W911PT-18-R-0019-Solicitation.docx

DOCX document 149 KB Posted

Attached to
Breech Cap Forging Federal contract opportunity
Solicitation number
W911PT18R0019
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Solicitation # W911PT-18-R-0019 - Breech Cap Forging

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT18R0019

Section A - Solicitation/Contract Form

NOTICE

THE GOVERNMENT INTENDS TO MAKE ONLY ONE AWARD FOR A TOTAL QUANTITY OF 300 EACH OF DRAWING # 12901193, EITHER WITH THE FIRST ARTICLE REQUIREMENT (CLIN 0001) OR WITHOUT THE FIRST ARTICLE REQUIREMENT (CLIN 0002).

LOCAL NARATIVES - SECTION A

DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE (Dec 2012) (ACC-WRN)

This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

To be eligible to gain access to this export controlled TDP (via FedBizOpps) YOUR FIRM must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to http://www.dlis.dla.mil/jcp/, click on documents, and follow instructions provided. See Clause 52.0000-4008, “Technical Data Package Information” for estimated certification time. Upon receipt of certification, you may request the TDP in accordance with the instructions stated in the solicitation's clause entitled, “Technical Data Package (TDP) Information (52.0000-4008). Additionally, before furnishing this TDP to a subcontractor you must assure that they also have a current DD 2345.

Upon completion of the purposes for which Government Technical Data has been provided, you, your subcontractors, all your vendors and all sub-vendors, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed from you.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

(End of Narrative)

Disclosure of Unit Price Information (Jun 2004) (ACC-WRN (WVA))

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.

Section B - Supplies or Services and Prices

LOCAL NARATIVES - SECTION B

NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS (Dec 2014) (ACC-WRN(WVA)):

IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Latelia Harris

TELEPHONE NUMBER: 518-266-4608

E-MAIL ADDRESS: latelia.t.harris.civ@mail.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: _________________________

VENDOR POC: __________________________

POC PHONE: ____________________________

E-MAIL ADDRESS (see note below): __________________________

DUNS NUMBER _______________________

CAGE CODE (if known) __________________

TAX ID NUMBER ________________________

VENDOR FAX NUMBER ________________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be datafaxed.

AWCF BULK FUND ____ DOES _X_ DOES NOT APPLY

POSTERS:

Walsh-Healey Act/Service Contract Act. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon Act” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

These posters can be accessed electronically at http://www.dol.gov .

Hard copies of the posters will be made available upon request to the contracting officer.

PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.apd.army.mil/pdffiles/r360_1.pdf

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
300
Each

FSC: 1015 Name: FORGING

FFP

FIRST ARTICLE APPROVAL REQUIRED - Breech Cap Forging, per Drawing # 12901193, Revision Initial Release, for 120mm Mortar. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; Along with general data drawings attachment A.

MID: EH17UWV107EHM7

FOB: Destination

NSN: 12901193:19206

MILSTRIP: W16H1F72160075

PURCHASE REQUEST NUMBER: W16H1F72160075

PSC CD: 1015

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
300
Each

FSC: 1015 Name: FORGING

FFP

FIRST ARTICLE APPROVAL WAIVED - Breech Cap Forging, per Drawing # 12901193, Revision Initial Release, for 120mm Mortar. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; Along with general data drawings attachment A.

MID: EH17UWV107EHM7

FOB: Destination

NSN: 12901193:19206

MILSTRIP: W16H1F72160075

PSC CD: 1015

NET AMT

Section C - Descriptions and Specifications

LOCAL NARATIVES - SECTION C

TECHNICAL DATA PACKAGE (TDP) INFORMATION (JUL 2013) (ACC-WRN (WVA)

The TDP for this solicitation is available only in electronic format via FedBizOpps (https://www.fbo.gov). The Army Contracting Command – Warren (ACC-WRN) (WVA) has discontinued its practice of providing TDP’s via email or CD-Rom. You must obtain a copy of the TDP for this solicitation via the web at FedBizOpps.

This solicitation contains one or more web-located TDPs within FedBizOpps. If multiple Contract Line Item Numbers (CLINS) are listed below; each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN’s Web-located TDP on FedBizOpps. To access the TDP, you will have to copy or type the link’s URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the “Text Select Tool,” then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: 0001 or 0002

TDP Link (URL): Attached within FBO

To access the data through FBO:

a. Log on to the FBO web site.

b. Enter your Marketing Partner Identification Number (MPIN).

c. Search for the solicitation number.

d. If solicitation is Export Controlled, select “Verify MPIN.”

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to http://www.dlis.dla.mil/jcp/ click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select “Request Explicit Access.” This will generate an email to the contract specialist at Army Contract Command - Warren (ACC-WRN) (WVA) with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 – 3 working days to complete this FBO-TDP access/approval process through the FBO system.

f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.

g. It is strongly suggested that you submit the explicit access request and provide the buyer with the completed “Use and Non-Disclosure Agreement” at the same time if the solicitation requires both to gain access to view the TDP.

h. A user guide for FBO can be found at https://www.fbo.gov - on the right is User Guides - click on “Vendor”.

ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES (MAR 2015) (ACC-WRN)

a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management (see clause 52.204-4959 “Trusted Associate Sponsorship System (TASS) Program” (Local ACC-WRN (WVA)).

c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see “Watervliet Arsenal (WVA) Information For Contractors” incorporated by reference in ACC-WRN (WVA) notice 52.0000-4200, “Notice of Watervliet Arsenal Information/Requirements” and available at: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf ) or at OCONUS locations, in accordance with Status of Forces Agreement and other theater regulations.

SCOPE OF WORK/IDENTIFICATION OF CASTING/FORGING MANUFACTURER (Aug 1993) (ACC-WRN(WVA))

If the offeror intends to subcontract the manufacture of a casting/forging required by this solicitation, he must indicate herein who will furnish the basic casting/forging. After award of a contract, any change of this subcontractor will not be made without prior approval of the contracting officer.

EXHIBIT A

CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002

B. EXHIBIT: A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A001

2. TITLE OF DATA ITEM: Certification/Data Report

3. SUBTITLE: Certified Test Report (CTR), Minor Forgings/Castings & Material (CN2)

4. AUTHORITY: DI-MISC-80678

5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With Each Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). Submit a CTR showing the results of all chemical and mechanical tests required by the drawing and/or specification. See QAP-APPX-WVA paragraph 4.6 for the requirement. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013

Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001

B. EXHIBIT: A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A002

2. TITLE OF DATA ITEM: Test/Inspection Report

3. SUBTITLE: Inspection Records – First Article Sample (CN 3)

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: First Article Clause

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: *See Block 16

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: ONE/P

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Article

13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article

14. DISTRIBUTION:

A. ADDRESSEES: As specified in contract or purchase order

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit WVA Form 702-61-R-E showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

J. DATE: 14 July 2016

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002

B. EXHIBIT: A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A003

2. TITLE OF DATA ITEM: Certification/Data Report

3. SUBTITLE: Certificate of Conformance (COC), NDT Applications (CN 9)

4. AUTHORITY: DI-MISC-80678

5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). See QAP-APPX-WVA paragraph 4.6 and 9 for the general requirements. The COC will also contain specific references to a specification or drawing for the acceptance standards, procedure and personnel qualifications. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002

B. EXHIBIT: A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A004

2. TITLE OF DATA ITEM: Test/Inspection Report

3. SUBTITLE: Inspection Records, Production Components (CN12)

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: QAP-APPX-WVA

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE:

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: With Each Submission

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: With First Shipment

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).

Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.

Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 0001 or 0002

B. EXHIBIT: A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO: A005

2. TITLE OF DATA ITEM: Test Procedure

3. SUBTITLE: Magnetic Particle Inspection Procedures (CN 23)

4. AUTHORITY: DI-NDTI-80603

5. CONTRACT REFERENCE: QAP-APPX-WVA and ASTM-E1444

6. REQUIRING OFFICE: TAWV-ODQ-M

7. DD250 REQUIRED: No

8. APP CODE: A

9. DISTRIBUTION STATEMENT REQUIRED: N/A

10. FREQUENCY: ONE/R

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: *See Block 16

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Submit written procedures for review and approval by the procuring office. The minimum elements of the procedure are detailed in paragraphs 5.3 thru 5.3.1.15 of ASTM-E1444. Specific heat treatment requirements will be per QAP-APPX-WVA paragraph 9.1. *With First Article or no later than 30 days prior to first production shipment when First Article is not required. Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

19. CCTA-HDW, FAX NUMBER: 518-266-5602

G. PREPARED BY:

H. DATE:

ATTACHMENT A

GENERAL DATA/GENERAL DRAWINGS

THIS TDP DOES NOT CONTAIN A SPECIFICATION OR STANDARD REQUIRING THE USE OF A CLASS I COC OR A CONTRACTUAL REQUIREMENT THAT CAN BE MET ONLY THROUGH USE OF SUCH A SUBSTANCE.

DRAWING
REV
DATE
TITLE

QAP-APP-BL

030731
GENERAL QUALITY ASSURANCE PROVISIONS
8769067
P
170516
Magnetic Particle Inspection Of Cannon And Mount Components

ADDITIONAL DRAWINGS/DOCUMENTS

DRAWING #
REV
DATE
TITLE
12901193
New
040624
Breech Cap Forging
QAP-12901193
Orig.
040624
Quality Assurance Provisions for :Breech Cap Forging

MILITARY/FEDERAL SPECIFICATIONS/STANDARDS

NUMBER
REV
AMD
NOT
DATE
TITLE
MIL-STD-130
N
121116
Identification Marking Of U.S. Military Property

INDUSTRY STANDARDS

SOCIETY/NUMBER
YEAR
TITLE
ASME Y14.3
12
Orthographic and Pictorial Views
ASME Y14.5
09
Dimensioning And Tolerancing
ASME Y14.100
13
Engineering Drawing Practices
SAE AMS 6414M
16
Steel, Bars, Forgings, and Tubing 0.80Cr - 1.8Ni - 0.25Mo (0.38 - 0.43C) (SAE 4340) Vacuum Consumable Electrode Remelted - UNS G43406

SAE AMS 6429H

ASTM E 10

ASTM E 1444/E1444M

AIA/NAS NAS410

SAE AMS H 6875B

ASTM D3951

Steel Bars, Forgings, Tubing, and Rings 0.78Cr – 1.8Ni – 0.35Mo – 0.20V (0.33 – 0.38C) (4335 Mod) Consumable Electrode Vacuum Melted - UNS K33517Standard Test Method Standard Test Method for Brinell Hardness of Metallic Materials Standard Practice for Magnetic Particle Testing NAS Certification & Qualification of Nondestructive Test Personnel - REV 4 Heat Treatment of Steel Raw Materials Standard Practice for Commercial Packaging

Section E - Inspection and Acceptance

INSPECTION ACCEPTANCE CRITERIA

PLACE OF INSPECTION AND ACCEPTANCE

Government inspection/acceptance will be made by the authorized Government Representative located at:

InspectionAcceptance
[X] Watervliet Arsenal[X] Watervliet Arsenal
[ ] Contractor’s Plant[ ] Contractor’s Plant

GENERAL REQUIREMENTS FOR QUALITY ASSURANCE (DEC 2001) (ACC-WRN(WVA))

Contractor requirements and inspection provisions are required in accordance with QAP-APPENDIX-BL and item QAP(s), if applicable.

LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))

When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical/chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor’s expense when so directed by the Contracting Officer.

FIRST ARTICLE APPROVAL – GOVERNMENT TESTING (Sep 1989) – ALTERNATE I (Jan 1997)

(a) The contractor shall deliver __Two BREECH CAP FORGING, 12901193, shall be furnished for 100% inspection to assure compliance with QAP(s), specification(s), drawing(s) and contract.

One BREECH CAP FORGING shall be destructively tested for mechanical properties. The properties shall be determined utilizing tensile and charpy specimens as specified on Dwg 12901193 & the applicable material document.

____________________ unit(s) of Lot/Item 0001 within 120 calendar days from the date of this contract to the Government at:

WATERVLIET ARSENAL

VENDOR QUALITY & GAGE CALIBRATION WORK GROUP

BLDG #35-E, ATTN: TAWV-ODQ-M

WATERVLIET, NY 12189-4050

for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 30 calendar days after the government receives the first article, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(j) The Contractor shall produce both the first article and the production quantity at the same facility.

SPECIAL INSPECTION EQUIPMENT (Jun 1996) (WATERVLIET ARSENAL)

The government-owned SIE listed below will not be supplied. SMTE is allowed, instead of the SIE cited in the QAP(s), for inspection of the characteristic(s). At the contractor’s expense, the SIE may be fabricated and used. The SIE drawing(s) is supplied for guidance.

SIE DRAWING NO.

12520367 12520368 12520369

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-16
Responsibility For Supplies
APR 1984
252.246-7000
Material Inspection And Receiving Report
MAR 2008

Section F - Deliveries or Performance

52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991

CLAUSES INCORPORATED BY FULL TEXT

52.0000-4202 DELIVERY INFORMATION (Dec 2017) (ACC-WRN(WVA))

NOTICE: NORMAL DELIVERY HOURS FOR RECEIPT OF SUPPLIES AT WATERVLIET ARSENAL ARE AS FOLLOWS:

Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST

Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2018 to be closed is January 5, 2018.

BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.

Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.

THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.

ITEM DESCRIPTION:

The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor’s expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor’s documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.

(END OF NOTICE)

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM
QUANTITY
DELIVERY

AS STATED

FIRST ARTICLE - 120 DAYS AFTER CONTRACT

PRODUCTION QUANTITY - 60 DAYS AFTER FIRST ARTICLE APPROVAL AT A MINIMUM RATE OF 75 EACH PER MONTH UNTIL COMPLETE

OR

0002
AS STATED
PRODUCTION QUANTITY - 120 DAYS AFTER DATE OF CONTRACT AT A MINIMUM RATE OF 75 EACH PER MONTH UNTIL COMPLETE
ITEM
SHIP TO ADDRESS

FIRST ARTICLES ONLY

W16H1F

WATERVLIET ARSENAL

VENDOR QUALITY & GAGE CALIBRATION WORKING GROUP

BLDG. #35E, ATTN: TAWV-OD(Q)

WATERVLIET, NY 12189-4000

PRODUCTION QUANTITIES ONLY

0001 or W16H1F

TRANSPORTATION OFFICER

WATERVLIET ARSENAL

BLDG. #35E, ATTN: TAWV-IML-S

SHIPPING AND RECEIVING

WATERVLIET, NY 12189-4000

518-266-5769

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Within Days

After Date

Item No. Quantity of Contract

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of clause)

52.211-16 VARIATION IN QUANTITY (APR 1984)

(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.

(b) The permissible variation shall be limited to:

3 Percent increase 3 Percent decrease This increase or decrease shall apply to CLIN 0001 or 0002.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov;and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the ``Web Based Training'' link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Invoice and Receiving Report (COMBO)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Inspection Location: Destination Acceptance Location: Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAACHQ0303
Issue By DoDAACW911PT
Admin DoDAACW911PT
Inspect By DoDAACW16H1F
Ship To CodeW16H1F
Ship From CodeNot Applicable
Mark For CodeNot Applicable
Service Approver (DoDAAC)Not Applicable
Service Acceptor (DoDAAC)Not Applicable
Accept at Other DoDAACNot Applicable
LPO DoDAACNot Applicable
DCAA Auditor DoDAACNot Applicable
Other DoDAAC(s)Not Applicable

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the ``Send Additional Email Notifications'' field of WAWF once a document is submitted in the system.

Not Applicable

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Latelia Harris, Contract Specialist, 518-266-4608

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

Section H - Special Contract Requirements

LOCAL NARATIVES - SECTION H

CRITICAL MILITARY TECHNOLOGY (APR 1988) ((ACC-WRN(WVA))

The documents, drawings (microfilms) listed herein contain critical military technology that is owned by the United States Government, Watervliet Arsenal. These documents, drawings (microfilm) are not to be used for any purpose other than the purpose for which they are furnished, nor shall they be distributed or reproduced for any purpose, nor any part of their contents revealed in any manner, to persons other than the individuals or organizations specified to receive it, or their employees, without written consent of the Watervliet Arsenal.

LIST OF DOCUMENTS/DRAWING NO.

12901193, Revision Initial Release

(End of Narative)

DISCLOSURE OF WATERVLIET ARSENAL TECHNOLOGY (APR 2005) (ACC-WRN(WVA))

In accordance with, Title 10 of the U.S. Code Section 4542, no Cannon Production Technology as defined herein, may be furnished to any foreign source or representative thereof. Therefore, solicitations and subsequent contracts for this requirement will be confined only to United States, Puerto Rico, and Canada which are considered part of the United States Industrial Base.

Cannon Production Technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside the offeror’s/contractor’s firm and/or the United States of America (the latter prohibition includes, but is not limited to, disclosure to the offeror’s/contractor’s foreign subsidiaries, affiliates, etc.) nor will such technology be used to manufacture cannon (as defined below) or other defense items being manufactured or developed at Watervliet Arsenal, in response to requests from anyone other than Watervliet Arsenal, without prior written approval of Watervliet Arsenal (WVA).

The offeror/contractor is hereby notified that any breach by him/her of the above provision may legally be pursued by the Government as a breach of implied contract (with respect to an offeror) or breach in contract (with respect to the firm awarded the contract). The offeror/contractor is hereby also placed on written notice that any damages the Government chooses to pursue for such breach may include any consequential damages for which the offeror/contractor would be liable. In addition, injunctive relief may be pursued in the event of violation of the above provision.

If prior approval of Watervliet Arsenal has been obtained, as required by the above provision, any subcontract is involved, the contractor shall insert the substance of this provision (that is, the first three full paragraphs above) in such subcontract. Failure of the contractor to include this provision in any subcontract may be pursued by the Government as a breach of contract by the contractor whereby he/she may be liable for any damage, to include consequential damages, caused Watervliet Arsenal due to unauthorized release or use of the data by the subcontractor.

Additionally, any drawings, specifications, or other technical data furnished with this solicitation need not be returned to the Watervliet Arsenal, but should be disposed of by the offeror, however care must be taken to assure disposal of the data is made in a manner which will comply with the terms of this provision.

DEFINITIONS

1. CANNON: is defined as a complete assembly consisting of a tube, breech mechanism, firing mechanism, and all integral components. It may include tube attachments and muzzle appendages. It is a component of a weapon system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars, and recoilless guns.

2. CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

a. TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

b. MANUFACTURING TECHNOLOGY: is technical knowledge, documentation, assistance, and equipment and machines used and useful in the manufacture of cannon.

(1) TECHNICAL KNOWLEDGE: is the know-how collected, trade secrets, production experience and special skills necessary for the production of cannon and is the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(2) TECHNICAL DOCUMENTATION: is manufacturing technical data; comprising drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions, and other information necessary and sufficient for the manufacture of cannon.

(3) TECHNICAL ASSISTANCE: is all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(4) EQUIPMENT AND MACHINES: are production machines, machine accessories, apparatuses, spare parts and tooling, complete and in such quantity and quality as to secure the proper operation of a plant for cannon manufacture.

Section I - Contract Clauses

LOCAL NARATIVES - SECTION I

PROMPT PAYMENT NOTICE TO FAR 52.232-25 (OCT 2003) (ACC-WRN(WVA))

(a)(5)(i) For the purposes of this clause referenced elsewhere herein, Government acceptance shall be deemed to have occurred constructively on the 30th day after the contractor delivered the supplies or performed the services.

52.202-1
Definitions
NOV 2013
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
MAY 2014
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2016
52.204-13
System for Award Management Maintenance
OCT 2016
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-5
Material Requirements
AUG 2000
52.211-15
Defense Priority And Allocation Requirements
APR 2008
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-14
Integrity of Unit Prices
OCT 2010
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2011
52.219-8
Utilization of Small Business Concerns
NOV 2016
52.219-14
Limitations On Subcontracting
JAN 2017
52.222-19
Child Labor -- Cooperation with Authorities and Remedies
JAN 2018
52.222-20
Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
MAY 2014
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-37
Employment Reports on Veterans
FEB 2016
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.