18-T-0026-P00005.pdf
PDF 315 KB Posted
- Attached to
- Forging Material Federal contract opportunity
- Solicitation number
- W9098S-18-T-0026
About this file
Amendment to incorporate revised drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18-T-0026-0004.pdf | ||
| W9098S18T00260003.pdf | ||
| 18-T-0026-0002.pdf | ||
| W9098S18T00260001.pdf | ||
| Scope_of_Work_NAVAIR_4Dec2017,_r1.pdf | ||
| W9098S-18-T-0026,_Released_10Jan2018.pdf | ||
| DRAFT_Scope_of_Work_NAVAIR_4Dec2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROCK ISLAND ARSENAL (ACC-RI)
JOHN JACOBSEN
PHONE: 309-782-5149
ROCK ISLAND IL 61299-5000
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to re-open the solicitation for initial and revised quotes, and to update the draw ings for CLINs 0001 - 0005.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9098S-18-T-0026
X 9B. DATED (SEE ITEM 11)
10-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2018
CODE
ROCK ISLAND ARSENAL (ACC-RI)
JOINT MANUFACTURING & TECHNOLOGY CENTER
BLDG 211 RODMAN AVENUE
1 ROCK ISLAND ARSENAL
ROCK ISLAND IL 61299-5000
W9098S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W9098S
FACILITY CODECODE
EMAIL:TEL:
W9098S-18-T-0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been deleted:
QUESTIONS AND ANSWERS
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Mar-2018 02:30 PM to 10-Apr-2018 02:30 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Forging, Front Section, Crosshead Body shall be in accordance with Government provided drawing 525884, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525884FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540045QA:
103_464PROJECT CODE: D12WBS or WO:
To:
Forging, Front Section, Crosshead Body shall be in accordance with Government provided drawing 525884 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525884FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540045QA:
103_464PROJECT CODE: D12WBS or WO:
CLIN 0002
Forging, Rear Section, Crosshead Body shall be in accordance with Government provided drawing 525885, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525885FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540043QA:
103_463PROJECT CODE: D12WBS or WO:
Forging, Rear Section, Crosshead Body shall be in accordance with Government provided drawing 525885 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525885FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540043QA:
103_463PROJECT CODE: D12WBS or WO:
CLIN 0003
Forging, Front Section, Fixed Sheave Body, shall be in accordance with Government provided drawing 525886, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525886FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539989QA:
103_461PROJECT CODE: D12WBS or WO:
Forging, Front Section, Fixed Sheave Body, shall be in accordance with Government provided drawing 525886 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525886FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements. Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539989QA:
103_461PROJECT CODE: D12WBS or WO:
CLIN 0004
Forging, Rear Section, Fixed Sheave Body shall be in accordance with Government provided drawing 525887, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525887FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539992QA:
103_462PROJECT CODE:WBS or WO:
Forging, Rear Section, Fixed Sheave Body shall be in accordance with Government provided drawing 525887 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525887FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements. Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539992QA:
103_462PROJECT CODE:WBS or WO:
CLIN 0005
Forging, Ctr Sec, Fixed/Crosshead Body shall be in accordance with Government provided drawing 525889, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525889FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539984QA:
103_459PROJECT CODE: D12WBS or WO:
Forging, Ctr Sec, Fixed/Crosshead Body shall be in accordance with Government provided drawing 525889 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525889FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.
Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539984QA:
103_459PROJECT CODE: D12WBS or WO:
(End of Summary of Changes)
File details come from the government source that posted it.