B08 QnA B-1 Windows.docx
DOCX document 13 KB Posted
- Attached to
- TEAD Building 1 Windows Federal contract opportunity
- Solicitation number
- W90WL521Q0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Required Soliciation Clause Fill-In FAR 52.204-24.docx | DOCX document | |
| B04 UT20200086.pdf | ||
| SOW T-1 New Windows- FINAL 16 FEB 21.pdf | ||
| B08 W90WL521Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W90WL521Q0017 Bldg 1 Windows Q & A
1. We wanted to verify that the frames are to be vinyl. This will not meet the blast rating.
The scope says that the glass interior glass meets blast requirements.
Government Response: Yes, the frames can be vinyl
2. What is the color of the vinyl frame to be.
Government Response: Color should match existing as much as possible
3. There are windows that are frosted. Should we price to have obscured glass?
Government Response: Yes, frost the windows that were frosted before.
4. There is wire glass in a window. We are not replacing with wire right?
Government Response: No, wire windows should not be replaced.
5. There is a Louver in one of the windows. Is that to be left in place?
Government Response: Yes leave the louvre, it is to a HVAC unit in the utility room.
6. Throughout the project while walking, the Blinds were not operating correctly. Would the government like to replace blinds throughout to match?
Government Response: Yes, replace blinds if needed. Match existing color to maintain the room cohesiveness.