W911PT-16-Q-0032.docx

DOCX document 122 KB Posted

Attached to
Machine & Facility Maintenance for MF100 in Cairo, EGY Federal contract opportunity
Solicitation number
W911PT16Q0032
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Solicitation and Scope of Work

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT-16-Q-0032

Section SF 30 - BLOCK 14 CONTINUATION PAGE

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Invoice 2-in-1 (Services Only)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Not Applicable

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAACHQ0303
Issue By DoDAACW911PT
Admin DoDAACW911PT
Inspect By DoDAACN/A
Ship To CodeN/A
Ship From CodeN/A
Mark For CodeN/A
Service Approver (DoDAAC)N/A
Service Acceptor (DoDAAC)W911PT
Accept at Other DoDAACN/A
LPO DoDAACN/A
DCAA Auditor DoDAACN/A
Other DoDAAC(s)N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

N/A

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N/A

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Maintenance of Machines & Facilities

FFP

Base Year Provide preventative maintenance for electronic and mechanical repair of all new and existing machines and equipment used in Military Factory (MF) 100 Egypt for the manufacture of the 120 MM cannon and mount per scope of work.

Prices will be inclusive of all labor to adequately staff the facility's maintenance needs year round with material equipment for the work to be staffed;

Travel shall be within the Joint Travel Regulations, and costs are inclusive of flights, per diem, lodging and car rental and/or transportation to and from the work site.

Coverage will be for work days during regular working hours, not inclusive of Egyptian Holidays or Ramadan.

Contracting Officer Representative is Alan Burke.

Monthly Billings in Arrears is authorized.

ALL VENDORS SUBMITTING A BID MUST READ ALL RESTRICTIONS AND REQUIREMENTS OF TRAVELING TO EGYPT: Security and Restrictions On Traveling In Certain Regions Of Egypt; Visa and Passport Requirements; Limitation On Healthcare; and Travel Over 30 Days In Country.

All Information Is Available At: http://travel.state.gov/content/passports/english/country/egypt.html

MID: MIPRTBD

FOB: Destination

NSN: AASSV151950009

PURCHASE REQUEST NUMBER: FMS151950009

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Spare Parts

Contractor shall provide spare parts on an as needed basis. This is a not to exceed line item. Each product provided shall be backed up with appropriate quote or substantiation of price.

Products are allowed to be marked up in agreed upon percentage of______ (fill in for evaluation).

It is estimated this line item will be a not to exceed of $25,000. Funds not used will be deobligated, and there is no minimum guarantee of this item.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Contract Data Requirements List

Contractor shall provide weekly status reports for all machines in the facility, per CDRL A001.

Contractor shall also provide monthly reporting of all work completed and machine conditions (summary of weekly reports) per CDRL A002.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Maintenance of Machines & Facilities

FFP

Option Year 1 Provide preventative maintenance for electronic and mechanical repair of all new and existing machines and equipment used in Military Factory (MF) 100 Egypt for the manufacture of the 120 MM cannon and mount per scope of work.

Prices will be inclusive of all labor to adequately staff the facility's maintenance needs year round with material equipment for the work to be staffed;

Travel shall be within the Joint Travel Regulations, and costs are inclusive of flights, per diem, lodging and car rental and/or transportation to and from the work site.

Coverage will be for work days during regular working hours, not inclusive of Egyptian Holidays or Ramadan.

Contracting Officer Representative is Alan Burke.

Monthly Billings in Arrears is authorized.

ALL VENDORS SUBMITTING A BID MUST READ ALL RESTRICTIONS AND REQUIREMENTS OF TRAVELING TO EGYPT: Security and Restrictions On Traveling In Certain Regions Of Egypt; Visa and Passport Requirements; Limitation On Healthcare; and Travel Over 30 Days In Country.

All Information Is Available At: http://travel.state.gov/content/passports/english/country/egypt.html

MID: MIPRTBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Spare Parts

FFP

Contractor shall provide spare parts on an as needed basis. This is a not to exceed line item. Each product provided shall be backed up with appropriate quote or substantiation of price.

Products are allowed to be marked up in agreed upon percentage of______ (fill in for evaluation).

It is estimated this line item will be a not to exceed of $25,000. Funds not used will be deobligated, and there is no minimum guarantee of this item.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List

FFP

Contractor shall provide weekly status reports for all machines in the facility, per CDRL A001.

Contractor shall also provide monthly reporting of all work completed and machine conditions (summary of weekly reports) per CDRL A002.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Maintenance of Machines & Facilities

FFP

Option Year 2 Provide preventative maintenance for electronic and mechanical repair of all new and existing machines and equipment used in Military Factory (MF) 100 Egypt for the manufacture of the 120 MM cannon and mount per scope of work.

Prices will be inclusive of all labor to adequately staff the facility's maintenance needs year round with material equipment for the work to be staffed;

Travel shall be within the Joint Travel Regulations, and costs are inclusive of flights, per diem, lodging and car rental and/or transportation to and from the work site.

Coverage will be for work days during regular working hours, not inclusive of Egyptian Holidays or Ramadan.

Contracting Officer Representative is Alan Burke.

Monthly Billings in Arrears is authorized.

ALL VENDORS SUBMITTING A BID MUST READ ALL RESTRICTIONS AND REQUIREMENTS OF TRAVELING TO EGYPT: Security and Restrictions On Traveling In Certain Regions Of Egypt; Visa and Passport Requirements; Limitation On Healthcare; and Travel Over 30 Days In Country.

All Information Is Available At: http://travel.state.gov/content/passports/english/country/egypt.html

MID: MIPRTBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
Spare Parts

FFP

Contractor shall provide spare parts on an as needed basis. This is a not to exceed line item. Each product provided shall be backed up with appropriate quote or substantiation of price.

Products are allowed to be marked up in agreed upon percentage of______ (fill in for evaluation).

It is estimated this line item will be a not to exceed of $25,000. Funds not used will be deobligated, and there is no minimum guarantee of this item.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List

FFP

Contractor shall provide weekly status reports for all machines in the facility, per CDRL A001.

Contractor shall also provide monthly reporting of all work completed and machine conditions (summary of weekly reports) per CDRL A002.

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0002
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0003
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0004
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0005
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0006
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0007
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0008
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

0009
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government
MILITARY FACTORY 100, CARIO, EGYPT

MILITARYFACTORY 100

CARIO

Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC
0001
POP 01-MAR-2016 TO

28-FEB-2017

N/A
N/A
0002
POP 01-MAR-2016 TO

28-FEB-2017

N/A
N/A
0003
N/A
N/A
N/A
N/A
0004
POP 01-MAR-2017 TO

28-FEB-2018

N/A
N/A
0005
POP 01-MAR-2017 TO

28-FEB-2018

N/A
N/A
0006
N/A
N/A
N/A
N/A
0007
POP 01-MAR-2018 TO

28-FEB-2019

N/A
N/A
0008
POP 01-MAR-2018 TO

28-FEB-2019

N/A
N/A
0009
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.203-3
Gratuities
APR 1984
52.203-6 Alt I
Restrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I
OCT 1995
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7
System for Award Management
JUL 2013
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2015
52.204-13
System for Award Management Maintenance
JUL 2013
52.204-16
Commercial and Government Entity Code Reporting
JUL 2015
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-7
Information Regarding Responsibility Matters
JUL 2013
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1
Instructions to Offerors--Commercial Items
OCT 2015
52.212-4
Contract Terms and Conditions--Commercial Items
MAY 2015
52.212-5 (Dev)
Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Deviation 2013-O0019)
DEC 2015
52.214-34
Submission Of Offers In The English Language
APR 1991
52.214-35
Submission Of Offers In U.S. Currency
APR 1991
52.217-5
Evaluation Of Options
JUL 1990
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2011
52.219-8
Utilization of Small Business Concerns
OCT 2014
52.219-14
Limitations On Subcontracting
NOV 2011
52.222-35
Equal Opportunity for Veterans
OCT 2015
52.222-37
Employment Reports on Veterans
OCT 2015
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-46
Evaluation Of Compensation For Professional Employees
FEB 1993
52.222-50
Combating Trafficking in Persons
MAR 2015
52.223-16 Alt I
Acquisition of EPEAT - Registered Personal Computer Products - Alternate I
JUN 2014
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.228-3
Worker's Compensation Insurance (Defense Base Act)
JUL 2014
52.229-6
Taxes--Foreign Fixed-Price Contracts
FEB 2013
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
JUL 2013
52.233-3
Protest After Award
AUG 1996
52.242-13
Bankruptcy
JUL 1995
52.242-15
Stop-Work Order
AUG 1989
52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.249-4
Termination For Convenience Of The Government (Services) (Short Form)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
System for Award Management Alternate A
FEB 2014
252.204-7008 (Dev)
Compliance with Safeguarding Covered Defense Information Controls
OCT 2015
252.204-7012 (Dev)
Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2015
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.222-7002
Compliance With Local Labor Laws (Overseas)
JUN 1997
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.225-7001
Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2012
252.225-7012
Preference For Certain Domestic Commodities
FEB 2013
252.225-7013
Duty-Free Entry--Basic (Nov 2014)
NOV 2014
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.225-7041
Correspondence in English
JUN 1997
252.225-7993 (Dev)
Prohibition on Providing Funds to the Enemy (Deviation 2015-O0016)
SEP 2015
252.225-7994 (Dev)
Additional Access to Contractor and Subcontractor Records in the United States Central Command Theater of Operations (Deviation)
MAR 2015
252.225-7995 (Dev)
Contractor Personnel Performing in the United States Central Command Area of Responsibility (Deviation)
JAN 2015
252.226-7001
Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.229-7000
Invoices Exclusive of Taxes or Duties
JUN 1997
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7008
Assignment of Claims (Overseas)
JUN 1997
252.232-7010
Levies on Contract Payments
DEC 2006
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
DEC 2012
252.247-7023
Transportation of Supplies by Sea
APR 2014
252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

52.0000-4002 REQUEST FOR QUOTE RESPONSES (Aug 2015) (ACC-WRN (WVA))

*** NOTICE – Vendors should not use the ASFI Bid Response System for submitting quote responses to this office as of 10 August 2015****

ALL RESPONSES MUST BE ELECTRONIC. YOU MAY SUBMIT YOUR QUOTE RESPONSES USING ONE OF THE FOLLOWING METHODS:

Email to matthew.b.pember.civ@mail.mil

Fax to 518-266-4627

As of 10 August 2015, you may use the Federal Business Opportunities (FBO) System. Offers received after this date using the ASFI Bid Response System (ASFI BRS), may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

1. Vendors must login to the FBO System to be able to submit electronic responses for opportunities.

1. Vendors must also registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

1. Once logged into the FBO System, vendors will be asked to enter basic information and then will be directed to upload one or more files containing the offer and any additional information as outlined in the solicitation.

1. FBO will send an email to the email address on file for the user confirming the electronic submission.

1. For additional information on submitting electronic bid responses via the Federal Business Opportunities System reference the FBO Vendor Guide – Section 4.3.1 Submitting an Electronic Response Topic (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).

REQUEST FOR QUOTES MUST BE FILLED OUT COMPLETELY AND SENT IN ITS ENTIRETY TO BE CONSIDERED RESPONSIVE.

(END OF NOTICE)

52.0000-4020 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES (MAR 2015) (ACC-WRN)

a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management (see clause 52.204-4959 “Trusted Associate Sponsorship System (TASS) Program” (Local ACC-WRN (WVA)).

c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see “Watervliet Arsenal (WVA) Information For Contractors” incorporated by reference in ACC-WRN (WVA) notice 52.0000-4200, “Notice of Watervliet Arsenal Information/Requirements” and available at: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf ) or at OCONUS locations, in accordance with Status of Forces Agreement and other theater regulations.

(End of Clause)

52.0000-4200 NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS (Dec 2014) (ACC-WRN(WVA)):

IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Matt Pember

TELEPHONE NUMBER: 518-266-5631

E-MAIL ADDRESS: matthew.b.pember.civ@mail.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: _________________________

VENDOR POC: __________________________

POC PHONE: ____________________________

E-MAIL ADDRESS (see note below): __________________________

DUNS NUMBER _______________________

CAGE CODE (if known) __________________

TAX ID NUMBER ________________________

VENDOR FAX NUMBER ________________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be datafaxed.

AWCF BULK FUND ____ DOES _x__ DOES NOT APPLY

POSTERS:

Walsh-Healey Act/Service Contract Act. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon Act” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

These posters can be accessed electronically at http://www.dol.gov .

Hard copies of the posters will be made available upon request to the contracting officer.

PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.apd.army.mil/pdffiles/r360_1.pdf

(END OF CLAUSE)

52.0000-4201 SERVICES/CONSTRUCTION REQUIREMENTS (Jan 2016) (ACC-WRN(WVA)):

SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to "JOB".

WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

1. The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

2. Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

3. Definitions:

a. CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components. It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

b. CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used an/or useful in the manufacturing of cannon.

(a) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(b) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(c) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(d) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE

JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2016 to be closed is January 8, 2016.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

52.0000-4202 DELIVERY INFORMATION (Dec 2015) (ACC-WRN(WVA))

NOTICE: NORMAL DELIVERY HOURS FOR RECEIPT OF SUPPLIES AT WATERVLIET ARSENAL ARE AS FOLLOWS:

Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST

Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2016 to be closed is January 8, 2016.

BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.

Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.

THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.

ITEM DESCRIPTION:

The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor’s expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor’s documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.

52.0000-4204 FOREIGN MILITARY SALES (JUL 1999) (ACC-WRN(WVA))

The following data is furnished to identify the units under this item that is applicable to Foreign Military Sales:

QUANTITY CASE NO. WATERVLIET ARSENAL REFERENCE ONLY

0001 NG-B-NFY

Offerors must include the line/subline item any price increase required for use of government-owned production and research property. Rent-free use is no longer authorized for Foreign Military Sales requirements.

52.0000-4385 EVALUATION OF OPTION TO EXTEND SERVICES UNDER FAR 52.217-8 (OCT 2011) (ACC)

As part of the price evaluation, the Government will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half of the offeror’s final option period price to the offeror’s total price. Thus, the offeror’s total price for the purpose of the evaluation will include the base period, total of options, and one-half of the last year option to determine the price basis. Offerors are required only to price the base and each option. Offerors shall not submit a price for the potential one-half year extension of services period.

(End of Provision)

52.0000-4702 HQ-AMC-LEVEL PROTEST PROCEDURES (Oct 2013) (ACC-WRN)

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/amc/commandcounsel.html

An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.

52.0000-4950 Disclosure of Unit Price Information (Jun 2004) (ACC-WRN (WVA))

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.

END OF CLAUSE

52.0000-4953 ORDER OF PRECEDENCE (Jan 2006) (ACC-WRN)

(a) In accordance with Army Policy issued 12 Jul 05, subject: Proper Use of Non-Department of Defense (Non-DoD) contracts, DoD unique terms have been added to this order.

(b) In the event a conflict or inconsistency exists between the terms of this order and the terms and conditions of the underlying contract, the terms and conditions of this order shall govern.

52.0000-4963 ALL OR NONE – COMMERCIAL ITEM ACQUISITION) (APR 2009) (ACC-WRN (WVA))

This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTION TO OFFERORS—COMMERCIAL ITEMS. Paragraph (h) is modified to say that you must offer to provide the total quantity of the items in this solicitation. ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL NOT BE CONSIDERED FOR AWARD.

52.0000-4968 Notice for AbilityOne Subcontracting Goal Credit (Jan 2010) (ACC-WRN)

"Note: In accordance with Public Law 102-396, AbilityOne organizations will be afforded the maximum practical opportunity to participate as subcontractors and suppliers in the performance of this contract.

As prescribed by 10 U.S.C. 2410d and Section 9077 of Public Law 102-396, and in accordance with DFARS 219.703, Eligibility requirements for participating in the program, offerors may receive credit towards the small business subcontracting goal for subcontracts placed with qualified nonprofit agencies participating in the AbilityOne program. AbilityOne organizations are qualified nonprofit agencies for the blind and other severely disabled that are approved by the Committee for Purchase from People Who Are Blind or Severely Disabled under the Javits-Wagner-O'Day Act (41 U.S.c. 46-48).

For additional information on AbilityOne's program and products see http://www.abilityone.gov/index.html. For additional information on DoD activities in support of AbilityOne see http://www.acq.osd.mil/dpap/cpic/cp/abilityone_program.html.

(End of provision)

52.203-16 Preventing Personal Conflicts of Interest (DEC 2011)

(a) Definitions. As used in this clause--

Acquisition function closely associated with inherently governmental functions means supporting or providing advice or recommendations with regard to the following activities of a Federal agency:

(1) Planning acquisitions.

(2) Determining what supplies or services are to be acquired by the Government, including developing statements of work.

(3) Developing or approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria.

(4) Evaluating contract proposals.

(5) Awarding Government contracts.

(6) Administering contracts (including ordering changes or giving technical direction in contract performance or contract quantities, evaluating contractor performance, and accepting or rejecting contractor products or services).

(7) Terminating contracts.

(8) Determining whether contract costs are reasonable, allocable, and allowable.

Covered employee means an individual who performs an acquisition function closely associated with inherently governmental functions and is--

(1) An employee of the contractor; or

(2) A subcontractor that is a self-employed individual treated as a covered employee of the contractor because there is no employer to whom such an individual could submit the required disclosures.

Non-public information means any Government or third-party information that--

(1) Is exempt from disclosure under the Freedom of Information Act (5 U.S.C. 552) or otherwise protected from disclosure by statute, Executive order, or regulation; or

(2) Has not been disseminated to the general public and the Government has not yet determined whether the information can or will be made available to the public.

Personal conflict of interest means a situation in which a covered employee has a financial interest, personal activity, or relationship that could impair the employee's ability to act impartially and in the best interest of the Government when performing under the contract. (A de minimis interest that would not ``impair the employee's ability to act impartially and in the best interest of the Government'' is not covered under this definition.)

(1) Among the sources of personal conflicts of interest are--

(i) Financial interests of the covered employee, of close family members, or of other members of the covered employee's household;

(ii) Other employment or financial relationships (including seeking or negotiating for prospective employment or business); and

(iii) Gifts, including travel.

(2) For example, financial interests referred to in paragraph (1) of this definition may arise from--

(i) Compensation, including wages, salaries, commissions, professional fees, or fees for business referrals;

(ii) Consulting relationships (including commercial and professional consulting and service arrangements, scientific and technical advisory board memberships, or serving as an expert witness in litigation);

(iii) Services provided in exchange for honorariums or travel expense reimbursements;

(iv) Research funding or other forms of research support;

(v) Investment in the form of stock or bond ownership or partnership interest (excluding diversified mutual fund investments);

(vi) Real estate investments;

(vii) Patents, copyrights, and other intellectual property interests; or

(viii) Business ownership and investment interests.

(b) Requirements. The Contractor shall--

(1) Have procedures in place to screen covered employees for potential personal conflicts of interest, by--

(i) Obtaining and maintaining from each covered employee, when the employee is initially assigned to the task under the contract, a disclosure of interests that might be affected by the task to which the employee has been assigned, as follows:

(A) Financial interests of the covered employee, of close family members, or of other members of the covered employee's household.

(B) Other employment or financial relationships of the covered employee (including seeking or negotiating for prospective employment or business).

(C) Gifts, including travel; and

(ii) Requiring each covered employee to update the disclosure statement whenever the employee's personal or financial circumstances change in such a way that a new personal conflict of interest might occur because of the task the covered employee is performing.

(2) For each covered employee--

(i) Prevent personal conflicts of interest, including not assigning or allowing a covered employee to perform any task under the contract for which the Contractor has identified a personal conflict of interest for the employee that the Contractor or employee cannot satisfactorily prevent or mitigate in consultation with the contracting agency;

(ii) Prohibit use of non-public information accessed through performance of a Government contract for personal gain; and

(iii) Obtain a signed non-disclosure agreement to prohibit disclosure of non-public information accessed through performance of a Government contract.

(3) Inform covered employees of their obligation--

(i) To disclose and prevent personal conflicts of interest;

(ii) Not to use non-public information accessed through performance of a Government contract for personal gain; and

(iii) To avoid even the appearance of personal conflicts of interest;

(4) Maintain effective oversight to verify compliance with personal conflict-of-interest safeguards;

(5) Take appropriate disciplinary action in the case of covered employees who fail to comply with policies established pursuant to this clause; and

(6) Report to the Contracting Officer any personal conflict-of-interest violation by a covered employee as soon as it is identified. This report shall include a description of the violation and the proposed actions to be taken by the Contractor in response to the violation. Provide follow-up reports of corrective actions taken, as necessary. Personal conflict-of-interest violations include--

(i) Failure by a covered employee to disclose a personal conflict of interest;

(ii) Use by a covered employee of non-public information accessed through performance of a Government contract for personal gain; and

(iii) Failure of a covered employee to comply with the terms of a non-disclosure agreement.

(c) Mitigation or waiver. (1) In exceptional circumstances, if the Contractor cannot satisfactorily prevent a personal conflict of interest as required by paragraph (b)(2)(i) of this clause, the Contractor may submit a request through the Contracting Officer to the Head of the Contracting Activity for--

(i) Agreement to a plan to mitigate the personal conflict of interest; or

(ii) A waiver of the requirement.

(2) The Contractor shall include in the request any proposed mitigation of the personal conflict of interest.

(3) The Contractor shall--

(i) Comply, and require compliance by the covered employee, with any conditions imposed by the Government as necessary to mitigate the personal conflict of interest; or

(ii) Remove the Contractor employee or subcontractor employee from performance of the contract or terminate the applicable subcontract.

(d) Subcontract flowdown. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts--

(1) That exceed $150,000; and

(2) In which subcontractor employees will perform acquisition functions closely associated with inherently governmental functions (i.e., instead of performance only by a self-employed individual).

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)

(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies in the pilot program on Contractor employee whistleblower protections established at 41 U.S.C. 4712 by section 828 of the National Defense Authorization Act for Fiscal Year 2013 (Pub. L. 112-239) and FAR 3.908.

(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in section 3.908 of the Federal Acquisition Regulation.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold.

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of Chief, Contracting Office and shall not be binding until so approved.

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

The significant evaluation factors, in the relative order of importance of the evaluation factors:

(i) technical capability of the item offered to meet the Government requirement;

(ii) price;

(iii) past performance (see FAR 15.304)

Technical and past performance, when combined, are equally as important as price in the evaluation.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2015) ALTERNATE I (OCT 2014)

The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (p) of this provision.

(a) Definitions. As used in this provision-- “Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Forced or indentured child labor” means all work or service—

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .