Attachment_2_-_Revisions_Informational_Sheet_19-B-0033_Construct_New_Building_A_NFH.docx

DOCX document 13 KB Posted

Attached to
Construct New Administration Building A Federal contract opportunity
Solicitation number
W91151-19-B-0033
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Attachment 2 - Revisions Informational Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Administration Building A, newest first.
File Type Posted
Bid_Opening_Sign_In_Roster_19-B-0033_Construct_New_Admin_Bldg_A_NFH.pdf PDF
Bid_Abstract_2-3_19-B-0033_Construct_New_Administration_Building_A_NFH.pdf PDF
Signed_Bid_Abstract_19-B-0033_Construct_New_Administration_Building_A_NF....pdf PDF
W91151-19-B-0033_Amendment_0004.pdf PDF
Technical_Exhibit_C_-_Revised_Specifications_19-B-0033_Construct_New_Building_A_NFH.pdf PDF
Amendment_03_19-B-0033_Construct_New_Building_A_NFH.pdf PDF
Amendment_02_19-B-0033_Construct_New_Administration_Building_A.pdf PDF
Amendment_01_19-B-0033_Construct_New_Administration_Building_A_NFH.pdf PDF
Site_Visit_Sign_In_Roster_19-B-0033_&_0034_Construct_Administration_Building_A_&_B.pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_11-20).pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_81-110).pdf PDF
Technical_Exhibit_B_-_Drawings_(Pages_1-10).pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_21-50).pdf PDF
Attachment_1_-_Appendix_A.pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_62-80).pdf PDF
Solicitation_19-B-0033_Construct_New_Administration_Building_NFH.pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_51-61).pdf PDF
Technical_Exhibit_A_-_Specifications_.pdf PDF
Technical_Exhibit_B-_Drawings_(Pages_111-122).pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING REVISIONS

1. REMOVED SCOPE RELATED TO THE DRIVEWAY, FENCING AND GUARDHOUSE PAD. REMOVED ASSOCIATED FENCING/PAVING DETAILS.

2. REMOVED DETAILS RELATED TO AMERICAN WATER’S INSTALLATION. AMERICAN WATER WILL BE RESPONSIBLE FOR FOLLOWING THEIR OWN SPECIFICATION.

3. CHANGED THE BUILDING EXTERIOR FAÇADE INSULATED METAL PANELS & INSULATED CONCRETE MASONRY SYSTEM TO EIFS.

4. REMOVED REQUIREMENT FOR CONCRETE ENCASEMENT OF UG COMMUNICATION TO THE BUILDING.

5. REDESIGNED THE BUILDING STRUCTURE AND SLAB (SEE REVISED STRUCTURAL DRAWINGS).

a. FOUNDATION: REDUCED TOTAL VOLUME OF CONCRETE. REDUCED SIZE AND QUANTITY OF REINFORCING STEEL.

b. Special INSPECTIONS: PERMITTED DPW ENGINEERING DIVISION TO PERFORM SPECIAL INSPECTIONS. THIRD PARTY TESTING SHALL STILL BE REQUIRED PER PROJECT SPECIFICATIONS.

c. MISC.

6. REVISED NOTES RELATED TO BLAST WINDOWS. REFERENCED STRUCTURAL DRAWINGS FOR PRESCRIPTIVE WINDOW REQUIREMENTS.

SPECIFICATIONS

1. ADDED SPEC SECTION 07 24 00 – EXTERIOR INSULATION AND FINISH SYSTEMS

2. DELETED SPEC SECTION 04 20 00.10 – INSULATED CONCRETE MASONRY SYSTEM

3. EDITED SPEC SECTION 08 51 13 TO CLARIFY INTENT ON BLAST WINDOW REQUIREMENTS. REFERENCE STRUCTURAL DRAWINGS FOR PRESCRIPTIVE WINDOW REQUIREMENTS.

4. VARIOUS SPECIFICATIONS – CLARIFIED THE GOVERNMENT’S INTENT REGARDING WARRANTY AND EXTENDED WARRANTIES. UPON FINAL ACCEPTANCE OF THE CONTRACT, THE GOVERNMENT REQUIRES A YEAR WARRANTY, AS SPECIFIED IN DIVISION 1. THE GOVERNMENT ALSO REQUIRES AN EXTENDED ROOF WEATHER TIGHTNESS WARRANTY, AS SPECIFIED IN SECTION 13 34 19. BEYOND THAT, THE GOVERNMENT WILL ACCEPT MANUFACTURER’S STANDARD PERFORMANCE GUARANTEES OR WARRANTIES THAT EXTEND BEYOND A 1-YEAR PERIOD.

File details come from the government source that posted it.