W911KF25Q0012.pdf

PDF 1 MB Posted

Attached to
ASRS Cybersecurity Workshop Federal contract opportunity
Solicitation number
W911KF25Q0012
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This is a Request for Quotation (RFQ) for an ASRS (Automated Storage and Retrieval System) Cybersecurity Workshop issued by the Army Contracting Command-Detroit Arsenal at Anniston Army Depot. The solicitation (W911KF25Q0012) is sole-sourced to Dematic Corporation and requires the contractor to conduct a workshop to determine cybersecurity requirements for the ASRS solution and identify gaps in Dematic's system to ensure the lifecycle upgrade of the ASRS system is cyber compliant.

The RFQ was issued on December 10, 2024, with quotes due by January 7, 2025, at 10:00 AM local time. The period of performance is February 1, 2025, through March 31, 2025. This is an unrestricted procurement with a size standard of $15 million under NAICS code 611430. The work will be performed at Anniston Army Depot in Anniston, AL. The solicitation incorporates various FAR and DFARS clauses related to commercial items, including requirements for Wide Area Workflow (WAWF) payment processing and pollution prevention compliance.

View the file

Other files for this federal contract opportunity

Other files attached to ASRS Cybersecurity Workshop, newest first.
File Type Posted
Attachment 2 Evidence of Authority To Sign Offers.pdf PDF
Attachment 1_SOW ASRS Cyber Workshop draft 2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

( No Col lect Cal ls )

W911KF25Q0012 10-Dec-2024

b. TELEPHONE NUMBER

571-588-0975

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 07 Jan 2025

5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

( SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t . Use Only)

23.

CODE 10. TH IS ACQUISI TION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911KF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAM E

SARA B. YOUNG

2. CONTRACT NO. 3 . AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRI ATION DATA

1. REQUISITION NUMBER

20.

ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO I TEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN

% FOR:SET ASI DE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY

12. DI SCOUNT TERMS11. DELIVERY FOR FOB DESTI NA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLIC ITATION

RFQ IFB RFPX

ANNISTON ARM Y DEPOT

WORK TO BE PERFORMED AT

ANNISTON ARM Y DEPOT

ANNISTON AL 36201- 4199

TEL: FAX:

256 235-6353FAX:

TEL: 256 235-6231

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

611430

X

OFFER DATED

29. AW ARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY

COPI ES TO ISSUI NG OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN- OWNED

SM ALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF44

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEI VED INSPECTED

32b. SIGNATURE OF AUTHORI ZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATI VE

32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FI NALPARTIALCOMPLETE

36. PAY MENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHI P NUMBER

PARTI AL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT

41b. SIGNATURE AND TITLE OF CERTIFYI NG OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC 'D (YY/ MM/DD) 42d. TOTAL CONTAI NERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911KF25Q0012

Section SF 1449 - CONTINUATION SHEET

LOCAL NARRATIVES

NARRATIVE NN0001: SOLE SOURCE NOTIFICATION

This procurement is sole sourced to:

Dematic Corporation

265 S 5200 W, Salt Lake City, UT 84104-6007

ANY ORGANIZATION WHICH BELIEVES ITSELF TO BE IN POSSESSION OF THESE CAPABILITIES

CAN PROVIDE WRITTEN EVIDENCE TO THIS EFFECT TO THE CONTRACTING OFFICER

AND MAY BE CONSIDERED FOR FUTURE PROCUREMENT ACTIONS.

NARRATIVE NN0002: POINTS OF CONTACT

Contractor POC: TBD

ANAD POC: TBD

Contract Specialist: Sara B. Young, 571-588-0975, sara.b.young.civ@army.mil Contracting Officer: Larry D. Stephney, 571-588-0970, Larry.d.stephney.civ@army.mil

NARRATIVE NN0003: LIST OF ATTACHMENTS

The following documents are incorporated as a part of this solicitation:

1. Statement of work

2. Evidence of Authority

NARRATIVE AS6311: ELECTRONIC CONTRACTING

All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses shall not be accepted. Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission. All solicitation responses must be submitted by email to the contract specialist.

It is the responsibility of the offeror to confirm receipt and ensure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation.

Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.

Offers submitted using any other means shall not be accepted, unless stated otherwise in the solicitation.

The System for Award Management (SAM) provides industry with a single point of access to all U.S. Army contract opportunities. Offerors must be registered in SAM and complete the electronic annual representations and certifications within SAM before being able to respond to a solicitation. In order to register in SAM, a Data Universal Numbering System (DUNS) must first be obtained. After contract award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page:

WWW.SAM.GOV.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

The applicable SF Form (SF33/SF1449/SF18/SF1442) filled out and signed.

All applicable fill-in provisions from the solicitation must be completed.

Any other information required by the solicitation.

It is offeror responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you shall be determined non-responsive.

PASSWORDS: If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

FILE VIRUSES: Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.” See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

BID BOND: Any bid bond required by this solicitation must be submitted with the offer. The properly completed original bid bond must be furnished to the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

NARRATIVE NN0004: CONTRACTOR CHOICE OF PAYMENT

The contractor must accept payment be either Government Smart Pay Credit Card (MasterCard) or Defense Finance Accounting Service (DFAS).

PROVIDE THE FOLLOWING INFORMATION WITH ANY OFFER.

Chosen Payment Method: MasterCard _____ DFAS _____

Contractor Contact Information:

POC: _______________________________________________

Telephone Number: ____________________________________ FAX Number: ________________________________________ Email: ______________________________________________

If your order will be paid for by DFAS, you must submit your invoice through Wide Area Workflow (WAWF), accessible at https://piee.eb.mil/piee-landing/. Helpful information follows.

To obtain a CAGE code or for other assistance, contact the WAWF helpdesk at 1-866-618- 5988 Questions concerning payment should be directed to the responsible Defense Finance Accounting Services

(DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order.

You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL

EMAILS CORRECTLY THROUGH WAWF:

WAWF

Data/CODES

N eeded for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/ MATERIALS

(PRs that DO NOT start with W31G1Y)

CONSTRUCTION

CAGE CODE SAM Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN

BY DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY DODAAC

(If needed)

W31G1Y (Must have inspector code)

W911KF

W911KF

(Unless Inspected by DCMA)

W911KF

SHIP TO W911KF N/A W911KF W911KF

ACCEPTOR N/A W911KF N/A N/A

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

NARRATIVE LS7015: HQ-AMC LEVEL PROTEST PROCEDURES

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/ An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.

NARRATIVE CS1008: LOCAL RULES AND REGULATIONS

The following requirements apply to all contractors working inside the controlled area of Anniston Army Depot

(ANAD).

A. IDENTIFICATION OF CONTRACTOR EMPLOYEES

1. Contractors shall submit the name of a company point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office (ISMO) upon notification of contract award.

22. Upon contract award each individual requiring ANAD facility access, shall submit a request through the Visitor Pre-Registration System: https://pass.aie.army.mil/

Please see attachment, Pre-Registration Workflow, for instructions.

3. Submissions should only be made for persons who are current employees of the contractor or who hold a letter of intent to hire issued by the Contractor. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE

CONDUCTED BY ANNISTON ARMY DEPOT.

4. Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

5. Derogatory information that may cause denial of an individual’s access to ANAD includes, but it not limited to, the following:

Criminal arrest information that causes the Installation Commander to determine that the individual presents a potential threat to good order, discipline, or health and safety on the installation.

The installation is unable to verify the individual’s claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

The individual has a current arrest warrant regardless of the offense or violation.

The individual is currently barred from entry to a Federal installation or facility.

The individual has EVER been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

The individual has a U.S. conviction for espionage, sabotage, treason.

The individual is a registered sex offender.

The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

The individual has been convicted of a felony firearms or explosives violation.

The individual has engaged in acts or activities designed to overthrow the U.S. government by force.

The individual is identified in the Terrorist Screening database as a known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

B. ANAD NETWORK ACCESS.

For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.

C. CONTRACTOR OWNED PROPERTY

1. When contractors bring in contractor owned property onto Anniston Army Depot for use in performing contracted work to repair, replace, or install, all contractor owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.

2. No unauthorized materials of any type may be brought onto or left unattended on the installation. Contractors must have a process in place to receive and store materials and have visibility of the location of those materials at all times while on ANAD. This includes construction materials, equipment, and miscellaneous items. This visibility/accountability of materials applies to the Contractor, its subcontractors, and its material suppliers.

3. All Contractor, subcontractor, and material supplier employees are prohibited from bringing personal belongings of any nature onto the installation if such items are to be left unattended at any time.

4. The Contractor is further required to have a plan of action for implementing these procedures and must submit it to the Contracting Officer upon request. This plan of action must include a provision for informing all employees and subcontractors of these procedures. The plan of action must also address monitoring and procedures the Contractor has in place to ensure compliance with this contractual provision.

5. Should the Contractor fail to comply with this mandatory contractual provision, the Contractor may be held responsible for all direct and indirect cost incurred by the Government in identifying, securing, segregating, removing, and otherwise properly disposing of improper or abandoned materials/equipment.

D. CONTRACTOR TRANSPORT OF GOVERNMENT OWNED PROPERTY

If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.

E. TRAFFIC

The Contractor shall conform to Depot regulations concerning:

1. Designated routes

2. Parking regulations

3. Insurance. See narrative entitled "Insurance Requirements (HS1001)"

4. Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition.

Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment.

However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

F. CAMERA USE:

Use of any camera, including cellular telephone cameras, is prohibited on this installation. Any camera illegally used on this installation is subject to confiscation Any violation may be punishable by fine or imprisonment or both.

To use any camera on ANAD, a camera pass and photgraphic permit must be obtained from the Depot Operations Office (DOO). A request must be made for possession or use of a company-owned camera; permits will not be granted for possession or use of a personal camera or for use of a cell phone camera on the depot. Requirements for photography must be included in the Statement of Work. The request for a permit must state the specific purpose, location, and expected distribution of photographs made on the installation. Such photographs will not be released or otherwise disclosed into the public domain without first completing the STA255 Form (OPSEC Review Certification) with the DOO, and obtain release authority from the Strategic Communications Office.

G. NOTICE TO CONTRACTOR: SEXUAL ASSAULT AND HARASSMENT IN THE WORKPLACE

Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.

As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.

In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises.

If you believe you are a victim of sexual harassment:

It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.

Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.

Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.

Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.

Follow whatever complaint procedures apply with your employer

If you witness sexual harassment or it is reported to you:

Report it to your supervisor Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Ms.

Wendy Suttles-walker, at (256) 240-3447.

Cooperate with any investigative agencies

H. TEMPORARY STRUCTURES:

The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.

I. FIRE PREVENTION AND PROTECTION:

The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

J. UTILITIES

Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

K LAND USE CONTROL

Contractors who will be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.

L. AIR EMISSIONS

The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.

M. ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001

The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.

The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.

N. CONTRACTOR SAFETY AND ACCIDENT PREVENTION

Contractors shall adhere to all ANAD safety rules and regulations.

Applicable Publication: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to FAR Clause 52.236-13 “Accident Prevention”, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials:

Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.

Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. The contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

The contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear, hearing protection and shall be used and provided by contractor.

The Government reseres the right to conduct unannounced safety inspections at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. The contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. The contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation with in 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post accident testing. This shall be part of their Safety Plan.

O. CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS:

For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted by the contractor. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 calendar days after contract award. The contractor must have an approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed in section N.

1. SIGNATURE SHEET. This must include the title, signature, and phone number of the following:

Plan preparer Plan approver, e.g., owner, company president, etc.

Other applicable personnel plan concurrers (other corporate and project contractor personnel, such as their safety officer, project manager, or superintendent)

2. BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

3. STATEMENT OF SAFETY AND HEALTH POLICY.

4. RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

5. SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

6. TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.

7. SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

8. SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

9. ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

10. PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED.

This list is not all-inclusive, nor will all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

11. Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

NARRATIVE CS1011: DEPARTMENT OF DEFENSE PREPAREDNESS TRAINING

This installation is subject to unannounced inspections and exercises that require practice evacuations of certain and/or all areas. Evacuation practices will be temporary in nature. Contractors will be required to participate in these practice evacuation exercises, as necessary, and the contract performance time may be extended to off-set the time lost because of the exercise, if required and approved by the Contracting Officer. This narrative should be taken into consideration during the preparation of bids/proposals since, other than appropriate time extensions, participation in such exercises will be at no additional cost to the Government.

NARRATIVE HS1001: INSURANCE REQUIREMENTS

A. In accordance with Insurance--Work on a Government Installation clause, FAR Reference 52.228-5, incorporated herein, the following amounts of insurance are required:

INSURANCE TYPE MINIMUM AMOUNT

Workers' Compensation and Employer's Liability $100,000.00 General Liability, Bodily Injury Liability $500,000.00 per occurrence Property Damage Liability $500,000.00 per occurrence

Automobile Coverages Liability $200,000.00 per person Bodily Injury $500,000.00 per occurrence Property Damage $ 20,000.00 per occurrence

B. A certificate of insurance, showing that the required amounts of insurance have been obtained, will be furnished.

Special attention is directed to the cancellation notice of the insurance certificate. The cancellation notice must state:

"In the event that this policy is cancelled or any material change in the policy is made that would adversely affect the interest of the Government, such change or cancellation shall not be effective for such period as may be prescribed by the laws of the state in which this contract is to be performed and in no event sooner than thirty (30) days after written notice thereof to the Contracting Officer."

NARRATIVE AS7526: NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION

(FPCON)

The contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

NARRATIVE CS6520: ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training. AT Level I awareness training is available at https://jkodirect.jten.mil Course #JS-US007-14.

NARRATIVE CS7523: OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training.

OPSEC awareness training is available at: https://securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).

NARRATIVE CS6522: iWATCH TRAINING The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR, if assigned, or the Contracting Officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees’ commencing performance, with the results reported to the COR, or Contracting Officer, no later than 14 calendar days after completion of training. Training may be obtained at http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

NARRATIVE FS1002: Installation Hours

WORK HOURS RECEIVING HOURS DAY(S) OF WEEK

7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturday, Sunday, Federal Holidays

A. Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract perf ormance period has taken this possibility into consideration.

B. Shutdown Periods. The Government may choose to shut down for up to a week to perform maintenance and conduct other activities. These shut downs typically revolve around the Independence Day Holiday or the Christmas Holiday. During these shutdowns, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted to work. In addition, The Government may choose to conduct Safety Stand-Down Day(s) or Employee Appreciation Day(s). These activities typically occur on a Friday and usually do not exceed eight (8) work hours per year. The Contractor’s services may not be required during these periods. In all cases, the Contractor will be notified in writing by the Government. These interruptions shall be at no cost to the Government.

C. Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.

D. Traffic: The Contractor shall conform to Depot regulations concerning:

1. Designated routes

2. Parking regulations

3. Insurance. See narrative entitled "Insurance Requirements (HS1001)"

4. Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition.

Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment.

However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

E. CAMERA USE:

Use of any camera, including cellular telephone cameras, is prohibited on this installation. Any camera illegally used on this installation is subject to confiscation Any violation may be punishable by fine or imprisonment or both.

To use any camera on ANAD, a camera pass and photgraphic permit must be obtained from the Depot Operations Office (DOO). A request must be made for possession or use of a company-owned camera; permits will not be granted for possession or use of a personal camera or for use of a cell phone camera on the depot. Requirements for photography must be included in the Statement of Work. The request for a permit must state the specific purpose, location, and expected distribution of photographs made on the installation. Such photographs will not be released or otherwise disclosed into the public domain without first completing the STA255 Form (OPSEC Review Certification) with the DOO, and obtain release authority from the Strategic Communications Office.

NARRATIVE HS7001: ARMY CONTRACT WRITING SYSTEM (ACWS) TRANSITION

INFORMATION FOR CONTRACTORS

A. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Contract.

B. During this transition period, Contractors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to generate distributable copies of this contract during its period of performance, as well as any subsequent modifications or orders (if applicable). As a result:

i. Subsequent documents you receive may appear noticeably different than the original award or previous contractual documents from the same Contracting Office.

ii. A change between contract writing systems may cause important information concerning contract terms and conditions to take on different formatting or appear in different parts of later documents issued.

iii. Contractors shall ensure Customer Relationship Management (CRM) systems and personnel interacting with this contract are prepared to identify and respond appropriately to differences between document versions.

2. The Government does not intend to use the shift between contract writing systems to effect any changes to contract terms and conditions. Therefore:

i. Contractors should view changes to terms or conditions between document versions as system-generated and potentially erroneous unless accompanied by narrative(s) designating such changes as deliberate and desired.

ii. Contractors shall inform the Contracting Officer listed on the first page of the most recent document issued for guidance regarding any suspected or observed inadvertent or system-generated changes (e.g.

noticing something missing in a new conformed copy).

iii. The Government will correct any inadvertent or system-generated changes, additions, or omissions discovered by either party, via bilateral modification, at no cost to the Contractor.

iv. The terms and conditions contained in the latest document reflecting deliberate action by the Contracting Officer (e.g. the last conformed copy of the award not affected by the observed issue) will take precedence until these problems are corrected.

3. In the unlikely event award information is corrupted or mutilated during system migration and replacement or re-issuance of this contract is necessary for continued contract administration, the Contracting Officer will:

i. Issue a continuation contract in accordance with DFARS 204.1601(c) and DFARS PGI 204.1601(c), carrying over all terms and conditions from the last-known version of this contract accurately reflecting mutual agreement of the parties.

ii. Incorporate the last-known version of this contract accurately reflecting mutual agreement of the parties as an attachment to the replacement or continuation contract for future reference.

iii. Ensure any such reissuance or continuance is properly reported to preserve the integrity of Contractor performance measurement data, if any (e.g. FAPIIS, CPARS).

NARRATIVE LS7002: ARMY CONTRACT WRITING SYSTEM (ACWS) TRANSITION

INFORMATION FOR OFFERORS

A. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.

B. During this transition period, Offerors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:

i. This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail).

Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.

ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.

iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer.

2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:

i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.

ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process.

iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.

3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.

4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:

i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.

ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.

iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.

iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

NARRATIVE CS7508: SECTION 508 CONFORMANCE

A. Under Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d), as amended by the Workforce Investment Act of 1998 (P.L. 105-220), August 7, 1998, federal agencies must give disabled employees and members of the public access to electronic information that is comparable to the access available to others. Section 508 requires that federal agencies' electronic and information technology (EIT) be accessible to people with disabilities. All EIT products and services purchased under this contract must conform to the Section 508 law by meeting all applicable accessibility standards.

B. The applicable accessibility standards are indicated in the Statement of Work and/or CLINs. Only the standards referenced in the Statement of Work and/or CLINs apply to this contract.

C. A summary of the accessibility standards can be found at http://www.section508.gov/. However, for compliance under the terms of this contract, the contractor shall ensure that all products and service comply with the applicable accessibility Technical Standards.

NARRATIVE NN0010: ADDENDUM TO FAR CLAUSE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .