W911PT-16-R-0004
Section A - Solicitation/Contract Form
NOTICE
THE GOVERNMENT INTENDS TO MAKE ONLY ONE AWARD FOR A TOTAL QUANTITY OF 155 EACH OF THIS ITEM EITHER WITH THE FIRST ARTICLE REQUIREMENT (CLIN 0001) OR WITHOUT THE FIRST ARTICLE REQUIREMENT (CLIN 0002).
CLIN #0003 IS FOR AN OPTION OF UP TO 155 EACH. THE OFFEROR IS TO COMPLETE THE STEPLADDER PRICING IN ACCORDANCE WITH THE DIFFERENT RANGES LOCATED AT THE VERY BOTTOM OF PAGE #5 AND THE TOP OF PAGE 6 OF THE SOLICITATION. **DO NOT FILL OUT ONE PRICE FOR CLIN #0003 AT MIDDLE OF PAGE 5, PLEASE LEAVE THAT BLANK**.
THE GOVERNMENT WILL HAVE THE RIGHT TO EXERCISE THE OPTION QUANTITY. WE MAY EXERCISE THE ENTIRE QUANTITY AT ONE TIME OR MULTIPLE QUANTITIES AT DIFFERENT TIMES UP TO THE MAXIMUM QUANTITY OF 155 EACH (SEE CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY FOR MORE INFORMATION).
CLAUSES INCORPORATED BY FULL TEXT
52.0000-4009 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE (Dec 2012) (ACC-WRN)
This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
To be eligible to gain access to this export controlled TDP (via FedBizOpps) YOUR FIRM must have a current DD 2345, “Militarily Critical Technical Data Agreement” certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to http://www.dlis.dla.mil/jcp/, click on documents, and follow instructions provided. See Clause 52.0000-4008, “Technical Data Package Information” for estimated certification time. Upon receipt of certification, you may request the TDP in accordance with the instructions stated in the solicitation's clause entitled, “Technical Data Package (TDP) Information (52.0000-4008). Additionally, before furnishing this TDP to a subcontractor you must assure that they also have a current DD 2345.
Upon completion of the purposes for which Government Technical Data has been provided, you, your subcontractors, all your vendors and all sub-vendors, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed from you.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(End of Notice)
52.0000-4950 Disclosure of Unit Price Information (Jun 2004) (ACC-WRN (WVA))
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.
END OF CLAUSE
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 155 |
| Each |
FSC: 1015
FFP
FIRST ARTICLE REQUIRED - PLATE (FORGING) PER DWG. #11579871, REV. C (SHTS. 2 & 3); FOR: 81MM MORTAR. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENT LIST which is included herein as EXHIBIT A and GENERAL DATA DRAWINGS - ATTACHMENT A. INSPECTION REQUIRED.
MID: EH16UWV659EHM71
FOB: Destination
NSN: 11579871FG:19206
MILSTRIP: W16H1F6056025Z
PURCHASE REQUEST NUMBER: W16H1F6056025Z
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 155 |
| Each |
FSC: 1015
FFP
FIRST ARTICLE WAIVED - PLATE (FORGING) PER DWG. #11579871, REV. C (SHTS. 2 & 3); FOR: 81MM MORTAR. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENT LIST which is included herein as EXHIBIT A and GENERAL DATA DRAWINGS - ATTACHMENT A. INSPECTION REQUIRED.
MID: EH16UWV659EHM71
FOB: Destination
NSN: 11579871FG:19206
MILSTRIP: W16H1F6056025Z
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 155 |
| Each |
| OPTION |
| FSC: 1015 |
FFP
PLATE (FORGING) PER DWG. #11579871, REV. C (SHTS. 2 & 3); FOR: 81MM MORTAR. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENT LIST which is included herein as EXHIBIT A and GENERAL DATA DRAWINGS - ATTACHMENT A. INSPECTION REQUIRED.
FOB: Destination
NSN: 11579871FG:19206
NET AMT
STEPLADDER PRICING
| STEPLADDER NAME |
| ITEM NO |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 11579871 PLATE (FORGING) |
| 0003 |
| 5.00 |
| 40.00 |
| 41.00 |
| 80.00 |
| 81.00 |
| 120.00 |
| 121.00 |
| 155.00 |
52.0000-4200 NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS (Dec 2014) (ACC-WRN(WVA)):
IMPORTANT DELIVERY/QUALITY REQUIREMENTS:
ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.
ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).
PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.
PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.
NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.
WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:
“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”
POC - CONTRACT SPECIALIST/BUYER: Peter J. Haschytz II
TELEPHONE NUMBER: 518-266-3933
E-MAIL ADDRESS: peter.j.haschytz.civ@mail.mil
CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:
Please provide the following information for your company.
VENDOR NAME: _________________________
VENDOR POC: __________________________
POC PHONE: ____________________________
E-MAIL ADDRESS (see note below): __________________________
DUNS NUMBER _______________________
CAGE CODE (if known) __________________
TAX ID NUMBER ________________________
VENDOR FAX NUMBER ________________
NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be datafaxed.
AWCF BULK FUND ____ DOES X DOES NOT APPLY
POSTERS:
Walsh-Healey Act/Service Contract Act. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.
Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon Act” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”
These posters can be accessed electronically at http://www.dol.gov .
Hard copies of the posters will be made available upon request to the contracting officer.
PAYMENTS:
Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.
RELEASE OF INFORMATION:
The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.apd.army.mil/pdffiles/r360_1.pdf
(END OF CLAUSE)
Section C - Descriptions and Specifications
EXHIBIT A
CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 & 0003
B. EXHIBIT A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A001
2. TITLE OF DATA ITEM: Certification/Data Report
3. SUBTITLE: Certified Test Report (CTR), Minor Forgings/Castings & Material (CN2)
4. AUTHORITY: DI-MISC-80678
5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With Each Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). Submit a CTR showing the results of all chemical and mechanical tests required by the drawing and/or specification. See QAP-APPX-WVA paragraph 4.6 for the requirement. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013
CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A002
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records – First Article Sample (CN 3)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: First Article Clause
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: *See Block 16
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/P
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Article
13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article
14. DISTRIBUTION:
A. ADDRESSEES: As specified in contract or purchase order
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit SMCWV Form 2005 showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 & 0003
B. EXHIBIT A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A003
2. TITLE OF DATA ITEM: Certification/Data Report
3. SUBTITLE: Certificate of Conformance (COC), NDT Applications (CN 9)
4. AUTHORITY: DI-MISC-80678
5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). See QAP-APPX-WVA paragraph 4.6 and 9 for the general requirements. The COC will also contain specific references to a specification or drawing for the acceptance standards, procedure and personnel qualifications. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 & 0003
B. EXHIBIT A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A004
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records, Production Components (CN12)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: QAP-APPX-WVA
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).
Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.
Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002 & 0003
B. EXHIBIT A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A005
2. TITLE OF DATA ITEM: Test Procedure
3. SUBTITLE: Penetrant Inspection Procedures (CN 24)
4. AUTHORITY: DI-NDTI-80603
5. CONTRACT REFERENCE: QAP-APPX-WVA and ASTM-E1417
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE: A
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/R
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: *See Block 16
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M, Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Submit procedures for review and approval by the procuring office. The minimum elements of the procedure are detailed in paragraphs 6.7 through 6.7.6 of ASTM-E1417. *With First Article or no later than 30 days prior to first production shipment when First Article is not required. Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil. Instructions and general guidance on documentation of CDRL and General Quality Assurance Provisions can be found at Watervliet Arsenal’s home page on the web at: http://www.wva.army.mil under “Doing Business with Watervliet Arsenal”.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
ATTACHMENT A
| DOC # |
| 6056025Z |
| WBS ELEMENT# |
| EH16UWV659EHM71 |
| DWG # |
| 11579871FG |
GENERAL DATA/GENERAL DRAWINGS
THIS TDP DOES NOT CONTAIN A SPECIFICATION OR STANDARD REQUIRING THE USE OF A CLASS I COC OR A CONTRACTUAL REQUIREMENT THAT CAN BE MET ONLY THROUGH USE OF SUCH A SUBSTANCE.
| DRAWING |
| REV |
| DATE |
| TITLE |
| 11579871 Sht. 2&3 |
| C |
| 061010 |
| Plate (Forging) |
| QAP-11579871 |
| G |
| 080312 |
| Plate (Forging & Finish Machined) |
ADDITIONAL DRAWINGS/DOCUMENTS
| DRAWING # |
| REV |
| DATE |
| TITLE |
QAP-APP-WVA
010301
GENERAL QUALITY ASSURANCE PROVISIONS
MILITARY/FEDERAL SPECIFICATIONS/STANDARDS
| NUMBER |
| REV |
| AMD |
| NOT |
| DATE |
| TITLE |
| DOD-STD-100 |
| Canceled |
| 011214 |
| Standard Practice For Engineering Drawings (Refer To ASME Y14.100, ASME Y14.24, ASME Y14.35M, ASME Y14.34M) |
| MIL-DTL-13931 |
| J |
| 2 |
| 141106 |
| Cannon: General Specification For |
SAE AMS-QQ-A-367
MIL-W-63150
D
120401 070208 Aluminum Alloy Forgings Weapons and Support Materiel Standard Quality Assurance Provisions for
INDUSTRY STANDARDS
| SOCIETY/NUMBER |
| YEAR |
| TITLE |
| ASME Y14.24 |
| 12 |
| Types And Applications Of Engineering Drawings |
| ASME Y14.34 |
| 13 |
| Associated Lists |
| ASME Y14.35 |
| 14 |
| Revision Of Engineering Drawings And Associated Documents |
| ASMEY14.100 |
| 13 |
| Engineering Drawing Practices |
ASTM E165/E165M
AIA/NAS NAS 410
Standard Practice for Liquid Penetrant Examination for General Industry NAS Certification & Qualification of Nondestructive Test Personnel - REV 4
52.0000-4008 TECHNICAL DATA PACKAGE (TDP) INFORMATION (JUL 2013) (ACC-WRN (WVA)
The TDP for this solicitation is available only in electronic format via FedBizOpps (https://www.fbo.gov). The Army Contracting Command – Warren (ACC-WRN) (WVA) has discontinued its practice of providing TDP’s via email or CD-Rom. You must obtain a copy of the TDP for this solicitation via the web at FedBizOpps.
This solicitation contains one or more web-located TDPs within FedBizOpps. If multiple Contract Line Item Numbers (CLINS) are listed below; each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN’s Web-located TDP on FedBizOpps. To access the TDP, you will have to copy or type the link’s URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the “Text Select Tool,” then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: 0001, 0002 & 0003
TDP Link (URL): Link is at solicitation page in FedBizOpps (FBO) website.
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select “Verify MPIN.”
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to http://www.dlis.dla.mil/jcp/ click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select “Request Explicit Access.” This will generate an email to the contract specialist at Army Contract Command - Warren (ACC-WRN) (WVA) with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 – 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the buyer with the completed “Use and Non-Disclosure Agreement” at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://www.fbo.gov - on the right is User Guides - click on “Vendor”.
[End of clause]
52.0000-4014 NOTICE TO VENDOR (Jun 2013) (ACC-WRN(WVA))
SOLICITATION:
Requests for applicable attachments to this procurement must be received within 5 calendar days from the solicitation issue date. Applicable attachments may consist of one or more of the following:
| Drawings |
| Specifications |
| Statement of Work |
| Certifications |
These requests must be in writing and include the following information: Name of company, address, phone number, fax number, e-mail address, name of requestor, CAGE and DUNS number, if known. Requests can be e-mailed to the contract specialist's e-mail address as shown in "Notice of Watervliet Arsenal Information/Requirements" at Clause 52.0000-4200. (IT IS MANDATORY THAT YOU INCLUDE IN THE SUBJECT LINE THE RFQ NUMBER), datafaxed to 518-266-4682 or mailed to DEPARTMENT OF THE ARMY, ATTN: CCTA-HDW/(insert the agent name)/ Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000. NO TELEPHONE REQUESTS WILL BE ACCEPTED.
IF YOU EXPERIENCE DIFFICULTIES READING THE WEB DOCUMENT, PLEASE CONTACT THE INDIVIDUAL SHOWN IN BLOCK 5B OF THE SOLICITATION. THEY CAN THEN FURNISH YOU A COPY OF DOCUMENT VIA E-MAIL.
RESULTANT AWARDS:
The resultant awardee will be provided a copy of the award document without the attachments. This is assuming that the vendor has retained a copy of the attachments associated with the solicitation. If you need copies of the attachments, please e-mail a request to the contract specialist e-mail address in "Notice of Watervliet Arsenal Information/Requirements" in Clause 52.0000-4200 (IT’S MANDATORY THAT YOU INCLUDE IN THE SUBJECT LINE THE ORDER NUMBER), or call the contract specialist shown in clause 52.0000-4200.
(END OF NOTICE)
52.0000-4020 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES (MAR 2015) (ACC-WRN)
a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management (see clause 52.204-4959 “Trusted Associate Sponsorship System (TASS) Program” (Local ACC-WRN (WVA)).
c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see “Watervliet Arsenal (WVA) Information For Contractors” incorporated by reference in ACC-WRN (WVA) notice 52.0000-4200, “Notice of Watervliet Arsenal Information/Requirements” and available at: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf ) or at OCONUS locations, in accordance with Status of Forces Agreement and other theater regulations.
(End of Clause)
52.0000-4104 SCOPE OF WORK/IDENTIFICATION OF CASTING/FORGING MANUFACTURER (Aug 1993) (ACC-WRN(WVA))
If the offeror intends to subcontract the manufacture of a casting/forging required by this solicitation, he must indicate herein who will furnish the basic casting/forging. After award of a contract, any change of this subcontractor will not be made without prior approval of the contracting officer.
(END OF SCOPE OF WORK)
Section E - Inspection and Acceptance
INSPECTION/ACCEPTANCE CRITERIA
| DOC # |
| 6056025Z |
| WBS ELEMENT# |
| EH16UWV659EHM71 |
| DWG # |
| 11579871FG |
INSPECTION AND ACCEPTANCE/FIRST ARTICLE CLAUSE REQUIREMENTS
52.0000-4901 PLACE OF INSPECTION AND ACCEPTANCE
Government inspection/acceptance will be made by the authorized Government Representative located at:
| Inspection | Acceptance | |
| [ X] Watervliet Arsenal | [ X] Watervliet Arsenal | |
| [ ] Contractor’s Plant | [ ] Contractor’s Plant |
52.0000-4917 GENERAL QUALITY ASSURANCE PROVISIONS (Jun 1996) (ACC-WRN(WVA))
Contractor requirements and inspection provisions are required in accordance with QAP-APPENDIX-WVA and the item QAP(s) (if applicable).
(END OF CLAUSE)
52.0000-4871 LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))
When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical/chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor’s expense when so directed by the Contracting Officer.
(END OF CLAUSE)
52.246-11 HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (Dec 2014)
The contractor shall comply with the higher-level quality standard selected below.
TITLE NUMBER DATE TAILORING
| [ ] Model for Quality Assurance | ANSI/ISO/ | In effect on date of | ______________ |
| in design, development, | ASQC-Q9001 | contract |
production, installation and servicing
| [ ] Model Quality Assurance | ISO-9001 | In effect on date of ______________ | |
| in production, installation | (ANSI/ISO/ | contract | |
| and servicing | ASQC-Q9001) |
[ ] Equivalent Quality System Program
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
52.209-4 Alt I FIRST ARTICLE APPROVAL – GOVERNMENT TESTING (Sep 1989) – ALTERNATE I (Jan 1997)
(a) The contractor shall deliver Two Plates (Forgings) Dwg #11579871 Rev C, sheet 2&3 unit(s) of Lot/Item 0001 within 120 calendar days from the date of this contract to the Government at:
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORK GROUP
BLDG #35-E, ATTN: TAWV-ODQ-M
WATERVLIET, NY 12189-4050
for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 30 calendar days after the government receives the first article, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(j) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of clause)
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
Section F - Deliveries or Performance
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
52.0000-4202 DELIVERY INFORMATION (Dec 2015) (ACC-WRN(WVA))
NOTICE: NORMAL DELIVERY HOURS FOR RECEIPT OF SUPPLIES AT WATERVLIET ARSENAL ARE AS FOLLOWS:
Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST
Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST
Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2016 to be closed is January 8, 2016.
BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.
Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.
THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.
ITEM DESCRIPTION:
The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor’s expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor’s documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM QUANTITY DELIVERY
| 0001 | AS STATED | FIRST ARTICLE – WITHIN 120 DAYS AFTER DATE OF | |
| CONTRACT. |
PRODUCTION QUANTITY – WITHIN 60 DAYS OF FIRST
ARTICLE APPROVAL AT THE RATE OF 75 PER MONTH UNTIL
COMPLETE.
OR
0002 AS STATED PRODUCTION QUANTITY – WITHIN 150 DAYS AFTER DATE
OF CONTRACT AT THE RATE OF 75 PER MONTH UNTIL
COMPLETE.
0003 155 EACH MAX OPTION QUANTITY - WITHIN 120 DAYS OF EACH EXERCISED MODIFICATION FOR OPTION QUANTITY AT THE RATE OF 75 PER MONTH UNTIL COMPLETE.
SHIP TO ADDRESS:
ITEM ADDRESS
| 0001 | W16H1F | |
| FIRST ARTICLE | WATERVLIET ARSENAL |
VENDOR QUALITY & GAGE CALIBRATION WORKING GROUP
BLDG. #35E, ATTN: TAWV-OD(Q)
WATERVLIET, NY 12189-4000
| 0001 OR 0002 (PRODUCTION | W16H1F | |
| QUANTITY) | TRANSPORTATION OFFICER | |
| & 0003 (OPTION QUANTITY) | WATERVLIET ARSENAL |
TAWV-IML-S/BLDG. 35
SHIPPING AND RECEIVING
WATERVLIET, NY 12189-4000
518-266-5769
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
INVOICE AND RECEIVING REPORT (COMBO)
Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
INSPECTION LOCATION: DESTINATION
ACCEPTANCE LOCATION: DESTINATION
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF
| Pay Official DoDAAC | HQ0303 | ||
| Issue By DoDAAC | W911PT | ||
| Admin DoDAAC | W911PT | ||
| Inspect By DoDAAC | W16H1F | ||
| Ship To Code | W16H1F | ||
| Ship From Code | Not applicable | ||
| Mark For Code | Not applicable | ||
| Service Approver (DoDAAC) | Not applicable | ||
| Service Acceptor (DoDAAC) | Not applicable | ||
| Accept at Other DoDAAC | Not applicable | ||
| LPO DoDAAC | Not applicable | ||
| DCAA Auditor DoDAAC | Not applicable | ||
| Other DoDAAC(s) | Not applicable |
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Not applicable
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Peter J. Haschytz II, Contract Specialist, 518-266-3933
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
52.0000-4058 CRITICAL MILITARY TECHNOLOGY (APR 1988) ((ACC-WRN(WVA))
The documents, drawings (microfilms) listed herein contain critical military technology that is owned by the United States Government, Watervliet Arsenal. These documents, drawings (microfilm) are not to be used for any purpose other than the purpose for which they are furnished, nor shall they be distributed or reproduced for any purpose, nor any part of their contents revealed in any manner, to persons other than the individuals or organizations specified to receive it, or their employees, without written consent of the Watervliet Arsenal.
LIST OF DOCUMENTS/DRAWING NO.
11579871 & QAP 11579871
52.0000-4471 DISCLOSURE OF WATERVLIET ARSENAL TECHNOLOGY (APR 2005) (ACC-WRN(WVA))
In accordance with, Title 10 of the U.S. Code Section 4542, no Cannon Production Technology as defined herein, may be furnished to any foreign source or representative thereof. Therefore, solicitations and subsequent contracts for this requirement will be confined only to United States, Puerto Rico, and Canada which are considered part of the United States Industrial Base.
Cannon Production Technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside the offeror’s/contractor’s firm and/or the United States of America (the latter prohibition includes, but is not limited to, disclosure to the offeror’s/contractor’s foreign subsidiaries, affiliates, etc.) nor will such technology be used to manufacture cannon (as defined below) or other defense items being manufactured or developed at Watervliet Arsenal, in response to requests from anyone other than Watervliet Arsenal, without prior written approval of Watervliet Arsenal (WVA).
The offeror/contractor is hereby notified that any breach by him/her of the above provision may legally be pursued by the Government as a breach of implied contract (with respect to an offeror) or breach in contract (with respect to the firm awarded the contract). The offeror/contractor is hereby also placed on written notice that any damages the Government chooses to pursue for such breach may include any consequential damages for which the offeror/contractor would be liable. In addition, injunctive relief may be pursued in the event of violation of the above provision.
If prior approval of Watervliet Arsenal has been obtained, as required by the above provision, any subcontract is involved, the contractor shall insert the substance of this provision (that is, the first three full paragraphs above) in such subcontract. Failure of the contractor to include this provision in any subcontract may be pursued by the Government as a breach of contract by the contractor whereby he/she may be liable for any damage, to include consequential damages, caused Watervliet Arsenal due to unauthorized release or use of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .