About this file
Amended Solicitation - RFI Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Drawings_AD102429P.PDF | ||
| Site_Visit_Sign_In_Roster_W91151-19-B-0023.pdf | ||
| Site_Visit_Sign_In_Roster_19-B-0023_Install_Signs_at_Building_36000.doc | DOC document | |
| Site_visit_agenda_19-B-0023_Install_Signs_at_Building_36000.doc | DOC document | |
| Technical_Exhibit_B_-_Drawings_(2).pdf | ||
| Solicitation_W91151-19-B-0023_26_Jun_2019.pdf | ||
| Technical_Exhibit_A-Specification_3-25-2019.pdf | ||
| Attachment_1-Appendix_A_27-JUL-2018_(1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011343801
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. The purpose of this amendment is for the Government to post their response to industry questions.
b. The purpose of this amendment is to add revised draw ings.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115119B0023
X 9B. DATED (SEE ITEM 11)
26-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2019
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115119B0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A 3173 27-APR-2019 Exhibit B Technical Exhibit B 13 29-APR-2019 Attachment 1 Appendix A 139 01-JUL-2019 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A 3173 27-APR-2019 Exhibit B Technical Exhibit B 13 29-APR-2019 Exhibit C Technical Exhibit C -
Revised Drawings
14 29-APR-2019
Attachment 1 Appendix A 139 01-JUL-2019
The following have been added by full text:
RFI RESPONSES
Solicitation 19-B-0023 Install Signs at Building 36000, Shoemaker Center Building RFIs Contractor submitted after Site Visit on 3 July 2019
1. There are no pad or slab details provided, will one be provided?
Contractor will be responsible for providing stamped shop drawings showing a foundation plan, structural plans/details, and framing plan to support the sign as designed.
2. There are no doweling details provided, will any be required?
Contractor will be responsible for providing stamped shop drawings showing a foundation plan, structural plans/details, and framing plan to support the sign as designed.
3. Drawing sheets C-501, and 502 show no framing details in reference to how the cement board is to attach, will any framing details be provided?
Contractor will be responsible for providing stamped shop drawings showing a foundation plan, structural plans/details, and framing plan to support the sign as designed.
4. Will a lay down area be provided, or do we only bring in materials needed for that day’s work?
A lay down area in the south parking lot will be designated for the contractor through the COR.
5. Will there be an area provided for a dumpster?
Yes, collocated with the lay down area.
6. Will a concrete pad be needed for the foundation of the two (2) new exterior sign structures?
Contractor will be responsible for providing stamped shop drawings showing a foundation plan, structural plans/details, and framing plan to support the sign as designed.
7. Will any electrical be required for the two (2) new exterior signs?
No, no electrical lighting nor power will be installed with the signs.
8. Pages C-501 and C-502, Can more details be provided for section 2 structural frame detail? Framing material?
Sheathing material?
Contractor will be responsible for providing stamped shop drawings showing a foundation plan, structural plans/details, and framing plan to support the sign as designed.
9. Are there latrines available for use on this project? Or will the contractor be responsible for supplying portable latrines to the on-site workers?
Contractors may use public restrooms within building 36000. Coordinate with COR for any equipment cleaning.
10. What color is the EIFs to be?
EIFS shall be finished to match SW 7027 “Well-Bred Brown”
11. What size split-face 4",6"or 8"?
8” splitface
12. Vertical rebar and grout ? if so what spacing ?
See revised C-501 and C-502
13. Is a Bond beam required?
See revised C-501 and C-502
14. Is Special Radius CMU required at the bench or short pieces to make the radius?
Short pieces are acceptable.
15. Where CMU column surrounds. Is it at 3 sides only or does it return back to the EIFS ?
Returns back to EIFS.
16. Is there a backup wall behind the CMU columns to anchor to?
To be determined by shop drawings.
17. Are the Columns to be built to the size as shown or count the courses?
Built to size shown. Number of courses may vary slightly.
18. Are the signs one sided or two sided?
2-sided.
19. How will the directory occupancy be attached or changed out?
Interior Directory Stands will each receive one paper print of the appropriate directory based on floor served. See general note 2, sheets A-100, 101, 102, 103, 104, 105
20. Are there any interior signs?
Yes, see A-100, 101, 102, 103, 104, 105
21. The drawings do not show a concrete foundation for the 2 exterior signs, what is required?
See revised C-501 and C-502
22. What type of structure is required to mount the exterior signs, drawing C-502, note 2 just states cement board for attaching signs?
See revised C-501 and C-502
23. The outside signs are to be constructed on uneven surfaces, is this correct?
Locations are currently uneven, contractor shall grade area directly beneath signs to level, and slope outward to meet existing grade. See revised C-103 and C-104.
24. Work Experience section of RFP: this section requires 3 examples of relevant wwork experience from the General Contractor. Will we be allowed to submit our prime subcontractors experience in lieu of the general contractors experience? This SOW is very specific not many WOSB contractors will be able to meet this requirement.
That is acceptable
25. How thick does the lettering need to be?
See C-503.
26. Will the referenced plants be provided by the Government?
No. See revised C-501 and C-502.
27. Will there be a foundation plan provided?
See revised C-501 and C-502
28. Will there be CMU on all 4 sides of the column or will the inside be EFIS?
CMU on all 4 sides of columns.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
a. The purpose of this amendment is for the Government to respond to industry questions.
b. The purpose of this amendment is to add revised drawings.
(End of Provision)
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Technical Exhibit A Specifications W91151-19-B-0023 Technical Exhibit B Drawings W91151-19-B-0023 Technical Exhibit C Revised Drawings W91151-19-B-0023 Attachment 1 Appendix A W91151-19-B-0023
(End of clause)