SOW (RIPD E4000-21-9-27).docx

DOCX document 29 KB Posted

Attached to
Hook Lift Trucks Federal contract opportunity
Solicitation number
W9098S21Q0066
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This statement of work outlines technical requirements for a hook lift truck to replace existing vehicles at Rock Island Arsenal. The vehicle must have a minimum lifting capacity of 35,000 pounds to transport loaded 20-foot shipping containers using a hooklift system. It must be a class 8 heavy-duty truck with an automatic transmission, enclosed cab, and capabilities to tow a trailer and transport loads on commercial highways and gravel lots. The vehicle is required to have in-cab controls, 61.75-inch hook height, and connections for air brakes, electrical receptacles, and pintle hooks rated for the load capacity. Training is to be provided at Rock Island Arsenal for five operators on safe and efficient operation of the delivered equipment according to the specified schedule. Delivery must be made between 6am and noon Monday through Thursday to the attention of the specified recipient at the arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to Hook Lift Trucks, newest first.
File Type Posted
W9098S21Q0066 0001.pdf PDF
E4000-0336-IFF1 Form RIA-JMTC 735-2A (Material Request)..pdf PDF
B08 - 21Q0066.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENALRIPD: E4000-21-9-27
PURCHASE DESCRIPTIONDATE: 20-Jan-21

TRAILERS AND TRANSPORTATION LIFE CYCLE REPLACEMENT

GENERAL SYSTEM DESCRIPTION

The purpose of this project is to replace existing vehicles that have exceeded their useful life at Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC). The vehicles will be used to transport large ISO containers utilizing a hooklift system.

DESIGN

General Design Standards DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.

UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English-US system or both the English-US and the metric systems, unless otherwise specified in this document.

ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable): Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).

DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.

ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.

NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.

COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.

Safety, Security and Environmental SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.

1.1.1.1 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.

1.1.1.1.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The COR shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.

1.1.1.1.2 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti-Terrorism Training.

1.1.1.1.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.

1.1.1.1.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.

1.1.1.2 Security Training: The contractor shall complete the following training:

1.1.1.2.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete. The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.

1.1.1.2.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.

1.1.1.3 No Common Access Card (CAC) will be issued related to this project.

FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.

REAL ID: Starting 01-Oct-2021 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.

INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.

MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.

SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including conforming to confined space work requirements when applicable.

COMPONENT SPECIFICATION

Equipment: The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication.

Hooklift Truck:

LIFTING CAPACITY: The equipment shall have a hooklift hoist with a minimum lifting capacity of 35,000 pounds.

CONTAINER SIZE: The equipment shall be able to transport loaded shipping containers, utilizing a hooklift system, that are 20-ft in length, 8-ft in width, and 8-ft in height.

HOOK HEIGHT: The equipment shall have a hook height of 61.75-inches.

CONTROLS: The equipment shall have all in-cab controls.

CLASS: The vehicle shall be a Class 8 Heavy-duty truck (per FHWA 13-Category Scheme) capable of transporting loads weighing 35,000 pounds.

TRANSMISSION: The vehicle shall be equipped with an automatic transmission.

CAB: The vehicle shall be equipped with a fully enclosed cab with standard vehicle features such as heat, defrost, air conditioning, and windshield wipers.

TRAILER CONNECTION: The vehicle shall be equipped to support the towing of an air brake trailer.

1.1.1.4 AIR BRAKE SYSTEM: The vehicle shall be equipped with a service line and an emergency air line to support the connection of a trailer.

1.1.1.5 LINE COUPLERS: The vehicle shall be equipped with Line Couplers (Gladhands) that shall follow SAE International Standard J318.

1.1.1.6 PINTLE HOOK: The vehicle shall be equipped with a Pintle Hook rated to tow loads up to 35,000 pounds. The hook shall be located 37-39 inches from the ground. The Pintle hook shall have a locking function.

1.1.1.7 ELECTRICAL CONNECTION: The vehicle shall be equipped with a MS75021-2 electrical receptacle or equivalent.

ROADWAYS: Capable of legal operation on commercial highways.

TERRAIN: Capable of legal operation in packed gravel storage lots.

APPROVAL/SHIPPING

Shipping RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.

SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 am (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.

RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN: Mr. David Holgorsen, TARA-IFF”. Items not correctly marked are subject to being returned at the vendor’s expense.

ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.

TRAINING

The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.

Schedule Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).

Location All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.

Type Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.

OPERATOR: Training shall be provided by the contractor for (5) operators. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment. (E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)

File details come from the government source that posted it. Updated .