W911PT19Q01360002.pdf
PDF 199 KB Posted
- Attached to
- Breech Block Forging Federal contract opportunity
- Solicitation number
- W911PT19Q0136
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT19Q0136 - Modified.pdf | ||
| W911PT19Q0136 - Mod.pdf | ||
| W911PT19Q0136.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is issued to add CLINS 0003 and 0004. As a result, the solicitation closing date is extended from 12/27/2019 to 01/10/2020.
See attached Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Dec-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911PT19Q0136
X 9B. DATED (SEE ITEM 11)
25-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2019
CODE
ARMY CONTRACTING COMMAND-WARREN (WVA)
ATTN: CCTA-HDW/BLDG 10
1 BUFFINGTON STREET
WATERVLIET NY 12189-4000
W911PT 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
nathan.w.bergert.civ@mail.milEMAIL:5182664813TEL:
NATHAN W. BERGERT / CONTRACT SPECIALIST
W911PT19Q0136
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Dec-2019 05:00 PM to 10-Jan-
2020 05:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 60 Each FSC: 1015 Name: BREECH BLOCK F Part Number: 12529569
FFP
FIRST ARTICLE APPROVAL REQUIRED - Breechblock Forging (Rough Machined), per Drawing # 12529569, Revision K, for 120mm M256 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; Along with general data drawings attachment A.
MID: EH15UWV537EHM71
FOB: Destination
NSN: 12529569:19206
MILSTRIP: W16H1F934401SB
PURCHASE REQUEST NUMBER: W16H1F934401SB
PSC CD: 1015
NET AMT
CLIN 0004 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 60 Each FSC: 1015 Name: BREECH BLOCK F Part Number: 12529569
FFP
FIRST ARTICLE APPROVAL Waived- Breechblock Forging (Rough Machined), per Drawing # 12529569, Revision K, for 120mm M256 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; Along with general data drawings attachment A.
MID: EH15UWV537EHM71
FOB: Destination
NSN: 12529569:19206
MILSTRIP: W16H1F934401SB
PSC CD: 1015
NET AMT
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
EXHIBIT A
CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003 or 0004
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A001
2. TITLE OF DATA ITEM: Chemical and Physical Properties for Forging or Casting Analysis Report
3. SUBTITLE: Record of Treatment and Test, Major Forgings/Castings (CN1)
4. AUTHORITY: DI-FORG-81196
5. CONTRACT REFERENCE: Applicable Drawing or Material Specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Submit SMCWV Form 1155 for each component or lot. A computerized version of SMCWV Form 1155 may be used with prior approval of the procuring office. Data Item Descriptions (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013CONTRACT DATA REQUIREMENT LIST – DD Form 1423
Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 and 0003
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A002
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records – First Article Sample (CN 3)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: First Article Clause
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: *See Block 16
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/P
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Article
13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article
14. DISTRIBUTION:
A. ADDRESSEES: As specified in contract or purchase order
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit WVA Form 702-61-R-E showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at:
http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
J. DATE: 14 July 2016
CONTRACT DATA REQUIREMENT LIST – DD Form 1423
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003 or 0004
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A003
2. TITLE OF DATA ITEM: Certification/Data Report
3. SUBTITLE: Certificate of Conformance (COC), NDT Applications (CN 9)
4. AUTHORITY: DI-MISC-80678
5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). See QAP-APPX-WVA paragraph 4.6 and 9 for the general requirements. The COC will also contain specific references to a specification or drawing for the acceptance standards, procedure and personnel qualifications. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
J. DATE: 9 May 2013
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003 or 0004
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A004
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records, Production Components (CN12)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: QAP-APPX-WVA
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).
Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.
Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 and 0003 or 0004
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A005
2. TITLE OF DATA ITEM: Test Procedure
3. SUBTITLE: Magnetic Particle Inspection Procedures (CN 23)
4. AUTHORITY: DI-NDTI-80603
5. CONTRACT REFERENCE: QAP-APPX-WVA and ASTM-E1444
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE: A
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/R
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: *See Block 16
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Submit written procedures for review and approval by the procuring office. The minimum elements of the procedure are detailed in paragraphs 5.3 thru 5.3.1.15 of ASTM-E1444. Specific heat treatment requirements will be per QAP-APPX-WVA paragraph 9.1.
*With First Article or no later than 30 days prior to first production shipment when First Article is not required.
Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Origin Government Origin Government
The following Acceptance/Inspection Schedule was added for CLIN 0004:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Origin Government Origin Government
INSPECTION ACCEPTANCE CRITERIA
PLACE OF INSPECTION AND ACCEPTANCE
Government inspection/acceptance will be made by the authorized Government Representative located at:
Inspection Acceptance [] Watervliet Arsenal [] Watervliet Arsenal [ X ] Contractor’s Plant [ X ] Contractor’s Plant
GENERAL QUALITY ASSURANCE PROVISIONS (Jun 1996) (ACC-WRN(WVA))
Contractor requirements and inspection provisions are required in accordance with QAP-APPENDIX-WVA and the item QAP(s) (if applicable).
(END OF CLAUSE)
LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))
When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical/chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor’s expense when so directed by the Contracting Officer.
(END OF CLAUSE)
52.209-3 Alt I FIRST ARTICLE APPROVAL- CONTRACTOR TESTING (Sept 1989) – ALTERNATE I (Jan 1997)
(a) The contractor shall test _ Two BREECHBLOCK FORGINGS (ROUGH MACHINED), 12529569, shall be furnished for 100% inspection, of all requirements, to assure compliance with QAP(s), specification(s), drawing(s), and the contract. unit(s) of Lot/Item 0001 and 0003 as specified in this contract. At least 15 calendar days before the beginning of first article tests, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the government may witness the tests.
(b) The contractor shall submit the first article test report within 135 calendar days from the date of this contract to:
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORK GROUP
BLDG #35E, ATTN: TAWV-ODQ-M
WATERVLIET, NY 12189-4050
Marked “FIRST ARTICLE TEST REPORT: Contract No. ______________ Lot/Item No. 0001 and 0003.”
Within 30 calendar days after the Government receives the test report, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of clause)
52.0246-0011 HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (GOVERNMENT
SPECIFICATION (FEB 1999)
The contractor shall comply with the higher-level quality standard selected below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]
TITLE NUMBER DATE TAILORING
[ ] Model for Quality Assurance ANSI/ISO/ In effect on date of ______________ in design, development, ASQC-Q9001 contract production, installation and servicing
[ ] Model Quality Assurance ISO-9001 In effect on date of ______________ in production, installation (ANSI/ISO/ contract and servicing ASQC-Q9001)
[ ] Equivalent Quality System Program
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule for CLIN 0003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
09-AUG-2020 60 AMCISS REQUESTS
WATERVLIET ARSENAL
ATTN: AMSTA-WV-IML-S
1 BUFFINGTON STREET
WATERVLIET NY 12189-4000
FOB: Destination
W16H1F
The following Delivery Schedule for CLIN 0004 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
09-AUG-2020 60 AMCISS REQUESTS
WATERVLIET ARSENAL
ATTN: AMSTA-WV-IML-S
1 BUFFINGTON STREET
WATERVLIET NY 12189-4000
FOB: Destination
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM SHIP TO ADDRESS
FIRST ARTICLES ONLY
0001 and 0003
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORKING GROUP
BLDG. #35E, ATTN: TAWV-OD(Q)
WATERVLIET, NY 12189-4000
PRODUCTION QUANTITIES
ONLY
0001 or 0002 and 0003 or 0004
TRANSPORTATION OFFICER
WATERVLIET ARSENAL
BLDG. #35E, ATTN: TAWV-IML-S
SHIPPING AND RECEIVING
WATERVLIET, NY 12189-4000
518-266-5769
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
ITEM QUANTITY DELIVERY
AND
AS STATED
FIRST ARTICLE - 135 DAYS AFTER DATE OF CONTRACT
PRODUCTION QUANTITY - 60 DAYS AFTER DATE OF
FIRST ARTICLE APPROVAL AT A MINIMUM RATE OF 20 PER
MONTH.
OR
AND
AS STATED PRODUCTION QUANTITY – 150 DAYS AFTER DATE OF
CONTRACT. AT A MINIMUM RATE OF 20 PER MONTH.
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
(End of Summary of Changes)