan. WGs and Forums include, but are not limited to, DtD WGs, AtN WGs, TtF WGs, Army C-IED Integrated Process Teams (IPTs), and Doctrine Development WGs, to include associated sub-WGs. WG meetings shall be no longer than two (2) hours in length. The Contractor shall provide analysis and recommendations to the COR for Government’s incorporation in the follow-on WG events. The PM-SMA shall collect notes from each Contractor participant and prepare and submit one (1) consolidated post meeting record (e.g. minutes or EXSUM) to COR NLT two (2) working days after the conclusion of each WG. The Contractor’s post WG record shall include identifying information, general observations, background and facts, analysis of C-IED and EH implications, conclusions or recommended actions, organizational perspectives, and any additional information, such as meeting materials (i.e. Microsoft® PowerPoint presentations, handouts, attendee lists, etc.). The Government anticipates between 60 and 120 post meeting records per year.
5.6. C-IED and EH Meeting Attendance, Minutes, and EXSUMs. The Contractor shall determine Contractor attendance based on topic/focus area of each C-IED or EH meeting as identified in the bi-weekly work plan. Said meetings include, but are not limited to, IPRs, IPTs, Councils of Colonels (CoC), and General Officer Steering Committees (GOSC). These meetings shall generally be no longer than two
(2) hours in length and may be conducted through, but not limited to, Secure Video Teleconference (SVTC) and Video Teleconference (VTC), teleconference, or Defense Collaboration Services (DCS). The Government anticipates between 40 and 70 meetings per week. The PM-SMA shall collect notes from each Contractor attendee and prepare and submit one consolidated post meeting record or EXSUM (Exhibit
5) to COR NLT two (2) working days after the conclusion of each meeting. The Contractor prepared post meeting minutes or EXSUM shall include identifying information, general observations, conclusions or recommended actions, and any additional information, such as meeting materials (i.e. Microsoft® PowerPoint presentations, handouts, attendee lists, etc.). Post meeting records and EXSUMs are not required for DCIED administrative meetings (i.e. weekly staff meetings and bi-weekly Action Officer WG meetings).
5.7. Weekly Significant Activities (SIGACTS) Reports. Contractor PM-SMA shall collect SIGACTS input from each Contractor employee and prepare and submit one (1) consolidated SIGACTS Report weekly. Each report shall provide an analysis of the prior week’s accomplishments or issues of significance to the C-IED and EH COI. Contractor shall submit report via e-mail to COR NLT noon Central Standard Time (CST) every Tuesday throughout the duration of this contract. Weekly SIGACTS Report shall be submitted in the format at Technical Exhibit 6.
5.8. Kick Off Meeting. Contractor shall attend a kick-off meeting with Government face-to-face (if in the FLW vicinity) or via VTC or teleconference, to discuss the scope of work and receive Government Furnished Information (GFI). Meeting date shall occur NLT ten (10) working days after PoP start date, but NLT 30 September 2016, and shall be scheduled by COR. Contractor shall collect notes from each Contractor employee and prepare and submit one (1) consolidated post minutes record or EXSUM of this meeting within two (2) working days after the date of the meeting. Minutes shall be prepared in Microsoft Word ®, shall follow AR 25-50 (preparing and Managing Army Correspondence) standards and shall be submitted electronically to the COR.
5.9. In-Progress Review (IPR). Contractor PM and PM-SMA shall attend via face-to-face, teleconference, or VTC, quarterly IPRs with COR. Contractor shall schedule the IPR date to occur within the first ten (10) calendar days of each quarter. The IPR shall be conducted at FLW. Contractor shall provide minutes of each IPR within two (2) working days of the date of the meeting. Minutes shall be prepared in Microsoft Word ®, shall follow AR 25-50 (preparing and Managing Army Correspondence) standards and shall be submitted electronically to the COR.
5.10. Monthly Status Reports. Contractor shall provide a status report NLT three (3) working days following the final day of the month. This status report shall capture workload completed, workload in progress, travel projected and completed, outstanding issues that need to be resolved, and any other applicable recommendations and information. Reports shall be prepared in Microsoft Word ®, shall follow AR 25-50 (preparing and Managing Army Correspondence) standards and shall be submitted electronically to the COR.
5.11. Final Report Summary. Contractor shall submit a final report summary of activities performed by Contractor in support of this Contract to COR. It shall include a summary of all deliverables completed.
The Final Report Summary report shall be submitted NLT the last day of each PoP (base year and option years if exercised). Report shall be prepared in Microsoft Word ®, shall follow AR 25-50 (preparing and Managing Army Correspondence) standards and shall be submitted electronically to the COR.
5.12. General acceptance criteria and quality measures. Contractor shall submit deliverables as set forth below to each deliverable and other work products provided to the Government under this PWS.
5.12.1. Accuracy – All deliverables shall be accurate in presentation, technical content, and adherence to accepted elements of style.
5.12.2. Clarity – All deliverables shall be concise and clear at every level of distribution. Any and all diagrams shall be easy to understand and be relevant to the supporting narrative.
5.12.3. Consistency to Requirements – All deliverables and other work products must satisfy the requirements of this PWS.
5.12.4. File Editing – All text and diagrammatic files shall be editable by Government.
5.12.5. Format – Deliverables shall be submitted as set forth in the PWS.
5.12.6. Content – Deliverables shall provide sufficient information and detail to document thoroughly the topic being covered, be self-explanatory, and able to stand on their own merit.
5.12.7. Timeliness – Deliverables shall be submitted on or before the due date specified in this PWS.
PART 7 TECHNICAL EXHIBIT / ATTACHMENT LISTING
7. Technical Exhibit And Attachment List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3. Technical Exhibit 3 – Estimated Workload Data
7.4. Technical Exhibit 4 - Bi-Weekly Work Plan
7.5. Technical Exhibit 5 – Post Meeting or EXSUM
7.6. Technical Exhibit 6 – Weekly Significant Activities (SIGACTS) Report
7.7. Technical Exhibit 7 – Surveillance Checklists
7.7.1 Paragraph 5.1.1 C-IED and EH Materiel and Non-materiel Processes, Concepts, and Strategies
7.7.2 Paragraph 5.1.2 C-IED and EH related Documents
7.7.3 Paragraph 5.1.3 C-IED and EH Capability Gap Assessments
7.7.4 Paragraph 5.1.4 C-IED and EH Doctrine Review
7.7.5 Paragraph 5.1.5 Army Techniques Publication (ATP) 3-90.37, Countering Improvised Explosive
Devices
7.7.6 Paragraph 5.1.6 TRADOC C-IED Campaign Plan (CP)
7.7.7 Paragraph 5.1.7 Directorate for Counter Improvised Explosive Devices (DCIED) Standard
Operating Procedures (SOP) for Counter Improvised Explosive Device (C- IED) Initiative Assessments
7.7.8 Paragraph 5.2 Limited DOTMLPF Analysis IAW Directorate for Counter Improvised
Explosive Devices (DCIED) Standard Operating Procedures (SOP) for Counter Improvised Explosive Device (C-IED) Initiative Assessments
7.7.9 Paragraph 5.3 Knowledge Management (KM) / Web Development
7.7.10 Paragraph 5.4 C-IED and EH Training
7.7.11 Paragraphs 5.5 C-IED and EH WG(S), Meeting Attendance, Minutes and
5.5 AND 5.6 EXSUMS
7.7.12 Paragraph 5.7 Weekly Significant Activities (SIGACTS) Reports
7.7.13 Paragraph 5.8 Kick-Off Meeting
7.8 Attachment 1 – DD Form 254, Department of Defense Contract Security Classification Specification
PRS # 3
5.1.3 C-IED and EH Capability Gap
Assessment. Contractor shall, through selective databases, review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments identifying materiel and non-materiel solutions that the current and future Army requires to conduct C-IED and EH missions in environments where IEDs and other explosives are a threat. review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments with recommendations as to the possible COAs to develop, manage or sustain existing, emerging, or newly identified capabilities; recommend changes to best practices based on mission analysis, responsibilities, processes, products, and deliverable of the DCIED, Army, Joint DoD organizations; and provide recommendations to support document and doctrine development required by the rapid fielding of new warfighting capabilities for Army maneuver support forces and the new capabilities that will integrate with the units’ existing warfighting capabilities and processes.
Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan that includes key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. POA&M shall also include an IPR at a minimum every 30 days until completion of the task. A status of each tasking shall be provided in weekly SIGACTS report. The written assessment shall provide technical, quantitative, ad qualitative analysis of specific C-IED materiel and/or non-materiel solutions identifying effectiveness/contributions of identified C-IED and EH solutions or capability gaps of the solution against current and future IED and other explosive threats. The written assessment must be organized by DOTMLPF, the Army’s WfF, required capabilities, and capability gaps, as appropriate. .Deliverables shall be submitted electronically, using generally acceptable business format, using correct grammar, spelling and punctuation (See paragraph 5.12 and its subparagraphs).
1. Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan.
2. Initial draft assessment shall contain 80% or better informational content, be accurate, complete, and correct.
3. Final proposed draft shall contain 90% or better informational content, be accurate, complete, and correct.
4. Final revised document shall be 100% informational content, be accurate, complete, and correct.
5. Deliverables submitted on time 95% of the time with the remaining submitted NLT 5 working days late.
The COR will perform 100% inspection of the Contractor’s deliverables utilizing the Government QASP, Metric Checklists, PRS, and acceptable allowable deviation level.
PRS # 4
5.1.4 C-IED and EH Doctrine
Review. Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments of Army and Joint DoD organizations doctrine revisions for C-IED and EH implications as they pertain to C- IED and EH fundaments; C-IED integration; DtD; AtN; and TtF frameworks as described in ATP 3- 90.37.
Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan that includes key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. POA&M shall also include an IPR at a minimum every 30 days until completion of the task. A status of each tasking shall be provided in weekly SIGACTS report. The written assessment shall provide recommendations for the incorporation of C-IED and EH considerations within the doctrine revisions. Deliverables shall be submitted electronically, using generally acceptable business format, using correct grammar, spelling and punctuation (See paragraph 5.12 and its subparagraphs).
1. Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan.
2. Initial draft assessment shall be submitted using standard CMR or DA Form 2028, contain 80% or better informational content, be accurate, complete, and correct.
3. Final proposed draft shall be submitted using standard CMR or DA Form 2028, contain 90% or better informational content, be accurate, complete, and correct.
4. Final revised document shall be submitted using standard CMR or DA Form 2028, 100% informational content, be accurate, complete, and correct.
5. Deliverables submitted on time 95% of the time with the remaining submitted NLT 5 working days late.
The COR will perform 100% inspection of the Contractor’s deliverables utilizing the Government QASP, Metric Checklists, PRS, and
PRS # 5
5.1.5 ATP 3-90.37, Countering
Improvised Explosive Devices, July 2014. Within 6 weeks prior to the end of contract PoP, Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments addressing needed revisions to ATP 3-90.37.
weekly work plan that includes key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. POA&M shall also include an IPR at a minimum every 30 days until completion of the task. A status of each tasking shall be provided in weekly SIGACTS report. The written assessment shall address needed revisions to ATP 3-90.37.
Deliverables shall be submitted electronically, using generally acceptable business format, using correct grammar, spelling and punctuation (See paragraph 5.12 and its subparagraphs).
1. Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan.
2. Initial draft assessment shall be submitted using standard CMR or DA Form 2028, contain 80% or better informational content, be accurate, complete, and correct.
3. Final proposed draft shall be submitted using standard CMR or DA Form 2028, contain 90% or better informational content, be accurate, complete, and correct.
4. Final revised document shall be submitted using standard CMR or DA Form 2028, 100% informational content, be accurate, complete, and correct.
5. Deliverables submitted on time 95% of the time with the remaining submitted NLT 5 working days late.
The COR will perform 100% inspection of the Contractor’s deliverables utilizing the Government QASP, Metric Checklists, PRS, and
PRS # 6
5.1.6 TRADOC C-IED Campaign
Plan (CP). Within 6 months of contract PoP start date, Contractor shall review, conduct research, analyze, provide supporting documents, make recommendations, and provide written assessments identifying required changes to the CP to ensure the document includes the proper framework to anticipate, adapt, and respond to IED and EH threats.
weekly work plan that includes key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. POA&M shall also include an IPR at a minimum every 30 days until completion of the task. A status of each tasking shall be provided in weekly SIGACTS report. The written assessment shall identify required changes to the CP to ensure the document includes the proper framework to anticipate, adapt, and respond to IED and EH threats.
Deliverables shall be submitted electronically, using generally acceptable business format, using correct grammar, spelling and punctuation (See paragraph 5.12 and its subparagraphs).
1. Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan.
2. Initial draft assessment shall be submitted using standard CMR or DA Form 2028, contain 80% or better informational content, be accurate, complete, and correct.
3. Final proposed draft shall be submitted using standard CMR or DA Form 2028, contain 90% or better informational content, be accurate, complete, and correct.
4. Final revised document shall be submitted using standard CMR or DA Form 2028, 100% informational content, be accurate, complete, and correct.
5. Deliverables submitted on time
Contractor’s deliverables utilizing the Government QASP, Metric Checklists, PRS, and
PRS # 7
5.1.7 DCIED SOP for Initiative
Assessments. Within 180 days of contract base year and second option year (if exercised) PoP start date, Contractor shall review, analyze, provide supporting documents, conduct research, recommend changes, and provide a written assessment identifying required changes to the SOP to ensure the document includes current and relevant procedures for conducting C-IED and EH assessments and analysis.
weekly work plan that includes key milestones leading to the completion of the task to include an initial draft, final proposed draft, and final revised document. POA&M shall also include an IPR at a minimum every 30 days until completion of the task. A status of each tasking shall be provided in weekly SIGACTS report. The written assessment shall identify required changes to the SOP to ensure the document includes current and relevant procedures for conducting C- IED and EH assessments and analysis.
Deliverables shall be submitted electronically, using generally acceptable business format, using correct grammar, spelling and punctuation (See paragraph 5.12 and its subparagraphs).
1. Contractor shall submit a POA&M within 10 working days of the bi-weekly work plan.
2. Initial draft assessment shall be submitted using standard CMR or DA Form 2028, contain 80% or better informational content, be accurate, complete, and correct.
3. Final proposed draft shall be submitted using standard CMR or DA Form 2028, contain 90% or better informational content, be accurate, complete, and correct.
4. Final revised document shall be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .