Technical_Exhibit_B-_Drawings.pdf

PDF 1 MB Posted

Attached to
Replace Boilers Bldg 10009, 10006 Federal contract opportunity
Solicitation number
w9115118b0023
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Technical Exhibit B

View the file

Other files for this federal contract opportunity

Other files attached to Replace Boilers Bldg 10009, 10006, newest first.
File Type Posted
Amendment_2_Wage_Determination.docx DOCX document
Attachment_1-Appendix_A_04-Aug-2016.pdf PDF
Technical_Exhibit_A-Specifications_1-11-16.pdf PDF
23_Solicitation_18-b-0023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

N

1"=200’

BUILDING LEGEND (POINTS OF INTEREST)

INDEX OF DRAWINGS

HWY 84

HWY 84

HWY 36

F .M

RES.BD.

RES.BD.

R E S . B

D

RES. BD.

R E

S .B

D

KILLEEN

CANTONMENT

AREA

WEST

FORT

HOOD

GATESVILLE

NORTH

FORT

HOOD

RESERVATION

BELTON

LAKE

COPPERAS

COVE

HWY190

HWY190

FORT HOOD AREA MAP

O L

D G

E O

R G

E T

O W

N R

D

E A

S T R

A N

G E R

D

N O

LA

N R

D

FORT HOOD

W E S

T R

A N

G E R

D

C L

A R

K E R

D

H W

Y

35 37

LOCATION

PROJECT

LAREDO

CORPUS

CHRISTI

HOUSTON

AUSTIN

KILLEEN

WACO

FORT WORTH DALLAS

FORT

SMITH

OKLAHOMA

CITY

TULSA

AMARILLO

ALBUQUERUE

SANTA FE

VICINITY MAP

LOUISIANA

MEXICO

MEXICO

TEXAS

ARKANSAS

NEW

MEXICO

ELPASO

OKLAHOMA

GULF OF

SAN ANTONIO

FORT HOOD

WICHITA FALLS

N

SCALE IN MILES

1/2 1

FORT HOOD MILITARY RESERVATION

MAIN CANTONMENT AREA

N

0 100 200

SCALE IN MILES

N

0 5 10

SCALE IN MILES

NORTH SYMBOL

GENERAL SYMBOLS

REVISION NUMBER

WALL TYPE MARK

DOOR MARKWINDOW MARK

DETAIL NUMBER

REFERENCE FROM

REFERENCE TO

G-101

C O

V E

R S

H E

E T

FORT HOOD,TEXAS

FORT HOOD DIRECTORATE OF PUBLIC WORKS-ENGINEERING DIVISION

NOTE BY SYMBOL

SHEET DESCRIPTION

W E S T R

A N

G E R

D

MONTAGUE VILLAGE

VILLAGEII

COMANCHE

CENTRAL DR

LANDFILL

FT.HOOD

W R

A T

T E

N

PATTON

PARK

BATTALION

NORTH

761ST

NORTH

WALKER VILLAGE

HOOD

ARMY

AIRFIELD

HILLIARD

CENTRAL

TEXAS

COLLEGE

HEIGHTS

WEST

FT.HOOD

VILLAGEIII

MURPHY

TURKEYRUN

T

H

N D

H W

Y

T

H

R

D

M U

R P

H Y

T

H

M A

R T

IN

62ND

WAINWRIGHT

TO

VILLAGEI

COMANCHE

T

H

T

H

LIBERTY VILLAGE

OLD IRONSIDES

BATTALION AVE

HELL ON WHEELSC

L

A R

K E R

O A

D C

L A

R K

E R

O A

D

C L E

A R C

R E

E K

US HIGHWAY 190

HELL ON WHEELS

OLD IRONSIDES

WARRIOR WAY

BUSINESS ROUTE 190

US HIGHWAY 190

PERSHING PARK

VENABLE VILLAGE

CHAFFEE VILLAGE

US HIGHWAY 190

RAIL HEAD

McNair Village

TANK DESTROYER RD

COPPERAS COVE RD

WEST RANGE RD

Santa Fe Av e

WAREHOUSE AVE

DESTROYER RD

TANK

COPP

ERAS

COVE

RD

O L

D G

E O

R G

R T

O W

N R

D

TURKEYRUN

C L E

A R C

R E

E K

T

H

EAST

R

AN

G E

R D

NORTH NOLAN RD

WEST RANCIER AVE

SOUTH RANGE RD

F T H

O O

D S

T

T .J

M

IL

L S B

L V

D

A

A

N

A

A

PROJECT SITE

BUILDING 4612 (DIRECTORATE OF PUBLIC WORKS)

DARNALL ARMY HOSPITAL

III CORPS HEADQUARTERS

COMPLETION DATE: 10-18-2017

AMERI VET ENTERPRISES LLC

FINAL AS BUILT DRAWING

HOT WATER SYSTEM CONTROLSM-701

MECHANICAL DETAILSM-501

MECHANICAL FLOOR PLANM-101

DEMOLITION PLAN - MECHANICAL PIPING D-101

COVER SHEETG-101

REPLACE BOILERS BLDG 10006 & 10009

PROJECT NO: CBM900578P

NUMBER

REFERENCE

SHEET

Project No.

D e s ig n e d B y

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E O

F

A B C D E F

D a te

D e s c ri p ti o n

DPW

FORT HOOD TEXAS

n oi sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P R

O J E

C T M

A N

A G

E R

D

A T

E

T

IM

E

F

IL

E L

CBM900578P

R E

P L

A C

E B

O

IL

E R

S

C .W

IT

T

C .W

IT

T

-A

P R -2

W -1

-C -X

X X

F O

R S

O L

IC

IT

A T

IO

N T

E C

H N

IC

A L E

X H

IB

IT

B

10006 &10009

HELL ON WHEELS AVE

OLD IRONSIDES AVE

T

H S

T

T

H S

T

T

H S

T

T

H

S

T T

H

S

T

CENTRAL DR

CENTRAL DR

10009

10035

10043

10017

10016

11030

10029

10018

10011

10015

10014

10008

10010

10007

10006

NOTES:

D-101SCALE: 1/8" = 1’

SCALE (FEET)

0 8 164 KEY PLANBASEMENT DEMOLITION PLAN - AREA A

P L

A N A

R E

A A

B A

S E

M E

N T D

E M

O L

IT

IO

N

N N

M A

T C

H L

IN

E

A R

E A B

KEY NOTES:

PATCH OPENING IN CHIMNEY

DEMO ALL EXHAUST DUCT AND

1.

2.

3.

PAD TO REMAIN FOR NEW BOILERS.3.

BACK TO EXISTING DISCONNECT.

SCHEDULE. DEMO PUMP STARTER AND CONDUIT

VALVES REFERENCE M-501 FOR DETAILS AND

REPLACE PUMP AND PIPING BACK TO ISOLATION2.

TO BE REMOVED.

CONDUIT MAY BE RE -USED, ANY UNUSED CONDUIT

DEMO CONTROL PANELS AND WIRING CONDUIT.1.

EQUIPMENT LIST

DESCRIPTIONNO.

EXPANSION TANK

EXPANSION TANK

EXPANSION TANK

CFS-1 CHEMICAL FEEDER SYSTEM

B-1 BOILER

B-2 BOILER

EPT-1

EPT-2

EPT-3

HWH-1 HOT WATER HEATER

HWH-2 HOT WATER HEATER

HWP-1 HOT WATER PUMP

HWT-1 HOT WATER STORAGE TANK

HOT WATER STORAGE TANKHWT-2

SF-1 SUPPLY FAN

22 2

TO INCLUDE ELECTRICAL AND CONTROL WIRING.

DEMO HB1, HWP1, AND ALL ASSOCIATED PIPING

NUMBER

REFERENCE

SHEET

Project No.

D e s ig n e d B y

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E

D a te

D e s c ri p ti o n sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P R

O J E

C T M

A N

A G

E R

D

A T

E

T

IM

E

F

IL

E L

CBM900578P

R E

P L

A C

E B

O

IL

E R

S

C .W

IT

T

C .W

IT

T

-A

P R -2

W -1

-C -X

X X

F O

R S

O L

IC

IT

A T

IO

N T

E C

H N

IC

A L E

X H

IB

IT

B

10006 &10009

HWT

HWT

CWP

HWP

HB

T

BCD

E

A

DN

ARMS ROOM

B04

DEPLOYMENT

AREA

B03

MECHANICAL

ROOM

B02

ELECTRICAL

ROOM

B01

UNEXCAVATED

ABCD

E

4"

1 1/2"

BC

A

LEGEND:

EXISTING COLD WATER RETURN

EXISTING CONDENSATION DRAIN

EXISTING DISCONNECT BOX

EXISTING HOT WATER SUPPLY

EXISTING COLD WATER SUPPLY

HVAC CONTROL PANELS

FRONT OF PANEL

EXISTING PANEL, 3’ CLEARANCE

M-101SCALE: 1/8" = 1’

SCALE (FEET)

0 8 164 KEY PLANBASEMENT MECHANICAL PLAN - AREA A

P L

A N A

R E

A A

B A

S E

M E

N T D

E M

O L

IT

IO

N

N N

M A

T C

H L

IN

E

A R

E A B

KEY NOTES:

EQUIPMENT LIST

DESCRIPTIONNO.

EXPANSION TANK

EXPANSION TANK

EXPANSION TANK

CFS-1 CHEMICAL FEEDER SYSTEM

B-1 BOILER

B-2 BOILER

EPT-1

EPT-2

EPT-3

HWH-1 HOT WATER HEATER

HWH-2 HOT WATER HEATER

HWP-1 HOT WATER PUMP

HWT-1 HOT WATER STORAGE TANK

HOT WATER STORAGE TANKHWT-2

SF-1 SUPPLY FAN

RISERS PER MANUFACTURER RECOMMENDATIONS.

INSTALL EXTERIOR EXHAUST FLUE AND COMBUSTION AIR3.

CONNECTIONS ON BOILER PIPING SEE M-501 FOR DETAILS.

CONTRACTOR SHALL USE FLEX CONNECTORS FOR FINAL2.

TO EXISTING. SEE DETAILS M-501.

REPIPE AS NECESSARY TO RECONNECT HYDRONIC PIPING1.

GENERAL NOTES:

NEW DDC CONTROLLER.

NEW VFD PUMP CONTROLLER.

PIPE PER MANUFACTURING RECOMMENDATIONS.

COMBINE FLUE PIPE AND COMBUSTION AIR

NECESSARY FOR FLUE PIPING.

1 PIECE PATCH PLATED AND CUT HOLES

CONTRACTOR TO USE STAINLESS STEEL FOR

BOILERS CIRC PUMPS

MOTOR STARTERS FOR

NEW HWP

NEW BOILERS

NUMBER

REFERENCE

SHEET

Project No.

D e s ig n e d B y

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E

D a te

D e s c ri p ti o n

SHEET OF

sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P R

O J E

C T M

A N

A G

E R

D

A T

E

T

IM

E

F

IL

E L

CBM900578P

R E

P L

A C

E B

O

IL

E R

S

C .W

IT

T

C .W

IT

T

-A

P R -2

W -1

-C -X

X X

F O

R S

O L

IC

IT

A T

IO

N T

E C

H N

IC

A L E

X H

IB

IT

B

10006 &10009

T

BCD

E

A

DN

ARMS ROOM

B04

DEPLOYMENT

AREA

B03

MECHANICAL

ROOM

B02

ELECTRICAL

ROOM

B01

ABCD

E

4"

1 1/2"

BC

A

LEGEND:

EXISTING COLD WATER RETURN

EXISTING CONDENSATION DRAIN

EXISTING DISCONNECT BOX

EXISTING COLD WATER SUPPLY

HVAC CONTROL PANELS

FRONT OF PANEL

EXISTING PANEL, 3’ CLEARANCE

M E

C H

A N

IC

A L D

E T

A

IL

S

NOTES:

1 1

1 REPLACE BOILER AND PIPING

PER MANUFACTURER INSTALLATION

INSTRUCTIONS.

2 EXISTING TO REMAIN.

FLEX CONNECTORS ON BOILERS.

INSTALL NEW TEMPERATURE AND PRESSURE GAUGES (TYP).

4 4

M-501

NUMBER

REFERENCE

SHEET

Project No.

D e s ig n e d B y

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E

D a te

D e s c ri p ti o n sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P R

O J E

C T M

A N

A G

E R

D

A T

E

T

IM

E

F

IL

E L

CBM900578P

R E

P L

A C

E B

O

IL

E R

S

C .W

IT

T

C .W

IT

T

-A

P R -2

W -1

-C -X

X X

F O

R S

O L

IC

IT

A T

IO

N T

E C

H N

IC

A L E

X H

IB

IT

B

10006 &10009

SCALE: 1/4" = 1’

80 4

SCALE (FEET)

-1 /2

H W

R

-1 /2

H W

S

-1 /2

H W

R

-1 /2

H W

S

-1 /2

G A

S

-1 /2

G A

S

M

M

GROUND MOUNTED PUMP DETAILS

HOT WATER BOILER PIPING WITH

E X

P A

N S

IO

N T

A N

K 150

BOILER-1 BOILER-2

HOT WATER BOILER SCHEDULE

MARK

95%

SERVICE

SYSTEM

HEATING

CAPACITY

OUTPUT

1260 MBH

FLOW

WATER TEMP.

EFF.

MIN

EWT LWT

155”F 180”F

ELECTRICAL DATA

120V/15A/1HP/60HZ 1, 2, 3, 4, 5

NOTES

NOTES:

BOILER PUMP

BOILER PUMP

AIR VENT

AIR SEPARATOR

BALL VALVE

DRAIN VALVE

TEMPARATURE SENSOR

THERMOMETER

ISOLATION VALVE

FLEX CONNECTOR

(HWP-1)

HEATING WATER PUMP

91.5 GPM

HEAD

NOTES:

PUMP SCHEDULE

HWP-1

FLOW

91.5 GPM SEE NOTE 1

ELECTRICAL

208/3PH/1800RPM

PROVIDE PUMP WITH VFD FOR BALANCING AND SOFT START.2.

SUBMIT FINDINGS OF TEST REPORT WITH SUBMITTAL OF NEW PUMP.

DETERMINE THE SYSTEM CURVE AND THE HEAD REQUIREMENT OF THE NEW PUMP.

CONTRACTOR TO MEASURE FLOW AND HEAD OF EXISTING PUMP IN ORDER TO 1.

B-1, B-2

EXISTING LIGHTS EXISTING LIGHTS

BACKFLOW PREVENTER

MAKE-UP WATER

RELIEF VALVE

PRESSURE REDUCING

VALVE

PROVIDE WITH OPTIONAL LON CARD.6.

CONDENSING BOILERS (MODEL BMK-1500).

BOILERS TO BENCHMARK 1500 HIGH EFFIENCY BOILERS DUAL FIRED5.

PROVIDE GAS PIPE CONNECTED TO BOILER WITH NEW GAS VALVE AND INTEGRAL DRIP LEG.4.

HOT WATER BOILER TO BE PROVIDED WITH MANUFACTURED IN LINE CIRCULATING PUMP.3.

HOT WATER BOILER TO BE LOW NOX AS REQUIRED BY TAC.2.

PROVIDE BOILER WITH FORCED DRAFT BURNER.1.

FROM BUILDING

TO BUILDING

VALVE

RELIEF

VALVE

RELIEF

BOTH SIDES

TEST PORTS ON

STRAINER WITH

DRAIN VALVE

FINISHED FLOOR

SUCTION DIFFUSER

TEST PORTS

WITH INSTALLED

TRIPLE DUTY VALVE

TEST PORT

TEST PORTTEST PORT

TEST PORT

TEST PORT

CIRCUIT SETTER

CIRCUIT SETTER

M-701

C O

N T

R O

L S

H O

T W

A T

E R S

Y S

T E

M

NUMBER

REFERENCE

SHEET

Project No.

D e s ig n e d B y

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E

D a te

D e s c ri p ti o n sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P R

O J E

C T M

A N

A G

E R

D

A T

E

T

IM

E

F

IL

E L

CBM900578P

R E

P L

A C

E B

O

IL

E R

S

C .W

IT

T

C .W

IT

T

-A

P R -2

W -1

-C -X

X X

F O

R S

O L

IC

IT

A T

IO

N T

E C

H N

IC

A L E

X H

IB

IT

B

10006 &10009

S

20 30 40 50 60 70

H O

T W

A T

E R S

E T P

O

IN

T

F

OUTSIDE AIR TEMPERATURE °F

E

S

E

HOT WATER SYSTEM SEQUENCE OF OPERATION:

DDC

DDC

DDC

T

T

DDC

T

T

DDC

DDC

HOT WATER SYSTEM CONTROLS DIAGRAM

HOT WATER RESET SCHEDULE

M

M

M

M

CONTROLS LEGEND

DDC

S

LON

TEMPERATURE SENSOR

DIRECT DIGITAL CONTROL SYSTEM

BOILER ENABLE

BOILER STATUS

LWA

HTA

LOW WATER ALARM

HIGH TEMP ALARM

E

DDC

S

LON

GENERAL NOTES:

T

BY BOILER CONTROLS

CIRC. PUMP ENABLED

T

E

BOILER-2BOILER-1

OUTSIDE AIR SENSOR

NEW DDC CONTROLLER

HOT WATER PUMP

NOT TO SCALE

NOT TO SCALE

WATER SYSTEM ENABLE SETPOINT OR THE SCHEDULE IS IN UNOCCUPIED MODE.

DISABLED WHENEVER THE OUTSIDE AIR TEMPERATURE IS 3° F BELOW THE CHILLED

AND THE OUTSIDE AIR TEMPERATURE IS ABOVE 60° F (ADJ.) THE SYSTEM WILL BE

THE CHILLED WATER SYSTEM WILL BE ENABLED WHENEVER THE OCCUPIED MODE1.

E

S

LON LOCAL OPERATING NETWORK

TT

M

M

NOT TO SCALE

CHILLED WATER SYSTEM SQUENCE OF OPERATION

CHILLED WATER SYSTEM SEQUENCE OF OPERATION:

ROUTER LOCATED IN BUILDING COMMUNICATIONS ROOM.

CONTRACTOR TO ROUTE LON TRUNK FROM NEW CONTROLLER TO EXISTING ILON7.

NECESSARY TO ACCOMPLISH THIS SPECIFIED SEQUENCE OF OPERATION.

6. INSTALL NEW SENSORS, RELAYS, ACTUATORS, AND OTHER DEVICES THAT ARE

5. INSTALL ALL NEW CONTROL COMPONENTS TO BE LON WORKS COMPLIANT.

THE DDC CONTROL PANEL IN THE MECHANICAL ROOM.

4. INSTALL NEW CONTROL DEVICES TO BE PLACED AS SHOWN AND CONNECT TO

CONTROL SYSTEMS IN THE MECHANICAL ROOM.

3. REPLACE OUTSIDE AIR SENSOR WITH NEW SENSOR AND CONNECT TO THE NEW DDC

THE NEW CONTROLLER SHALL BE LON WORKS COMPLIANT.

AND ASSOCIATED DDC CONTROL COMPONENTS.

2. PROVIDE NEW DDC CONTROL SYSTEMS TO INCLUDE NEW CONTROLLER,

CONTROL PANEL AND ALL EXISTING CONTROL COMPONENTS (RELAYS, SENSORS...ETC).

1. DEMO EXISTING DDC CONTROLLER (BOILER’S CONTROLLER) LOCATED IN THE EXISTING

AND VISE VERSA).

TUESDAY. (WHEN THE LAG BOILER STARTS, THE LEAD BOILER SHALL BE DISABLED

CONTROLLER WILL ALTERNATE THE LEAD AND LAG BOILERS WEEKLY, AT 0200

MORE THAN THE 30 MINUTES, THE LAG BOILER WILL BECOME THE LEAD. THE

LEAD/LAG - ONCE ENABLED, IF THE HOT WATER TEMPERATURE IS BELOW SETPOINT FOR 3.

THE BOILER MAINTAINS ITS DISCHARGE TEMPERATURE BASED ON ITS INTERNAL CONTROLS.

PROVIDES THE HOT WATER SUPPLY TEMPERATURE SETPOINT BASED ON A RESET SCHEDULE.

TEMPERATURE CONTROL - WHEN THE HEATING SYSTEM IS ENABLED, THE DDC 2.

AFTER A 5 MINUTE DELAY THE PUMP WILL BE STOPPED.

THE SETPOINT. ONCE DISABLED THE BOILER WILL BE DISABLED FIRST AND

DISABLED BY THE SCHEDULE OR THE OUTSIDE AIR TEMPERATURE IS ABOVE

BOTH PUMPS AND BOILER OPERATE CONTINUOUSLY UNTIL THE SYSTEM IS

SENSING RELAYS VERIFY PUMP OPERATION, THE BOILER WILL BE ENABLED.

THE HOT WATER PUMPS ARE STARTED. AFTER THE HOT WATER PUMP CURRENT

THE SCHEDULE IS IN THE UNOCCUPIED MODE. ONCE THE SYSTEM IS ENABLED,

TEMPERATURE IS 3°F ABOVE THE HOT WATER SYSTEM ENABLE SETPOINT OR

(ADJ). THE SYSTEM WILL BE DISABLED WHENEVER THE OUTSIDE AIR

THE OCCUPIED MODE AND THE OUTSIDE AIR TEMPERATURE IS BELOW 65°F

THE HOT WATER SYSTEM WILL BE ENABLED WHENEVER THE SCHEDULE IS IN 1.

G-101-Sheet-000
D-101-Sheet-000
M-101-Sheet-000
M-501-Sheet-000
M-701-Sheet-000

File details come from the government source that posted it.