Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade HVAC System, newest first.
File Type Posted
PO42_DRAWINGS.pdf PDF
W911KF-16-B-0001.pdf PDF
Attachment2EvidOfAuth.pdf PDF
Attachment3ContrRequestforWaiver.pdf PDF
AttachmentNo._1_STATEMENT_OF_WORK.pdf PDF
Attachment5AFFIRMPROCREPORTING.pdf PDF
Attachment4EPAGuidelineItems.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31G1Y614700Z0

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

see page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF-16-B-0001

X 9B. DATED (SEE ITEM 11)

23-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Sep-2016

CODE

ARMY CONTRACTING COMMAND - WARREN (ANAD)

HEATHER GLOVER

7 FRANKFORD AVENUE

ANNISTON AL 36201

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF-16-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

PROVISIONS

1. The purpose of this amendment is to complete FAR Clause 52.228-1 and to extend the closing date.

2. FAR Clause 52.228-1 -- Bid Guarantee is modified as shown below.

3. The closing date and bid opening date are both changed from September 28 at 10:00 AM CST to October 12, 2016 at 10:00 AM CST.

4. All other terms and conditions remain unchanged.

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Sep-2016 10:00 AM to 12-Oct-2016 10:00 AM.

The following have been modified:

PROVISIONS

Provision #1: The following attachments are incorporated as part of this solicitation:

(1) Statement of Work

(2) Evidence of Authority to Sign Offers

(3) Contractor Request for Waiver For Non-EPA Comprehensive Guideline Items

(4) EPA Guideline Items

(5) Contractor Affirmative Procurement Report Form

(6) Wage Determinations

Provision #2: Proposals MUST be submitted through FedBizOps https://www.fbo.gov/.

Provision #3: An organized site visit for all prospective offerors is scheduled for September 7, 2016 at 9:00 AM CST. See Local Clause 52.0237-4710 SITE INSPECTION ARRANGEMENT.

If you plan to attend, please send an email by August 31, 2016 at 4:30 PM CST to Heather Glover at heather.n.glover2.civ@mail.mil to include your name, company name and number of people from your company that will attend.

Provision #4: Bid opening will be held on October 12, 2016 at 10:00 AM CST at Anniston Army Depot, bldg 35, 7 Frankford Ave., Anniston, Alabama 36201. Since the Anniston Army Depot is a secure installation, an escort will be required before entry. Please arrive at the Anniston Army Depot Badge Office no later than 9:30 AM CST. If you plan to attend the bid opening, please send an email to Heather Glover at heather.n.glover2.civ@mail.mil.

Provision #5: Read the Statement of Work, Instructions, Conditions and Notices to Offerors and Evaluation of Factors for Award carefully to be sure all materials and documentation are submitted to the contracting officer as required.

Provision #6: See FAR Clause 52.246-21 entitled "Warranty of Construction".

Provision #7: SAM REGISTRATION: Please review the accuracy of your System for Award Management (SAM) Registration information. It is imperative that the information for your company is correctly recorded. If the offeror does not become registered in the SAM database in the time prescribed by the Contracting officer, the contracting officer will proceed to award to the next otherwise successful registered offeror.

Provision #8: Lateness Rules are as follows:

14.304 – Submission, Modifications and Withdrawal of Bids.

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bid (IFB) by the time specified in the IFB. They may use any transmission method authorized by the IFB (i.e., regular mail, electronic commerce, or facsimile). If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)

(1) Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late bid would not unduly delay the acquisition; and—

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government’s control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

Provision #9: Contractors must provide their electronic funds transfer address. Contractors must be registered in the System Award Management (SAMs) Registration before an award will be issued. COMPLETE THE FOLLOWING INFORMATION AND INCLUDE WITH ANY

OFFER.

If no, EFT address: ________________________

Federal Tax Identification Number: __________________ Dun & Bradstreet Number (DUNS):__________________ CAGE Code: _____________ Central Contractor Registration: Yes______ No_______ Expiration Date:__________

Vendor Contact Information: POC____________________________ Telephone:_______________________

FAX: ___________________________

Email:___________________________

Provision #10: The contractor shall comply with Resource Conservation and Recovery Act (RCRA) affirmative procurement (or 'buying recycled') requirements by giving preference in their purchasing process to products and practices that promote recycling and other environmentally friendly practices. The contractor is also responsible for insuring that all sub-contractors comply with Affirmative Procurement (AP) requirements. Except as specifically waived in writing, for reasons of price, performance or availability, any products in the attached EPA guideline items list provided by the contractor as part of the performance of this contract must meet the minimum percentage levels of recovered materials as specified to these standard contract terms and conditions. Please refer to the attached EPA list of designated recovered materials content products (attached). On completion of work, contractor shall submit to the COR or Contract Specialist a completed “affirmative procurement reporting form” (attached) for actions taken under that specific order.

The contractor shall submit the attached "Contractor Request for Waiver for Non-EPA Comprehensive Guideline Items" (attached) as written documentation to support the decision not to acquire items meeting the minimum content levels, based on one of the three justifications below:

a. The product is not available from a sufficient number of sources to maintain a sufficient level of competition (i. e., available from two or more sources) or is not available at a reasonable price.

b. The product is not available within a reasonable period of time.

c. The product does not meet the performance standards in applicable specifications or fails to meet reasonable performance standards of the agency.

See FAR clauses 52.223-4.

Provision #11: WAWF PROCEDURES

If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/

Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. The previous ‘Central Contractor Registration (CCR)’ system has been migrated to the System for Award Management (SAM) and accessible at www.sam.gov. For SAM access and navigation issues, follow the instruction provided at “User Guides and Helpful Hints” on SAM Home page.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil/http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at:

www/dfas.mil/money/vendor.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND

ADDITIONAL EMAILS CORRECTLY THROUGH WAWF:

WAWF

Data/CODES needed for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE CCR Cage code listed in Contractor/Offer or field of contract

CCR Cage code listed in Contractor/Offe r or field of contract

CCR Cage code listed in Contractor/Offe r or field of contract

CCR Cage code listed in Contractor/Offer or field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF W911KF

(Unless Inspected by

DCMA)

W911KF

SHIP TO

(Supplies/Materials Only)

W911KF NOT

AVAILABLE

W911KF W911KF

ACCEPTOR

(Services/Equipmen t Only)

NOT

AVAILABLE

W911KF NOT

AVAILABLE

NOT

AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

EMAIL POINT OF CONTACT LISTING: (Please insert following addresses for additional email distribution)

CONTRACT ADMINISTRATOR:

CONTRACTING OFFICER:

USER AND/OR INSPECTOR:

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

(End of Summary of Changes)