Amendment 0001.pdf
PDF 193 KB Posted
- Attached to
- Large Capactiy Turntable Washer Federal contract opportunity
- Solicitation number
- W911KF-20-Q-0068
About this file
This document is an amendment to a solicitation for a large capacity turntable washer. The amendment extends the response deadline from July 31, 2020 to August 3, 2020 at 10:00 AM. It modifies the statement of work including requirements for turntable size and doors. Acceptable door styles are now either a single hinged door or a roll-in door. The amendment answers four questions from industry relating to programmable logic controller (PLC) and human-machine interface (HMI) specifications, exhaust fan material, and availability of overhead hoisting. The original solicitation was for a aqueous-based turntable spray washer to be provided to Anniston Army Depot for cleaning transmissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1_Revised Statement of Work.pdf | ||
| Attachment 3_Evidence of Authority To Sign Offers.pdf | ||
| Attachment 5_DD Form 1664.pdf | ||
| Attachment 1_Statement of Work.pdf | ||
| Solicitation_W911KF-20-F-0068.pdf | ||
| Attachment 7_Past Performance Questionnaire.pdf | ||
| Attachment 6_SioanForm380-2 Personal Data Questionnaire.pdf | ||
| Attachment 2_Request for Technical Literature.pdf | ||
| Attachment 4_DD Form 1423.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page tw o.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF20Q0068
X 9B. DATED (SEE ITEM 11)
01-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2020
CODE
ACC-ANAD
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF20Q0068
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 31-Jul-2020 10:00 AM to 03-Aug-2020 10:00 AM.
(End of Summary of Changes)
The following items are applicable to this modification:
AMENDMENT NOTES
1. The purpose of this amendment is to extend the solicitation closing date, make changes to the Statement of Work, and answer industry questions.
2. The solicitation closing date is hereby extended to 3 Aug 2020 at 10 AM CST.
3. The Requirements for Large Turntable Washer in section 2.1 and General Requirements &
Salient Features in section 2.2 have been modified.
4. The revised Statement of Work is attached to this amendment.
5. Industry questions are as follows:
Question 1: Side by side swing‐out v‐notched doors with constructed of stainless steel. Dual doors opening from center to the left and to the right with overhead access. Better Engineering offers two door styles here. A single hinged door and a “roll‐in” door that rolls into the back of the cabinet. Please let me know which would be considered an “or equal” or which you would prefer.
Answer 1: Either door style is acceptable. The ‘roll in’ door would be a preferred for space utilization. The washer & door shall stay within the space envelope referenced in 2.2.a.
Question 2: Siemens Brand Logo version 8 PLC with a Siemens Logo Human‐Machine Interface (HMI) (or equivalent). The PLC shall monitor the diverting flapper valves to insure the correct ones are open and closed in order to direct solution back to the appropriate wash and rinse tank. The PLC shall also control the cycle times and pauses between stages (wash, rinse, and shop air blow off), to let wash drip and return to wash tank before switching to rinse stage of cycle. The HMI shall provide feedback to the operator of which part of the cleaning cycle the machine is in and how much time remains for the cycle. The cycle times shall be changeable on the HMI screen and have the capability to be password protected. The HMI shall display any and all fault conditions. Our PLC and HMI is Allen Bradley, but has all of these capabilities.
Please confirm this will be considered an “equal”.
Answer 2: Yes
Question 3: 2.2.9 STEAM EXHAUST SYSTEM: Washer shall be equipped with an exhaust system to produce a minimum of 1000 (cubic feet per minute (CFM) to remove steam exhaust system from the washer process chamber. The system shall utilize a powder coated, mild steel tube axial type, belt driven exhaust fan, powered by a half horsepower, 1,725 revolutions per minute (RPM), three phase, totally enclosed, fan‐cooled (TEFC) electric motor. An exhaust box shall be
W911KF20Q0068
provided to the machine to be set up for a 12” tube axial fan connection. We use an aluminum fan housing so it doesn’t rust over time as a mild steel housing would. Is this ok?
Answer 3: Yes
Question 4: Is there an overhead hoist system inside of the shop where this cleaner will be going to lift all of the transmissions up and into the cleaner?
Answer 4: Yes
6. All other terms and conditions remain unchanged.