18-T-0026-P00005.pdf

PDF 315 KB Posted

Attached to
Forging Material Federal contract opportunity
Solicitation number
W9098S-18-T-0026
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

Amendment to incorporate revised drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Forging Material, newest first.
File Type Posted
18-T-0026-0004.pdf PDF
W9098S18T00260003.pdf PDF
18-T-0026-0002.pdf PDF
W9098S18T00260001.pdf PDF
Scope_of_Work_NAVAIR_4Dec2017,_r1.pdf PDF
W9098S-18-T-0026,_Released_10Jan2018.pdf PDF
DRAFT_Scope_of_Work_NAVAIR_4Dec2017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL (ACC-RI)

JOHN JACOBSEN

PHONE: 309-782-5149

ROCK ISLAND IL 61299-5000

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to re-open the solicitation for initial and revised quotes, and to update the draw ings for CLINs 0001 - 0005.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9098S-18-T-0026

X 9B. DATED (SEE ITEM 11)

10-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2018

CODE

ROCK ISLAND ARSENAL (ACC-RI)

JOINT MANUFACTURING & TECHNOLOGY CENTER

BLDG 211 RODMAN AVENUE

1 ROCK ISLAND ARSENAL

ROCK ISLAND IL 61299-5000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W9098S

FACILITY CODECODE

EMAIL:TEL:

W9098S-18-T-0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been deleted:

QUESTIONS AND ANSWERS

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 02-Mar-2018 02:30 PM to 10-Apr-2018 02:30 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Forging, Front Section, Crosshead Body shall be in accordance with Government provided drawing 525884, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525884FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540045QA:

103_464PROJECT CODE: D12WBS or WO:

To:

Forging, Front Section, Crosshead Body shall be in accordance with Government provided drawing 525884 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525884FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540045QA:

103_464PROJECT CODE: D12WBS or WO:

CLIN 0002

Forging, Rear Section, Crosshead Body shall be in accordance with Government provided drawing 525885, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525885FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540043QA:

103_463PROJECT CODE: D12WBS or WO:

Forging, Rear Section, Crosshead Body shall be in accordance with Government provided drawing 525885 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525885FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52540043QA:

103_463PROJECT CODE: D12WBS or WO:

CLIN 0003

Forging, Front Section, Fixed Sheave Body, shall be in accordance with Government provided drawing 525886, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525886FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539989QA:

103_461PROJECT CODE: D12WBS or WO:

Forging, Front Section, Fixed Sheave Body, shall be in accordance with Government provided drawing 525886 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525886FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements. Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539989QA:

103_461PROJECT CODE: D12WBS or WO:

CLIN 0004

Forging, Rear Section, Fixed Sheave Body shall be in accordance with Government provided drawing 525887, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525887FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539992QA:

103_462PROJECT CODE:WBS or WO:

Forging, Rear Section, Fixed Sheave Body shall be in accordance with Government provided drawing 525887 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525887FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements. Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539992QA:

103_462PROJECT CODE:WBS or WO:

CLIN 0005

Forging, Ctr Sec, Fixed/Crosshead Body shall be in accordance with Government provided drawing 525889, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525889FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539984QA:

103_459PROJECT CODE: D12WBS or WO:

Forging, Ctr Sec, Fixed/Crosshead Body shall be in accordance with Government provided drawing 525889 Rev D, and supplemental Scope of Work (SOW), dated 4 December 2017. This requirement is subject to the Availability of Funds, in accordance with FAR 52.232-18. Part Number: 525889FNOTICES:A Certificate of Conformance (COC) shall accompany each delivery, in accordance with FAR 52.246-15, AND a Certified Test Report (CTR), in addition to any special report requirements IAW the Government provided drawing(s) and supplemental SOW requirements.

Failure to include all required deliverables results in material considered non-conforming, and shipment will be rejected at the manufacturer's expense. Any changes to a vendor's technical process, not in accordance with Government controlled drawings and SOW shall be sent to the Contracting Officer for approval prior to implementing any changes impacting a technical process. POST AWARD CONFERENCE: The contractor shall attend all post award conferences. FOR RIA INTERNAL USE ONLY:LMP: Planning 52539984QA:

103_459PROJECT CODE: D12WBS or WO:

(End of Summary of Changes)

File details come from the government source that posted it.