FAT_requirements_updated.pdf

PDF 779 KB Posted

Attached to
HUSK WINDOW ASSEMBLIES Federal contract opportunity
Solicitation number
W9098S18T0116
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

FAT document updated to reflect proper quantity

View the file

Other files for this federal contract opportunity

Other files attached to HUSK WINDOW ASSEMBLIES, newest first.
File Type Posted
18-T-0116-P00003.pdf PDF
18-T-0116-0002.pdf PDF
18-T-0116-0001.pdf PDF
FAT_Requirements.pdf PDF
18T0116.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52.209.3 -- First Article Approval -- Contractor Testing.

RIA FORM 702-2, JUL 2010 Previous Editions may not be used

RIA PE v2.00

[Contracting Officer shall insert details]

(a) The contractor shall test _____________ unit(s) of Lot/item _____________ as specified in this contract. At least ______ 2 12638842 15 calendar days before the beginning of the first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within calendar days from the date of this contract

, Lot/Item No. ", Within calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contactor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request , shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph ((b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extensionj of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article reort on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery with in the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or desroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocatable to this contract for

(1) progress payments, or

(2) termnation settlements if the contract is terminatd for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may

(End of Clause)

Alternate I (Jan 1997)

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(g) Before the first article approval, the Contracting Officer may, by written authorzation, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal

As prescribed in (a) and (b), insert the following clause:9.308-1

First Article Approval -- Contracting Testing (Sep 1989) to RIA-JMTC, ATTN: TARA-PQI Rock Island, IL 61299-6400, marked "First Article Test Report Contract No.

As prescribed in (a)(2) and (b)(2), add the following paragraph (i) to the basic clause:9.308-1

Alternate II (Sep 1989) As prescribed in (a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause9.308-1 deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

10_1157

RIA PE v2.00

[Contracting Officer shall insert details]

(a) The contractor shall test _____________ unit(s) of Lot/item _____________ as specified in this contract. At least ______ 2 12638870 15 calendar days before the beginning of the first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within calendar days from the date of this contract

, Lot/Item No. ", Within calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contactor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request , shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph ((b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extensionj of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article reort on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery with in the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or desroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocatable to this contract for

(1) progress payments, or

(2) termnation settlements if the contract is terminatd for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may

(End of Clause)

Alternate I (Jan 1997)

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(g) Before the first article approval, the Contracting Officer may, by written authorzation, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal

As prescribed in (a) and (b), insert the following clause:9.308-1

First Article Approval -- Contracting Testing (Sep 1989) to RIA-JMTC, ATTN: TARA-PQI Rock Island, IL 61299-6400, marked "First Article Test Report Contract No.

As prescribed in (a)(2) and (b)(2), add the following paragraph (i) to the basic clause:9.308-1

Alternate II (Sep 1989) As prescribed in (a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause9.308-1 deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required

10_1158

RIA PE v2.00

[Contracting Officer shall insert details]

(a) The contractor shall test _____________ unit(s) of Lot/item _____________ as specified in this contract. At least ______ 4 12638671 15 calendar days before the beginning of the first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within calendar days from the date of this contract

, Lot/Item No. ", Within calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contactor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request , shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph ((b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extensionj of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article reort on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery with in the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or desroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocatable to this contract for

(1) progress payments, or

(2) termnation settlements if the contract is terminatd for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may

(End of Clause)

Alternate I (Jan 1997)

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(g) Before the first article approval, the Contracting Officer may, by written authorzation, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal

As prescribed in (a) and (b), insert the following clause:9.308-1

First Article Approval -- Contracting Testing (Sep 1989) to RIA-JMTC, ATTN: TARA-PQI Rock Island, IL 61299-6400, marked "First Article Test Report Contract No.

As prescribed in (a)(2) and (b)(2), add the following paragraph (i) to the basic clause:9.308-1

Alternate II (Sep 1989) As prescribed in (a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause9.308-1 deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required

10_1159

Binder1
Page1.pdf
Page4.pdf
Binder2
Page1 (002).pdf
Page4 (002).pdf
Binder3
Page1 (003).pdf
Page4 (003).pdf

FAT Requirements

File details come from the government source that posted it.