APPENDIX_F_-_COMPREHENSIVE_SITE_EVALUATION_FORM.PDF

PDF 172 KB Posted

Attached to
Stormwater Program Support Services Federal contract opportunity
Solicitation number
W911S2-16-T-3014
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comprehensive Site Compliance Evaluation

Location:

Date:

Inspector:

1. Industrial materials, residue, trash on ground that could contaminate or be washed away into stormwater?

2. Leaks or spill from industrial equipment, drums, barrels, tanks, ect.

3. Unauthorized non-stormwater discharges?

4. Offsite tracking of industrial material or sediment where vehicles enter or exit.

5. Tracking or blowing of raw, final or waste materials from areas of no exposure to exposed areas.

6. Evidence of, or the potential for, pollutants entering the drainage system?

Summary:

"Revision control of this document is maintained electronically. If printed, individuals are responsible for ensuring use of latest revision." Revised

File details come from the government source that posted it. Updated .