A.07.24_Amendment_01.pdf
PDF 4 MB Posted
- Attached to
- 2018-2020 Maintenance Dredging, Anchorage, Alaska Federal contract opportunity
- Solicitation number
- W911KB18R0001
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_03.pdf | ||
| A.07.24_Amendment_02.pdf | ||
| A.07.24_Amendment_01.pdf | ||
| A.01.13_W911KB18R0001_Drawings.pdf | ||
| A.07.23_W911KB18R0001_RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Project Title and Location: 2018-2020 Maintenance Dredging, Anchorage, Alaska
a. The above numbered solicitation is hereby amended to update the solicitation. See Summary of Changes for further details on page 2.
b. The date/time for receipt of offers remains unchanged at 5 December 2017 at 2:00 P.M. Alaska Time.
YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE SF1442.
c. POC for this amendment is Au Nguyen at (907) 753-5754.
1. CONTRACT ID CODE PAGE OF PAGES
1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB18R0001
X 9B. DATED (SEE ITEM 11)
01-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Nov-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
x 1
(RFP)
(Include area code) (NO COLLECT CALLS)
(See _________________________
(If "YES," indicate within how many calendar days after award in Item 12B.)
(date).
(Construction, Alteration, or Repair)
(Title, identifying no., date):
(hour)
(If Other Than Item 7)
(Construction, Alteration, or Repair) the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(To be completed by Government)
(4 copies unless otherwise specified)
(Insert any number equal to or greater than
(Include ZIP Code) (Include area code)
(Include only if different than Item 14)
(Contractor is not required to sign this document.)
document and return _______ copies to issuing office.)
31A. NAME OF CONTRACTING OFFICER (Type or print)
(Type or print)
TEL: EMAIL:
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this
(M ust be fully completed by offeror)
W911KB18R0001
SUMMARY OF CHANGES
AMENDMENT #0001
The following drawings are substituted for the superseded drawings:
NONE
The following revised documents are substituted for the superseded documents:
The identifier “AM#01” appears before and after new and/or revised material and replacement pages are provided, except as noted:
SF1442 is updated to change all references from “Port of Alaska” to “Anchorage Harbor”
Proposal Schedule is replaced in its entirety
Section 00 22 11 replaced is in its entirety
Section 00 73 46 Wage Determination is replaced in its entirety
Section 31 09 13.00 29 Surveys (Civil Works) replaced in its entirety
The following documents/drawings are deleted:
NONE
The following documents are added:
NONE
The following revisions are incorporated:
Project Title and Location is changed from "2018-2020 Maintenance Dredging, Port of Alaska (formerly the Port of Anchorage), Anchorage, Alaska" to "2018-2020 Maintenance Dredging, Anchorage, Alaska. Project Title change have been changed in the attached documents. All other changes to the project title to the drawings and specifications will be reflected in the award document.
W911KB18R0001
Other:
Pre-Proposal Conference Minutes.
Preproposal Conference “2018-2020 Maintenance Dredging, Anchorage, AK slides.
Section 00 11 01 – CLIN SCHEDULE
AM#1…
PROPOSAL SCHEDULE
W911KB18R0001
2018-2020 Maintenance Dredging Anchorage, Alaska
BASE ITEMS 2018 MAINTENANCE DREDGING
Item No.
Description Quantity Unit Unit Price
Amount
Anchorage Harbor Mobilization and Demobilization, 2018 Complete
1 JOB $_________ $_________
Anchorage Harbor Maintenance Dredging and Disposal 2018, All Areas except Areas B and D, Complete
0002AA First 800,000 CY 800,000 CY $_________ $_________
0002AB
All over 800,000 CY, Complete 300,000 CY $_________ $_________
0003 Anchorage Harbor Dredge Standby Time, 2018 Complete
NTE
DAY $_________ $_________
Anchorage Harbor Hydrographic Surveys Summer 2018, Pre Dredge, Post Dredge and Intermediate Hydrographic Surveys, All Areas except Areas B and D, Complete
NTE EA $_________ $_________
Anchorage Harbor Hydrographic Winter Surveys 2018/2019, Complete
NTE EA $_________ $_________
TOTAL OF BASE ITEMS (0001 thru 0005) FOR 2018: $_________
OPTION ITEMS 2018 MAINTENANCE DREDGING
No.
Description Quantity Unit Unit Price
Amount
0006 Early Season Mobilization, 2018 Complete
1 JOB $_________ $_________
Early Season Dredging Days 2018 Complete
NTE DAY $_________ $_________
0008 Early Season Standby Time 2018 Complete
NTE DAY $_________ $_________
Cook Inlet Navigation Channel Dredging and Disposal 2018, Complete
0009AA First 200,000 CY 200,000 CY $_________ $_________
0009AB All Over 200,000 CY 150,000 CY $_________ $_________
Cook Inlet Navigation Channel Hydrographic Surveys 2018, Complete
0010AA
Survey – Condition/Pre- Dredge
NTE EA $_________ $_________
0010AB
Surveys – Interim and Post-Dredge
NTE EA $_________ $_________
TOTAL OF OPTION ITEMS (0006 thru 0010) FOR 2018: $_________
TOTAL OF BASE PLUS OPTIONAL ITEMS (0001 THRU 0010) FOR 2018: $_________
OPTION ITEMS 2019 MAINTENANCE DREDGING
No.
Description Quantity Unit Unit Price
Amount
Anchorage Harbor Mobilization and Demobilization, 2019 Complete
1 JOB $_________ $_________
Anchorage Harbor Maintenance Dredging and Disposal 2019, All Areas except Area D, Complete
0012AA First 800,000 CY 800,000 CY $_________ $_________
0012AB All over 800,000 CY, Complete 300,000 CY $_________ $_________
0013 Anchorage Harbor Dredge Standby Time, 2019 Complete
NTE
DAY $_________ $_________
Anchorage Harbor Hydrographic Surveys Summer 2019, Pre Dredge, Post Dredge and Intermediate Hydrographic Surveys, Complete
NTE EA $_________ $_________
Anchorage Harbor Hydrographic Surveys Winter 2019/2020 Winter Surveys, Complete
NTE EA $_________ $_________
0016 Early Season Mobilization, 2019 Complete
1 JOB $_________ $_________
Early Season Dredging Days 2019 Complete
NTE DAY $_________ $_________
0018 Early Season Standby Time 2019 Complete
NTE DAY $_________ $_________
Cook Inlet Navigation
Disposal 2019, Complete
0019AA
First 200,000 CY
200,000 CY
0019AB
All Over 200,000 CY 150,000 CY $_________ $_________
Cook Inlet Navigation
Surveys 2019, Complete
0020AA
Dredge
NTE
EA $_________ $_________
0020AB
Post-Dredge
NTE
TOTAL OF OPTION ITEMS (0011 thru 0020) FOR 2019: $_________
OPTION ITEMS 2020 MAINTENANCE DREDGING
No.
Description Quantity Unit Unit Price
Amount
Anchorage Harbor Mobilization and Demobilization, 2020 Complete
1 JOB $_________ $_________
Anchorage Harbor Harbor Maintenance Dredging and Disposal 2020, Complete
0022AA First 800,000 CY 800,000 CY $_________ $_________
0022AB
All over 800,000 CY, Complete 300,000 CY $_________ $_________
0023 Anchorage Harbor Dredge Standby Time, 2020 Complete
NTE
DAY $_________ $_________
Anchorage Harbor Hydrographic Surveys Summer 2020, Pre Dredge, Post Dredge and Intermediate Hydrographic Surveys, Complete
NTE EA $_________ $_________
Anchorage Harbor Hydrographic Surveys Winter 2020/2021 Winter Surveys, Complete
NTE EA $_________ $_________
0026 Early Season Mobilization, 2020 Complete
1 JOB $_________ $_________
Early Season Dredging Days 2020 Complete
NTE DAY $_________ $_________
Early Season Standby Time 2020 Complete
NTE DAY $_________ $_________
Cook Inlet Navigation
Disposal 2020, Complete
0029AA First 200,000 CY 200,000 CY $_________ $_________
0029AB All Over 200,000 CY 150,000 CY $_________ $_________
Cook Inlet Navigation
Surveys 2020, Complete
0030AA
Dredge
0030AB
Post-Dredge
NTE
TOTAL OF OPTION ITEMS (0021 thru 0030) FOR 2020: $_________
EVALUATIONS OF OFFERS:
1. AWARD: Award will be made in accordance with Section 00 22 11 –
EVALUATION FACTORS FOR AWARD.
2. EVALUATION OF OPTIONS and TOTAL EVALUATED PRICE: Reference FAR 52.217- 5, the Government will evaluate offers for award purposes by adding the total price of all options, except option items for Transition Dredging, to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.
3. EVALUATION OF SUBDIVIDED ITEMS: The Government will evaluate subdivided items in accordance with UAI 5152.211-9000 Evaluation of Subdivided Items included in Section 00 21 00.
4. INCOMPLETE PROPOSALS: Failure to submit an offer on all items in the schedule will result in an incomplete offer and the offer will be rejected.
Unit or lump sum prices must be shown for each item within the schedule.
5. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will govern.
6. SPECIAL OFFER CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total offered price, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
-- End of Proposal Schedule --
…AM#1
TRANSITION DREDGING – PORT OF ANCHORAGE
No.
Description Quantity Unit Unit
Price
Amount
Mob/Demob for Transition Dredging (Areas D and DS), Complete
1 JOB $_________ $_________
Transition Dredging (Areas D and DS), Complete.
0032AA
First 500,000 CY 500,000 CY $_________ $_________
0032AB
All over 500,000 CY 100,000 CY $_________ $_________
Hydrographic Surveys of POA Transitional Survey Limits (See Note 2); Pre Dredge, Post Dredge and Intermediate Hydrographic Surveys, Complete
EA
TOTAL OF OPTION ITEMS (0031 thru 0033) FOR TRANSITION DREDGING: $_________
GRAND TOTAL BASE AND OPTION ITEMS (0001 THRU 0033): $_________
NOTES:
1. NTE = Not to Exceed. Unit pricing for NTE items is not subject to adjustment under FAR 52.211-18, Variation in Estimated Quantities however the quantity may be increased upon approval of the Contracting Officer.
2. ESTIMATED QUANTITIES: The quantities shown in the “QUANTITY” column for all unit priced items measured by the cubic yard (CY) above are estimated quantities. Actual quantities may vary. Reference FAR 52.211-18, Variation in Estimated Quantities and UAI 5152.211-9001 Variations in Estimated Quantities – Subdivided Items.
3. ADDITIONAL TRANSITIONAL DREDGING SURVEY LIMITS: See Drawing C-104 for limits of additional POA Transitional Survey area required during transitional dredging.
SECTION 00 22 11
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD
ONE STEP - - BEST VALUE
(SINGLE AWARD)
1.0 OVERVIEW
2.0 BASIS FOR AWARD
3.0 GENERAL INSTRUCTIONS
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS
5.0 VOLUME 1, TAB A - FACTOR 1: PERFORMANCE CAPABILITY
6.0 VOLUME 1, TAB B - FACTOR 2: EXPERIENCE
7.0 VOLUME 1, TAB C – FACTOR 3: PAST PERFORMANCE (CONFIDENCE ASSESSMENT)
8.0 VOLUME 2, TAB A – FACTOR 4: SMALL BUSINESS PARTICIPATION PLAN
9.0 VOLUME 2, TAB B – FACTOR 5: STANDARD FORM 1442, PROPOSAL DATA SHEET, AND
CONTRACT LINE ITEM SCHEDULE
10.0 VOLUME 2, TAB C – REQUIRED PRE-AWARD INFORMATION
11.0 VOLUME 2, TAB D - SMALL BUSINESS SUBCONTRACTING PLAN
12.1 EVALUATION PROCEDURES
ATTACHMENTS
1 – PROPOSAL DATA SHEET
2 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR
3 – PAST PERFORMANCE QUESTIONNAIRE
4 – SMALL BUSINESS PARTICIPATION PLAN FORMAT
5 – SMALL BUSINESS SUBCONTRACTING PLAN FORMAT
1.0 OVERVIEW
1.1. Interested firms (here after referred to as Offerors) shall submit proposals demonstrating their capability to successfully execute the construction contract resulting from this solicitation. The Government will evaluate the proposals in accordance with the criteria described herein.
1.2 This is a “Best Value” solicitation for 2018-2020 Maintenance Dredging at the Anchorage Harbor, located in Anchorage, Alaska. The Government will evaluate the proposals in accordance with the criteria described herein and award a firm fixed price contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation and is determined to represent the overall best value to the Government utilizing the trade-off process described in FAR 15.101-1.
2.0 BASIS FOR AWARD
2.1 The Contracting Officer will award a firm fixed price contract to the responsible Offeror whose proposal the Source Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined are considered significantly more important than price, however the contract award may not exceed the cost magnitude described in Section 00 21 00 for this project. The intent of this solicitation is to obtain the best proposal within the cost magnitude. After the Government individually evaluates and rates each proposal, the Contracting Officer/Source Selection Authority will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offerors. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. If there is a lower priced, conforming offer(s), the Contracting Officer/Source Selection Official must determine that the added value of a more expensive proposal would justify award to that offeror.
3.0 GENERAL INSTRUCTIONS
3.1. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
3.2 Submit a proposal in tabbed, three-ring binders in accordance with Section 00 21 00. Note that the Government will not evaluate any material that exceeds the page limits, indicated in the solicitation.
4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance
Volume 1, Tab A Factor 1 Performance Capability Most Important Factor
Volume 1, Tab B Factor 2 Experience 2nd Most Important Factor (slightly less important than
Factor 1)
Volume 1, Tab C Factor 3 Past Performance 3rd Most Important Factor (slightly less important than
Factors 2)
Location Factor Number Description Relative Importance
Volume 2, Tab A Factor 4 Small Business Participation Plan 4th Most Important Factor (significantly less important than
Factor 3)
Volume 2, Tab B Factor 5 Price (Standard Form 1442, Proposal Data Sheet Contract Line Item Schedule) Significantly less important than
Factors 1, 2, 3, and 4 combined
Volume 2 TAB C N/A Required Pre-Award Information Not Rated
Volume 2 TAB D N/A Small Business Subcontracting Plan Scored in accordance with AFARS, Appendix DD
5.0 VOLUME 1 – TAB A - FACTOR 1: PERFORMANCE CAPABILITY
5.1 Submission Requirements:
5.1.1 Provide a proposal with the following:
a. Identify the equipment type, size, capability, operating condition and production rates proposed to meet the maintenance dredging requirements, at the Anchorage Harbor, for removal of shoal material and transportation of that dredged material to the open water placement site. Indicate whether the equipment is owned or subcontracted and describe the availability of the equipment to be on site for the entire dredge season. Describe how the equipment will be able to successfully remove material to within five feet of the dock face. Address plan for equipment to be Dredge
Quality Management System compliant (Reference specification 35 20 23.13 or 35 20 23.23 as applicable).
b. Provide a brief survey plan including the independent survey firm name, qualifications, equipment, and strategy to meet the survey requirements of the solicitation and ensure accurate and timely submittal of the results.
5.1.2 Evaluation Criteria:
5.1.2.1 The Government will evaluate the proposed equipment to determine how well it can dredge the materials identified for the Anchorage Harbor in SECTION 35 30 24.00 29 and how well its production rates meet the dredging requirements for the removal of shoal maintenance material.
5.1.2.2 If the equipment proposed is not on hand or not manufactured, the Government will evaluate the Contractor’s plan to build or obtain the equipment in the timeframes available to start dredging on schedule and dredge the entire season. Greater consideration will be given to equipment currently manufactured.
5.1.2.3 The Government places a higher value on equipment that can dredge between 3,000 and 12,000 cubic yards per day of shoal material. The Government will evaluate the size and operating limits of the equipment to determine if it meets the requirement of SECTION 35 30 24.00 29 to dredge within 5 feet of the dock for maintenance dredging. The Government places a higher value on hopper dredges which are maneuverable and capable of meeting this requirement. Equipment which is not as maneuverable as a hopper dredge will be given a lower rating.
5.1.2.4 The Government will evaluate the survey plan to determine if it meets the contract requirements of SECTION 31 09 13.00 29 and the requirement to provide surveys within the time periods indicated. A higher rating will be given to plans that provide the names and qualifications of the independent surveyor.
6.0 VOLUME 1- TAB B - FACTOR 2: EXPERIENCE
6.1 1 Submission Requirements:
6.1.1 The prime contractor shall submit two (2) projects which demonstrate experience relevant to their role on this project on similar, relevant projects. The projects must demonstrate a record of recent, relevant experience dredging 500,000 cubic yards or more of shoal material during a dredging season of six (6) months or less and transporting and placing the dredge material within open-water placement site boundaries. Utilize the COMPANY SPECIALIZED EXPERIENCE FORM (Attachment 2) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a newly formed joint venture without any previous experience as the joint venture, each joint venture partner shall provide information demonstrating experience relevant to their role on this project. Submit projects that are currently well underway (at least 50% completed) or completed and turned over no longer than six (6) years preceding the date of this solicitation. Project examples should be limited to those projects performed by the firm submitting the offer. Offerors who submit experience information of a parent, sister, predecessor or other affiliated company must describe what involvement such company will have on the contract resulting from this acquisition. The proposal should clearly and specifically indicate how the resources of the parent, sister, predecessor or other affiliated company – its workforce, management, facilities, or other resources – will be provided or relied upon for contract performance. The Contracting Officer may discount experience of a parent, sister, predecessor or other affiliated company unless the prime contractor clearly provides, in its proposal, evidence of a binding teaming agreement or other contractual agreement which creates legal responsibility on the part of the parent, sister, predecessor or other affiliated company. If there is no contractual arrangement between the prime contractor and the parent, sister, predecessor or other affiliated company, provide a Meaningful Relationship Commitment Letter including the following:
1. Clear and legal identification of the meaningful relationship between the Offeror and entity identified.
2. A statement of commitment as to the performance and utilization of the identified entity’s resources on this project.
3. Signatures of both the Offeror and Meaningful Relationship Entity.
A firm may receive credit for relevant experience under a previous business arrangement (joint venture for example); if the firm demonstrates that their role on the project submitted for Specialized Experience is relevant to their anticipated role on this project. Clearly identify the role and responsibilities of each joint venture partner.
6.1.2 Provide a supplemental narrative, not to exceed two (2) pages, to address any of the following that are applicable. The information shall be limited to projects that are well underway (at least 50% completed) or have been completed within six (6) years and turned over.
…AM#1
(a) If submitting projects performed under a prior business arrangement (joint venture for example) for Specialized Experience, address why that experience is relevant to the experience of the firm submitting the offer. Clearly identify the role and responsibilities of each joint venture partner.
(b) Describe any previous teaming experience between proposed team members, if not described on the specialized experience forms. Identify specific projects.
6.2. Evaluation Criteria:
6.2.1. The Government will evaluate the extent to which the offeror has demonstrated a record of recent, related experience for dredging 500,000 cubic yards or more of shoal material during a dredging season.
Experience may include similar state or local government or private counterparts. Recent experience includes projects well underway (at least 50% completed) or those completed within six (6) years preceding the date of this solicitation.
6.2.2. The Government will evaluate the extent of similar, related experience of the prime contractor as relevant to their role on this project. The Government shall place greater importance on dredging projects which exceed the minimum experience requirement of 500,000 cubic yards of shoaled material per season.
For the prime contractor, the Government may place greater importance on projects performed as a prime contractor rather than as a subcontractor, depending upon overall role and relevancy considerations.
Federal Government project experience will not be rated inherently more important than non-Federal Government project experience. In assessing relevancy of Specialized Experience, the relevancy ratings included under the Past Performance evaluation factor will be utilized.
6.2.3. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), other DoD or Government appraisal systems or by interviewing owners or references. The Government may check any or all cited references to verify supplied information.
6.2.4. To receive credit for extent (amount) of experience, the prime contractor shall demonstrate a history of similar, relevant experience. Experience of a parent, affiliate or separate division will not be considered if the offeror fails to demonstrate what resources of the parent, sister, predecessor or other affiliated company will be provided or relied upon for this project or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister, predecessor or other affiliated company.
Experience under a previous business arrangement will not be considered relevant if the firm’s role on the submitted project is not considered relevant to their anticipated role on this project.
6.2.5. The Government will consider the extent of recent experience and degree of relationship of such experience to this project. Some examples of relevancy to this project include:
(a) Size, type and complexity of the work;
(b) Location of work and similarity to the type of equipment proposed to dredge this project;
(c) Firm’s familiarity with applicable maritime requirements and local conditions and;
(d) Firm's role and extent of work self-performed (brokering out all work on a cited project is an example of less relevant experience)
6.2.6. The Government may consider previous recent teaming experience among the team members as value added, even if on different types of construction projects than this project. The more relevant the experience, the more credit will be given.
7.0 VOLUME 1, TAB C - FACTOR 3: PAST PERFORMANCE (CONFIDENCE ASSESSMENT)
7.1. Submission Requirements:
7.1.1. Past performance refers to the quality of recent project experience from the owner's perspective. Past performance evaluations or questionnaires shall be provided for all projects submitted under Tab B. For Federal projects submitted under Specialized Experience (Tab B), the offeror may rely on finalized CCASS or CPARS reports, otherwise the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror to submit to the client for each project. Previously completed PPQ’s may be submitted however ensure a current phone number and email address is provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal and may be duplicated for submission on future solicitations. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the offeror should complete and submit with the proposal the first 2 pages of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Christine Dale, via email at christine.a.dale@usace.army.mil prior to the proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Projects cited shall be currently well underway (at least 50% progress completed) or completed within six
(6) years preceding the date of this solicitation.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting Systems (CPARS), inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
An offeror will not receive credit for past performance of a parent, sister, predecessor or other affiliated company if the offeror fails to demonstrate what resources of the parent, sister, predecessor or other affiliated company will be provided or relied upon for this project or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister, predecessor or other affiliated company. An offeror may receive credit for relevant past performance under a previous business arrangement (joint venture for example) if the offeror demonstrates that their role on the submitted project is relevant to their role on this project.
7.2. Evaluation Criteria:
7.2.1. The Government will first assess and rate the relevancy of recent projects accomplished by the offeror to the scope of this contract for overall application to the performance confidence assessment ratings described hereinafter. The projects will include those submitted under the Specialized Experience Factor as well as from other sources described above. This rating is not a separate proposal rating but is only used in developing overall past performance confidence assessment rating assigned to the Past Performance Factor. The past performance relevancy ratings are described below:
Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
7.2.2 The Government will next consider how well the offeror performed on the contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. An offeror may receive credit for relevant past performance under a previous business arrangement (joint venture for example); if the offeror demonstrates that their role on the project submitted is relevant to their role on this project. The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control and customer satisfaction. The Government places a higher value on projects, which document successful outcomes and are supported by outside source confirmation, such as CPARS or other agency performance databases, offeror furnished references, or personal knowledge. The Government also places a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The rating for this factor will be expressed as a degree of confidence in the offeror’s ability to successfully accomplish the contract requirements. The rating system used for the performance confidence assessment is as follows:
Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
7.2.3 Each entity (firm) will be rated on its own performance. Past performance of a parent, affiliate or separate division will not be considered if the offeror fails to demonstrate what resources of the parent, sister, predecessor or other affiliated company will be provided or relied upon for this project or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister, predecessor or other affiliated company. Past performance under a previous business arrangement will not be considered relevant if the offeror’s role on the project is not considered relevant. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence (Neutral)”.
8.1 VOLUME 2 SMALL BUSINESS PARTICIPATION AND PRICE
8.2 VOLUME 2, TAB A – FACTOR 4 SMALL BUSINESS PARTICIPATION
8.2.1 Submission Requirements:
8.2.1.1 All offerors shall identify the extent to which Small Businesses (SBs), Veteran-Owned Small
Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), HUBZone Small
Businesses, Small Disadvantaged Businesses (SDBs), Woman-Owned Small Businesses (WOSBs) and
Historically Black Colleges/Universities or Minority Institutions (HBCU/MIs) would be utilized in the performance of this proposed contract. For small businesses, as defined by the North American Industry
Classification System (NAICS) Code applicable to this solicitation, the offeror shall identify their own participation as a SB, VOSB, SDVOSB, HUBZONE SB, SDB, WOSB, or HBCU/MI, and it will be considered in evaluating the proposed small business participation plan (use Attachment 4 - Small Business
Participation Plan Format).
8.2.1.2 Offerors must propose goals for Small Business Participation. Small business participation goals are to be an estimated percentage of total contract dollars (total proposed amount including all options).
Provide an overall goal to be accomplished through collective small business participation from any type of small business, to include all small business programs, and propose individual goals for each small business program. The work to be performed directly by a small business prime offeror will be included the offeror’s
Small Business Participation goal.
8.2.1.3 The offeror’s proposal must meet the minimum Total Small Business Participation goal (all types of small business combined) of 20% of total proposed contract value including all options for this acquisition. Recommended goals for each small business category are as follows:
Small Disadvantaged Business 6% HUBZone Small Business 1% Women Owned Small Business 1% Service Disabled Veteran Owned SB 1% Veteran Owned Small Business 1% HBCU/MI Offeror’s best effort
8.2.2 Evaluation Criteria:
8.2.2.1 All Offerors (both large and small businesses) will be evaluated on the level of small business commitment that they demonstrate for the proposed acquisition.
8.2.2.2 A small business offeror also receives credit for their small business participation as a Prime
Contractor and can apply their dollar value when calculating percentages in all the applicable small business categories.
8.2.2.3 Small Business Participation Plans (from large and small businesses) will be evaluated on the basis of:
a. The extent to which Small Business firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to utilize the identified Small Business firms (for example, enforceable commitments are to be weighed more heavily than non-enforceable ones);
c. The complexity and variety of the work small business firms are to perform;
d. Past performance of the offerors in complying with requirement of the clauses at FAR 52.219-
8, Utilization of Small Business Concerns, and 52.219-9, Small Business Subcontracting Plan
(large businesses only); and
e. The extent of participation of SB firms in terms of total proposed contract dollars
(including options) and the extent to which the proposal meets or exceeds the small business participation goal for this acquisition.
9.0 VOLUME 2, TAB B – FACTOR 5: PRICE (STANDARD FORM 1442, PROPOSAL DATA
SHEET, AND CONTRACT LINE ITEM SCHEDULE)
9.1. Submission Requirements:
9.1.1. Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing. See instructions in Section 00 21 00, “Instructions to Offerors.”
Submit the Proposal Data Sheet (Attachment 1).
9.1.2 HUBZONE CONTRACTORS: This RFP includes Contract Clause 52.219-4 regarding a 10% price evaluation preference for HUBZone small business concerns. Those HUBZone small business concerns electing to waive the evaluation preference shall submit a copy of Clause 52.219-4 indicating such.
HUBZone small business concerns not waiving the evaluation preference shall submit a copy of their SBA certification letter under this tab.
9.1.3. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals, the Government will request a price breakdown of the Contract Line items in a sealed envelope marked “Price Breakdown Information,” in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three (3) working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an offeror to revise its non-price or price proposal.
9.2 Evaluation Criteria:
9.2.1 Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis which will consist of a comparison of proposed prices to the Independent Government Estimate and other offers received. The price evaluators will also check for appearance of unbalanced line item prices. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.
9.2.2 If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.
9.2.3 Award may not be made for total project cost exceeding the contract cost magnitude described herein.
10.0 VOLUME 2, TAB C - REQUIRED PRE-AWARD INFORMATION
10.1. Submission Requirements:
10.1.1. Submit this information for the Contracting Officer’s determination of Offeror responsibility, which includes, but is not limited to the following:
(a) Joint Venture Agreement or Limited Liability Company Certificate of Organization, Articles of
Organization and Operating Agreement, if applicable.
(b) A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor’s performance.
(c) A certified statement listing: (1) each contract awarded within the preceding three (3) month period exceeding $1,000,000.00 in value with a brief description of the contract; and (2) each contract awarded within the preceding three (3) year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract. If the prospective contractor is a joint venture, each joint venture member will be required to submit the above defined certification
(d) Competed Representations and Certifications included by full text in Section 00 45 00. List any changes to SAM (System for Award Management) in 52.204-8 for FAR Clauses and 252.204-
7007 for DFARS clauses. Provide for any certification where the offeror indicated in SAM that certification would be provided with specific offer.
(e) One copy of the following information shall be provided:
(1) Proof of Financial Ability (Most recent financial statement covering assets and liabilities)
(2) Number of years the firm has been in business
(3) Name, address and telephone number of firm’s bonding company
(4) Information showing offeror’s bondability for this project. Submit a letter from the prime contractor’s bonding company indicating the offeror’s ability to obtain performance and payment bonds in the full amount of their proposal price.
(5) Name, address and telephone numbers of two credit/trade references.
10.1.2. Evaluation Criteria:
In addition to the other proposal information, the Contracting Officer shall use this information in making an affirmative responsibility determination for award to the Successful Offeror.
11.0 VOLUME 2, TAB D – SMALL BUSINESS SUBCONTRACTING PLAN
11.1 Submission Requirements: (This requirement applies to large businesses only)
11.1.1 eparate and distinct from the Small Business Participation Plan, large business offerors must also submit a Subcontracting Plan, as required by FAR 52.219-9, under Volume 2, Tab D. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. The Subcontracting Plan will be based on subcontracted dollars rather than total contract dollars but shall reflect and be consistent with the commitments to small business firms outlined in the Small Business Participation Plan.
11.1.2 If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM REPRESENTATION”, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN and DFARS 252.219-7003, “SMALL BUSINESS SUBCONTRACTING PLAN” (see Section 00 72 00 of this solicitation).
11.1.3 The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with AFARS Appendix DD and FAR Clause 52.219-9, as it will be incorporated into the contract upon award upon final approval of the Contracting Officer. The Small Business Subcontracting Plan format at Attachment 5 may be utilized.
11.1.4 The Plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB) (to include historically black colleges and universities/minority institutions (HBCU/MI)), woman-owned small business (WOSB), HUBZone business, veteran-owned small business (VOSB) and service-disabled veteran-owned small business (SDVOSB), along with the proposed dollars and percentages Subcontracting.
11.2 Evaluation Criteria:
The Government will evaluate the Plan in accordance with the rating scheme in AFARS Appendix DD (http://farsite.hill.af.mil/VFAFARA.HTM) and with the requirements of FAR Clause 52.219-9. Offerors are encouraged to review AFARS Appendix DD for how the subcontracting plan will be scored. To be acceptable, subcontracting plans must address all requirements in AFARS Appendix DD, DD-301.
12.0 EVALUATION PROCEDURES
12.1. SOURCE SELECTION EVALUATION BOARD (SSEB)
12.1.1. The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.
12.2. EVALUATION
12.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor.
12.2.2. The Government intends to award without discussions. Offerors are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it.
12.2.3. A “Competitive Range” is a subjective determination of the most highly rated proposals in the event the Government decides that discussions with offerors are required or are considered to be in the Government’s best interests. In such an event, the Contracting Officer will establish a competitive range of all the most highly rated proposals.
12.2.4. If discussions are held, the Government may engage in a broad give and take with those offerors in the competitive range, in accordance with FAR 15.306(d). During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it.
12.2.5. Upon conclusion of discussions, those offerors still considered the most highly rated, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.
12.3. DEFINITIONS
12.3.1. Deficiency
A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
12.3.2. Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
12.3.3. Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
12.3.4. Strength: Any aspect of a proposal that, when judged against a stated evaluation criterion, enhances the merit of the proposal or increases the probability of successful performance of the contract.
12.3.5. Significant Strength: A significant strength appreciably enhances the merit of a proposal or appreciably enhances the probability of successful contract performance.
12.3.6. Deviation: Proposal implies or specifically offers a deviation below the specified criteria. The offeror may or may not have called the deviation to the Government’s attention. A deviation is a deficiency. The proposal must conform to the solicitation requirements for award.
12.4 EVALUATION RATING SYSTEM
12.4.1 General: The Government will review the proposals and rate the quality of each evaluation factor.
The SSEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements.
Proposals will not be compared at this time. After all proposals are rated, the Government will compare the ratings and relative advantages and disadvantages of proposals against each other in order to determine which offeror provides the best value to the Government.
12.4.2 Review Write-up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.
12.4.3 Rating System: After listing proposal strengths, weaknesses and deficiencies, the SSEB will assign an adjective rating of “Outstanding,” “Good,” “Acceptable,” “Marginal,” or “Unacceptable” to each factor (except the Past Performance Factor) and for the overall technical proposal. The ratings reflect the Government's confidence in each offeror's ability, as demonstrated in its proposal, to perform the requirements stated in the RFP. The adjectival ratings shall be assigned using the following criteria, which incorporate a proposal risk assessment:
12.4.3.1 Outstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
12.4.3.2 Good: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
12.4.3.3 Acceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
12.4.3.4 Marginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
12.4.3.5 Unacceptable: Proposal…