W911PT24Q0037.pdf
PDF 547 KB Posted
- Attached to
- Helium Trailer Recertification for Watervliet Arsenal Federal contract opportunity
- Solicitation number
- W911PT24Q0037
About this file
This solicitation requests proposals for the refurbishment, recertification, and maintenance of compressed gas container equipment. Key details include the following:
The contractor shall inspect, refurbish, recertify and provide necessary maintenance or repair services for compressed gas tube-bank trailers, ISO containers on chassis, stand-alone chassis, and GTMU's owned by Watervliet Arsenal. Services include cleaning, painting, repairing metalwork and components, recertifying cylinders, and converting equipment between gas services. The contractor must be able to store equipment during and after work is completed. Pricing shall be provided for work on four specified helium trailers. The response due date is 12 February 2024. The place of performance will be the contractor's facility with final inspection and acceptance conducted by Watervliet Arsenal. The agency is the Department of the Army Contracting Command at Watervliet Arsenal.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
( No Col lect Cal ls )
W911PT24Q0037 01-Feb-2024
b. TELEPHONE NUMBER
5182664607
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 12 Feb 2024
5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
( SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t . Use Only)
23.
CODE 10. THIS ACQUISI TION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911PT9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORM ATION CALL:
a. NAM E
CHRISTOPHER BATTISTE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRI NT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52. 212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRI ATION DATA
1. REQUISITION NUMBER
20.
ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDI TIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE
SET FORTH HEREIN, I S ACCEPTED AS TO I TEMS:
. YOUR OFFER ON SOLI CI TATION
28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN
% FOR:SET ASI DE:UNRESTRI CTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILI TY
OFFEROR CODE
ARMY CONTRACTI NG COMMAND-WARREN (WVA)
ATTN: CCTA-HDW /BLDG 10
1 BUFFINGTON STREET
WATERVLIET NY 12189-4000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATI NG
CODE15. DELI VER TO CODE W911PT 16. ADMI NI STERED BY
12. DI SCOUNT TERMS11. DELI VERY FOR FOB DESTI NA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ARMY CONTRACTING COM M AND- WARREN ( WVA)
SERVICES TEAM
ATTN: CCTA-HDW/BLDG 10
1 BUFFINGTON STREET
WATERVLIET NY 12189- 4000
TEL: 518-266-4535 FAX:
FAX:
TEL: SERVI CE-DISABLED
VETERAN-OWNED
SMALL BUSI NESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,000,000
NAI CS:
541380
X
OFFER DATED
29. AW ARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY
COPI ES TO ISSUI NG OFFI CE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOM EN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOM EN- OWNED
SM ALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF71
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTI TY IN COLUMN 21 HAS BEEN
RECEI VED I NSPECTED
32b. SIGNATURE OF AUTHORI ZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATI VE
32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATI VE
37. CHECK NUMBER
FI NALPARTI ALCOMPLETE
36. PAY MENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHI P NUMBER
PARTI AL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAI D BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT
41b. SIGNATURE AND TI TLE OF CERTIFYI NG OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/ MM/ DD) 42d. TOTAL CONTAI NERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 30 - BLOCK 14 CONTINUATION PAGE
LOCAL NARRATIVES
A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS
(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:
(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE
REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE
ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.
(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE
DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO
COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION
OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND
DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).
(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS
IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING
PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.
(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR
CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.
NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.
(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:
“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”
POC - CONTRACT SPECIALIST/BUYER: Christopher Battiste
TELEPHONE NUMBER: 518-266-4607
E-MAIL ADDRESS: christopher.k.battiste.civ@army.mil
CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:
Please provide the following information for your company.
VENDOR NAME: ___________
VENDOR POC: ___________
POC PHONE: ___________
E-MAIL ADDRESS (see note below): ___________
DUNS NUMBER ___________
CAGE CODE (if known) ___________
TAX ID NUMBER ___________
VENDOR FAX NUMBER ___________
NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.
If we experience difficulties with e-mail, it will be data faxed.
(c) AWCF BULK FUND ____ DOES __X__ DOES NOT APPLY
(d) POSTERS:
(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.
(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”
(3) These posters can be accessed electronically at http://www.dol.gov .
(4) Hard copies of the posters will be made available upon request to the contracting officer.
(e) PAYMENTS:
Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.
(f) RELEASE OF INFORMATION:
The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf
C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).
It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.
Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:
‐ Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
‐ Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
‐ OSHA Form 300A
Applicable contractors may submit the above immediately following the completion of a quarter, if desired.
H._1_ SERVICES/CONSTRUCTION REQUIREMENTS
(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to
"JOB".
(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:
The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf
(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE
OF WATERVLIET ARSENAL TECHNOLOGY
(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.
(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.
(3) Definitions:
(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components.
It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.
(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.
(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.
(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.
(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.
(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.
(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.
(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.
TYPED OR PRINTED NAME, SIGNATURE DATE
TYPED OR PRINTED NAME, SIGNATURE DATE
TYPED OR PRINTED NAME, SIGNATURE DATE
(e) JOB SITE AVAILABILITY:
The work site will be available for performance during normal business hours:
Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST
Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST
Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2024 to be closed is January 12, 2024.
Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.
When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.
Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.
(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:
Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.
Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.
Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.
Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.
(h) CONTRACTOR IDENTIFICATION:
Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.
A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA
(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:
(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(4) Other electronic formats are not acceptable.
(c) Please select only one medium by which to transmit each bid/proposal.
(d) Timely receipt of offers/proposals:
(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.
(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.
(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.
(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.
(f) Electronic bids/proposals must include, as minimum:
(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).
(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.
(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.
(4) Any other information required by the solicitation.
(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.
(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.
Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.
*Registered trademark
C.__ REQUEST FOR QUOTE RESPONSES
ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING
THE FOLLOWING METHODS:
(a) Email to: christopher.k.battiste.civ@army.mil
(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.
STATEMENT OF WORK
STATEMENT OF
OBJECTIVES
31 October 2023
1. DESCRIPTION OF REQUIREMENT: Watervliet Arsenal requires the refurbishment, recertification, and maintenance of compressed gas tube-bank trailers, International Organization for Standardization (ISO) containers on chassis, stand-alone chassis, and Gas Transport Module Units (GTMU’s) on chassis which are utilized for bulk compressed gas service. The Contractor shall provide all supplies, products, management, tools, equipment, and labor necessary to ensure that container equipment is brought to and or maintained to a safe, serviceable and roadworthy condition. Compressed gas Tube-Bank Trailers, ISO’s, GTMU’s and chassis, will be referred to hereafter as "equipment".
2. SCOPE: The Contractor shall inspect, refurbish, recertify and provide necessary maintenance or repair services for equipment owned by Watervliet Arsenal. The Contractor shall be able to store equipment while awaiting service and after service is complete while it is pending transportation.
3. INSPECTIONS: The Contractor shall inspect each piece of equipment when it is delivered to Contractor’s facility to determine scope of work needed to bring or keep equipment serviceable and in roadworthy condition as required by the Department of Transportation (DOT). The Contractor shall perform the following inspection services:
3.1 Incoming Equipment Inspection: the Contractor shall inspect each piece of equipment IAW 49 CFR § 396 within 24 hours of equipment arriving at Contractors facility document the condition of equipment.
The Contractor shall utilize the attached DD Form 626, “Motor Vehicle Inspection (Transporting Hazardous Materials)” or equivalent to document the condition of the equipment.
Equipment inspection reports shall be submitted to the Requiring Activity by equipment serial number via email within three days of report.
3.2 Maintenance Inspection: within fourteen working days or as otherwise specified on the assigned Purchase Order (PO) issued by the Procuring Contracting Officer (PCO), the Contractor shall inspect equipment and submit to the PCO a detailed list of repairs required to return the equipment to usable, serviceable and roadworthy condition. In addition to this detailed list, the Contractor shall also include digital photographs of equipment indicating the Contractor’s proposed repairs. The Contractor shall be responsible for visually inspecting all mechanical, electrical, pneumatic and structural components for damage, wear, distortion, missing parts, or other forms of failure or potential failure. The Government reserves the right to have a Government Representative inspect the equipment relative to the repairs proposed by the Contractor, prior to approval/acceptance of the Contractor’s proposal. The PCO will advise the Contractor of approved repairs.
The Maintenance Inspection will be the document used to track work required and approved, and will include, but not limited to, items listed in paragraphs below titled “Recertification” and “Maintenance and Refurbishment”.
3.3 The Contractor shall provide a qualified inspector that meets the requirements of 49 CFR § 396.19 and 49 CFR § 396.25. The Contractor shall perform an Annual Inspection of chassis IAW CFR § 396.21 and Appendix G to Subchapter B – “Minimum periodic inspection standards” when annual
PR 20-0014
chassis inspection is expired or within one month of expiration. The Contractor shall provide a copy of the annual report to the requiring activity via email within three days of report.
4. RECERTIFICATION: Cylinders shall be recertified by an approved DOT testing method. For GTMU’s, cylinders shall be recertified as specified in DOT SP 14266 or DOT SP 14867 . If applicable the Contractor shall submit a copy of their DOT special permit showing the method by which the cylinder will be tested. Cylinders shall be recertified IAW all applicable regulations and requirements. The following requirements shall apply regardless of which type of testing method is used.
4.1 PRODUCT SPECIFICATION:
4.1.1 All gaseous helium used during the recertification process shall meet the requirements of MIL- PRF-27407D, Type I, Grade A, 01 Aug 2014.
4.1.2 All gaseous nitrogen used during the recertification process shall meet the requirements of MIL- PRF-27401G, Type I, Grade A, 07 Aug 2013.
4.2 REQUIREMENTS: The following requirements shall apply regardless of which type of testing method is used.
4.2.1 The Contractor shall be a DOT certified testing facility.
4.2.2 The Contractor shall assure all records clearly identify corresponding cylinder number and equipment number. Provide a tube diagram for each piece of equipment indicating pass or fail.
4.2.3 The Contractor shall provide a continuous chart recording of pressure and time for each cylinder hydrostaticly tested.
4.2.4 When disassembly/reassembly is required, the Contractor shall document the location of cylinders on the equipment by serial number, location and equipment license number.
4.2.5 Testing of the cylinders to the required pressure by DOT and testing of the manifolds to the required pressure IAW American Society of Mechanical Engineers (ASME) Code for Pressure Piping, B31 shall be performed. Clean/filtered water shall be used for hydrostatic testing to prevent contamination of cylinders and manifolds.
4.2.6 The Contractor shall replace all burst discs in the manifold. Rupture disc heads shall be installed with a minimum torque of 40 ft-lbs.
4.2.7 After approved DOT testing method and cylinder assembly, all internal surfaces that will be in contact with the product shall be rinsed with water which meets the requirements of ASTM D 1193, Type IV or equivalent and then purged with dry, filtered nitrogen until the exiting gas reaches a maximum dew point of -80°F. Other methods to ensure cylinders are clean and dry after testing may be acceptable with prior approval of the Procuring Contracting Officer (PCO).
4.2.8 The cylinders shall be filled with a helium/nitrogen gas mixture of at least 5% helium/95% Nitrogen for system leak testing. The fully assembled gas system (cylinders, valves, manifolds and safety devices) shall be pressurized to the maximum allowable working pressure with the gas mixture.
All threaded joints and other potential source of leaks shall be leak-checked using a leak detector common to the industry.
The Contractor shall repair all leaks and demonstrate the absence of leaks in the trailer assembly for a minimum period of 24 hours, at the maximum allowable working pressure.
4.2.9 Once the gas system has been determined to be leak free, the Contractor shall bleed down the helium/nitrogen pressure to 15-20 psig @ 70F or purge the helium/nitrogen mixture from the cylinders and replace with either helium or nitrogen blanket at 15-20 psig @ 70F. The 15-20 psig inert blanket shall be maintained on the cylinders to prevent contamination.
4.2.10 Prior to the Government inspection and final acceptance, the Contractor shall perform the following for equipment requiring recertification testing only.
4.2.10.1 Operational and visual checks of completed equipment to ensure the equipment is roadworthy and can be safely transported IAW Federal, State and local regulations.
4.2.10.2 Verify the king pin/plate and landing gear are greased and functional.
4.2.10.3 The air brake line fitting connections shall be leak checked with soap solution while the line is under full tractor supplied air pressure. No leaks are permitted. Verify functionality of glad hand connections, service brake, parking brake and emergency brake systems.
4.2.10.4 Should the Contractor discover any additional repair(s), as a result of the above inspection, the PCO shall be notified in order that the cost of these repair(s) for evaluation.
4.2.10.5 All materials and components used as replacement material/components shall be compatible with the intended service and equivalent in design to the original. If original part “equivalency” requires the use of outdated technology, the Contractor shall propose to the PCO to use replacement parts that are of newer technology. Prior approval by the PCO is required before newer components are installed.
4.2.10.6 If any cylinder fails to comply with the testing requirements as specified herein, the Contractor shall provide the PCO with a detailed description stating the reasons for cylinder failure and include costs to repair or replace the cylinder. All removed parts and/or hardware shall be retained until offered to the Government for inspection. The PCO will review and provide preapproval to the Contractor to repair or replace the parts. The Government will make the determination of which removed components will be disposed of by the Contractor. The Contractor shall be responsible for transportation of the parts sent to be disposed of, with proof of final disposal location.
5. MAINTENANCE AND REFURBISHMENT: Contractor shall complete a Maintenance Inspection and have PCO approval prior to proceeding with maintenance or refurbishment tasks.
5.1 Cleaning all external surfaces of the equipment chassis/framework and paint. The Contractor shall only use an abrasive blasting procedure to remove all rust, scale, grease, oil and clean all external surfaces. All surface areas exposed to abrasive blasting shall be primed and painted within 12 hours of exposure to the environment using the following procedures:
5.1.1 Painting of Cylinders, Cabinet and Chassis: Prepare surfaces IAW primer and finish coat manufacturer’s recommendation. The Contractor shall prime and paint IAW MIL-PRF-23236D, dated 15 September 2009. An example meeting this requirement is Sherwin Williams Industrial and Marine Coatings DURA-PLATE 235 Multi-Purpose Epoxy.
Spray paint all external metal surfaces, except brakes, suspension and operational equipment with zinc chromate primer which meets the requirements of Class C, TT-P-1757B, dated 15 May 1997. Alternatively, the Contractor may substitute an epoxy based primer that meets the requirements of MIL-DTL-53022E(1) Notice 1, dated 20 Dec 2017 when used in combination with a polyurethane finish coat that meets the requirement of MIL-DTL-64159B NOT 1, dated 16 Nov 2015 or MIL-PRF- 85285E Notice 1, dated 13 Oct 2016. Other primer and finish coatings may also be utilized with prior approval of the PCO.
When visually inspected, the finish coating shall be a smooth, continuous, adherent film which is free of surface imperfections such as: runs, sags, blisters, orange peel, blushing, streaks, craters, blotches, brush marks, fish eyes, seediness or pinholes.
Painting, lettering and marking shall be accomplished IAW 49 CFR.
5.1.1.1 Cylinders only: ID: 33446, Color Group: Yellow, Color Name: Tan 686A Camo, IAW Aerospace Material Specification, AMS-STD-595 Rev. A, dated Feb 2017.
5.1.1.2 Cabinet and Chassis only: ID: 13538, Color Group: Yellow, Color Name: DOT Highway Yellow, ANA 506 IAW Aerospace Material Specification, AMS-STD-595 Rev. A, dated Feb 2017.
5.2. Prior to painting, the Contractor shall repair or overhaul by: patching, re-welding, rebuilding or replacing all metal areas which are rusted or damaged. All materials shall be furnished by the Contractor. Repairing or overhauling the metal work shall include, but are not limited to the following, if required:
5.2.1 Repairing or replacing hinges.
5.2.2 Straightening or replacing doors.
5.2.3 Repairing or replacing handles and locks.
5.2.4 Reinforcing or replacing weakened door sections with similar metal plates.
5.2.5 Straighten, repair or replace missing, torn, twisted or bent metal sections of trailer beds, fenders, bumpers, skirts, cabinets, brackets, eye bolts, tie downs, shackles, tow rings, pintel hook hitch and framework.
5.2.6 Repairs or replacements of metal sections by bolting, welding or riveting to be typical of the original fabrication.
5.2.7 Installing new belting material on the trailer as needed. These trailers have belting type spacers between and under cylinders retaining straps. These spacers shall be replaced with new commercial grade four-ply belting. Dimensions of new spacers shall be the same as spacers removed.
5.2 8 Reassembling of cylinders, all piping removed or renewed gas system components onto trailers.
5.2.9 Due to the age of the current Watervliet Arsenal owned equipment and the increasing number of landing gear failures, Contractors responsible for repairing trailers shall perform a thorough inspection of all trailer landing gear assemblies in their possession. Any repairs/replacements identified during the landing gear inspections to return them to a “like new” condition shall be included with other repair/replacement items they identify in their trailer repair proposals.
Areas of specific interest include, but are not limited to:
5.2.9.1 Any indication of binding gears when loading or off loading trailer.
5.2.9.2 Gear box housings shall be visually inspected for cracks and leaking seals.
5.2.9.3 Cracks in the landing gear housing welds or visibly bent landing gear.
5.2.9.4 Rust in the gear boxes due to lack of grease.
5.2.9.5 Visibly worn or broken gears.
5.2.9.6 Bent or damaged struts bracing the landing gear to the frame.
5.2.9.7 Rusted or corroded landing gear handle or worn handle to gear shaft pin.
5.2.10 General inspection, repair and maintenance include:
5.2.10.1 Repair lighting devices and reflectors
5.2.10.2 Repair flat tires or replace if un-reparable and/or re-inflate tires (If required, the Contractor shall replace tires, including the spare tire, with new 11XOOX22.5 Steel Radial Tires, or equivalent. Standard rims for these tires are up to 10 holes with steel bud.) Disposal of tires shall be included in the detail repair quote.
5.2.10.3 Repair/Replace glad hands
5.2.10.4 Service or replace brakes including trailer brake connections
5.2.10.5 Repair electrical wiring
5.2.10.6 Lubricate landing gear and fifth wheel skid plate
5.2.10.7 Replace placarding for hazardous material (UN1046 Non-Flammable Gas)
5.2.10.8 Replace and/or install license plates including return of old plates to Watervliet Arsenal.
5.2.10.9 Perform any other minor repairs not previously identified
5.2.11 Maintenance and overhaul shall be completed by:
5.2.11.1 Recertification testing: within 45 calendar days of PCO approval
5.2.11.2 Chassis maintenance/overhaul: within 30 calendar days of PCO approval
5.2.11.3 Cylinder maintenance/overhaul: within 21 calendar days of PCO approval
6.0 TUBE BANK TRAILER CONVERSION (CLEANING): Contractor shall have the capability to convert Government furnished trailers from one gas service to another IAW 49 CFR and IAW guidance in CGA C-10. Products currently used include Nitrogen, Helium, Hydrogen, Oxyge n, and Methane Gas.
6.1 The trailers that are within test will not require recertification testing. Trailers will be shipped to the Contractor with a nitrogen blanket pressure IAW 49 CFR.
6.2 Modification to the trailers may include but is not limited to manifold, fittings, valves, pressure relief devices, pressure gauge valves, pressure gauges, change of trailer markings, placarding and installation of new rubber cover caps on all vent bleed-off cylinders, if applicable and any other modification necessary to meet 49 CFR requirements.
6.3 The Contractor shall perform the following procedures on the trailers for conversion from helium service to various compressed gas products:
6.3.1 Evacuate the cylinders to 26” of Hg vacuum (absolute pressure of 100 microns). Evacuated gas shall be handled/recovered appropriately IAW all local, State, Federal environmental guidelines.
6.3.2 Fill the cylinders with clean, dry gaseous nitrogen that meets MIL-PRF-27401G, Type I, Grade A to the maximum allowable working pressure.
6.4 The fully assembled gas system (cylinders, valves, manifolds and safety devices), all threaded joints and other potential source of leaks shall be leak-checked using a leak detector common to the industry. The Contractor shall repair all leaks and demonstrate the absence of leaks in the trailer assembly for a minimum period of 24 hours. Once the gas system has been determined to be leak free, the Contractor shall bleed down or purge the nitrogen pressure to 15-20 psig @ 70°F. The 15-20 psig inert blanket shall be maintained on the cylinders to prevent contamination.
7.0 ORDERING:
7.1 For maintenance and repairs that are to be negotiated, this amount will not be known at the time the order is placed and as such, historical prices of previous maintenance and repairs under this or the Contractor’s previous contracts, may also be used.
7.2 For maintenance and repair of equipment, in submitting the estimate, the Contractor shall provide digital pictures that corroborate the work that needs to be accomplished.
7.3 When offering repairs to the Contractor, the Contractor must indicate if they will accept equipment partially filled with product or without product.
8.0 INSTALLATION OF PRESSURE GAUGE: The Contractor shall furnish and install a pressure gauge with an isolation valve, if required. This will be an additional charge as an unforeseen issue. The pressure gauge shall have a range of no less than 0-3,000 psi and no more than 0-4,000 psi with a 4” to 5” dial on each manifold per trailer. Watervliet Arsenal will approve the Ashcroft Duragauge Pressure Gauge® Type 1377, Grade 2A (+0.5%) or equivalent.
9.0 MARKING AND TRAILER NAME PLATE:
9.1 The equipment shall be stenciled on each side and each end with the words IAW 49 CFR with 4 inches black lettering.
Examples; “HELIUM, COMPRESSED”, and “HYDROGEN, COMPRESSED”.
9.2 All equipment shall include Placards IAW 49 CFR. Also, equipment designated for CONUS use shall, be stenciled with the words "WATERVLIET ARSENAL" on each side of the container with 4 inch black lettering.
9.3 In addition to the existing name plate, a permanent aluminum, brass, bronze or stainless steel nameplate shall be mounted inside the rear cabinet displaying the following information:
-Container Serial Number.
-Record of serial numbers of all cylinders.
10.6.1 Date of test and retest pressure.
10.6.2 Name of Contractor.
10.6.3 Contract number.
10.6.4 Total nominal water volume of the trailer.
10.6.5 Maximum service pressure.
10.6.6 Date of thread and flang inspection.
10.6.7 Contractor shall replace and/or install license plates as requested by the requiring activity representative and return of old plates to Watervliet Arsenal in provided return envelopes or box.
10. TESTING RECORDS AND FINAL TEST REPORTS: The Contractor shall record and report the following to the
PCO:
10.1 The percentage of permanent expansion versus total expansion of each cylinder for each trailer hydrostatically tested.
10.2 Each cylinder passing 5/3 times the maximum allowable working pressure test shall be plainly and permanently metal stamped with the month and year of the test per CFR 49 requirements.
10.3 The Contractor shall maintain adequate records of all inspections and tests performed. The records shall provide evidence that the required inspections and tests have been performed, including part or component identification and inspection or test involved. The report shall show cylinder serial number, the test data obtained during the test and the results of the test made on each cylinder. Included shall be a statement on Contractors dated letterhead that the assembly (identified by serial number) has been visually inspected IAW the Compressed Gas Association Publication, C-6 (Latest revision) and tested and recertified IAW 49 CFR. This statement shall be signed by the Contractor's inspector and a Government Representative.
10.4 The Contractor shall prepare, sign and furnish the equipment Cleaning and Inspection certifications in hard copy paper format to the Requiring Activity Representative.
10.5 Contractor shall provide five digital photographs (front, back, each side and data plate) of the completed equipment.
Digital photographs shall be taken before and after trailer repair or recertification. The photographs shall be electronically provided, via email, to the PCO and requiring activity representative 24 hours prior to final inspection and acceptance.
W911PT24Q0037
11. APPLICABLE DOCUMENTS: The following documents are to be in compliance with the most current publication/edition on date of request.
11.1 Department of Transportation (DOT), Title 49,Code of Federal Regulations (49 CFR) Parts 100-
11.2 American Society of Mechanical Engineers (ASME) Code for Pressure Piping, B31
11.3 MIL-STD-101C, Color Code for Pipelines and for Compressed Gas Cylinders, dated 26-Aug-2014
11.4 Compressed Gas Association Inc, (CGA) Publication C-1, Methods for Pressure Testing Compressed Gas Cylinders
11.5 Compressed Gas Association Inc, (CGA) Publication C-6, Standards for Visual Inspection of Steel Compressed Gas Cylinders
11.6 Compressed Gas Association Inc, (CGA) Publication C-6.2, Guidelines for Visual Inspection and Requalification of Fiber Reinforced High Pressure Cylinders
11.7 Compressed Gas Association Inc, (CGA) Publication C-10, Guidelines to Prepare Cylinders and Tubes for Gas Service and Changes in Gas Service
11.8 American Society for Testing Materials, ASTM D1193-6 (2011), Standard Specification for Reagent Water
11.9 MIL-PRF-27407D, Propellant Pressurizing Agent, Helium, dated 01 Aug 2014
11.10 MIL-PRF-27401G, Propellant Pressurizing Agent, Nitrogen, dated 07-Aug-2013
12. REQUIRED DELIVERY: Depending upon the services to be performed on the equipment the required delivery date will be stated on the purchase order.
13. EQUIPMENT ACCEPTANCE: Inspection and final acceptance of equipment shall be performed by the Government Representative at the Contractor's facility. The Contractor is responsible for performing all cylinder test and inspections on manufactured cylinders as identified by DOT. The Contractor shall notify the assigned Government Representative 3 government business days prior to performing any tests/inspections in three days to permit inspection by the government.
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for
Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice as 2-in-1 (Services Only)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0303
Issue By DoDAAC W911PT
Admin DoDAAC** W911PT
Inspect By DoDAAC N/A
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) W911PT
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed
(End of clause)
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Helium Trailer Recertification
FFP
Contrator to provide the refurbishment, recertification, and maintenance of compressed gas tube-bank trailers, International Organization for Standardization (ISO) containers on chassis, stand-alone chassis, and Gas Transport Module Units (GTMU’s) on chassis which are utilized for bulk compressed gas service. The Contractor shall provide all supplies, products, management, tools, equipment, and labor necessary to ensure that container equipment is brought to and or maintained to a safe, serviceable and roadworthy condition as per SOW attached.
Contractor to provide pricing for:
Helium trailer HA-133; 12 tube jumbo trailer holds 154 MC of helium. $_______
Helium trailer HA-136; 11 tube jumbo trailer holds 164 MC of helium. $_______
Helium trailer HA-139; 11 tube jumbo trailer holds 163 MC of helium. $_______
Helium trailer1-10-856; 10 tube jumbo trailer holds 163 MC of helium $_______
Turnaround time per trailer: ________ days.
Any unused funds will be de-obligated at contract closeout.
Technical POC: Peter Kane FOB: Destination
PSC CD: J066
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .