W81K00-19-Q-0204-0001_Solicitation_Amendment_(released).pdf

PDF 163 KB Posted

Attached to
Anatomical Pathology Ref Lab Testing Federal contract opportunity
Solicitation number
W81K00-19-Q-0204
Issued by
Department of the Army Medical Command

About this file

Solicitation Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Anatomical Pathology Ref Lab Testing, newest first.
File Type Posted
W81K00-19-Q-0204-0001_Solicitation_Amendment_(conformed_copy).pdf PDF
W81K00-19-Q-0204_Solicitation.pdf PDF
PWS_(updated)_13Jun19_(KO_Approved).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W40M USA HLTH CONTRACTING ACT

REGIONAL HEALTH CONTRACT OFF CENTRAL

POC: ANGEL D BARKLEY

36000 DARNELL LOOP

FORT HOOD TX 76544

0011346829

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to update the language in the Performance Work Statemet (PWS). Paragraph 1 of the PWS has been changed to read "The local laboratory must provide STAT anatomical and histologic testing w ith a turnaround time of 60 minutes for frozen section services performed on site at IACH, and 24-72 hours for all testing performed at the reference laboratory facility".

B. All other solicitation terms and conditions remain the same.

See SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W81K0019Q0204

X 9B. DATED (SEE ITEM 11)

26-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2019

CODE

W40M USA HLTH CONTRACTING ACT

REGIONAL HEALTH CONTRACT OFF CENTRAL

2539 GARDEN AVENUE

JBSA FT SAM HOUSTON TX 78234-0000

W81K00 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W81K00

FACILITY CODECODE

EMAIL:TEL:

W81K0019Q0204

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PWS

Performance Work Statement Anatomical Pathology Reference Laboratory Testing

Irwin Army Community Hospital Fort Riley, Kansas

GENERAL.

1. DESCRIPTION OF WORK: Irwin Army Community Hospital (IACH), Fort Riley, Kansas has a requirement for STAT anatomical pathology specimen testing. The local laboratory must provide STAT anatomical and histologic testing with a turnaround time of 60 minutes for frozen section services performed on site at IACH, and 24-72 hours for all testing performed at the reference laboratory facility. The Contractor shall meet this turnaround time and provide copies of all reports within the established timeframe. This non-personal services contract shall cover all testing as provided in the quote. No equipment is provided by the Contractor.

1.1. This contract is a non-personal services contract under, which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.2. The inspection and acceptance point for all services rendered under this contract will be by the Contracting

Officer’s Representative (COR), Department of Pathology. The performance by the Contractor technician, the quality of services rendered, and any documentation or written material in support of same, shall be subject to continuous inspection, surveillance and review for acceptance by the COR or designated representative. Other performance evaluation factors will be monitored that are not quantified by numerical measurements, Contractor technician relationship with hospital staff/Government contracting personnel and compliance with hospital policy and procedures.

1.3. Sexual Assault Prevention and Response Program.

1.3.1. The Contractor shall comply with OTSG/MEDCOM Policy Memo 13-062, Policy for Reporting Incidents of Sexual Assault and Sexual Harassment under the Sexual Assault Prevention and Response Program (SHARP), 12 Nov 2013. The SHARP reporting requirements apply only to knowledge obtained by Contractor personnel while performing services under this contract. The Contractor shall ensure all service providers receive Sexual Harassment/Assault Response and Prevention (SHARP) training not later than 60 calendar days after contractor personnel begins performance under this contract. Training can be obtained either online or in person. Contractor personnel can attend SHARP training provided by MEDCOM on an every other month basis by contacting (210) 221-6118 for class date/time and availability. If the employee has an Army Knowledge Online (AKO) account, they can access online the Team Bound Self Study course through Army Learning Management System (ALMS) at http://www.atsc.army.mil/tadlp/delivery/alms.asp1.

1.3.2. The Contractor shall require all HCP(s) with knowledge of an incident of sexual assault occurring on a Government facility, to include a Government leased facility, where the Contractor is providing services under this contract, to report the incident to the Contractor who shall immediately (within 24 hours) report the incident in writing to the Government COR. All incidents shall be reported whether they involve Contractor personnel, or other individuals.

1.4. The Contractor shall notify its employees of the United States Government's zero tolerance policy described in paragraph (b) of FAR clause 52.222-50 “Combating Trafficking in Persons” and the actions that will be taken against employees for violations of this policy.

2. Contractor Requirements. N/A as equipment is not part of this contract.

3. Administrative.

3.1. Reports. The Contractor shall submit reports to the COR or Contracting Officer as requested for use in monitoring Contractor performance. The Contractor shall provide the balance of the required information to the clinical engineering manager no later than 48 hours after services are completed. See paragraph 7.6 for details.

3.2. Safety. The Contractor shall ensure its personnel comply with all installation and MTF safety regulations.

Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal. Copies of these regulations are on file in the medical activity safety office or may be obtained through the COR. The use of cellular phones and 2-way radios is expressly forbidden in all Medical Treatment Facilities and Health Clinics. “The Government and the Contractor’s service representative will exchange hazard communication information before the commencement of any repair." “When required, the Contractor’s service representative will comply with the Office of Safety and Health Administration (OSHA) lockout/tag-out standards while performing sustainment on

MD/MDS.”

3.3. Security.

3.3.1. The Contractor shall ensure its personnel comply with the local installation requirements for vehicle registration and operation on the military facility. Any vehicle operated by contract personnel on the military installation must have the minimum liability coverage required by the state in which the performance is located.

3.3.2. The Contractor shall ensure its personnel comply with installation and MTF personnel identification and access requirements. The Contractor is responsible for absences due to expired identification and access documents.

3.4. Antiterrorism/Operations Security (AT/OPSEC) Requirements.

3.4.1. Antiterrorism (AT) Level I Training. All Contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the Contracting Officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

3.4.2. For Contractors that do not require Common Access Card (CAC), but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3.4.3. iWATCH Training. The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

3.4.4. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the Contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

3.4.5. Threat Awareness Reporting Program. For all Contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or trainer as specified in 2-4b of AR 381-12.

3.5. Hours of Operation. Clinical Engineering Branch, IACH, office hours 7:00 A.M. thru 4:30 P.M., CST, Monday thru Friday. Overtime hours are not allowed, in accordance with the contract. Thus, the contractor is not allowed to work overtime hours, if service is required, after normal business hours.

3.6. Software upgrades. N/A

3.7. Contractor shall provide all documentation required to meet all regulatory compliance testing procedures.

3.8. Invoices and Payment Information.

Payment will be made by Defense Finance and Accounting Service, (DFAS Indianapolis), Indianapolis, IN (address in Block 18a), after receipt of services. Contractor submits their 2-n-1 invoice in the Wide Area Workflow (WAWF) system for payment. The COR shall verify for acceptance to be submit to DFAS Indianapolis. Government Payment will only be authorized for services actually rendered. Advance payments under this contract are not authorized.

4. Contractor Conduct.

4.1. The Contractor is responsible for the conduct of his/her employees. All services shall be provided in accordance with established standards, principles, and ethics of the profession and applicable professional specialty organizations, and shall ensure the highest regard to patient dignity.

4.2. The Contractor shall ensure that its personnel comply with MTF policies regarding personal appearance and conduct.

4.3. Inquiries. Contractor shall ensure that its personnel do not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the COR, who will relay them to the MTF Commander. There shall be no interviews, comments, or any other response without the knowledge and approval of the MTF Commander. Other than routine inquiries from external agencies, all other inquiries and complaints shall be brought to the attention of the Government.

4.4. Smoking. The Contractor shall ensure its personnel shall comply with the MTF smoking policy.

4.5. Complaints. Complaints will be validated by the COR and be reported in writing to the Contracting Officer and the Contractor for action, if it constitutes a failure to perform, as determined by the Government. The Contractor shall have no more than one substantiated complaint for each period of performance.

4.6. Contractor Representation. The Contractor shall designate a Contract Officer Technical Representative (COTR) for the contract. The COTR shall be the only authorized representative of contractor authorized to discuss with the COR, any and all sustainment services required by the contract and ensure response to requests for performance of the contract. The COTR shall have the authority to make decision for the Contractor. The Contracting Officer or the COR shall be notified promptly whenever the POC changes. COTR shall be submitted no later than 10 days after award of contract, and shall include as a minimum name, title, and telephone number.

5. APPLICABLE FORMS AND PUBLICATIONS: Publications documents and forms applicable to this PWS are listed below. The Contractor shall use reasonable efforts to comply with these directives. Supplements or amendments may be issued during the life of the contract and will be considered to be in full force and effective immediately upon receipt by the Contractor. If compliance with such supplements and amendments changes the contract cost, scope or purpose, it shall be a change within the meaning of the “Changes” clauses of the contract.

5.1. FORMS. The forms listed below will be provided to the Contractor by the Government for use in the performance of this contract.

DD Form 2163, Medical Equipment Verification/Certification.

5.2. PUBLICATIONS. Army publications shall be made available to the Contractor during the period of the contract. These publications are located in the Clinical Engineering Branch, IACH.

AR 40-5 Preventive Medicine AR 40-61, Medical Logistics Policies and Procedures SB 8-75-11 Augments AR 40-61 TB MED 7, Maintenance Expenditure Limits for Medical Equipment TB MED 750-1, Operating Guide for Medical Equipment Maintenance

FR MEDDAC 750-1

5.3. OTHER PUBLICATIONS – The following publications will be acquired by the Contractor for his use at his own expense. These publications are other than Army publications, which establish guidelines for administering adequate healthcare services. When a conflict between these publications and Army publications arises, the publication which is more restrictive will be followed.

Joint Commission of Accreditation of Healthcare Organization Manual (Current edition).

National Fire Protection Association (NFPA) 99, Health Facilities Handbook, (Current edition).

National Fire Protection Association (NFPA) 101, Life Safety Code, (Current edition).

6. Contractor Manpower Reporting

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-contractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UCI for the purposes of reporting this information); (11) Locations where contractor and sub-contractors perform the work )specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

(End of Performance Work Statement)

(End of Summary of Changes)

File details come from the government source that posted it.