W911N2-16-T-0037-0001.pdf
PDF 51 KB Posted
- Attached to
- Relocation of Goff Rotary Blast Table Federal contract opportunity
- Solicitation number
- W911N2-16-T-0037
About this file
Question and Answer Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_W911N2-16-T-0037.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALLEN G. MILLER JR.
LETTERKENNY CONTRACTING OFFICE
1 OVERCASH AVENUE CCAM-DPD
717-267-8714
CHAMBERSBURG PA 17201-4150
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions and to extend the closing date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911N2-16-T-0037
X 9B. DATED (SEE ITEM 11)
27-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jul-2016
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911N2
FACILITY CODECODE
EMAIL:TEL:
W911N2-16-T-0037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
W911N2-16-T-0037 Questions
Q1. What is the length / width and height of the roll off? (The hopper or container that will be located under the dust collector for collection of dust). Normally we use 55 gallon drums but the spec. asked for the collector to be elevated to accept 6' high x 8' wide - how deep is it?
A1. The depth is the same as the width, 8’ deep.
Q2. What is the orientation of the roll off to the dust collector inlet/outlet? If we place the dust collector parallel or perpendicular to the building - will they be able to access the container?
A2. Parallel or perpendicular will work either way, but I think perpendicular would be best.
Q3. Measure the 6 ft. height from the rotary valve or the existing legs?
A3. In addition to the existing legs.
Q4. Height to be measured from the rotary valve discharge point?
A4. Correct, height of 6’ is to be measured from the rotary valve. .
Q5. 4.2 Individual component sizes and weights” Please provide a general arrangement drawing with sizes and weights of the components.
A5. Not available.
Q6. Will a dig permit be required for the 4 x 4 x 4 foundation?
A6. Not likely. Once whichever contractor is awarded the contract, they ought to provide a schematic of their planned installation in Bldg. 37 and whether or not digging will be required. It likely will not because the blast cabinet is just screwed into the floor, currently, in Bldg. 1.
Q7. Air is being returned via the HEPA filter to the inside of the building?
A7. Yes.
Q8. Is there a dbA requirement for sound attenuation for either the inside or the outside of this system?
A8. No.
Q9. Will NRTL certification shall be required for this system?
A9. No.
Q10. Are electrical schematics of the Table Blast Control Panel and the Dust Collector control panel available?
A10. Yes.
Q11. What is the weight of that blast tank?
A11. I don’t know. I could not find weights for the blast table or the dust collector.
Q12. Regarding the three fire suppression devices located on that system. Would you happen to know who the supplier / provider of those units may be?
A12. SSI Electric.
W911N2-16-T-0037
Q13. We would like to know if the Goff table machine and other equipment to be relocated is operational?
A13. Yes, it has routine PM-checks performed on it as well even though it has not been getting used much.
Q14. We would like to run all the equipment - to insure everything is operational and record the operating parameters - AMPs of all the motors/static pressures- etc.
A14. This sounds fine. I'm assuming that the contractor is asking about running the equipment prior to it being dissembled moved, in Bldg. 1. This is a good idea. Then the pre-move recordings can be compared to when we run the machine post-move, in Bldg. 37, after it is reassembled. Then we can see whether it's still operating at its full performance level.
Q15. Suggested adders:
a. Provide and install regulator / filter / drain for compressed air to dust collector manifold.
b. Provide and install Magnahelic gages for Primary filters for the dust collector and HEPA filters.
c. Access safety ladder and platform for filter / solenoid / diaphragm maint for the dust collector.
d. Wire brush / prime with 2 part epoxy and top coat with 2 part urethane paint – all carbon steel bolts / flanges and Exposed steel on the exterior dust collector.
e. Structure for dust collector to accommodate roll off container to be blasted, primed with 2 part epoxy, top coat with 2 part Urethane to match color of existing FARR collector.
A15. We’ve confirmed that we want the blast cabinet located all the way in the corner in Bldg. 37; not against the windows but in the corner. The front of the blast cabinet should face the hall so it can be loaded by a forklift. The blast cabinet should not affect the 2-ton crane located in the adjacent workspace.
Whichever contractor is awarded this contract, they should provide a schematic/plans for their installation of the blast cabinet, dust collector, etc. into Bldg. 37. Once PED in DOPS is provided with that schematic, we can ensure that utilities are installed thru DPW and that IRG is notified about holes in the wall.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Jun-2016 04:00 PM to 13-Jul-2016 04:00 PM.
(End of Summary of Changes)