Technical_Exhibit_B-_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Replace Boilers Bldg 10009, 10006 Federal contract opportunity
- Solicitation number
- w9115118b0023
About this file
Technical Exhibit B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2_Wage_Determination.docx | DOCX document | |
| Attachment_1-Appendix_A_04-Aug-2016.pdf | ||
| Technical_Exhibit_A-Specifications_1-11-16.pdf | ||
| 23_Solicitation_18-b-0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
N
1"=200’
BUILDING LEGEND (POINTS OF INTEREST)
INDEX OF DRAWINGS
HWY 84
HWY 84
HWY 36
F .M
RES.BD.
RES.BD.
R E S . B
D
RES. BD.
R E
S .B
D
KILLEEN
CANTONMENT
AREA
WEST
FORT
HOOD
GATESVILLE
NORTH
FORT
HOOD
RESERVATION
BELTON
LAKE
COPPERAS
COVE
HWY190
HWY190
FORT HOOD AREA MAP
O L
D G
E O
R G
E T
O W
N R
D
E A
S T R
A N
G E R
D
N O
LA
N R
D
FORT HOOD
W E S
T R
A N
G E R
D
C L
A R
K E R
D
H W
Y
35 37
LOCATION
PROJECT
LAREDO
CORPUS
CHRISTI
HOUSTON
AUSTIN
KILLEEN
WACO
FORT WORTH DALLAS
FORT
SMITH
OKLAHOMA
CITY
TULSA
AMARILLO
ALBUQUERUE
SANTA FE
VICINITY MAP
LOUISIANA
MEXICO
MEXICO
TEXAS
ARKANSAS
NEW
MEXICO
ELPASO
OKLAHOMA
GULF OF
SAN ANTONIO
FORT HOOD
WICHITA FALLS
N
SCALE IN MILES
1/2 1
FORT HOOD MILITARY RESERVATION
MAIN CANTONMENT AREA
N
0 100 200
SCALE IN MILES
N
0 5 10
SCALE IN MILES
NORTH SYMBOL
GENERAL SYMBOLS
REVISION NUMBER
WALL TYPE MARK
DOOR MARKWINDOW MARK
DETAIL NUMBER
REFERENCE FROM
REFERENCE TO
G-101
C O
V E
R S
H E
E T
FORT HOOD,TEXAS
FORT HOOD DIRECTORATE OF PUBLIC WORKS-ENGINEERING DIVISION
NOTE BY SYMBOL
SHEET DESCRIPTION
W E S T R
A N
G E R
D
MONTAGUE VILLAGE
VILLAGEII
COMANCHE
CENTRAL DR
LANDFILL
FT.HOOD
W R
A T
T E
N
PATTON
PARK
BATTALION
NORTH
761ST
NORTH
WALKER VILLAGE
HOOD
ARMY
AIRFIELD
HILLIARD
CENTRAL
TEXAS
COLLEGE
HEIGHTS
WEST
FT.HOOD
VILLAGEIII
MURPHY
TURKEYRUN
T
H
N D
H W
Y
T
H
R
D
M U
R P
H Y
T
H
M A
R T
IN
62ND
WAINWRIGHT
TO
VILLAGEI
COMANCHE
T
H
T
H
LIBERTY VILLAGE
OLD IRONSIDES
BATTALION AVE
HELL ON WHEELSC
L
A R
K E R
O A
D C
L A
R K
E R
O A
D
C L E
A R C
R E
E K
US HIGHWAY 190
HELL ON WHEELS
OLD IRONSIDES
WARRIOR WAY
BUSINESS ROUTE 190
US HIGHWAY 190
PERSHING PARK
VENABLE VILLAGE
CHAFFEE VILLAGE
US HIGHWAY 190
RAIL HEAD
McNair Village
TANK DESTROYER RD
COPPERAS COVE RD
WEST RANGE RD
Santa Fe Av e
WAREHOUSE AVE
DESTROYER RD
TANK
COPP
ERAS
COVE
RD
O L
D G
E O
R G
R T
O W
N R
D
TURKEYRUN
C L E
A R C
R E
E K
T
H
EAST
R
AN
G E
R D
NORTH NOLAN RD
WEST RANCIER AVE
SOUTH RANGE RD
F T H
O O
D S
T
T .J
M
IL
L S B
L V
D
A
A
N
A
A
PROJECT SITE
BUILDING 4612 (DIRECTORATE OF PUBLIC WORKS)
DARNALL ARMY HOSPITAL
III CORPS HEADQUARTERS
COMPLETION DATE: 10-18-2017
AMERI VET ENTERPRISES LLC
FINAL AS BUILT DRAWING
HOT WATER SYSTEM CONTROLSM-701
MECHANICAL DETAILSM-501
MECHANICAL FLOOR PLANM-101
DEMOLITION PLAN - MECHANICAL PIPING D-101
COVER SHEETG-101
REPLACE BOILERS BLDG 10006 & 10009
PROJECT NO: CBM900578P
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F T
H O
O D T
E X
A S
S A
N T
A F
E E
N G
IN
E E
R D
R
B
L D
G
F O
R T H
O O
D T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E O
F
A B C D E F
D a te
D e s c ri p ti o n
DPW
FORT HOOD TEXAS
n oi sivi
D secivreS & gn ir ee ni g n
E
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T M
A N
A G
E R
D
A T
E
T
IM
E
F
IL
E L
CBM900578P
R E
P L
A C
E B
O
IL
E R
S
C .W
IT
T
C .W
IT
T
-A
P R -2
W -1
-C -X
X X
F O
R S
O L
IC
IT
A T
IO
N T
E C
H N
IC
A L E
X H
IB
IT
B
10006 &10009
HELL ON WHEELS AVE
OLD IRONSIDES AVE
T
H S
T
T
H S
T
T
H S
T
T
H
S
T T
H
S
T
CENTRAL DR
CENTRAL DR
10009
10035
10043
10017
10016
11030
10029
10018
10011
10015
10014
10008
10010
10007
10006
NOTES:
D-101SCALE: 1/8" = 1’
SCALE (FEET)
0 8 164 KEY PLANBASEMENT DEMOLITION PLAN - AREA A
P L
A N A
R E
A A
B A
S E
M E
N T D
E M
O L
IT
IO
N
N N
M A
T C
H L
IN
E
A R
E A B
KEY NOTES:
PATCH OPENING IN CHIMNEY
DEMO ALL EXHAUST DUCT AND
1.
2.
3.
PAD TO REMAIN FOR NEW BOILERS.3.
BACK TO EXISTING DISCONNECT.
SCHEDULE. DEMO PUMP STARTER AND CONDUIT
VALVES REFERENCE M-501 FOR DETAILS AND
REPLACE PUMP AND PIPING BACK TO ISOLATION2.
TO BE REMOVED.
CONDUIT MAY BE RE -USED, ANY UNUSED CONDUIT
DEMO CONTROL PANELS AND WIRING CONDUIT.1.
EQUIPMENT LIST
DESCRIPTIONNO.
EXPANSION TANK
EXPANSION TANK
EXPANSION TANK
CFS-1 CHEMICAL FEEDER SYSTEM
B-1 BOILER
B-2 BOILER
EPT-1
EPT-2
EPT-3
HWH-1 HOT WATER HEATER
HWH-2 HOT WATER HEATER
HWP-1 HOT WATER PUMP
HWT-1 HOT WATER STORAGE TANK
HOT WATER STORAGE TANKHWT-2
SF-1 SUPPLY FAN
22 2
TO INCLUDE ELECTRICAL AND CONTROL WIRING.
DEMO HB1, HWP1, AND ALL ASSOCIATED PIPING
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F T
H O
O D T
E X
A S
S A
N T
A F
E E
N G
IN
E E
R D
R
B
L D
G
F O
R T H
O O
D T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n sivi
D secivreS & gn ir ee ni g n
E
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T M
A N
A G
E R
D
A T
E
T
IM
E
F
IL
E L
CBM900578P
R E
P L
A C
E B
O
IL
E R
S
C .W
IT
T
C .W
IT
T
-A
P R -2
W -1
-C -X
X X
F O
R S
O L
IC
IT
A T
IO
N T
E C
H N
IC
A L E
X H
IB
IT
B
10006 &10009
HWT
HWT
CWP
HWP
HB
T
BCD
E
A
DN
ARMS ROOM
B04
DEPLOYMENT
AREA
B03
MECHANICAL
ROOM
B02
ELECTRICAL
ROOM
B01
UNEXCAVATED
ABCD
E
4"
1 1/2"
BC
A
LEGEND:
EXISTING COLD WATER RETURN
EXISTING CONDENSATION DRAIN
EXISTING DISCONNECT BOX
EXISTING HOT WATER SUPPLY
EXISTING COLD WATER SUPPLY
HVAC CONTROL PANELS
FRONT OF PANEL
EXISTING PANEL, 3’ CLEARANCE
M-101SCALE: 1/8" = 1’
SCALE (FEET)
0 8 164 KEY PLANBASEMENT MECHANICAL PLAN - AREA A
P L
A N A
R E
A A
B A
S E
M E
N T D
E M
O L
IT
IO
N
N N
M A
T C
H L
IN
E
A R
E A B
KEY NOTES:
EQUIPMENT LIST
DESCRIPTIONNO.
EXPANSION TANK
EXPANSION TANK
EXPANSION TANK
CFS-1 CHEMICAL FEEDER SYSTEM
B-1 BOILER
B-2 BOILER
EPT-1
EPT-2
EPT-3
HWH-1 HOT WATER HEATER
HWH-2 HOT WATER HEATER
HWP-1 HOT WATER PUMP
HWT-1 HOT WATER STORAGE TANK
HOT WATER STORAGE TANKHWT-2
SF-1 SUPPLY FAN
RISERS PER MANUFACTURER RECOMMENDATIONS.
INSTALL EXTERIOR EXHAUST FLUE AND COMBUSTION AIR3.
CONNECTIONS ON BOILER PIPING SEE M-501 FOR DETAILS.
CONTRACTOR SHALL USE FLEX CONNECTORS FOR FINAL2.
TO EXISTING. SEE DETAILS M-501.
REPIPE AS NECESSARY TO RECONNECT HYDRONIC PIPING1.
GENERAL NOTES:
NEW DDC CONTROLLER.
NEW VFD PUMP CONTROLLER.
PIPE PER MANUFACTURING RECOMMENDATIONS.
COMBINE FLUE PIPE AND COMBUSTION AIR
NECESSARY FOR FLUE PIPING.
1 PIECE PATCH PLATED AND CUT HOLES
CONTRACTOR TO USE STAINLESS STEEL FOR
BOILERS CIRC PUMPS
MOTOR STARTERS FOR
NEW HWP
NEW BOILERS
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F T
H O
O D T
E X
A S
S A
N T
A F
E E
N G
IN
E E
R D
R
B
L D
G
F O
R T H
O O
D T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n
SHEET OF
sivi
D secivreS & gn ir ee ni g n
E
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T M
A N
A G
E R
D
A T
E
T
IM
E
F
IL
E L
CBM900578P
R E
P L
A C
E B
O
IL
E R
S
C .W
IT
T
C .W
IT
T
-A
P R -2
W -1
-C -X
X X
F O
R S
O L
IC
IT
A T
IO
N T
E C
H N
IC
A L E
X H
IB
IT
B
10006 &10009
T
BCD
E
A
DN
ARMS ROOM
B04
DEPLOYMENT
AREA
B03
MECHANICAL
ROOM
B02
ELECTRICAL
ROOM
B01
ABCD
E
4"
1 1/2"
BC
A
LEGEND:
EXISTING COLD WATER RETURN
EXISTING CONDENSATION DRAIN
EXISTING DISCONNECT BOX
EXISTING COLD WATER SUPPLY
HVAC CONTROL PANELS
FRONT OF PANEL
EXISTING PANEL, 3’ CLEARANCE
M E
C H
A N
IC
A L D
E T
A
IL
S
NOTES:
1 1
1 REPLACE BOILER AND PIPING
PER MANUFACTURER INSTALLATION
INSTRUCTIONS.
2 EXISTING TO REMAIN.
FLEX CONNECTORS ON BOILERS.
INSTALL NEW TEMPERATURE AND PRESSURE GAUGES (TYP).
4 4
M-501
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F T
H O
O D T
E X
A S
S A
N T
A F
E E
N G
IN
E E
R D
R
B
L D
G
F O
R T H
O O
D T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n sivi
D secivreS & gn ir ee ni g n
E
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T M
A N
A G
E R
D
A T
E
T
IM
E
F
IL
E L
CBM900578P
R E
P L
A C
E B
O
IL
E R
S
C .W
IT
T
C .W
IT
T
-A
P R -2
W -1
-C -X
X X
F O
R S
O L
IC
IT
A T
IO
N T
E C
H N
IC
A L E
X H
IB
IT
B
10006 &10009
SCALE: 1/4" = 1’
80 4
SCALE (FEET)
-1 /2
H W
R
-1 /2
H W
S
-1 /2
H W
R
-1 /2
H W
S
-1 /2
G A
S
-1 /2
G A
S
M
M
GROUND MOUNTED PUMP DETAILS
HOT WATER BOILER PIPING WITH
E X
P A
N S
IO
N T
A N
K 150
BOILER-1 BOILER-2
HOT WATER BOILER SCHEDULE
MARK
95%
SERVICE
SYSTEM
HEATING
CAPACITY
OUTPUT
1260 MBH
FLOW
WATER TEMP.
EFF.
MIN
EWT LWT
155”F 180”F
ELECTRICAL DATA
120V/15A/1HP/60HZ 1, 2, 3, 4, 5
NOTES
NOTES:
BOILER PUMP
BOILER PUMP
AIR VENT
AIR SEPARATOR
BALL VALVE
DRAIN VALVE
TEMPARATURE SENSOR
THERMOMETER
ISOLATION VALVE
FLEX CONNECTOR
(HWP-1)
HEATING WATER PUMP
91.5 GPM
HEAD
NOTES:
PUMP SCHEDULE
HWP-1
FLOW
91.5 GPM SEE NOTE 1
ELECTRICAL
208/3PH/1800RPM
PROVIDE PUMP WITH VFD FOR BALANCING AND SOFT START.2.
SUBMIT FINDINGS OF TEST REPORT WITH SUBMITTAL OF NEW PUMP.
DETERMINE THE SYSTEM CURVE AND THE HEAD REQUIREMENT OF THE NEW PUMP.
CONTRACTOR TO MEASURE FLOW AND HEAD OF EXISTING PUMP IN ORDER TO 1.
B-1, B-2
EXISTING LIGHTS EXISTING LIGHTS
BACKFLOW PREVENTER
MAKE-UP WATER
RELIEF VALVE
PRESSURE REDUCING
VALVE
PROVIDE WITH OPTIONAL LON CARD.6.
CONDENSING BOILERS (MODEL BMK-1500).
BOILERS TO BENCHMARK 1500 HIGH EFFIENCY BOILERS DUAL FIRED5.
PROVIDE GAS PIPE CONNECTED TO BOILER WITH NEW GAS VALVE AND INTEGRAL DRIP LEG.4.
HOT WATER BOILER TO BE PROVIDED WITH MANUFACTURED IN LINE CIRCULATING PUMP.3.
HOT WATER BOILER TO BE LOW NOX AS REQUIRED BY TAC.2.
PROVIDE BOILER WITH FORCED DRAFT BURNER.1.
FROM BUILDING
TO BUILDING
VALVE
RELIEF
VALVE
RELIEF
BOTH SIDES
TEST PORTS ON
STRAINER WITH
DRAIN VALVE
FINISHED FLOOR
SUCTION DIFFUSER
TEST PORTS
WITH INSTALLED
TRIPLE DUTY VALVE
TEST PORT
TEST PORTTEST PORT
TEST PORT
TEST PORT
CIRCUIT SETTER
CIRCUIT SETTER
M-701
C O
N T
R O
L S
H O
T W
A T
E R S
Y S
T E
M
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F T
H O
O D T
E X
A S
S A
N T
A F
E E
N G
IN
E E
R D
R
B
L D
G
F O
R T H
O O
D T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n sivi
D secivreS & gn ir ee ni g n
E
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T M
A N
A G
E R
D
A T
E
T
IM
E
F
IL
E L
CBM900578P
R E
P L
A C
E B
O
IL
E R
S
C .W
IT
T
C .W
IT
T
-A
P R -2
W -1
-C -X
X X
F O
R S
O L
IC
IT
A T
IO
N T
E C
H N
IC
A L E
X H
IB
IT
B
10006 &10009
S
20 30 40 50 60 70
H O
T W
A T
E R S
E T P
O
IN
T
F
OUTSIDE AIR TEMPERATURE °F
E
S
E
HOT WATER SYSTEM SEQUENCE OF OPERATION:
DDC
DDC
DDC
T
T
DDC
T
T
DDC
DDC
HOT WATER SYSTEM CONTROLS DIAGRAM
HOT WATER RESET SCHEDULE
M
M
M
M
CONTROLS LEGEND
DDC
S
LON
TEMPERATURE SENSOR
DIRECT DIGITAL CONTROL SYSTEM
BOILER ENABLE
BOILER STATUS
LWA
HTA
LOW WATER ALARM
HIGH TEMP ALARM
E
DDC
S
LON
GENERAL NOTES:
T
BY BOILER CONTROLS
CIRC. PUMP ENABLED
T
E
BOILER-2BOILER-1
OUTSIDE AIR SENSOR
NEW DDC CONTROLLER
HOT WATER PUMP
NOT TO SCALE
NOT TO SCALE
WATER SYSTEM ENABLE SETPOINT OR THE SCHEDULE IS IN UNOCCUPIED MODE.
DISABLED WHENEVER THE OUTSIDE AIR TEMPERATURE IS 3° F BELOW THE CHILLED
AND THE OUTSIDE AIR TEMPERATURE IS ABOVE 60° F (ADJ.) THE SYSTEM WILL BE
THE CHILLED WATER SYSTEM WILL BE ENABLED WHENEVER THE OCCUPIED MODE1.
E
S
LON LOCAL OPERATING NETWORK
TT
M
M
NOT TO SCALE
CHILLED WATER SYSTEM SQUENCE OF OPERATION
CHILLED WATER SYSTEM SEQUENCE OF OPERATION:
ROUTER LOCATED IN BUILDING COMMUNICATIONS ROOM.
CONTRACTOR TO ROUTE LON TRUNK FROM NEW CONTROLLER TO EXISTING ILON7.
NECESSARY TO ACCOMPLISH THIS SPECIFIED SEQUENCE OF OPERATION.
6. INSTALL NEW SENSORS, RELAYS, ACTUATORS, AND OTHER DEVICES THAT ARE
5. INSTALL ALL NEW CONTROL COMPONENTS TO BE LON WORKS COMPLIANT.
THE DDC CONTROL PANEL IN THE MECHANICAL ROOM.
4. INSTALL NEW CONTROL DEVICES TO BE PLACED AS SHOWN AND CONNECT TO
CONTROL SYSTEMS IN THE MECHANICAL ROOM.
3. REPLACE OUTSIDE AIR SENSOR WITH NEW SENSOR AND CONNECT TO THE NEW DDC
THE NEW CONTROLLER SHALL BE LON WORKS COMPLIANT.
AND ASSOCIATED DDC CONTROL COMPONENTS.
2. PROVIDE NEW DDC CONTROL SYSTEMS TO INCLUDE NEW CONTROLLER,
CONTROL PANEL AND ALL EXISTING CONTROL COMPONENTS (RELAYS, SENSORS...ETC).
1. DEMO EXISTING DDC CONTROLLER (BOILER’S CONTROLLER) LOCATED IN THE EXISTING
AND VISE VERSA).
TUESDAY. (WHEN THE LAG BOILER STARTS, THE LEAD BOILER SHALL BE DISABLED
CONTROLLER WILL ALTERNATE THE LEAD AND LAG BOILERS WEEKLY, AT 0200
MORE THAN THE 30 MINUTES, THE LAG BOILER WILL BECOME THE LEAD. THE
LEAD/LAG - ONCE ENABLED, IF THE HOT WATER TEMPERATURE IS BELOW SETPOINT FOR 3.
THE BOILER MAINTAINS ITS DISCHARGE TEMPERATURE BASED ON ITS INTERNAL CONTROLS.
PROVIDES THE HOT WATER SUPPLY TEMPERATURE SETPOINT BASED ON A RESET SCHEDULE.
TEMPERATURE CONTROL - WHEN THE HEATING SYSTEM IS ENABLED, THE DDC 2.
AFTER A 5 MINUTE DELAY THE PUMP WILL BE STOPPED.
THE SETPOINT. ONCE DISABLED THE BOILER WILL BE DISABLED FIRST AND
DISABLED BY THE SCHEDULE OR THE OUTSIDE AIR TEMPERATURE IS ABOVE
BOTH PUMPS AND BOILER OPERATE CONTINUOUSLY UNTIL THE SYSTEM IS
SENSING RELAYS VERIFY PUMP OPERATION, THE BOILER WILL BE ENABLED.
THE HOT WATER PUMPS ARE STARTED. AFTER THE HOT WATER PUMP CURRENT
THE SCHEDULE IS IN THE UNOCCUPIED MODE. ONCE THE SYSTEM IS ENABLED,
TEMPERATURE IS 3°F ABOVE THE HOT WATER SYSTEM ENABLE SETPOINT OR
(ADJ). THE SYSTEM WILL BE DISABLED WHENEVER THE OUTSIDE AIR
THE OCCUPIED MODE AND THE OUTSIDE AIR TEMPERATURE IS BELOW 65°F
THE HOT WATER SYSTEM WILL BE ENABLED WHENEVER THE SCHEDULE IS IN 1.
| G-101-Sheet-000 |
| D-101-Sheet-000 |
| M-101-Sheet-000 |
| M-501-Sheet-000 |
| M-701-Sheet-000 |
File details come from the government source that posted it.