Amended_Solicitation_W91151-17-B-0028.pdf

PDF 142 KB Posted

Attached to
Upgrade Overhead Cranes Federal contract opportunity
Solicitation number
W91151-17-B-0028
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Amended Solicitation

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010996070 AD010496P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment:

a) Is to exend the bid opening date from 13 September 2017 @ 1:00pm to19 September 2017 @ 2:00pm. Bid Opening location remains unchanged.

b) RFI's are being added and addressed in this amendment as w ell.

c) All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-17-B-0028

X 9B. DATED (SEE ITEM 11)

14-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2017

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91151-17-B-0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 13-Sep-2017 01:00 PM to 19-Sep-2017 02:00 PM.

The following have been added by full text:

REQUEST FOR INFORMATION

RFIs

1. Specification section 41 22 13.15 is for under running bridge cranes. The cranes that are requested in the solicitation are top running bridge cranes. Should this specification be changed?

SEE REVISED SPECIFICATIONS IN TECHNICAL EXHIBIT C.

2. The existing cranes do not meet specification 41 22 13.15 in the following aspects and several others

a. 2.1.6 – Current hoists do not have a mechanical load brake

b. 2.1.6.3 – Current hoist wire rope is not 6 x 37 class construction, and is not double‐reeved

c. 2.1.6.5 – Current hoist drums do not have grooves cut right and left hand.

d. 2.1.6.6 – Current hoists do not have a mechanical load brake.

e. 2.4.2 – Current hoists do not have adjustable frequency controllers for the hoist.

Do the new cranes need to meet these aspects of the specification?

THIS PROJECT ENTAILS UPGRADING THE EXISTING CRANES. UPGRADED CRANES MAY

INCLUDE FEATURES THAT WERE NOT PRESENT IN THE OLD CRANES. SEE REVISED

SPECIFICATIONS IN TECHNICAL EXHIBIT C FOR REQUIREMENTS.

3. Section 1.6.3 requires a certificate stating that the crane can be load tested to 125% of the capacity plus 5%, minus 0. OSHA 1910.179.k.2 states that a load test shall not be more than 125%. Does section 1.6.3 need to be met?

YES. “PLUS 5% MINUS 0%” IS THE ACCEPTABLE LOAD RANGE FROM 125%. THAT IS, IT IS

DEEMED AN ACCEPTABLE LOAD TEST IF TEST MATERIAL RANGES FROM 125% TO 131.25% OF

THE RATED CAPACITY OF THE CRANE.

4. Section 2.1 states the radio control shall allow for independent and slave/master operation of the 10 ton hoists. Please clarify this requirement since there is only one hoist per crane.

5. Section 2.1.4.2 is specifically for under running crane end trucks and cannot be met with top running crane end trucks. Please verify that this section can be ignored.

6. 2.4.3 requires “slave/master operations of the two 3‐ton hoist”. The cranes specified are 10 ton with a single hoist. Please clarify this requirement.

7. Section 2.7 requirements are specific to under running crane runways. Please verify that this section can be ignored.

8. Does the contractor have to determine the capacity of the building columns and runway haunches to carry the crane loads?

STRUCTURAL ANALYSIS OF THE EXISTING STRUCTURE HAS ALREADY BEEN CONDUCTED BY

DPW ENGINEERING. THE ANALYSIS WAS CONDUCTED USING CRITERIA FROM SHEET S‐001 IN

THE AMENDMENT 1 DRAWINGS DATED 17‐AUG‐17. IF CRANES ARE SELECTED WITH

DIFFERENT LOADING BEHAVIOR THAN WHAT IS FOUND ON SHEET S‐001 THEN THE

CONTRACTOR SHALL BE RESPONSIBLE FOR ASSESSING THE EXISTING STRUCTURES ADEQUACY.

9. There is no commercially available hoist in production that meets specification 41 22 13.15. To meet this specification would require a custom built, one off hoist. This would greatly increase the cost of the hoist and make quick delivery very difficult. Is this the intent of the customer?

10. Specification 41 22 13.15 is for under‐running bridge cranes, the existing cranes are single girder top running cranes, the existing buildings are designed and currently equipped with runway systems for single girder top running bridge cranes. Please confirm that the intent is to have the successful vendor supply single girder top‐running cranes

ALL EXISTING CRANES SHALL BE REPLACED WITH NEW TOP RUNNING CRANES. SEE REVISED

SPECIFICATIONS IN TECHNICAL EXHIBIT C.

11. Paragraph 1.6.5 states: “ Submit calculations verifying the sizing of the bridge girder, end trucks and travel drives. Calculations must be must be reviewed, signed and sealed by a licensed professional engineer.”

Can the manufactures standard published capacity/load charts be provided for the Bridge girder, end trucks & drives in lieu of sealed calculations per paragraph 2.7 Of this specification

CALCULATIONS SHALL BE SEALED BY A LICENSED ENGINEER.

12. Paragraph 2.1 states: Provide under running bridge overhead electric crane, with under running trolley mounted hoist, conforming to CMAA 74, Class C (Moderate Service) for indoor service.

Crane must be controlled by radio control. Control shall allow for independent and slave/master operation of the 10‐ton hoists. All components of the crane system must comply with MHI MH27.1, Class C (Moderate Service),and CMAA 74, Class C, except as modified and supplemented in this specification section. See contract drawings for required crane spans.

A) The under running should be changed to top running to match the existing systems.

SEE REVISED SPECIFICATIONS IN TECHNICAL EXHIBIT C.

B) The existing cranes are not radio controlled, please verify that the new cranes are to be radio controlled and if so is a back‐up pendent required.

SEE REVISED SPECIFICATIONS IN TECHNICAL EXHIBIT C.

C) Master/Slave requires 2‐hoist this specification calls for 1‐hoist, this should this requirement be removed

D) MHI MH27.1 is for under‐running patented track cranes, this should be deleted, the correct specification would be CMAA‐74 as noted.

13. Paragraph 2.1.4.1: Provide an AISC W‐beam in accordance with MHI MH27.1 for the crane bridge girder. The summation of all normal stresses on a girder section under analysis cannot exceed the allowable stress for tension or compression as stated in CMAA 74.

MH27.1 is patented track and would not be applicable to the design of a AISC W‐beam, CMAA‐ 74 would be the correct design document.

14. Paragraph 2.1.4.2: This paragraph covers the requirements for under running patented track end trucks and is not applicable to this project. The following paragraph would apply to single girder top running end trucks: “ Provide single flanged trolley wheels and double flanged bridge travel wheels of rolled‐to‐shape wrought or forged steel. Rim toughen bridge wheels to not less than 320 BHN. Wheel sizing and flange‐to‐rail head clearances must be in accordance with CMAA 74 recommendations.

15. Paragraph 2.1.6: Hoist “ASME HST‐4, Class H3, double reeved, except as modified and supplemented in this section. Equip hoist with a spring set, electro‐mechanically released brake plus a mechanical load brake.”

A) 4 of the 5 existing hoist are DEMAG hoist. These hoist have a low headroom trolley and as such are single reeved, and utilize a 150% a motor brake along with regenerative braking to prevent load overhaul in the lowering mode. The existing hoist has a headroom dimension (bottom of the bridge girder to the cradle of the hook in its highest position of 18+/‐”. The 5th hoist is a cross mounted ACCO hoist (building 26041) with double reeving and a mechanical load brake with a head room dimension of 35” +/‐

In order to maintain the current hook elevations (or as close to them as possible) Can we utilize a low headroom trolley design similar to the existing Demag design with single reeving, a 150% a motor brake and with regenerative/dynamic braking. In the event we are required to furnish the hoist with a mechanical load brake in lieu of regenerative braking and double in lieu single reeving we will loose approximately 2’6” of the existing vertical hook envelope. Please keep in mind that a single reeved hoist will have the same wire rope factor of safety as the double reeved hoist.

YES. A LOW HEADROOM TROLLEY DESIGN MAY BE UTILIZED.

16. 2.1.6.3: Provide wire rope conforming to ASTM A 1023/A 1023M, improved or extra improved plow steel as a minimum, regular lay, uncoated, 6 by 37 class construction, with an independent wire rope core. Provide double reeved reeving arrangement. Connect hoisting rope dead end to equalizer bars (if used) by means of zinc‐speltered sockets or swaged fittings installed in a manner, which develops the full breaking strength of the hoisting rope.

In order to maintain the current hook elevations (or as close to them as possible) can we utilize a low headroom trolley design similar to the existing Demag design with single reeving?

YES. A LOW HEADROOM TROLLEY DESIGN MAY BE UTILIZED.

17. 2.1.6.6: Provide both a mechanical load brake and an electro‐mechanical brake (shoe or disc).

In order to maintain the current hook elevations (or as close to them as possible) Can we furnish a 150% a motor brake and with regenerative/dynamic braking similar to the existing Demag hoist.

YES.

18. Several of the existing bridge cranes are equipped with bridge travel slow down and stop limit switches; are bridge travel limit switches required for the new cranes and if so are we to furnish slow down & stop of just stop limits to prevent the bridge from running into the crane runway end stops.

PROVIDE STOP LIMIT SWITCHES FOR THE BRIDGE.

19. Are Trolley travel limit switches required for the new cranes and if so are we to furnish slow down & stop of just stop limits to prevent the trolley from running into the trolley end stops.

PROVIDE STOP LIMIT SWITCHES FOR THE TROLLEY.

20. Note # 2 on drawing S‐101 for building 26041 states that the existing runway beams may be reused.

Please confirm what “may “ means.

A) Has DPW confirmed that the existing beams are structurally capable of supporting the new 10‐ton crane and therefore can be re‐used with any additional engineering on the part of the vendor B) Or is DPW stating that the beams can be reused if the vendor provides suitable calculations to indicate that they are adequate for the new 10‐ton crane.

DPW ENGINEERING CONDUCTED A STRUCTURAL ANALYSIS OF THE EXISTING STRUCTURE

WITH LOAD DATA FROM SHEET S‐001 AND DETERMINED THAT THE EXISTING STRUCTURE IS

ADEQUATE TO SUPPORT THE NEW LOADS.

21. If the vendor determines that the existing runway rail is adequate for the new application, meets the new specifications including the service class required can it be re‐used?

YES. EXISTING RAIL MAY BE RE‐USED AT THE DISCRETION OF THE CRANE VENDOR.

In summation I believe that the specification needs to be modified to reflect the existing design (not necessarily brand) so that we can provide the increased capacity without a significant loss of the operational hook envelope, especially the vertical hook height.

S‐001 Structural notes

S‐301 Building Section Building ‐26041

S‐302 Building Section ‐ 30036, 35012, 44015, and 88302

22. Date Start/ projected completion time/ Is there a demo‐plan

START AND COMPLETION DATE WILL BE SPECIFIED AT TIME OF AWARD. DEMO PLAN IS/ARE

INCLUDED IN THE DRAWINGS.

23. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?

THE GOVERNMENT DOES NOT PAY TAXES. OUR OFFICEWILL NOT PROVIDE A SALES TAX

EXEMPTION CERTIFICATE.

24. Will the Government provide comprehensive written badging requirements for the project if badging is required?

NO

25. Where will the designated parking area be for workers accessing the construction site?

Laydown?

IF PARKING IS UNAVAILABLE IN THE MOTOR POOL, ADDITIONAL PARKING MAY BE FOUND

OUTSIDE THE GATES OF EACH SITE.

26. Will the fire sprinkler system and/or the fire alarm system need to be disrupted during construction? If yes, what if any additional security measures will the government require e.g.

fire watch, temporary fire alarms, adjustments to sprinkler heads, etc.

BASED ON A GOVERNMENT SITE OBSERVATION IT APPEARS THAT THE FIRE SPRINKLER

SYSTEM WILL NOT BE A CONFLICT WITH THE NEW CRANE SYSTEM. THE SPRINKLER SYSTEM

AND FIRE ALARM SYSTEM NEED NOT BE DISRUPTED DURING CONSTRUCTION.

27. Does the base have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?

CONTACT INFORMATION WILL BE PROVIDED IF NEEDED BEFORE CONSTRUCTION BEGINS.

28. Will there be the need for any modification to the foundation to support the new equipment?

NO FOUNDATION MODIFICATIONS WILL BE REQUIRED.

29. What utilities may be relocated? How will the G.C. Prepare for modifications to existing, hanging utilities if they are not listed in the SOW?

THE NEW CRANES SHALL MAINTAIN A 3” CLEARANCE AWAY FROM THE EXISTING STRUCTURE

AND EXISTING UTILITIES. CONTRACTOR SHALL COORDINATE WITH CRANE VENDOR TO

DETERMINE WHAT UTILITIES (IF ANY) WILL NEED TO BE RELOCATED BASED ON THEIR CRANE

SELECTION.

30. Pg. S‐001 Is listed in the drawing index but missing from the plans.

SEE AMENDMENT 1 DRAWINGS DATED 17‐AUG‐17.

31. Will the building beams have to be demolished including the columns supporting it?

EXISTING RUNWAY BEAMS ARE TO BE REMOVED AND REPLACED WHERE NOTED ON THE

DEMOLITION PLAN. EXISTING COLUMNS SHALL BE RE‐USED.

32. In the radio control section, it talks about (2) 3 ton hoist and 5 ton hoist which doesn’t coincide with the 10 ton cranes.

33. What is the lifting height for the hoists?

CRANES SHALL BE CAPABLE OF PERFORMING A 20‐FT VERTICAL LIFT.

34. The specs call out under hung cranes and the drawing states runway rail (which is not used in under hung crane systems)?

35. The end truck section calls out the end truck wheels to have side guide rollers (or these guide rollers necessary)?

36. Is there any hoist manufacturer that is of preference?

THE EXISTING BUILDINGS WERE ANALYZED BASED ON LOAD DATA FURNISHED FROM 10 TON

DEMAG CRANES. THE CONTRACTOR MAY SELECT A CRANE MANUFACTURER OF THEIR

CHOICE. ALL CRANES MUST BE FROM THE SAME MANUFACTURER.

37. Will users be present during replacement?

USERS WILL NOT BE PRESENT AT THE TIME OF INSTALLATION.

38. Will all vehicles and machinery be removed from site?

ALL VEHICLES AND EQUIPMENT WILL BE REMOVED PRIOR TO CRANE INSTALLATION.

39. Will product being installed be DEMAG?

THE EXISTING BUILDINGS WERE ANALYZED BASED ON LOAD DATA FURNISHED FROM 10 TON

DEMAG CRANES. THE CONTRACTOR MAY SELECT A CRANE MANUFACTURER OF THEIR

CHOICE. ALL CRANES MUST BE FROM THE SAME MANUFACTURER.

40. Will there be alternates when submitting for other product other than DEMAG?

CONTRACTOR SHALL SELECT A VENDOR OF THEIR CHOICE HOWEVER THE EXISTING

STRUCTURES HAVE BEEN ANALYZED WITH THE CRANE DATA PRESENTED IN SHEET S‐001. IF

THE CRANE SELECTION DIFFERS FROM THIS DATA THEN THE CONTRACTOR SHALL BE

RESPONSIBLE FOR VERIFYING THE ADEQUACY OF THE EXISTING STRUCTURE.

41. Can we re‐use existing runway? This should cost saving to the government.

IN OUR ANALYSIS IT WAS DETERMINED THAT THE EXISTING RUNWAY BEAMS WERE NOT

ADEQUATE FOR THE NEW LOADS. CONTRACTOR MAY RE‐USE EXISTING RUNWAY BEAMS IF

SUPPORTED BY CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE

STATE OF TEXAS. CALCULATIONS MUST BE SUBMITTED TO DPW ENGINEERING.

42. Can we re‐use existing rail (Per note #3 Sheet S‐101‐105)

RE‐USE OF THE EXISTING RAIL SHALL BE AT THE DISCRETION OF THE CRANE

MANUFACTURER/VENDOR.

43. Can we obtain As‐Builts per each structure?

LIMITED AS‐BUILT DRAWINGS ARE AVAILABLE FOR THESE BUILDINGS. SEE TECHNICAL EXHIBIT

D FOR AVAILABLE AS‐BUILT DRAWINGS. DIMENSIONS FOUND ON THESE DRAWINGS MAY BE

USED FOR BIDDING PURPOSES HOWEVER IT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO THOROUGHLY VERIFY ALL APPLICABLE DIMENSIONS BEFORE PROCEEDING

WITH THE WORK.

44. What is the extent of the load test?

45. Bldg. 35012 Can we obtain specs on damaged vertical column? Runways?

THE DAMAGED COLUMN SHALL BE REPLACED WITH AN A992 W18x40 HOT ROLLED STEEL

COLUMN. MATCH BASE PLATE AND TOP PLATE THICKNESS, DIMENSIONS AND BOLT HOLE

PATTERNS. RUNWAY BEAMS SHALL BE REPLACED WITH NEW BEAMS, SIZES INDICATED ON

SHEET S‐103. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR NEW RUNWAY BEAMS

THAT INCLUDE CAP TO WF BEAM WELDS AND STIFFENER PLATES AT THE ENDS OF EACH

BEAM.

46. What is the purpose of the vertical column on Bldg. 35012?

THE DAMAGED COLUMN PROVIDES LATERAL SUPPORT IN A PORTAL FRAME FOR THE MAIN

WIND FORCE RESISTING SYSTEM.

47. Will Fall protection training be required?

48. Will vertical column be bolted or welded in place to connect to structure?

THE NEW COLUMN SHALL BE BOLTED TO THE EXISTING WF BEAM. MATCH BASE PLATE AND

TOP PLATE THICKNESS, DIMENSIONS AND BOLT HOLE PATTERNS. PROVIDE NEW A325 BOLTS

AT BEAM‐TO‐COLUMN CONNECTION.

49. Are funds currently available and obligated for this solicitation?

50. The demo drawings indicate that the cranes shall be returned to the Government in a usable condition. Co‐ordinate crane return with COR. Where will the cranes be returned to?

Transport and a crane will be required to load and unload.

EXISTING CRANES SHALL BE REMOVED AND LEFT ON SITE IN USEABLE CONDITION.

51. Confirm that QC support is adequate?

The COR will be available.

52. Will the new runway beams need to be painted?

MATCH PAINT COLOR OF EXISTING STRUCTURE.

53. Please provide “as Built” drawings for each building. We need to determine the exact distance between crane rails.

LIMITED AS‐BUILT DRAWINGS ARE AVAILABLE FOR THESE BUILDINGS. SEE TECHNICAL EXHIBIT

D FOR AVAILABLE AS‐BUILT DRAWINGS. DIMENSIONS FOUND ON THESE DRAWINGS MAY BE

USED FOR BIDDING PURPOSES HOWEVER IT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO THOROUGHLY VERIFY ALL APPLICABLE DIMENSIONS BEFORE PROCEEDING

WITH THE WORK.

54. Will the existing demo’ed runway beams be removed from site?

RUNWAY BEAMS SHALL BE DELIVERED TO THE FORT HOOD RECYCLE CENTER LOCATED IN THE

VICINITY OF BUILDING 4621 FOR GOVERNMENT DISPOSAL.

55. Will the existing columns be adequate to support the additional weight of the new runway beams, the crane, and the 2.5 ton additional load capacity?

THE EXISTING STRUCTURE WAS ANALYZED WITH THE LOAD CRITERIA ON SHEET S‐001. IN OUR

ANALYSIS IT WAS DETERMINED THAT THE EXISTING COLUMNS WERE ADEQUATE TO SUPPORT

THE ADDITIONAL LOADING.

56. Please provide building 35012’s damaged portal column information?

COLUMN. MATCH BASE PLATE AND TOP PLATE THICKNESS, DIMENSIONS AND BOLT HOLE

PATTERNS. RUNWAY BEAMS SHALL BE REPLACED WITH NEW BEAMS, SIZES INDICATED ON

SHEET S‐103. DAMAGED COLUMN SHALL BE DELIVERED TO FORT HOOD RECYCLING FOR

GOVERNMENT DISPOSAL.

57. Confirm that all equipment will be removed from each of the buildings while the cranes are being installed?

ALL EQUIPMENT WILL BE REMOVED FROM EACH BUILDING DURING INSTALLATION.

58. Confirm that this project will require one Superintendent who will supervise work at all five locations?

ONE MAY BE SUFFICIENT AS LONG AS THE PERSON IS MOBILE.

59. Can you provide the size of the column that is to be replaced from prior damage?

COLUMN. MATCH BASE PLATE AND TOP PLATE THICKNESS, DIMENSIONS AND BOLT HOLE

PATTERNS. RUNWAY BEAMS SHALL BE REPLACED WITH NEW BEAMS, SIZES INDICATED ON

SHEET S‐103.

60. Will any design or load calculations be required for the new column and runway beams?

LOAD CALCULATIONS WILL NOT BE REQUIRED FOR THE NEW COLUMN AND NEW RUNWAY

BEAMS SO LONG AS THE NEW CRANE SELECTED DOES NOT DEVIATE FROM THE DESIGN

CRITERIA ON SHEET S‐001. IF THE SELECTED CRANE DIFFERS FROM THE CRITERIA ON SHEET S‐

001, THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ADEQUACY OF THE

EXISTING STRUCTURE (INCLUDING RUNWAY BEAMS). NO CALCULATIONS WILL BE REQUIRED

FOR THE NEW COLUMN.

61. All demolition drawings state existing crane and associated hardware shall be returned to government in usable condition. Coordinate crane return with COR. For bidding purpose will all of the existing cranes need to be returned to a specific area on base via semi‐truck or left on each job site?

EXISTING CRANES SHALL REMAIN ON SITE AFTER REMOVAL.

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.232-18 Availability Of Funds APR 1984

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $200,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

(End of Summary of Changes)