W911PT24Q0024.pdf

PDF 527 KB Posted

Attached to
UPS Maintenance for a base and two option years Federal contract opportunity
Solicitation number
(W911PT24Q0024)
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This is a solicitation for uninterruptible power supply (UPS) maintenance services at multiple buildings on the Watervliet Arsenal. The contractor will provide preventative and corrective maintenance for UPS systems in Buildings 44, 110, 115, 137, the South Gate Overwatch, and Substation 1A1 over a base year plus two option years. Services include annual inspections, equipment checks, calibrations, repairs, and emergency response. The response due date is January 26, 2024. The Department of the Army Materiel Command Contracting Command Detroit Arsenal is the contracting agency. Pricing will be firm fixed price. The solicitation incorporates standard clauses for commercial item contracts and small business set asides.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

( No Col lect Cal ls )

W911PT24Q0024 18-Jan-2024

b. TELEPHONE NUMBER

5182664607

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 26 Jan 2024

5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

( SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t . Use Only)

23.

CODE 10. THIS ACQUISI TION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911PT9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORM ATION CALL:

a. NAM E

CHRISTOPHER BATTISTE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRI NT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52. 212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRI ATION DATA

1. REQUISITION NUMBER

20.

ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDI TIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W16H1F3292004V

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE

SET FORTH HEREIN, I S ACCEPTED AS TO I TEMS:

. YOUR OFFER ON SOLI CI TATION

28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN

% FOR:SET ASI DE:UNRESTRI CTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILI TY

OFFEROR CODE

ARMY CONTRACTI NG COMMAND-WARREN (WVA)

ATTN: CCTA-HDW /BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATI NG

CODE15. DELI VER TO CODE W911PT 16. ADMI NI STERED BY

12. DI SCOUNT TERMS11. DELI VERY FOR FOB DESTI NA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ARMY CONTRACTING COM M AND- WARREN ( WVA)

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189- 4000

TEL: 518-266-4535 FAX:

FAX:

TEL: SERVI CE-DISABLED

VETERAN-OWNED

SMALL BUSI NESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$34,000,000

NAI CS:

811210

X

OFFER DATED

29. AW ARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY

COPI ES TO ISSUI NG OFFI CE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOM EN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOM EN- OWNED

SM ALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF66

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTI TY IN COLUMN 21 HAS BEEN

RECEI VED I NSPECTED

32b. SIGNATURE OF AUTHORI ZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATI VE

32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATI VE

37. CHECK NUMBER

FI NALPARTI ALCOMPLETE

36. PAY MENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHI P NUMBER

PARTI AL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAI D BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT

41b. SIGNATURE AND TI TLE OF CERTIFYI NG OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/ MM/ DD) 42d. TOTAL CONTAI NERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911PT24Q0024

Section SF 30 - BLOCK 14 CONTINUATION PAGE

LOCAL NARRATIVES

A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE

REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE

ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE

DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO

COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION

OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND

DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS

IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING

PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR

CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Christopher Battiste

TELEPHONE NUMBER: 518-266-4607

E-MAIL ADDRESS: christopher.k.battiste.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: ___________

VENDOR POC: ___________

POC PHONE: ___________

E-MAIL ADDRESS (see note below): ___________

DUNS NUMBER ___________

CAGE CODE (if known) ___________

TAX ID NUMBER ___________

VENDOR FAX NUMBER ___________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.

If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND _X__ DOES ____ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).

It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.

Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:

‐ Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

‐ Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

‐ OSHA Form 300A

Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

H._1_ SERVICES/CONSTRUCTION REQUIREMENTS

(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to

"JOB".

(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

(3) Definitions:

(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components.

It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.

(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

(e) JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2024 to be closed is January 12, 2024.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

(h) CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA

(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:

(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.

(4) Other electronic formats are not acceptable.

(c) Please select only one medium by which to transmit each bid/proposal.

(d) Timely receipt of offers/proposals:

(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.

(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.

(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.

(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet

Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.

(f) Electronic bids/proposals must include, as minimum:

(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).

(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.

(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.

(4) Any other information required by the solicitation.

(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.

(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.

Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.

*Registered trademark

C.__ REQUEST FOR QUOTE RESPONSES

ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING

THE FOLLOWING METHODS:

(a) Email to: christopher.k.battiste.civ@army.mil

(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

UPS MAINTENANCE CONTRACT

AT

Watervliet Arsenal Buildings 44, 110, 115, 137, South Gate Overwatch, and Substation 1A1.

Project #: 23PW024

Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F)

PART 1 GENERAL

1.1 SUMMARY OF WORK

1.1.1 Project Description

a. This Statement of Work (SOW) defines the effort required for Preventive and Corrective Maintenance of Six (6) Uninterruptible Power Systems – Peripheral Maintenance Bypass Module Battery Disconnect, Load Bus Sync, Power Tie Slim Line Distribution Cabinet. The corrective action may require repairs to the equipment and components or adjustments to the systems.

1.1.2 Location of Work

a. The work is located at Buildings 44, 110, 115, 137, South Gate Overwatch, and Substation 1A1 approximately as indicated. The exact location will be shown by the Contracting Officer at the Watervliet Arsenal.

1.1.3 Period of Performance

a. Base year + 2 Option Years.

1.1.4 Hours of Operation

a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-workdays. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.2 SUBMITTALS

1.2.1 General Submittal Requirements

a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.

b. The contractor shall be a Vertiv trained, and factory trained authorized technician.

c. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for the complete list of required submittals.

1.2.2 Contractor Safety Plan

a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

1.2.3 Lockout / Tagout (LOTO) Acknowledgement

a. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification Acknowledgement

Record” prior to working on or de-energizing any electrical equipment.

1.2.4 Asbestos Notification Acknowledgement Record

a. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Project COR prior to starting project work.

1.2.5 Project Schedule

a. The contractor shall create a project schedule and submit for Government review and approval.

b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.

1.3 GENERAL REQUIREMENTS

1.3.1 Watervliet Arsenal Information for Contractors (WAIC)

a. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at:

<http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>

1.3.2 Utility Outage Requests and Utility Connection Requests

a. Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

b. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.3.3 Safety Requirements

a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per

OSHA 29 CFR 1910.147.

b. The contractor shall inspect the project work site prior to starting work and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.

1.4 ON-SITE PERMITS

1.4.1 Excavation (Dig Permit)

a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.

b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2-E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.

1.4.2 Hot Work and Confined Space

a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire

Department by calling (518)266-5990 each day the permit is to be used.

i. Contractor shall supply all necessary PPE for handling of electrical systems outlined.

1.5 APPLICABLE DOCUMENTS

1.5.1 Drawings

a. The following drawings accompany this Statement of Work and are a part thereof.

i. NA

1.5.2 Specifications

a. The following specifications accompany this Statement of Work and are a part thereof.

i. 23 05 00 Common Work Results for Electrical

ii. 26 05 05 – General Provisions for Electrical Systems

iii. 26 05 13 – Medium Voltage Cables

iv. 26 05 19 – Low-Voltage Electrical Power Conductors and Cables

v. ANSI C84.1 – Voltage ratings for Electrical Power Systems and Equipment

vi. NEMA PE1 – Uninterruptible Power Systems

vii. UFGS 26 33 53 Static Uninterruptible Power Supply (UPS)

1.5.3 References

a. The following references accompany this Statement of Work and are a part thereof.

i. Watervliet Arsenal Instructions for Contractors (WAIC).

ii. NFPA 70 – National Electric Code (NEC).

1.6 CONTRACTOR EQUIPMENT

1.6.1 Equipment Identification

a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:

i. Company Name, POC Name (first, last), POC phone number, Project Number.

1.6.2 Waste Dumpster

a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

b. Place waste dumpsters with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.

d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.

PART 2 PRODUCTS

2.1 GENERAL

All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

2.1.1 Hazardous Materials

a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.

2.1.2 Asbestos, Mercury, Lead, PCB

a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

2.1.3 DoD Green Procurement Program

a. All construction materials shall meet the applicable requirements of the DoD Green Procurement

Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.1.4 Paint

a. To meet the Affirmative Procurement Program (Federal Government’s Buy Recycled

Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials. This applies only to interior latex paint, only if available at the time of the project.

i. Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall contain 20% Post consumer content.

ii. Reprocessed Latex Paint (Grey, Brown Earth tones, and Other Dark Colors) shall contain 50-99% Post consumer content.

iii. Consolidated Latex Paint shall contain 100% Post consumer content.

2.2 PRODUCTS

2.2.1 Material

a. Contractor shall provide material, including parts coverage including batteries (state any noted limitations in proposal)

2.2.2 UPS Equipment List

a. Building 44

i. Liebert UPS 07/03 Model NO.: NPOWER Part No.: 37SA130A0C6E434 Battery Cabinet NO.: 37BP130XWJ1BAL Bypass Distribution NO.:37DU130C0A1ZZ

b. Building 110

i. Liebert APM UPS 07/11

Model NO.: NRC40CCSAHA0371 Serial NO.: D11FAA0027 Bypass Distribution: NRMB0C4C2RA0203

c. Building 115

i. Liebert APM UPS 05/2012

Model NO.: NRC90CCSA0A3364 Serial NO.: M12E3F0010 Battery Cabinet NO.: NRBA4MX1L1A0009 Bypass Distribution Cabinet NO.: NRMB1A9C4RA0285

d. Building 137

i. Emergi-Lite UPS 02/2020

Model NO: 277SG3000FTC-277-90-ICB-RS232-OCB0620 Part NO: C-1300RPBF

Serial NO: 112472L1-1

e. South Gate Overwatch

i. Eaton 08/2020 Model Number: 93PM-L-60

f. Substation 1A1

i. Controlled Power Company 9/19

Model Number: LTN-AAX-2IK-N-10-S-S

g. BDSICONTROLLER

h. BDSIDCMLM

PART 3 EXECUTION

3.1 ITEMS OF WORK

3.1.1 General Preparation

a. This contract will consist of a base year and two (2) option years. The contractor shall conduct Annual Inspections to be executed no later than June of every year.

b. The contractor shall supply all required expertise, tools, materials, supplies, equipment, labor, temporary utilities, and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.

c. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.

d. The contractor shall bring to the attention of the Project COR, any damage found within the work areas.

e. The contactor shall clean all work areas, at the end of each workday, to remove all tools, equipment, debris, materials, and all waste from the work site.

3.1.2 Battery Execution

a. Battery Monitoring Diagnostic Systems 256

i. Perform a complete visual inspection of the equipment, including sub-assemblies, wiring harnesses, contacts, cables, and major components.

ii. Check all mechanical connections for tightness and heat discoloration, making corrections where necessary.

iii. Clean any foreign material and dust from internal compartments.

iv. Perform a status check of alarm circuits. (If applicable).

v. Calibration of the equipment to meet manufacturer's specifications. Data Control

Module (DCM).

vi. Calibrate Load Module.

vii. Clear memory in controller.

viii. Maintain and archive battery diagnostic system database.

ix. Perform any necessary software / firmware upgrades to Controller, Load Module and

Data Control Modules.

x. Synchronize database with system hardware.

xi. Generate battery health inspection report.

xii. Return unit to operational service with normal load then measure and verify display indications.

3.1.3 Uninterruptible Maintenance Bypass Cabinet Load Bus Sync, Power Tie and Slim Line Distribution Cabinet.

a. UPS Maintenance Bypass Cabinet

i. Perform a complete visual inspection of the equipment, including sub-assemblies, wiring harnesses, contacts, cables, and major components.

ii. Check all mechanical connections for tightness and heat discoloration, making corrections where necessary.

iii. Clean any foreign material and dust from internal compartments.

iv. Perform a status check of alarm circuits. (If applicable).

v. Calibration of the equipment to meet manufacturer's specifications (if applicable).

vi. Operational checkout of the system to include transfers and proper status indications.

vii. Install check or perform Engineering Field Change Notices (FCN) as necessary.

viii. Return unit to operational service with normal load then measure and verify display indication.

3.1.4 Uninterruptible Power Systems APM UPS

a. APM UPS

i. Perform a temperature check on all breakers, connections, and associated controls.

Repair and report all high temperature areas in a report and turned over to customer.

ii. Perform a complete visual inspection of the equipment, including subassemblies, wiring harnesses, contacts cables and major components.

iii. Check air filters for cleanliness. Indicate in report if a filter is to be changed.

iv. Record all voltage and current meter readings on the module control cabinet and/or the system control cabinet.

v. Check all modules completely for discoloration broken or burned wires to include snubber boards inverter and rectifier snubbers.

vi. Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

vii. Check fuses on the DC capacitor deck for continuity (if applicable).

viii. Calibrate and record all electronics to systems specifications.

ix. Check or perform Engineering Filed Change Notices (FCN) as necessary.

x. Measure and record all low-voltage power supply levels.

xi. Record phase-to-phase input voltage and currents.

xii. Check power capacitors for swelling or leaking oils.

xiii. Check DC capacitor vent caps that have extruded more than 1/8” (if applicable).

xiv. Measure and record harmonic trap filter currents (if applicable).

3.1.5 Uninterruptible Power Systems 3-Phase Models

a. Annual UPS 3 Phase Full Preventive Maintenance Service.

i. Perform temperature check on all breakers, connections, and associated controls. Repair and report all high temperature areas in a report and turned over to customer.

ii. Check air filters for cleanliness. Indicate in report if a filter is to be changed.

iii. Perform a complete visual inspection of the equipment, including subassemblies, wiring harnesses, contacts cables and major components.

iv. Record all voltage and current meter readings on the module control cabinet and/or the system control cabinet.

v. Check all modules completely for discoloration broken or burned wires to include snubber boards inverter and rectifier snubber.

vi. Check power capacitors for swelling or leaking oil.

vii. Check DC capacitor vent caps that have extruded more than 1/8” (if applicable).

viii. Check fuses on the DC capacitor deck for continuity.

ix. Check or perform Engineering Field Change Notices (FCN) as necessary.

x. Calibrate and record all electronics to systems specifications.

xi. Measure and record harmonic trap filter currents (if applicable).

xii. Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

xiii. Measure and record all low-voltage power supply levels.

xiv. Record phase to phase input voltage and currents.

xv. With customer approval, perform operational test of the system including unit transfer and battery discharge.

3.1.6 Internal Battery Full Preventive Maintenance Service 45KVA

a. Annual Service

i. Inspect the appearance and the cleanliness of the battery and the battery room. Clean the normal cell top dirt accumulation.

ii. Measure and record the total battery float voltage and charging current.

iii. Measure and record the overall AC ripple current.

iv. Measure and record the overall AC ripple voltage.

v. Visually inspect the jars and covers for cracks and leakage.

vi. Visually inspect for evidence of corrosion.

vii. Measure and record the ambient temperature.

viii. Verify the condition of the ventilation equipment, if applicable.

ix. Verify the integrity of the battery rack/cabinet.

x. Measure and record 100% of the cell temperatures.

xi. Measure and record the float voltage of all cells.

xii. Measure and record all internal impedance readings.

xiii. Provide a detailed written report noting any deficiencies and corrective action needed, taken and/or planned.

xiv. Re-tighten all battery connections to the battery manufacture’s specifications.

xv. Refurbish cell connections as deemed necessary by the detailed inspection report.

xvi. Provide a detailed report via email/pdf to COR noting any deficiencies and corrective actions taken and/or planned.

3.1.7 Stationary Battery Systems VRLA (Sealed) Battery Scope of Work.

a. VRLA Battery Scope.

i. Inspect the appearance and the cleanliness of the battery and the battery room. Clean the normal cell top dirt accumulation.

ii. Measure and record the total battery float voltage and charging current the battery room.

iii. Measure and record the overall AC ripple current.

iv. Measure and record the overall AC ripple voltage.

v. Visually inspect the jars and covers for cracks and leakage.

vi. Visually inspect for evidence of corrosion.

vii. Measure and record the ambient temperature.

viii. Verify the integrity of the battery rack/cabinet.

ix. Measure and record 100% of the jar temperatures.

x. Measure and record the float voltage of all jars.

xi. Measure and record all internal ohmic readings.

xii. Re-tighten all battery connections to the battery manufacture’s specifications. Measure and record all battery connection resistances in micro-ohms, when applicable.

xiii. Refurbish cell connections as deemed necessary by the detailed inspection report.

xiv. Provide a detailed report via email/pdf to COR noting any deficiencies and corrective actions taken and/or planned.

3.1.8 Single Jar Replacement for Lead and Acid Batteries

a. Lead Acid Batteries

i. The battery string SHALL be calculated as to whether it is in good health; that the battery string is not beyond expected years or has excessive single jar replacements that would make the string unstable.

ii. If a bad jar is found it shall be replaced with consideration of the string health.

3.2 CLOSEOUT REQUIREMENTS

3.2.1 Construction and Demolition Debris

a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris and/or recycled materials, under this scope of work. Submit documentation per Appendix A, “Consolidated List of Submittals”.

3.2.2 Cleanup of Work Site

a. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.

b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.

c. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.

3.2.3 Restoration of Work Site

a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.

b. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.

3.2.4 Operations Reports and Maintenance Manuals

a. The contractor shall provide three (3) hard copies and (1) electronic copy of full operations and

Maintenance manuals to the project COR for all equipment included in this project.

b. The contractor shall provide COR for the government generated reports of all maintenance recordings, findings, and recommendations.

3.2.5 Warranty

a. The contractor shall provide a [1] year warranty on 23PW024.

3.2.6 As-Built Drawings

a. The contractor shall provide as-built drawings for 23PW024 (generally only for major changes to systems or floor plan)

PART 4 APPENDICES

a. Consolidated List of Submittals

b. Quality Assurance Surveillance Plan (QASP)

c. AMC Environmental Requirements Supplement

APPENDIX A: Consolidated List of Submittals Line Item Submitted Submittal Needed

By Submittal Reviewed By (Office)

1 Safety Data Sheets for Hazardous Materials

(SDS)

NLT 7 Calendar Days After Award

Safety Office

2 Signed Contractor Asbestos Notification Form

NLT 7 Calendar Days After Award

Environmental Office

3 Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record

NLT 7 Calendar Days After Award

Safety Office

4 Project Schedule NLT 7 Calendar Days After Award

COR

5 Contractor Safety Plan NLT 7 Calendar Days After Award

COR

6 Solid Waste Reporting Log, Bills of Lading, Dump Slips for C&D Debris and Recycled Materials

NLT the 10th Day of the Following Month, and at Project Completion.

Environmental Office

7 Supporting Documentation of VERTIV

AUTHORIZED FACTORY TECHNICIAN

With Proposal Contracting

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for

Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice as 2-in-1 (Services Only)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0303

Issue By DoDAAC W911PT

Admin DoDAAC** W911PT

Inspect By DoDAAC N/A

Ship To Code N/A

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) W911PT

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

N/A

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed

(End of clause)

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

UPS MAINTENANCE

FFP

Contractor to provide Maintenance and Emergency Response for Uninterruptible Power Supply (UPS) systems on post at the Watervliet Arsenal per Statement of Work #23PW024 for Period of Performance One (1) Year 2/15/2024 - 2/14/2025.

ALL RESPONSIBLE PROPOSALS WILL BE CONSIDERED.

Service Contract Labor Standard Wage Determination No. 2015-4143 Latest REV applies and is incorporated.

Technical POC is Grant Horn

FOB: Destination

NSN: AASSVC3292004V

MILSTRIP: W16H1F3292004V

PURCHASE REQUEST NUMBER: W16H1F3292004V

PSC CD: J059

NET AMT

0002 1 Lot

OPTION UPS MAINTENANCE

FFP

Contractor to provide Maintenance and Emergency Response for Uninterruptible Power Supply (UPS) systems on post at the Watervliet Arsenal per Statement of Work #23PW024 for Period of Performance One (1) Year 2/15/2024 - 2/14/2025.

ALL RESPONSIBLE PROPOSALS WILL BE CONSIDERED.

Service Contract Labor Standard Wage Determination No. 2015-4143 Latest REV applies and is incorporated.

Technical POC is Grant Horn

FOB: Destination

NSN: AASSVC3292004V

MILSTRIP: W16H1F3292004V

0003 1 Lot

OPTION UPS MAINTENANCE

FFP

Contractor to provide Maintenance and Emergency Response for Uninterruptible Power Supply (UPS) systems on post at the Watervliet Arsenal per Statement of Work #23PW024 for Period of Performance One (1) Year 2/15/2024 - 2/14/2025.

ALL RESPONSIBLE PROPOSALS WILL BE CONSIDERED.

Service Contract Labor Standard Wage Determination No. 2015-4143 Latest REV applies and is incorporated.

Technical POC is Grant Horn

FOB: Destination

NSN: AASSVC3292004V

MILSTRIP: W16H1F3292004V

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 15-FEB-2024 TO

14-FEB-2025

N/A ARMY CONTRACTING COMMAND-

WARREN (WVA)

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

518-266-4535 FOB: Destination

W911PT

0002 POP 15-FEB-2025 TO

14-FEB-2026

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 15-FEB-2026 TO

14-FEB-2027

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .