DRAFT_Scope_of_Work_NAVAIR_4Dec2017.pdf
PDF 49 KB Posted
- Attached to
- Forgings Federal contract opportunity
- Solicitation number
- W9098S-18-T-0026
About this file
Draft Scope of Work for Forgings
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work (SOW), Forging Material
Page 1 of 2, dated 4 December 2017
Scope of Work
1. The purpose of this Scope of Work (SOW) is to provide supplemental contractual instructions, and does not replace any required process or documentation as indicated in all drawings: 525884, 525885, 525886, 525887, and 525889, for the delivery of the Mark 7 Arresting Engine Crosshead and Fixed Sheave Forgings.
All parts provided shall be in accordance with the Government provided controlled drawings. This SOW specifies the testing requirement deliverables due with deliveries of the five (5) different forging components. All Certified Test Reports (CTR) and Certificate of Conformance (COC) are to be delivered with the forgings to JMTC.
2. All deliverables shall include the following test reports:
a. Hardness testing of forging IAW SAE AMS 2759/1 per Note 7 of drawing 525884, 525885, 525886, 525887, and 525889.
b. Tensile testing (yield and elongation) IAW ASTM E8 per Note 8 of drawing
c. Fracture toughness IAW ASTM E399 per Note 8 of drawing 525884, 525885, 525886, 525887, and 525889.
d. Ultrasonic Inspection (U.I) IAW SAE AMS 2630 per Note 9 of drawings
e. Visually inspect IAW SAE AMS 6400 to verify that forgings are free of tears, cracks, seams laps and imbedded scale; and perform ultrasonic inspection IAW SAE AMS 2630 to class A1 Requirements in addition to surface inspection requirements of SAE AMS 6400 per Note 9 of drawing
f. All Certified Test Reports (CTR) and Certificate of Conformance (COC), in accordance with FAR 52.246-15, are to be delivered with the forging material to JMTC.
3. Inspections: The contractor shall submit a written ultrasonic test procedure IAW SAE AMS 2630 per drawing 525884, 525885, 525886, 525887, and 525889.
a. Ultrasonic inspections performed in accordance with this specification shall be detailed in written procedures. Procedures, testing, and inspections shall be prepared by the vendor and all reports shall be submitted with the forging material. Failure to meet required specifications will result in non-conforming material and subsequently rejected; therefore, all rejected material will be returned at the vendor’s expense.
Scope of Work (SOW), Forging Material
Page 2 of 2, dated 4 December 2017
b. Procedures shall identify the type of ultrasonic equipment, method(s) of test, ultrasonic test reference, search unit type, style, frequency, method of reporting indications, and all other instructions that pertain to the actual test.
Procedures shall be detailed sufficiently such that another lab could duplicate the test and obtain equivalent information.
4. Distribution authorized to the Department of Defense and DOD contractors only;
“Critical Technology” to protect information subject to the provisions of DoD Directive 5230.25. Other requests for this document shall be referred to Naval Air Warfare Center, Aircraft Division Lakehurst, NJ 08733 per Title Box on the following prints 525884, 525885, 525886, 525887, 525889. All vendors shall be Joint Certification Program (JCP) certified prior to accessing the controlled drawings. Drawings are available in accordance with DFARS 252.211-7001.
5. Contractor shall provide evidence with its priced offer that it has previously manufactured and/or supplied similar items that were received, accepted, and determined to be in conformance with contractual requirements. Evidence shall include type of item, value of items, contract number and/or purchase order number, point of contact for verification purposes. Vendors who fail to provide evidence may not be considered for award.
File details come from the government source that posted it.