Solicitation_W911KF19Q0033.pdf

PDF 1 MB Posted

Attached to
Spectrometer Federal contract opportunity
Solicitation number
W911KF19Q0033
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Spectrometer, newest first.
File Type Posted
W911KF19Q0033_Solicitation_Amendment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911KF19Q0033 07-Feb-2019

b. TELEPHONE NUMBER

256-741-5128

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 11 Mar 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911KF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LUKE A. MARTIN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W31G1Y9023015U

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CONTRACTING COMMAND - WARREN (ANAD)

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ANNISTON ARMY DEPOT

REQUISITION PROPERTY MGMT. DIV.

7 FRANKFORD AVENUE

ANNISTON AL 36201-4199

TEL: FAX:

256 235-6353FAX:

TEL: 256 235-6231 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,000

NAICS:

334516

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF65

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911KF19Q0033

Section SF 1449 - CONTINUATION SHEET

LOCAL NARRATIVE

1. The statement of work is incorporated into this solicitation.

2. Quotes must be submitted on Standard Form 1449. YOUR BID WILL BE CONSIDERED TO BE NONRESPONSIVE IF THE SF FORM 1449 IS NOT SUBMITTED IN ITS ENTIRETY. Quoters’ that fail to furnish required representations or information, or whom reject the terms and conditions of the request may be determined to be NON‐RESPONSIVE. It is your responsibility to furnish all information requested.

We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you may be determined NON‐RESPONSIVE.

3. It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you will be determined non-responsive.

IMPORTANT: IT IS YOUR RESPONSIBILITY TO ENSURE YOUR BID HAS BEEN RECEIVED BY

THE CLOSING DATE AND TIME AS SPECIFIED IN THE SOLICITATION.

4. PLEASE SUBMIT QUOTES TO: Luke Martin luke.a.martin18.civ@mail.mil

5. INSTALLATION SECURITY

No unauthorized materials of any type may be brought onto or left unattended on the installation.

Contractors must have a process in place to receive and store materials and have visibility of the location of those materials at all times while on ANAD. This includes construction materials, equipment, and miscellaneous items. This visibility/accountability of materials applies to the Contractor, its subcontractors, and its material suppliers. Further, all Contractor, subcontractor, and material supplier employees are prohibited from bringing personal belongings of any nature onto the installation if such items are to be left unattended at any time. The Contractor is further required to have a plan of action for implementing these procedures and must submit it to the Contracting Officer upon request. This plan of action must include a provision for informing all employees and subcontractors of these procedures. The plan of action must also address monitoring and procedures the Contractor has in place to ensure compliance with this contractual provision. Should the Contractor fail to comply with this mandatory contractual provision, the Contractor may be held responsible for all direct and indirect cost incurred by the Government in identifying, securing, segregating, removing, and otherwise properly disposing of improper or abandoned materials/equipment.

6. RECEIVING HOURS

a. Receiving hours for deliveries to the Receiving Area (see paragraph b):

Monday – Friday 7:00 a.m. - 12:00 p.m. and 12:40 p.m. - 2:00 p.m.

b. Normal Depot working hours are as follows:

Monday – Thursday 7:00 a.m. - 12:00 p.m. and 12:30 p.m. - 4:30 p.m.

Every Other Friday 7:00 a.m. - 12:00 p.m. and 12:30 p.m. - 3:30 p.m.

c. Anniston Army Depot will be closed Saturdays, Sundays, Federal Holidays, and every other Friday.

d. Details of this order/contract should not be discussed with anyone other than the Contract Administrator whose name and telephone number are shown in the ADMINISTERED BY block of the order/contract.

Should you receive any inquiry(ies) from any source other than as indicated above, we would appreciate you contacting us in writing or by telephoning the appropriate administrator at Anniston Army Depot.

e. If the purchase/contract/delivery order number is not noted on the shipping document or marked clearly on the box/package, it will be REJECTED.

7. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current. COMPLETE

THE FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.

Federal Tax Identification Number: ________________ Dun & Bradstreet Number (DUNS): _______________ CAGE Code: _____________ System for Award Management (SAM) Registration: Yes _____ No_______ Expiration Date: ___________

Vendor Contact Information: POC ___________________________ Telephone: ______________________

FAX: ___________________________

Email:___________________________

WAWF PROCEDURES

This contract will be paid by DFAS (not by credit card) and contains DFARS Clause 252.232-7003. You must submit your invoice through Wide Area Workflow (WAWF). Invoices for supplies and services purchased by the DoD must be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/

Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. The previous ‘Central Contractor Registration (CCR)’ system has been migrated to the System for Award Management (SAM) and accessible at www.sam.gov. For SAM access and navigation issues, follow the instruction provided at “User Guides and Helpful Hints” on SAM Home page.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618-5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil/http://www.dfas.mil. Your purchase order/contract will be required to inquire status of your payment. Go to DFAS on the web at:

www/dfas.mil/money/vendor.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL

EMAILS CORRECTLY THROUGH WAWF:

WAWF

Data/CODES needed for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE SAM Cage code listed in Contractor/Offero r field of contract

SAM Cage code listed in Contractor/Offe ror field of contract

SAM Cage code listed in Contractor/Offer or field of contract

SAM Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF W911KF

(Unless Inspected by

DCMA)

W911KF

SHIP TO

(Supplies/Materials Only)

W911KF NOT

AVAILABLE

W911KF W911KF

ACCEPTOR

(Services/Equipment Only)

NOT

AVAILABLE

W911KF NOT

AVAILABLE

NOT AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

DELIVERY ORDER NUMBER (IF APPLICABLE):

EMAIL POINT OF CONTACT LISTING: luke.a.martin18.civ@mail.mil

CONTRACT ADMINISTRATOR: Luke Martin

CONTRACTING OFFICER: T. Morey Gaddy

Statement of Work:

1.0 Scope. This specification establishes the requirement for the purchase and installation of a commercial Arc Spark Plasma Generated All Digital Spectrometer for determining the chemistry of metallic alloys that will be provided to Anniston Army Depot, Anniston, Alabama. This requirement is for a SPECTRO MAXx M FV Spectrometer or equivalent. The Arc Spark Plasma Generated All Digital Spectrometer shall be designed, fabricated, and installed by the contractor with all functions, capabilities and equipment as described herein. The contractor shall provide the resources necessary to design, manufacture, install, calibrate and demonstrate the functional operation of the Arc Spark Plasma Generated All Digital Spectrometer. The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.

2.0 Applicable Documents:

2.1 Government Documents. The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of request for proposal shall apply.

Occupational Safety and Health Administration (OSHA) 29 CFR 1910

2.4 Other Publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of request for proposal shall apply. Detail requirements listed in this specification shall override any contradictory portions of the following specifications, codes and standards.

2.4.1 National Fire Protection Association (NFPA) 70 & 79

2.4.2 American National Standards Institute (ANSI) Publication C2.

2.4.5 National Electrical Code (NEC).

2.4.6 The National Electrical Manufacturers Association (NEMA).

2.4.7 Joint Industrial Council of Electrical Standards for General Purpose System Tools

(JIC EGP-1 1967).

2.4.8 Underwriters Laboratory (UL) listings or DIN.

2.5 Order of Precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take preference.

3.0 Requirements. The Arc Spark Plasma Generated All Digital Spectrometer shall be a standard commercial readily available item configured to the requirements herein.

3.0.1 The equipment shall be so constructed that, when installed and connected to necessary utilities, it will be ready for operation. Contractor shall supply all necessary start up materials. The contractor shall calibrate the equipment. The equipment shall be constructed of parts, which are without defects and free of repair.

3.0.2 The supplier shall furnish and install one (1) SPECTRO MAXx M FV Arc Spark Plasma Generated All Digital Spectrometer (floor model) with a 140-670 nm effective wavelength range, including PC with DVD RW, 22" monitor, printer, PC stand to match spectrometer, and ICAL sample. (2) Minimum of 9 matrix modules; Fe, Al, Cu, Ni, Co, Ti, Mg, Pb, Zn. (3) Analytical program software for showing chemical composition and identifying alloys; Fe-01, Fe-10, Fe-20, Fe-30, Fe-40, Fe-50, Fe-60, Fe-65, Al-01, Cu- 01, Cu-20, Cu30-, Cu-40, Cu-50, Cu-60, Cu-70, Cu-80, Ni-01, Ni-20, Ni-30, Ni-40, Ni- 50, Ni-60, Ni-70, Co-01, Co-20, Co-30, Co-40, Ti-01, Ti-20, Ti-30, Mg-01, Mg-20, Mg-

30, Pb-01, Zn-10, Zn-20, Zn-30, Zn-40, Zn-60, Zn-70, Zn-80, Te, Se. Including shipping and handling. FOB Anniston.

OR EQUAL

3.0.2.1 The spectrometer shall possess all of the capabilities listed above which include as a minimum the features listed below:

A) The spectrometer shall accurately analyze, identify and provide the chemical composition of metallic alloys including low alloy steels, tool steels, manganese steels, stainless steels, gray iron, ductile iron, inconel, monel, hastelloy, nickel alloys, all aluminum alloys, all titanium alloys, brass, bronze, copper alloys, galvanizing zinc, zamack alloys, high aluminum zinc, all cobalt alloys, all lead alloys, all magnesium alloys.

B) The spectrometer shall have improved carbon detection accuracy.

C) The spectrometer shall include a complete, comprehensive database including ferrous and nonferrous metals for automatic material alloy and grade identification directly from the chemical analysis obtained from the sample. The Database shall include identification of unknown material alloy grades from a choice of thousands of materials. The database shall also include mechanical properties and heat details for the identified alloys.

D) The spectrometer shall have thermal stabilized optics for operation from 50 to 90 degrees F or better without losing profile.

E) The spectrometer shall have automatic profiling and notify the operator when calibration is needed.

F) The spectrometer shall be calibrated with one sample.

G) The spectrometer shall have monochrometer high resolution scanning capabilities of the full 140-670 nm wavelength range or better for positive identification of all elements with complete flexibility for full scanning of the optical system so additional elements can be added in the future when detection and analysis is needed.

H) The spectrometer shall be all digital with no tubes and have a minimum of 16 Charge Couple Device (CCD) detectors for repeatability and high resolution.

I) All the necessary operation, calibration, and data software including lifetime user licenses shall be provided.

J) The equipment shall display all units of measure in the U.S. Customary System of Units.

3.0.2.2 Support component list: The following items shall also be supplied:

a. (1) one PC stand if required.

b. (1) one spark stand plate for small samples.

c. (5) five Ceramic disks ID 6mm for small sample plate.

d. (1) one Basic adapter kit.

e. (1) one Adapter for 0.8-3mm dia. wire.

f. (1) one Adapter for 0.8-10mm dia. wire.

g. (1) one Adapter for 0.1-1 mm thick sheets.

h. (1) one SIRICAL argon purifier.

i. (1) one Argon regulator.

j. (1) one standard line conditioner.

k. (1) one consumables package.

l. (1) one spare parts package.

m. Any other item needed for the proper operation of the equipment to meet the required performance.

n. Installation at ANAD.

o. (36) thirty six hours of training.

3.0.3 Electrical. The spectrometer shall be capable of operating on 110 VAC or 220 VAC. The machine will be configured to plug into the existing 120 VAC or 240 VAC outlets in the Materials Lab.

3.0.4 Safety. Protection against electrical shock shall be provided in all subsystems.

3.0.5 Extras. The contractor shall supply anything this specification leaves out that is required to make the Arc Spark Plasma Generated All Digital Spectrometer or any component of the system to function and perform properly.

3.1 Proposals. The vendor shall state at time of quotation either "EXCEPTION" or "NO EXCEPTION" to each and every paragraph of this specification. Where exception is taken, the degree of noncompliance shall be fully explained.

3.1.1 Itemized Costs. The proposal shall itemize all costs

3.1.2 References. Upon request, the contractor shall cite at least 3 similar Arc Spark Plasma Generated All Digital Spectrometer systems sold over the last 3 years and include the following information for each Arc Spark Plasma Generated All Digital Spectrometer System: customer, contract or purchase order number, and customer point of contact information (phone number, e-mail, etc.).

3.2 Equipment Location. The Arc Spark Plasma Generated All Digital Spectrometer is to be located in building 128 Materials Lab at Anniston Army Depot, Anniston, Alabama.

3.3 Electrical Noise. The electrical power at ANAD is subject to noise. If the Arc Spark Plasma Generated All Digital Spectrometer System requires clean electrical power for proper operation, a properly sized power-conditioning unit shall be included with the Spectrometer System. If the Spectrometer System is subject to interference from adjacent machinery, the Spectrometer System shall include the proper shielding to prevent malfunctions.

3.4 Safety and Health Requirements. The Arc Spark Plasma Generated All Digital Spectrometer shall be in compliance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910. The Arc Spark Plasma Generated All Digital

Spectrometer shall include warning lights/indicators and or labels to alert the System’s operator to unsafe operating conditions.

3.5 Ergonomics. The equipment shall be ergonomically designed to prevent the occurrence of repetitive stress injuries.

3.6 Maintainability. The Arc Spark Plasma Generated All Digital Spectrometer shall be constructed using commercial off-the-shelf components to the maximum extent possible to ensure the prompt availability of repair parts will be readily available for a minimum of 5 years after installation or can be easily replaced with newer components of the same type. This includes not only contractor-manufactured items but also those supplied by sub-contractors. The contractor shall provide evidence that repair parts and service for the spectrometer are readily available.

3.7 Construction. The Arc Spark Plasma Generated All Digital Spectrometer shall be constructed of corrosion resistant material to the maximum extent possible.

3.7.1.1 The Arc Spark Plasma Generated All Digital Spectrometer shall be structurally sound and constructed for maximum safety, life and performance.

3.7.1.2 Standard Products. All materials and equipment shall be a standard product of a manufacturer regularly engaged in the manufacture of the product and shall essentially duplicate items that have been utilized before. The manufacturer has the choice of configuration and functional design of the systems except where specifically stated in this specification.

3.7.1.3 Welding, brazing, or soldering shall be employed only where those operations are required in the original design. These operations shall not be employed as repair measures for defective parts or materials.

3.7.1.4 All replaceable parts shall be manufactured to definite standards of tolerance, clearance and finish in order that any such part may be field installed without further machining or requiring modification of parts.

3.7.1.5 All such parts subject to removal or adjustment shall not be swaged, penned, staked or otherwise permanently deformed. All screws, bolts and other similar fastening devices shall be installed with adequate means for preventing loss of proper tightness and adjustment.

3.7.2 Components. The components used to manufacture this Arc Spark Plasma Generated All Digital Spectrometer shall be the latest make and model.

3.8 Environmental Compliance. The charge Spectrometer provided under this contract shall meet all applicable Environmental Protection Agency (EPA) restrictions in effect on the date of the contract. These regulations apply to the environment or the user’s health and shall be adhered to during the manufacture, service, transportation, storage and operation of the spectrometer.

3.8.1 Recovered Materials. The offerer/contractor is encouraged to use recovered materials to the maximum extent possible in accordance with paragraph 23.403 of the Federal Acquisition Regulation (FAR).

4.0 Acceptance Testing & Verification:

4.1 Conformance. The Arc Spark Plasma Generated All Digital Spectrometer shall meet the requirements of this specification and conform to the manufacturer’s own drawings, specifications, standards, and quality assurance practices. The Government reserves the right to, at any time during the contract period, require proof of such conformance or to inspect the spectrometer to determine compliance with the requirements of this specification.

4.2 Calibration. The Arc Spark Plasma Generated All Digital Spectrometer shall be calibrated and a sticker noting such calibration shall be affixed to the system.

4.3 Performance Test. Upon completion of the Arc Spark Plasma Generated All Digital Spectrometer System’s installation and calibration, the contractor shall demonstrate the System’s ability to meet the requirements of paragraph 4.3.1. During these tests, the contractor shall demonstrate proper operation of all the Arc Spark Plasma Generated All Digital Spectrometer System’s controls, functions and features. The Government will provide the components to be tested. All tests must be witnessed by the ANAD Contracting Officer or Contracting Officer's Representative. Should a malfunction or failure occur during any test, the contractor shall correct the problem and repeat the entire test from the beginning.

4.3.1 Test. The contractor shall demonstrate the ability of the Arc Spark Plasma Generated All Digital Spectrometer to accurately identify and match Government owned National Institute and Bureau of Standards samples against their certificates of analysis.

4.4 Acceptance. Acceptance of the equipment will be determined by how accurately the National Institute and Bureau of Standards samples are identified and matched against their certificates of analysis. Equipment not capable of matching standards shall be subject to rejection.

Final acceptance will be at Anniston Army Depot.

5.0 Installation and Delivery: Price includes delivery to ANAD and installation.

5.1 Delivery. The contractor shall complete the delivery and installation of all equipment within ninety (90) days after award of contract.

5.1.1 Shipping, Handling. The contractor shall be responsible for all shipping, and handling of the Arc Spark Plasma Generated All Digital Spectrometer System and all materials.

5.2 Installation. The Government will unload and place the equipment. The contractor will be responsible for the rest of the installation. The contractor shall be responsible for installing the Arc Spark Plasma Generated All Digital Spectrometer System to include all labor and materials required. The contractor shall be responsible for insuring that the installation is compatible with existing facilities. Unless otherwise approved by the Contracting Officer, installation shall be done during normal depot working hours. The area near where the equipment is to be installed is in operation. The contractor shall not interfere with ongoing Government operations and production unless authorized by the Contracting Officer. Installation shall be completed and the equipment operational within ninety (90) days after award of contract.

5.2.3 Trades. Coordination of trades installing the equipment shall be the responsibility of the contractor.

5.2.6 Site Cleanup. The contractor shall dispose all debris, scrap material, trash, etc.

from the job site daily in the proper trash container or dumpster at ANAD. No equipment will be provided by the Government to perform any of the work performed by the contractor.

6.0 Documentation. The contractor shall provide documentation to the government as listed below. Three paper documents as well as CDs for each of the following technical data shall be provided as specified on the attached Data Item Description Forms with the Spectrometer System.

6.1 Content. The manuals shall include electrical, hydraulic, and pneumatic schematics, as applicable; parts lists, trouble shooting procedures, preventive maintenance requirements, lubrication schedules, calibration procedures, etc. Catalogs shall fully describe optional tooling, fixtures, and attachments available for the equipment furnished. In addition, any other technical data normally furnished with the equipment shall be provided. All technical data shall be furnished in the English language and be IAW with the following data item descriptors (DIDs)

Operator' Manual CDRL A01 DI-TMSS-80527C Engineering Support Manuals CDRL A02 DI-TMSS-80527C

APPENDIX A

Component Test Procedure

The contractor shall demonstrate the ability of the Arc Spark Plasma Generated All Digital Spectrometer to accurately identify and match Government owned National Institute and Bureau of Standards samples against their certificates of analysis.

Appendix B Request for Technical Literature

a. The bidder shall provide, with its bid, descriptive literature that has previously been used to market the proposed Arc Spark Plasma Generated All Digital Spectrometer System. The literature will be used to technically evaluate the bid and shall describe how the Arc Spark Plasma Generated All Digital Spectrometer System meets requirements of the specification; specifically the paragraphs:

Information Furnished Ref. Paragraph(s) Complete Requirements Section 3.0

b. The features, which must be addressed in the descriptive literature, are necessary to consider the bid responsive. If the bidder’s preprinted literature does not show all these features, the bidder must attach a letter of supplemental information to the literature describing in detail those required features.

c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.

d. Descriptive literature furnished under this solicitation that contains statements similar to ‘specifications are subject to change without notice’, ‘bid is subject to the following conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The government has no assurance the products offered will conform to the specification; therefore, the bid is not considered a firm bid and will not be considered for an award.

e. Bidders who furnish a product catalog to satisfy this requirement must indicate which item is the subject of the bid by citing (highlighting, marking, etc.) model numbers and page numbers from the catalog in Section B of the solicitation along with the bid price.

Bids that fail to clearly establish what item or items are bid will be considered as non-responsive.

DELIVERY: This information is needed with the proposal in order to properly evaluate the proposed package.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

SPECTROMETER

FFP

See attached Statement of Work. Contractor shall provide one total price for all combined requirements in the Statement of Work. In addition, contractor shall provide itemized pricing for installation and for training.

FOB: Destination

NSN: PRECISION-METAL-ANAL

MILSTRIP: W31G1Y9023015U

PURCHASE REQUEST NUMBER: W31G1Y9023015U

PSC CD: 6625

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ADC 1 ANNISTON ARMY DEPOT

REQUISITION PROPERTY MGMT. DIV.

7 FRANKFORD AVENUE

ANNISTON AL 36201-4199

FOB: Destination

W31G1Y

CLAUSES INCORPORATED BY REFERENCE

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2019-O0003).

DEC 2018

52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2019-O0003). DEC 2018 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-37 Employment Reports on Veterans FEB 2016 52.222-50 Combating Trafficking in Persons MAR 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.233-3 Protest After Award AUG 1996 52.242-15 Stop-Work Order AUG 1989 52.247-34 F.O.B. Destination NOV 1991 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7013 Duty-Free Entry--Basic MAY 2016 252.225-7016 I Restriction of Acquisition of Ball and Roller Bearings

Alternate I

DEC 2000

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

(a) Definition. As used in this provision-- Internal confidentiality agreement or statement, subcontract, and subcontractor, are defined in the clause at 52.203- 19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(End of provision)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)

(a) Definitions. As used in this clause-- Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.

(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.

(End of clause)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)

(a) Definitions. As used in this clause--

Covered article means any hardware, software, or service that--

(1) Is developed or provided by a covered entity;

(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or

(3) Contains components using any hardware or software developed in whole or in part by a covered entity.

Covered entity means--

(1) Kaspersky Lab;

(2) Any successor entity to Kaspersky Lab;

(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or

(4) Any entity of which Kaspersky Lab has a majority ownership.

(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L.

115-91) prohibits Government use of any covered article. The Contractor is prohibited from--

(1) Providing any covered article that the Government will use on or after October 1, 2018; and

(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.

(c) Reporting requirement.

(1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:

(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.

52.207-4 ECONOMIC PURCHASE QUANTITY--SUPPLIES (AUG 1987)

(a) Offerors are invited to state an opinion on whether the quantity(ies) of supplies on which bids, proposals or quotes are requested in this solicitation is (are) economically advantageous to the Government.

Each offeror who believes that acquisitions in different quantities would be more advantageous is invited to recommend an economic purchase quantity. If different quantities are recommended, a total and a unit price must be quoted for applicable items. An economic purchase quantity is that quantity at which a significant price break occurs. If there are significant price breaks at different quantity points, this information is desired as well.

OFFEROR RECOMMENDATIONS

PRICE

ITEM QUANTITY QUOTATION TOTAL

(c) The information requested in this provision is being solicited to avoid acquisitions in disadvantageous quantities and to assist the Government in developing a data base for future acquisitions of these items. However, the Government reserves the right to amend or cancel the solicitation and resolicit with respect to any individual item in the event quotations received and the Government's requirements indicate that different quantities should be acquired.

52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--

REPRESENTATION (NOV 2015)

(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).

(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.

(c) Representation. The Offeror represents that--

(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and

(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (DEVIATION 2018-O0018) (OCT 2018)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF

1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.

Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.

Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.